ARISSANDRA 1

DESIRAS 2nd Consortium meeting

ARISSANDRA 2

Arissandra Cosmetics (Dr Katsos) LTD

Progress update on technology testing and stewardship –

challenges encountered

ARISSANDRA 3

KICK OFF MEETING CYPRUS

21 February

ARISSANDRA 4

Installation of sensors.

ARISSANDRA 5

Installation of the

weather station

ARISSANDRA 6

Difficulties with the system communication . Upgrade of the moisture sensors software. SIM-Cards communication.

ARISSANDRA 7

Field Audit by David Ogg FICFor on 9th June 2011.

ARISSANDRA 8

Future activities Software practical implementations. Comparison of the water consumption. Save Water.