ARISSANDRA 1
DESIRAS 2nd Consortium meeting
ARISSANDRA 2
Arissandra Cosmetics (Dr Katsos) LTD
Progress update on technology testing and stewardship –
challenges encountered
ARISSANDRA 3
KICK OFF MEETING CYPRUS
21 February
ARISSANDRA 4
Installation of sensors.
ARISSANDRA 5
Installation of the
weather station
ARISSANDRA 6
Difficulties with the system communication . Upgrade of the moisture sensors software. SIM-Cards communication.
ARISSANDRA 7
Field Audit by David Ogg FICFor on 9th June 2011.
ARISSANDRA 8
Future activities Software practical implementations. Comparison of the water consumption. Save Water.