Post on 07-Apr-2018
transcript
8/4/2019 Pb Portfolio Web02
1/76
PETAR BOJOVI
portfolio 2007 - 2010
implosion
the city
the house
self - fab
social enterprise
ManPowered
disperse
uncharted
megastructure
commercial
infrastructure
8/4/2019 Pb Portfolio Web02
2/76
graphics on the covers:
development of concept forSichuan School International Conceptual Design Competitionteam: Igor Panti, Petar Bojovi
8/4/2019 Pb Portfolio Web02
3/76
WORK
implosion .... Student Housing - Competition for Architects Upto 35
the city .... Competition for Design of the Republic Square With the Fish Market
the house .... Baji House - preliminary design
sustainable .... Self - Fab Housing 2007 - Competition Entry
JimAuditorium - Boobamara - social enterprise
ManPowered Mobile Cultural center - Competition Entry
disperse dwelling
masters thesis .... Contradictory Nature of the Places That Are Not on the Map
megastructure .... Demilitarization of the City Space
commercial .... Competition for Design of Residential/Commercial Building
infrastructure .... The Bridge - Competition Entry
computer visualization
CV
LIST OF REFERENCES
02 |
08 |
16 |
22 |
28 |
30 |
34 |
40 |
48 |
54 |
56 |
60 |
64 |
67 |
CONTENT
8/4/2019 Pb Portfolio Web02
4/76
8/4/2019 Pb Portfolio Web02
5/76
8/4/2019 Pb Portfolio Web02
6/76
8/4/2019 Pb Portfolio Web02
7/76
8/4/2019 Pb Portfolio Web02
8/76
main hall
8/4/2019 Pb Portfolio Web02
9/76
8/4/2019 Pb Portfolio Web02
10/76
8/4/2019 Pb Portfolio Web02
11/76
8/4/2019 Pb Portfolio Web02
12/76
The state of the complex ux of dierent spatial inuences is reected in the structureof the pavement.
Our main architectural and political position regarding this particular spot is that the publicspace of the city has to be preserved and unied. The main tool for conductance of this policywas the geometrical grid that covers the entire area.
Primary direction of spatial ow of all the primary communications, along the boulevard on thenorth side of location is represented in the lines of the pavement material - with the spreadingof the paving tiles.
The secondary transversal direction between the old organic city structure and the neworthogonal one is very strong, but has no tangible references in the space to which we couldhave reacted. It creates the feeling that isnt articulate enough to be caught with lines and ispresent more like some kind of subconscious entity. This was captured with the color. Theelds that are closer to the old city block with its passages and alleys are darker, while thosethat are more in the open are lighter.
the city | 10
8/4/2019 Pb Portfolio Web02
13/76
8/4/2019 Pb Portfolio Web02
14/76
8/4/2019 Pb Portfolio Web02
15/76
8/4/2019 Pb Portfolio Web02
16/76
the city | 14
8/4/2019 Pb Portfolio Web02
17/76
15 | the city
8/4/2019 Pb Portfolio Web02
18/76
The Preliminary Design for
The Baji HouseRepublika Srpska, Bosnia, Banjaluka .... 02. 03. 2010(freelance for Beg_Ing Studio, Belgrade)
8/4/2019 Pb Portfolio Web02
19/76
8/4/2019 Pb Portfolio Web02
20/76
8/4/2019 Pb Portfolio Web02
21/76
8/4/2019 Pb Portfolio Web02
22/76
elevations
the house | 20
8/4/2019 Pb Portfolio Web02
23/76
8/4/2019 Pb Portfolio Web02
24/76
Belgrade has widely spread and deeply rooted do it your self building culture that is mostly a con-sequence of socialist urban planning, which did not allow any form of individual dwelling nor privatebuilding initiative.
The spontaneous building culture in Belgrade implies variety of habits and life styles associatedwith the use of specic parts of the city. The islands of river Sava are among such places. Thoseare green oasis in the heart of the city and favorite spaces for recreation. Ada Medjica is one ofthe most popular islands with many oating houses, where people of Belgrade spend theirweekends.
Most of the built structure on Medjica island is do it your self type of architecture. There is neitherfresh water nor regulated waste disposal on the island. Floating houses, distributed on inappropri-ately short distances oat on technically unreliable pontoons made out of used oil barrels. They areparasites on city power grid and they are polluting the river and the islands forest with all kinds ofwaste.
Their owners in many cases visit them rarely, and because of that, very attractive space re-mains occupied but unused. Also, there is no coordination amongst community members,and therefore it is impossible to regulate the pattern of space usage.****We suggest that existing oating houses are replaced with short lived ephemeral structures,that are mainly build out of recycled elements which are produces on the island. The usersassemble their own new oating houses on one of the potential positions out of the elements
that are provided by the community center / Mothership.
All elements, beside solar panels and inatable pontoons have very limited expiration date. Theplatform and wall panels are made out of mixture of recycled paper and organic glue, and are 5 or15 cm thick. After they are installed and exposed to moisture, they are useable for a period of ap-proximately 7 days.
Expiration date of proposed oating house, matches the average time its users spend on the islandduring a single visit (2 10 days).
All the things that are needed to assemble the oating house and to live there for a short period oftime, are prepared, produced and recycled in the Mothership. That is the only permanent buildingon the island and it consists out of following functional elements:
1. space for gathering and classication of waste; 2. space for recycling and production of dierentkinds of paper elements; 3. space for preparation and issuing of capsules with batteries, fresh water(The Cell); 4. compost with extraction of biogas; 5. food storage; 6. kitchen; 7. restaurant; 8.administration; 9. dock
The energy for maintenance of the entire system is provided by 16 water turbines, solar panels andbiogas extracted from the biological waste.
8/4/2019 Pb Portfolio Web02
25/76
23 | sustainable
Location: Medjica Island, river Sava, New Belgrade
turbines housing units The Mothership
8/4/2019 Pb Portfolio Web02
26/76
sustainable | 24
The production of electrical energy is realized in 3 possible ways:
1. harvesting the river stream power2. using the solar energy
3. recycling biological waste
1. By using the new generation of specialized river turbines positioned along the coast line, it
is possible to produce the main portion of the electric energy which is further used to supply allconsumers within this project.
Characteristics of such system are:- Turbine diameter / height D=1000mm / H=1500mm- Average river speed V=1m/s- Turbine power 29.3kW- Number of turbines 16> The expected turbine power is 468kW.
2. By installing approximately 90 solar panels (550x400x25mm) on each housing unit roof and withaverage of 2000 sunny hours per year we can expect to generate 14kW of power for further electricalenergy production.
Characteristics:- number of panels per house / single roof area 20 / 25m2- total number of panels / single panel area 1800 / 0.22m2
8/4/2019 Pb Portfolio Web02
27/76
25 | sustainable
3. Biological waste can be converted to biogas and further distributed for housing units exploitation.The total amount of electrical energy, generated by approximately 485kW of power given by the river(96.5%), sun (3%) and the biological waste (0.5%), is used for supplying 20 housing units and theMothership.
Primary power consumers:
1. Mothership
heating; kitchen / restaurant; waste recycling (paper, biological waste, etc.); panel productionline; cranes; illumination
2. Housing units
heating; household appliances; illumination
The Cell battery lifetime is signicantly shorter during the winter period - it can last no more than24 hours. During the summer period, the battery can last up to ve days.
8/4/2019 Pb Portfolio Web02
28/76
16 turbines = 468 kW
20 oating house units, supplied by The Mothershipissuing of The Capsulesgathering and classication of waste
1 - space for gathering and classication of waste; 2 - space for recycling and production of dier-ent kinds of paper elements; 3 - space for preparation and issuing of capsules with batteries and fresh wa-ter (The Cell); 4 - compost with extraction of biogas; 5 - food storage; 6 - kitchen; 7 - restaurant 8 - administration; 9 - dock; 10 - store
food
sustainable | 26
8/4/2019 Pb Portfolio Web02
29/76
1 - The Cell; 2 - paper tube structure; 3 - steel frame; 4 - oor paper panels - 150mm;5 - inatable pontoon; 6 - collapsible fence; 7 - ceiling paper panels - 100mm; 8 - solar panels
27 | sustainable
8/4/2019 Pb Portfolio Web02
30/76
JimAuditorium - Boobamarasocial enterprise .... for Sava river quay , Begrade .... August 2010(team: Nataa Prica, Jelena Gruji, Petar Bojovi)
Site:Quay on the river bank in zone of New Belgrades River Sava Projects. (1965 1977).
The main community center functions in this part of the city were never built during the Socialist
government because of the permanent lack of funds.
Besides of that, in the present moment it suers from all the social problems of typical a modernisturban environment combined with those related to transition and poverty: the people are alienatedand busy, the youth is uninspired to socialize, to study or to work. Not too many people feel connectedwith the space in which they live.
The only functioning local activities are gyms and pubs.
Concept:
Ephemeral traveling auditorium for lectures and small concerts powered by electricity generatedby people who workout on the gym bicycles that are connected to electric power generators while
watching the performance.
The success of the performance depends of the motivation of the audience to pedal and theskill of the performer, because if they stop pedaling the light and sound systems will stopfunctioning because of the lack of power and the show will soon be over.
Team work of the audience and performers is essential.
8/4/2019 Pb Portfolio Web02
31/76
8/4/2019 Pb Portfolio Web02
32/76
page 04
Project title: Slinky Rig
The main goal is to provide easily transformable rig that can be adapted to many dierentkinds of urban environments and activities.
The proposed design is a six-wheel platform that carries a set of seven rings, connectedwith steel armature (or bamboo brackets) and strong water-resistible tent or parachutecanvas.
By pooling the strings attached to the rings that stretch canvas, the users can decidein which way they want to occupy the space. They can lift the secondary platform up,if they want to create a stage or if they need some privacy, or they can put it next to themain platform to render more space in the same level.
Slinky rig is manpowered and there is a possibility (if nance allows it) of installment ofgenerator that would signicantly enhance its autonomy.
DOT, International Competition for
ManPowered Mobile Cultural CenterIndia, Bangalore .... 15. 03. 2009Honorable Mention
8/4/2019 Pb Portfolio Web02
33/76
31 | sustainable
8/4/2019 Pb Portfolio Web02
34/76
8/4/2019 Pb Portfolio Web02
35/76
8/4/2019 Pb Portfolio Web02
36/76
Disperse Dwellingstudio Prof Branislav Mitrovi .... 2007
The starting point of the analysis was the fact that the most wanted, best selling and most expensive
($/m) apartments on Belgrade real-estate market are those of 30m, or 50m divided in as many
as possible small rooms.
This fact carries a lot of implications - since all of the social groups are buying or renting
apartments.
If we skip the obvious case of the families that belong to vulnerable social groups that cant aord to
buy a bigger apartment (and that governments social programs dont help much either) maybe we
can conclude that certain number of at-purchasers dont need one. Maybe we can assume that
there are people living in the city who have such a lifestyle which could be supported with
the living space of 30 - 40 m.
The phenomenon becomes even more clear when we think about the collapse of the notion of
archetypal Family in relation to the notion of the House in context of the modern city e.g.:
* The majority of single working men and women do not eat at home
they dont need the large kitchen with dining room for eight people.
* Many people make their social interactions in public spaces (cafs, restaurants, clubs)
they dont need a very large living room for to many guests
* Students learn and practice in reading rooms or special places for that on their faculties
- they dont need a big library and two large working desks
* Many sports fans watch their favorite matches in the pub or betting houses
- they dont need a large plasma TV and room for many chairs in front of it
Fast pace of life, mass communications, the media and consumerism have changed the habits and
expanded expectations of people when it comes to entertainment, nutrition, recreation so to some
extent it is absurd to expect them to satisfy their needs within the boundaries of an urban at.
Changing needs require revised denition of the comfortable apartment. Family, whose members
are not bound to the mutual living space by any of its primary daily activities, naturally has dierent
needs in comparison with the Families who gather around the table in the center of the House.
Therefore a small apartment can be the curse of the vulnerable groups or the result of the
lifestyle of people whose dwelling is dispersed throughout the urban matrix, along the paths
of their daily migrations. (In any case small ats in Belgrade sometimes do not provide even the
basic conditions for life making their tenants to take some of the activities outside weather or
not it is their free choice)
Substandard at without adequate functional context planned on the level of entire neighboring areasimply cant sustain humane life conditions.
My thesis is that all of this boils down to conclusion that the small living unit is in fact an
urban issue that requires a specic planning of the residential area.
8/4/2019 Pb Portfolio Web02
37/76
8/4/2019 Pb Portfolio Web02
38/76
reading room
media library
jacuzzy
retired people club
massage
psychologist
TV room
hair dresser
video club
TV room
billiard club
table tennis
dentist
massage
sports betting house
laundry
fast food
video club
hostel
sound insulatedmusic room
lawyers oce TV room
8/4/2019 Pb Portfolio Web02
39/76
The building has sockets for insertion ofpublic commercial acctivities that supplementthe dwelling.
37 | disperse dwelling
8/4/2019 Pb Portfolio Web02
40/76
8/4/2019 Pb Portfolio Web02
41/76
8/4/2019 Pb Portfolio Web02
42/76
8/4/2019 Pb Portfolio Web02
43/76
Contradictory Nature of the Places That Are Not on the MapCase Study: Belgrade and Pantelleria
The island and the city of Pantelleria were unnecessarily bombed by the allies at the end of WW
II and turned to rubble. The citys population of 20.000 shrank to present number of 2000. Dueto inertia of the state government spatial planning administration and disappearance of many landowners the Island is still interspersed with many sixty years old ruins and empty lots.
Ruins of Pantelleria are not famous enough to be marked on the tourist map of the island, nor arethey visible or important enough to be cleared or rebuilt, even tough the residents of the island arewaiting for it to happen for more than sixty years. Paradoxical, temporary situation in life of buildingsthat lasts as much as it is necessary for them to be (re)built, accepted and deployed by governmentsystem takes in Pantelleria so long that it has become a new form of life. Ruins - the physical andpolitical state of them is what I imagine to be a general tone that gives color to all that is happeningin the city are not on the map.
State of the Pantelleria city reminds me very much of the state of many places in Belgrade (in manyways of the whole city). These are places which, although living for years with the city, somehow
manage to stay out of sight of the general public and the authorities. Something about them preventsthem from being recognized, acknowledged, named, or in any way put in the system amongst theother places that are on the map.
Properties of which I speak are mostly heterotopias described by Michel Foucault 1967. Incontrast to utopias that are the inversion of the existing society but do not exist as such,heterotopias are related to a number of really existing inversions. These are the placesthat are possessed with the contradictions that are opposed to some of the basic, a prioriprinciples that are underlying the space and layout of modern society: the relationshipbetween public and private, between work and leisure, cultural and utilitarian, family andsociety, reality and illusion, legal and illegal ...
Heterotopias - the points at which the invisible conicts that dene the space in which we
live are amplied - were the subject of my interest.Working on them, was an opportunity forme to review many of the unconsciously adopted (systemic) design patterns and to deal with spatialproblems that exist for me personally (Barth 1980).
I wanted to form my own description of the concept through a series of case studies and architecturaldesigns. By doing that, I wanted to compare the situation of selected Belgrade heterotopias andthose from Pantelleria in order to prove similarity.
Master Thesis - excerptionstudio Prof Branislav. Mitrovi .... 2008Faculty of Architecture, University of Belgrade
>>
>>
41 | the uncharted
8/4/2019 Pb Portfolio Web02
44/76
8/4/2019 Pb Portfolio Web02
45/76
Temporary Screening Room and Theater
The selected site is privately owned parcel which contains the remains of an amphitheater fromthe thirties. Its activation involves an intervention that will not damage the archaeologicalsite; which will be limited by the time frame duration of archaeological, legal, urban andother necessary analysis needed to make the conditions so that on this plot could be builtany kind of permanent structure.
The proposed solution is a temporary structure: the projection room as a box of polycarbonatepanels, mounted on the dismantling steel structure that stands on the existing remains of theamphitheater. The extension that includes technical properties (wardrobe, room for chemical toilets,storage, tank for drinking water and bar) connects the screening room with the secondary objectthat comes out on the street and stands in the place of ruin of some residential building. Inside ofthe secondary object is store for selling books and lms on the ground oor and a multifunctional
hall for fty viewers on the rst oor.
8/4/2019 Pb Portfolio Web02
46/76
Bicycle Tourism Center of Belgrade(in the garage for discarded police vehicles under Brankos bridge in Belgrade)
This area is involved in the process of decomposition that lasts for more than twenty years. Inaddition to the physical deterioration of the material of which it is made, in the past period of time,the essence of the relationship between its name, function and location has largely collapsed as well.Uncertainties related to the history and meaning of this facility, tell more about its nature than theknown facts, or its actual appearance.
My answer lies in the mobilization of the existing cycling culture of this area. The solution
depends on the networking of this area with existing and potential bicycle paths and routesin the city and beyond.
The proposed Center of bicycle tourism is a exible space that should function as a service foractivities related to the sport: bike rental, bicycle hostel in Belgrade for guests that ended a long roadstage, showers, massage, shop, caf, a special kitchen for cyclists food, tourist agencies, mechanic
and tness.
police garage under the bridge
Belgrade
8/4/2019 Pb Portfolio Web02
47/76
8/4/2019 Pb Portfolio Web02
48/76
cross sectiondetail
the uncharted | p46
cross section
8/4/2019 Pb Portfolio Web02
49/76
8/4/2019 Pb Portfolio Web02
50/76
8/4/2019 Pb Portfolio Web02
51/76
8/4/2019 Pb Portfolio Web02
52/76
8/4/2019 Pb Portfolio Web02
53/76
8/4/2019 Pb Portfolio Web02
54/76
8/4/2019 Pb Portfolio Web02
55/76
8/4/2019 Pb Portfolio Web02
56/76
8/4/2019 Pb Portfolio Web02
57/76
8/4/2019 Pb Portfolio Web02
58/76
The bridge is located at the tender required location, on the existing pillars of the former railwaybridge Franz Josef built in 1883, under the Petrovaradin Fortress.
Basic postulates of the solution are: 1) the bridge has to be visually dierent from the existing -grid has been chosen 2) that the bridge has smaller longitudinal slope - small depth of the structure
deck, 3) structure deck has to be inexpensive, resistant to fatigue and to atmospheric eects, cheapfor maintenance - composite deck structure, 4) main load bearing system has the minimum of therequired steel material.
According to the previous structural and architectural considerations, the system of composite steel-concrete trusses, chords with the wave motion through the space was chosen. Thats how the wholeproject was named The Danube wave.
International Competition for
The Bridge In Novi SadSerbia, Novi sad.... 15. 01. 2009Honorable Mention
8/4/2019 Pb Portfolio Web02
59/76
57 | infrastructure
8/4/2019 Pb Portfolio Web02
60/76
8/4/2019 Pb Portfolio Web02
61/76
The bridge is an extension of one of the main boulevards of Novi Sad. It connects the oldcity center with the Austro-Hungarian Petrovaradin fortress.
The main architectural considerations regarding the form of the structure were: 1) toemphasize the view of the fortress from the direction of the boulevard, 2) to try to makethe structure as discreet as possible when perceived from the bridge deck, 3) to introduce
it as a new landmark of the city.
The structure is consisted out of four consecutive parabolic arches that form awave line which goes above and below the bridge deck. In that way we managed tohide the arches that are closest to the river banks and the fortress. The composition isdynamic and uent when watched from the from the city quay and discreet when viewedfrom the old fortress.
59 | infrastructure
8/4/2019 Pb Portfolio Web02
62/76
8/4/2019 Pb Portfolio Web02
63/76
8/4/2019 Pb Portfolio Web02
64/76
8/4/2019 Pb Portfolio Web02
65/76
8/4/2019 Pb Portfolio Web02
66/76
8/4/2019 Pb Portfolio Web02
67/76
8/4/2019 Pb Portfolio Web02
68/76
LIST OF REFERENCESwww.petarbojovic.com
competitionscommisions - freelanceinterior designwork with MitArch
8/4/2019 Pb Portfolio Web02
69/76
Competitions:
Student Housing - International Competition for Architects Upto 35
Greece, Athens - 07. 09. 2009
team: arko Uzelac, Igor Panti, Petar Bojovi>>> Shortlisted
International Competition for Conceptual Designof the Republic Square With the Fish Market
Serbia, Novi Sad - 27. 04. 2009
team: arko Uzelac, Nikola Marini, Petar Bojovi>>> Ist prize
Sichuan School International Conceptual Design Competition
China, Sichuan - 12. 04. 2009
team: Igor Panti, Petar Bojovi>>> Honorable Mention
DOT, International Competition for Mobile Cultural Center
India, Bangalore - 15. 03. 2009team: Slobodan Krsmanovi, Petar Bojovi>>> Honorable Mention
International Competition for The Bridge In Novi Sad
Serbia, Novi sad - 15. 01. 2009
team of authors: Aleksandar Bojovi - bridge structure,
Nenad Jakovljevi - pillars and foundations,Petar Bojovi - architecture, Mio Maksimovi - tunnels, |Duan Pai - roads and urbanism>>> Honorable Mention
International Competition for The New Building
of The Museum of Contemporary Art of Vojvodina.
Serbia, Novi sad - 28. 06. 2007
team: Nikola Marini, Uro Kovaevi, Petar Bojovi
>>> Shortlisted
Self Fab Housing. IAAC, Barcelona - 17. 09. 2007
team: Nikola Damjanov, Slobodan Krsmanovi, Petar Bojovi>>> Shortlisted, published by Actar
Conceptual Design for The City Square of Ruma Competition
Serbia, Ruma - 23. 12. 2006team: Milo Paunovi, Petar Bojovi, Igor Panti, Uro Kovaevi
67 | references
8/4/2019 Pb Portfolio Web02
70/76
Commissions / Freelance:
Ostoji House - preliminary design (110m2)
Serbia, Belgrade September 2010(freelance)
Baji House - preliminary design (650m2)
Republika Srpska, Bosnia, Banjaluka - 02. 03. 2010(freelance for Beg_Ing Studio, Belgrade)
Three Mosques in Lybia - conceptual design
Lybia - April 2010
(freelance)
Collective Housing - preliminary design (2 800m2)
Republika Srpska, Bosnia, Banjaluka - 20. 10. 2008(freelance for Beg_Ing Studio, Belgrade)
Reconstruction of Water Tower for Steam Engines
Serbia, Inija - 01. 09. 2008commissioned by Municipality of Inijateam: arko Uzelac, Nikola Marini, Petar Bojovi
Elementary School - preliminary design
Serbia, Inija - 25. 08. 2008commissioned by Municipality of Inijateam: arko Uzelac, Nikola Marini, Igor Panti, Petar Bojovi
Motel preliminary design (600m2)
Serbia, Belgrade - 05. 08. 2007(freelance)
Sky Center - conceptual design (25 000m2)
Bosnia, Kozile 07. 08. 2006team: Petar Bojovi, Sran Deraji(freelance for Beg_Ing Studio, Belgrade)
Interior Design
IT College - detailed design (1200m2)
Serbia, Inija - August 2010(with Studio BUM)
references | 68
8/4/2019 Pb Portfolio Web02
71/76
Apartment - detailed design
Serbia, Belgrade, Jurija Gagarina street - 10. 07. 2010(freelance)
Apartment conceptual design
Serbia, Belgrade, Jurija Gagarina street - 01. 06. 2010(freelance)
Apartment - detailed design
Serbia, Belgrade, Dimitrija Tucovia street - 12. 12. 2008(freelance)
Apartment - detailed design
Serbia, Belgrade, Radoja Dakia street - 01. 11. 2008
(freelance)
Green Party Youth Club - conceptual design
Serbia, Belgrade, Dragoslava Popovia street, 30. 10. 2008(freelance)
Schkatula Store - conceptual design and logo
Serbia, Belgrade, Svetog Save 8 - 09. 08. 2008(freelance)
Terrace of the Bar Favela - detailed design
Serbia, Belgrade,Miroka 3 - 30. 04. 2008(freelance)
Restaurant Oasis detailed design
Serbia, Belgrade 28. 04. 2008
Interior of the Bar Favela - detailed design
Serbia, Belgrade,Miroka 3 - 14. 07. 2007(freelance)
Work in Studio MitArh (Prof. Branislav Mitrovi)
February 2007 March 2008
Commissions:
Residential/Commercial Building for Atlas Bank - conceptual design
Monte Negro, Budva - April 2007[architectural designer + 3d]
Hotel Starr (50 000m) - conceptual design
Serbia, Belgrade, Dedinje - April 2007[junior associate elaboration of functional areas]
Residential Complex in Municipality St. Stefan - conceptual design
Monte Negro, St. Stefan - March 2007
[junior associate elaboration of functional areas]
8/4/2019 Pb Portfolio Web02
72/76
Residential Building in Petrovac - preliminary design
Monte Negro, Petrovac - May 2007[3d]
Residential Complex Bijeli Rat - conceptual design
Monte Negro, St. Stefan - June 2007
[analysis of form + 3d]
Miranovi House - preliminary design
Monte Negro, St. Stefan - September 2007
[analysis of form + 3d]
Residential/Commercial Building - conceptual design
Serbia, Belgrade, Dimitrija Tucovia street - September 2007 [architectural designer]
Six Starr Hotel (4 variants, 80 000 m) - conceptual design
Monte Negro, Beii - November 2007[architectural designer + 3d]
Residential/Commercial Building - conceptual design
Serbia, Subotica - November 2007
[architectural designer + 3d]
Urban Design of Residential Complex Bijeli Rat (60 000 m)
- conceptual design
Monte Negro, St. Stefan - December 2007
[junior associate elaboration of functional areas]
Penthouse Apartment
Serbia, Belgrade, Bulevar Kralja Aleksandra - February 2008[analysis of form + 3d]
Residential Complex on Site Zoganje - conceptual design
Monte Negro, St. Stefan - February 2008
[analysis of form + 3d]
Popovi House - preliminary design
Monte Negro, St. Stefan - March 2008
[architectural designer + 3d]
Durutovi House. preliminary designMonte Negro, St. Stefan - March 2008
[architectural designer + 3d]
references | 70
8/4/2019 Pb Portfolio Web02
73/76
Competitions:
Conceptual Design for Tax Administration Building in Novi Sad
Serbia, Novi sad - April 2007
>>> Ist prize
[junior associate]
Conceptual Arch - Urb Design for Block 25 and 26
in Novi Beograd (600 000 m)
Serbia, Belgrade - 18. 04. 2007 [architectural designer]
Competition for Conceptual Design of Residential/Commercial Building in
Mavanska Street. Serbia, Belgrade - 28. 06. 2008>>> Ist prize
[analysis of form + 3d]
Conceptual Design of Monument of Independence
of Republic Azerbaijan - 01. 10. 2007
[3d]
Competition for Conceptual Design
of Residential/Commercial Building in Block 11a (25 000 m)
Serbia, Belgrade - 12. 02. 2008>>> Ist prize
[coauthor]
Junior associate:
Elaboration of functional areas solving functional problems in a specic segment of design(e.g. hotel kitchen, apartment unit, entrance hall .)
drafting
making nal drawings in CAD
3d:Making and rendering of digital models (work and nal)Exploring graphical representation concepts
Analysis of form
Architectural designer:
Initial analysis of context and programMaking primary architectural concept with main program and functional elements
under supervision and guidance from chief of studio
Coordination of other associates working on the same task
Author:Making decisions throughout the entire design process
Coordination of other associates working on the same task
8/4/2019 Pb Portfolio Web02
74/76
Every limitation is an opportunity for invention.
8/4/2019 Pb Portfolio Web02
75/76
8/4/2019 Pb Portfolio Web02
76/76