01.10.2009

ddProduction of construction Production of construction materials in Uzbekistanmaterials in Uzbekistan ––materials in Uzbekistan materials in Uzbekistan

cooperation prospectscooperation prospects

E.Akramov

Chairman of the Board

JSC “U b ild i l ”JSC “Uzbuildmaterials”

Foundation and structure

Company was established in 1997N b f i 100Number of enterprises – over 100Annual volume of production– 616 mln. USD

“UZBUILDMATERIALS”

Enterprises ofcement industry Enterprises of special Enterprises of non Wall material

producingcement industry building materials ore materials producing enterprises

Trade enterprisesScientific research

Institute Mining and geological expedition

Volume of a commodity output (million USD)

615,9700,0

419 4472,2

548,5600,0

293 3 321,2349,0

390,1

419,4

400,0

500,0

293,3 ,

300,0

100,0

200,0

0,02001 2002 2003 2004 2005 2006 2007 2008

Structure of productionStructure of production86 3%86.3%

cement - 6640 thous. tonncement 6640 thous. tonn

glass - 10,0 mln.m2 ( 2-х mm)

wall materials - 1,4 bill.items

bl it 370 th 2

цц

12%

0 8%

marble, granite - 370 thous m2

others0.4%

0.5%

0.8%

Export dynamics for 2001-2008. (million USD)

117,1 117,3120

140

100

120

8053,6

60

14,0 21,131,5 33,940

14,0

0

20

02001 2002 2003 2004 2005 2006 2007 2008

Geography of ExportGeography of Export

Investment offer (1)Proposed projects for glass production !

The project of creation of the enterprise on production of glassenterprise on production of glass

Capacity– 600 tones/ per day (10 million sq.m, 4 mm calc)Project Cost Project Cost -- 885 million US dollars5 million US dollarsDemand for glass in 2010-2015 - till 125 000 tonesThere are raw materials components and external mainThere are raw materials components and external main communications

Market: Domestic market - Republic of UzbekistanExport - Central Asia Republics and

Af h i tAfghanistan

Production and consumption of glassProduction and consumption of glass

in Central Asia (thousand tones)

№ CountryProduction

(annual capacity)

Consumption Gapcapacity)

1 Kazakhstan - 100 - 100

2 Kyrgyzstan 93 10 + 83

3 U b ki 65 150 853 Uzbekistan 65 150 - 85Total 158 260 - 102

Provision of raw material

Raw material type Deposit nameApproved deposits

( illi t )Provision

( )yp p (million tones) (years)

Quartz sand Mayskoe 7 50

Limestone Urgazskoe 96.6 over 100

Dolomite Dehkanabad 2.6 over 50

/Calcium soda Kungrad soda plant 0.1/year

Feldspar Karichsay 24,3 over 50

Investment offer (2)

j f i f iThe project of creation of the enterprise on production of ceramic tile

The capacity of the project - 3,0 million sq. mProject Cost Project Cost -- -- 27,027,0 million US dollarsmillion US dollarsMarket demands - 4,0 million sq. mImport (2008) - 3,7 million sq. mThere are raw materials components and external main communicationsMarket– Uzbekistan, Central Asia, Russia

d Af h i tand Afghanistan

Investment offer (3)

j f i f iThe project of creation of the enterprise on production of sanitary ware

Capacity - 200 thousand item per year Project CostProject Cost -- 17 617 6 million US dollarsmillion US dollarsProject CostProject Cost 17,617,6 million US dollarsmillion US dollarsAssortment of product – ceramic washstands, lavatories, sinks, bowls, etc., ,Import (2008) - 150 thousand itemsThere are raw materials components and external main pcommunicationsMarket – Uzbekistan, Central Asia, Russia and Afghanistan

Production and consumption Production and consumption ceramic tile and sanitary ware in Uzbekistanceramic tile and sanitary ware in Uzbekistan

ProductMeas. unit

Production Consumption Gap

Ceramic tilesmillion

sq. 1 5 - 4qmetres

S ithousand

25 150 125Sanitary ware pieces 25 150 - 125

Provision of raw materialProvision of raw material

The authorizedThe name of raw material Deposit name

The authorized stocks

(million tons)

Provision(Years)

Kaolin Altin tay 5,4 over 50

Quartz sand Djeroy 205,0 over 100

Feldspar Lyangar 27.8 over 50

D l i D hk b d 2 6 50Dolomite Dehkanabad 2.6 over 50

The offer for investments (4)The offer for investments (4)

The design on taking and manufacture of products from a marble and granite.products from a marble and granite.

Cost of a production line on:Cost of a production line on:- to taking a marble and granite - 1,5 million USD;

hi i bl 1 0 illi USD- to machining a marble - 1,0 million USD;- to machining granite - 2,0 million USD.

The organization of manufacture of a continuous basalt fibre and basalt-plastic pipes (5)

Manufacture of a continuous basalt fibre by power of 1,5 thousand tons and basalt-plasticpipes of 90 kms one year in diameter from 50 up to 500 mm.

C f d k S dCost of the design makes 14,5-17,1 million US dollars (without taking into account buildings, constructions, engineering lines).

Pay-back period of expenses of 36-40 months.

Contacts:Contacts:Contacts:Contacts:

www.uzsm.uzwww.uzsm.uzchairman@uzsm.uz@

uzbuild@ars.uzТеl: +99871 2522063/5F 998 1 255 0Fax: +99871 2557707

Th k f tt ti !Th k f tt ti !Thank you for your attention!Thank you for your attention!