We are back again with another project update for the month of December 2014.

Our construction at site is in full swing in all the blocks.The latest pictures of the same are shared in the slides that follow.

We are poised and committed to deliver a quality product.Our endeavour is to serve the best and we shall alwaysstrive towards it.

Please note:

Since the 4th floor slab has been completed, we request all the customers of Tower A to settle this instalment.

With Best Regards,  

Team Prisha

A Project by

Block A

Block A: North side

Block B

Block B: West side

Block B and C

Progress Report

Tower A:The 4th floor slab is completed.

Tower B:6th floor slab is completed.

Work for the 7th floor slab has commenced andis expected to be completed before the end ofthis month.