Overview Metro and the City of Los Angeles are partnering to improve 5th Street and 6th Street in downtown LA to enhance mobility and safety for the thousands of people who walk, bike, roll, ride transit or drive in the area. This project is an important step in building a comprehensive, multi-modal transit network in downtown LA.
Street Improvements > Improve road conditions by repaving and restriping lanes along both streets.
> Add protected bike lanes to create a safe and well connected network that better facilitates east-west travel, especially in the eastern section of downtown.
> Add dedicated bus lanes to enhance service and efficiency for transit users.
Project BoundariesThis project is located along 5th Street and 6th Street in downtown LA, between Flower Street on the west and Central Avenue on the east. Road improvements and bus lanes will span the entire corridor. Protected bike lanes will run from Spring Street to Central Avenue.
Timelinephase 1 (june–july 2020)
> Pre-construction activities
> Repave and restripe 5th Street and 6th Street
> Activate bus-only lane on westbound 5th Street from Central Avenue to mid-block pedestrian crossing signal (roughly 400 feet east of Flower Street)
> Activate bus-only lane on eastbound 6th Street from Hope Street to Central Avenue
phase 2 (tentatively april 2021) > Extend bus-only lane on westbound 5th Street from mid-block to Flower Street
> Install signal queue jumper for buses on 5th Street at Flower Street
Resumen Metro y la ciudad de Los Angeles se asociaron para mejorar las calles 5th y 6th en el centro de Los Angeles para mejorar la movilidad y la seguridad de las miles de personas que caminan, andan en bicicleta, ruedan, viajan en transporte público o conducen en el área. Este proyecto es un paso importante en la construcción de una red de transporte público integral y multimodal en el centro de Los Angeles.
Mejoras de la calle > Mejorar las condiciones de la calle por medio de repavimentación y volviendo a marcar los carriles a lo largo de ambas calles.
> Agregar carriles dedicados a las bicicletas para crear una red segura y bien conectada que facilite los viajes de este a oeste, especialmente en la sección al lado este del centro de la ciudad.
> Agregar carriles de autobús dedicados para mejorar el servicio
y la eficiencia para usuarios de transporte público.
Límites del proyectoEste proyecto se ubica a lo largo de las calles 5th y 6th en el centro de Los Angeles, entre Flower St en el oeste y Central Av en el este. Las mejoras en las calles y los carriles de autobuses abarcarán todo el corredor. Los carriles dedicados a las bicicletas correrán desde Spring St hasta Central Av.
Horariofase 1 ( junio a julio de 2020)
> Actividades previas a la construcción
> Repavimentar y volver a pintar los carriles en las calles 5th y 6th
> Activar el carril de autobús dedicado en la calle 5th hacia el oeste desde Central Av hasta la señal de cruce peatonal a mitad de la cuadra (aproximadamente 400 pies al este de Flower St)
> Activar el carril de autobús dedicado en la calle 6th en dirección este desde Hope St a Central Av
fase 2 (tentativamente abril de 2021) > Extender el carril de autobús dedicado en la calle 5th hacia el oeste desde la mitad de la cuadra hasta Flower St
> Instalar señal para dar prioridad a los autobuses en la intersección 5th y Flower St
metro.net/dtlaimprovements
Next stop: improving mobility in downtown LA.
Fact Sheet5th street ⁄6th street improvement project
summer 2020
LOS ANGELES RIVER
TRACTION
CESAR E. CHAVEZ
STADIUM WAY
AV
BAUCHET
ADOB
E
VIGNES
LYON
RAMIREZ
CLARA
NEW DEPOT COLLEGE
DUCOMMUN
TEMPLE
DUCOMMUN
CROCKERTO
WNE
MOLINO
HEWITT
STANFO
RDGLA
DYS
CERES
COLYTOW
SEATON
LOS ANGELES ST
SANTEE
WALL
SAN PEDRO
PL
PL
PL
FIGUEROA
Little Tokyo/Arts District
HistoricBroadway
Civic Center/Grand Park
Grand Av Arts/Bunker Hill
(Under Construction)
20-3
135j
o ©
2020
lac
mta
contact us ⁄ contÁctenosFor more information or to ask questions, please visit our website or contact us:Para obtener más información o hacer preguntas, visite nuestro sitio web o contáctenos:
Julia Brown, Community Relations ManagerJulia Brown, Gerente de Relaciones Comunitarias
dtlaimprovements@metro.net
metro.net/dtlaimprovements
5th street ⁄6th street improvement projectproyecto de mejoras en las calles 5th y 6th
Metro Rail Lines& Stations
Metro Busway & Station
Regional Connector& Station (under construction)
Amtrak/Metrolink
Existing ProtectedBike Lanes
Project Alignment
Protected Bike Lanes
Subject to Change 20-3148 ©2020 LACMTA
5th Street/6th Street Improvement Project (under construction)
Metro Rail Lines & StationsLínea y estación de Metro
Metro Busway & StationMetro Busway y estación
Regional Connector & Station (under construction)Regional Connector y estación (bajo construcción)
Amtrak/Metrolink
Existing Protected Bike LanesCarriles dedicados a bicicletas existentes
Project AlignmentAlineamiento del proyecto
Protected Bike LanesCarriles dedicados a bicicletas
Subject to Change Sujeto a cambios 20-3148 ©2020 LACMTA
5th Street/6th Street Improvement Project (under construction)Proyecto de mejoras en las calles 5th y 6th (bajo construcción)
Línea y estaciónde Metro
Metro Busway y estación
Regional Connectory estación (bajo construcción)
Amtrak/Metrolink
Carriles dedicados a bicicletas existentes
Pro
Alineamientodel proyecto
Carriles dedicadosa bicicletas
Sujeto a cambios 20-3148 ©2020 LACMTA
Proyecto de mejoras en las calles5th y 6th (bajo construcción)