Portfolio boucachard mathieu en

Post on 06-Apr-2016

221 views 5 download

description

 

transcript

BOUCACHARDMathieu

Graduate in ARCHITECTUREINSA of Strasbourg 2014

PORTFOLIO

Contents

- Recapture

- Trinational mesh

- Wooden construction

- Maillon’s Project

- Projet: Kriol Eco Resorts

- A House of the Sustainable development

- Master Degree Project: An island in the Danube in Strasbourg

2

6

9

11

13

16

20

2

3

The first stage is a phase of recapture of the Huningue and Weil am Rhein’s banks by their inhabitants.

Proposal of a landscaping rather hardly on banks for introduce new uses and reappropriation.

Recapture Work of town planning on the municipality of Huningue and Weil am Rhein.

4

The second stage allows the establishment of new activities and a diversity of program.

5

The third stage constitutes an increasingly dense tissue.

It accomodates a project of tramway’s extension..

6

Trinational mesh

- A footbridge to connect two banks: the crossing of the island is made in height favoring the continuity of the volume through the built.

- The tramway station creates a link between the footbridge and the island and so the only way of access to the footbridge since this place.

- The feeling of encirclement got by the structure of the footbridge which disappears when we turn to the river and take advantage of the porosity of the structure.

- The height variation of the elliptic structure between supports is structural but offer also a variation of the internal volume.

- The tramway station is the support to both parts of the footbridge crossing the river.

192 m 122 m 85 m 60 m12 m

250 m 60 m 160 m

LE RHIN

RUE DES 3 FRONTIERES

LE RHIN

ARRET DE TRAM

BONERGASSE+ 4,00

+ 0,00

+ 4,00

+ 0,00

N

+ 17,75

+ 1,50+ 1,50

+ 3,35

160 m 30 m 22 m 16 m 22 m58 m 30 m 80 m 50m12 m

FRANCE

LE RHIN

ARRET DE TRAM

LE RHIN

SUISSE+ 4,00

+ 0 ,00 + 1,50+3,35

+ 11,35

+ 4,00

+ 0,00

Elévation

Master Plan

7

Section

picture of model

8

Reference project : Géodomia : pôle de ressources environnementales Merlieux (02), France Morris & Renaud architectes

9

Used tools: - information on the Internet- information found in magazines- plans called upon the architect

Wooden construction

10

Purpose: Understand the «wood structure» course through the study of a built example.

Master Plan

11

Perspective

Principal plan

Maillon’s Project

A B

A’B’

Coupe BB’

PLAN RdC

PLAN R+1

Section AA’

12

The site

13

Master Plan

Projet: Kriol Eco Resorts Sustainable tourism in the archipelago of the Cape Verde

Perspective

Used materials:- Volcanic stone- Sugar cane- Pozzolana

Section

14

15Principle of natural convection Principle of natural ventillation Principle of sun visor

Plan of bungalowSection of bungalow

A House of the Sustainable developmentfor Belfort (90) France

16

Program

Principle of layout

Complementarity environment House and sustainable development HousePublic

A House of the Sustainable developmentfor Belfort (90) France

17

PLAN RdC

Model

18

PLAN R+1 PLAN R+2

19

Principle of heating and air conditioning on the scale of the URBAN DEVELOPMENT ZONE

Principle of natural ventillation

Refreshment’s principle by the vegetation

Sun visor and natural lightWest facade

An island in the Danube in StrasbourgMaster Degree Project

Master Plan

the project site , at the time of my diplome.

20

Schema of nursery school The high school playground

The central patio of the nursery school

21

Principle of the vegetated roof

Detail vegetated roof

22

Plan RDC

23

Plan R+1

24

section a-a’

Section b-b’

25

Models 1/200 et 1/500

26