1111

1111111222222333

CILACAP RESID FLUID CATALYTIC CRACKING (RFCC) PROJECTPT. PERTAMINA (PERSERO)

Document No. RFCC-A-ME-VP-47A501-DR003

Rev. No. : 4

Piping & Instrumentation Diagram - Odorant Injection Package Page No.: 2/3

Page 3 Piping & Instrumentation Diagram Revise Pressure Vessel Tank detail

Revision Historical Page

Rev. Page / Paragraph Item Describtion of Change

Page 3 Piping & Instrumentation Diagram Revise LegendPage 3 Piping & Instrumentation Diagram Revise All valve to ball valve

Page 3 Piping & Instrumentation Diagram Added Notes

Page 3 Piping & Instrumentation Diagram Added drain valve at day tank

Page 3 Piping & Instrumentation Diagram Added Line number

Page 3 Piping & Instrumentation Diagram Remove drain valve at storage tank

Page 3 Piping & Instrumentation Diagram Remove Drain valve after pumpPage 3 Piping & Instrumentation Diagram Added gravity flow

Page 3 Piping & Instrumentation Diagram Added HLL and LLL

Page 3 Piping & Instrumentation Diagram Added Reducer

Page 3 Piping & Instrumentation Diagram Revise Pressure Vessel working capacity to 2.75 m³Page 3 Piping & Instrumentation Diagram Added Flexible hose at filling conection

Page 3 Piping & Instrumentation Diagram Revise Utility valve and nozzle to 3/4"Page 3 Piping & Instrumentation Diagram Added Drain valve after pump

Page 3 Piping & Instrumentation Diagram Revise Pump type to reciprocating double diaphragm pumpPage 3 Piping & Instrumentation Diagram Revise TP to VP and VP number

Page 3 Piping & Instrumentation Diagram Revise PSV setting to 18 501 kg/cm²g

Page 3 Piping & Instrumentation Diagram Revise PSL linePage 3 Piping & Instrumentation Diagram Revise drain position of day tank

33334444

Page 3 Piping & Instrumentation Diagram Revise PSV setting to 18.501 kg/cm g

Page 3 Piping & Instrumentation Diagram Revise Working capacity to working volumePage 3 Piping & Instrumentation Diagram Added Orifice size for PSV pressure vessel

Page 3 Piping & Instrumentation Diagram Added Drain valve before pumpPage 3 Piping & Instrumentation Diagram Revise HLL and HLL to LAH and LALPage 3 Piping & Instrumentation Diagram Added Drain valve at PSV pressure valve

Page 3 Piping & Instrumentation Diagram Added Reducer at outlet of PSV pressure vesselPage 3 Piping & Instrumentation Diagram Added Note-7 Pump PSV use non-API standards