Michelle Beauvais Portfolio 2010.1

Post on 18-May-2015

904 views 0 download

Tags:

transcript

Michelle Beauvais

LEED AP

843 Todd Preis Dr.

Nashville, TN 37221

h: 615.646.1981

c: 318.376.1123

mlbeauvais@gmail.com

4th and Monroe

Mixed Use Development

Nashville, TN

Revit - Quad floor plans

Revit - Townhome section

Revit

The Pinnacle at Symphony Place

Office and Retail High Rise

Nashville, TN

Revit

The Pinnacle at Symphony place is the result of a collaboration between

Pickard Chilton Architects (Design Architect) and Everton Oglesby Architects

(Architect of Record). The project is an office high-rise with retail at ground levels

and an interior parking garage. The project earned LEED-Silver certification.

The seventh floor features a green roof and terrace over the parking garage.

The project was started in AutoCAD at Pickard Chilton then modeled in

Revit at Everton Oglesby to provide the team with a working 3D model of the building.

The Revit model helped both firms locate potential problems

early in the design process so that adjustments could be

made to keep the project on its fast-track schedule.

The Pinnacle at Symphony Place

Office and Retail High Rise

Nashville, TN

RetailRetail Parking

Water

Harvesting

Office Office

Parking

Parking

Shelby Street

Pedestrian Bridge

Demonbreun

Green Roof / Terrace

Ground Water Sump

-Building-wide recycling program

-Vegetated green roof with seating

-Reduced construction pollution, soil erosion, storm water contamination, and dust

-Reduced Heat Island with green roof and Energy Star compliant roofing

-Water Harvesting: The project harvests ground water flowing into

the site and rainwater for irrigation of the green roof. A 12,000

gallon rainwater harvesting tank, located in the lower levels of the

parking garage, holds the collected water.

-Water-efficient landscaping and plumbing

-Maximized day-lighting

-Improved indoor air quality

Revit and Photoshop

Terrace @ Green Roof

Pathway @ Green Roof

Planting Beds @ Green Roof

The Pinnacle at Symphony Place

Office and Retail High Rise

Nashville, TN

Revit

The Pinnacle at Symphony Place

Office and Retail High Rise

Nashville, TN

RevitRevit Revit

Pinnacle Bank Branch and Offices

Interior Build-out at The Pinnacle

Nashville, TN

Interior build-out for a branch bank

and corporate offices located in The

Pinnacle at Symphony Place. The branch

bank occupies a two-story retail space at the corner of

3rd Ave South and the Shelby Street Bridge. The corporate offices

occupy three and a half floors of office space in the building tower.

Revit plans and perspectives

Branch Bank Lobby

Pinnacle Bank Branch and Offices

Interior Build-out at The Pinnacle

Nashville, TN

Revit

Revit casework secitons

Branch Bank space under construction

Branch Bank Lobby

Murfreesboro Missionary Baptist Church

Murfreesboro, TN

A small Missionary Baptist Church in the Victory Station

neighborhood of Murfreesboro, TN. The church is wood

stud construction with brick veneer. The program includes

the sanctuary, classrooms, restrooms, pastor’s office, and

fellowship hall. The project was modeled in Revit.

Revit plans and sections

Murfreesboro Missionary Baptist Church

Murfreesboro, TN

Revit sections, details, and perspectives

Conceptual Designs for Modular Water Treatment System

Brief Study in designing a screening

system for shipping containers

re-purposed as modular water-

treatment facilities.

SketchUp and Podium

Vanderbilt Women’s Center

Nashville, TN

Revit

Project Bid Proposal for the renovation of the Vanderbilt Women’s Center.

Our firm researched the existing building, measured and photographed it.

We then modeled it in Revit and created three possible options for how

to proceed with the renovation. The research and proposed options were presented

to the representatives of Vanderbilt and the Women’s Center.

Revit

Revit and Photoshop

Bethany Retreat Cener

Mixed Use

Dixon, TN

Bethany Retreat Center is a mixture of a

dormitory-style residence and assembly space.

The first floor houses the majority of the

residential spaces while the second floor and

loft contain the assembly spaces and a few

extra sleeping rooms. The project was built and

rendered in Revit. The 3D views and renderings

were used to help the client better understand

the design, and to help generate enthusiasm

in the financial donor.

Currently under construction.

Revit

Revit

Revit

Bethany Retreat Cener

Mixed Use

Dixon, TN

Revit

Revit

Revit and Photoshop

Revit and Photoshop

Refectory - Revit and Photoshop Chapel - Revit

Great Room - Revit and Photoshop

RevitRevit

Bethany Retreat Cener

Mixed Use

Dixon, TN

Bethany Retreat Cener

Mixed Use

Dixon, TN

Phase 1 of Bethany Retreat Center is currently under construction.

Revit and Photoshop - view from the driveway

Above: Pump House under construction, chip and seal drive

Below: Drained pond with fire pump water intake and new dock.

Phase 1 foundation under construction

Revit