Post on 18-Mar-2020
transcript
TAKOMA PARKMIDDLE SCHOOL
Montgomery County Public Schools
September 10, 2015 -- 7:00pmFacility Advisory Group Meeting #1
TAKOMA PARK MIDDLE SCHOOLSchedule
Feasibility Study
• Meeting #1 – September 10, 2015, 7:00pm
• Meeting #2 – September 16, 2015, 3:20pm
• PTA Presentation – October 13, 2015, 7:00 pm
2
TAKOMA PARK MIDDLE SCHOOLObjectives / Considerations
• Addition Location
• Program & Site Adjacencies
• Student Circulation
• Access to Fields & Paved Play Areas
Community use of site
• Maintain Natural Light
• Sustainability
• 21st Century Learning
3
TAKOMA PARK MIDDLE SCHOOLProgram Analysis
4
TAKOMA PARK MIDDLE SCHOOLExisting Site
5
N
TAKOMA PARK MIDDLE SCHOOLExisting Site Fields & Play Areas
6
N
TAKOMA PARK MIDDLE SCHOOLExisting Site Parking
7
N
TAKOMA PARK MIDDLE SCHOOLExisting Site Public vs. Private
8
N
TAKOMA PARK MIDDLE SCHOOLExisting Site Analysis
9
N
W
S
E
TAKOMA PARK MIDDLE SCHOOLExisting Public vs. Private
PublicPrivateMain Street
10
N
TAKOMA PARK MIDDLE SCHOOLExisting Horizontal Circulation
11
N
PublicPrivateMain Street
TAKOMA PARK MIDDLE SCHOOLExisting Horizontal and Vertical Circulation
12
N
PublicPrivateMain Street
TAKOMA PARK MIDDLE SCHOOLExisting 1st Floor Plan
13
cafeteriamusic
lab
lab
p p
cr cr cr
cr cr cr cr
labesol
adminguidance
art
homeecon
aux gym
gym girlslockers
boyslockers
crcr
gh
mainentrance
N
cr
cr
cr
dance
TAKOMA PARK MIDDLE SCHOOLExisting 2nd Floor Plan
14
lab
lab
cr cr cr
cr cr cr cr
lab cr
media center
cr
N
p p
TAKOMA PARK MIDDLE SCHOOLExisting 3rd Floor Plan
15
lab
lab
cr cr
cr cr cr cr
lab cr
crcr
N
p p
cr
mech
TAKOMA PARK MIDDLE SCHOOLExisting Site Layout
16
N
TAKOMA PARK MIDDLE SCHOOLPotential Addition Areas
17
Four Potential Addition Areas
4
3
2
1
N
TAKOMA PARK MIDDLE SCHOOLPotential Addition Areas
18
Four Potential Addition AreasArea 1 – East of Building
o Adjacent to programs requiring additional program (gym, cafeteria, performing arts)
o Sufficient areao Ability to tie into existing
corridorso Located on blacktop
used by community
1
N
TAKOMA PARK MIDDLE SCHOOLPotential Addition Areas
19
Four Potential Addition AreasArea 2 – North Side of Building
o Sufficient area for construction
o Room to plan for future expansion
o Adjacent to main academic area
o Ability to tie into existing corridors
o Sloping terraino Impacts existing
amphitheater
2
N
TAKOMA PARK MIDDLE SCHOOLPotential Addition Areas
20
Four Potential Addition AreasArea 3 – Along Piney Branch Rd.
o Adjacent to existing science laboratories
o Not adjacent to existing corridors
o Adjacent to streeto Very small areao Would require additional
academic expansion area
o Interrupts site circulation
3
N
TAKOMA PARK MIDDLE SCHOOLPotential Addition Areas
21
Four Potential Addition AreasArea 4 – Front of School
4
o Adjacent to programs requiring additional square footage (administration, guidance, general academics)
o Provide a new building front
o Too close to existing bus loop
o Very small areao Would require
additional academic expansion area
o Would requiresignificant interior renovation
N
TAKOMA PARK MIDDLE SCHOOLConcepts
22
TAKOMA PARK MIDDLE SCHOOLMusic, Physical Ed. & Building Services Addition
23
4
N
Area to relocate hardtop/basketball courts
PE/Music Addition
- addition
- renovation
TAKOMA PARK MIDDLE SCHOOLMusic, Physical Ed. & Building Services Addition
cafeteria stage
st
aux gym
st
icbt
healthcr
music
bsf
24
fitnessaux gym
gym
cafeteria
stagest
music
aux gym
gym
N
Existing Partial 1st Floor Plan Proposed Floor Plan
girlslockers
boyslockers
dancedance
girlslockers
boyslockers
TAKOMA PARK MIDDLE SCHOOLExisting Site Layout
25
N
TAKOMA PARK MIDDLE SCHOOLConcept 1 Layout
26
N
PE/Music Addition
Academic Addition
CONCEPT 1Renovation / Repurpose Areas
cafeteria stage
st
27
lab
lab
p p
cr cr cr
cr cr cr cr
cresol
admin
art
homeecon
aux gym
gym
N
cr cr
girlslockers
boyslockers
- renovation
guidance
cr
cr
cr
dance
CONCEPT 11st Floor Plan
cr
cr
mplab
pt
cafeteria stage
st
aux gym
st
icbt
healthcr
music
bsf
28
cr
crfitness
lab
lab
cr cr cr
cr cr cr cr
cresol
admin
art
homeecon
aux gym
gym
N
s
girlslockers
boyslockers
p p
admin
guidance
cr
cr
cr
dance
CONCEPT 12ND Floor Plan
29
cr
cr
reslab
t
cr
cr
lab
lab
cr cr
cr cr cr cr
lab cr
media center
N
p
s
p p
CONCEPT 13RD Floor Plan
30
esol
cr
crlab
t
cr
cr
lab
lab
cr cr
cr cr cr cr
lab cr
sped
N
p
s
p p mech
CONCEPT 1Circulation
cafeteria stage
st
st
icb
t
healthcr
music
bsf
31
cr
crcr
cr aux gym fitness
admin
tlab
lab
cr cr cr
cr cr cr cr
cresol
admin
art
homeecon
aux gym
gym
N
pgirls
lockers
boyslockers
mplab
s
p p
guidance
cr
cr
cr
dance
TAKOMA PARK MIDDLE SCHOOLExisting Site Layout
32
N
TAKOMA PARK MIDDLE SCHOOLConcept 2 Layout
33
N
PE/Music Addition
Academic Addition
CONCEPT 2Renovation / Repurpose Areas
cafeteria stage
st
34
lab
lab
cr cr cr
cr cr cr cr
esol
adminguid
art
homeecon
aux gym
gym
N
cr cr
girlslockers
boyslockers
- renovation
- renovation(1st floor only)
p p lab
cr
cr
cr
dance
CONCEPT 21st Floor Plan
cafeteria stage
st
st
icb
t
admnp
t
healthcr
music
cr cr cr
bsf
35
aux gym fitness
N
s
admn
lab
lab
p p
cr cr cr
cr cr cr cr
esol
adminguid
art
homeecon
aux gym
gym girlslockers
boyslockers
res
mplab
lab
cr
cr
cr
dance
CONCEPT 22nd Floor Plan
36
tcr cr cr
cr
lab
lab
lab
cr cr cr
cr cr cr cr
lab cr
media center
p
s
p p
N
CONCEPT 23rd Floor Plan
37
tcr cr cr
esol
lab
lab
lab
cr cr cr sped
lab cr
cr cr cr cr
N
p
s
p p mech
CONCEPT 2Circulation
cafeteria stage
st
st
icb
t
healthcr
music
bsf
38
aux gym fitness
tcr cr cr
res
mplab
admn
lab
lab
cr cr cr
cr cr cr cr
cresol
adminguid
art
homeecon
aux gym
gym
N
p
s
p p
girlslockers
boyslockers
cr
cr
cr
dance
CONCEPT 1Future Expansion
39
Area For Future Addition• 3 stories – 12 classrooms (single
loaded corridor)
N
CONCEPT 2Future Expansion
40
Area For Future Addition• 3 stories – 12 Classrooms
N
TAKOMA PARK MIDDLE SCHOOLConcept 1 - Pros and Cons
Concept 1
Renovated Square Footage – 15,190 sf
Addition Square Footage – 27,500 sf
Efficiency Factor – 78.1 %
• Pros
Efficient double loaded corridor
Compact floor plan
Minimal site impact
Natural light in all spaces
Views to exterior (vs. courtyard) in allspaces
• Cons
Corridor dead ends into stair
More demolition of existing classrooms (6 total)
41
Academic AdditionPE/Music Addition
TAKOMA PARK MIDDLE SCHOOLConcept 2 - Pros and Cons
Concept 2
Renovated Square Footage – 13,285 sf
Addition Square Footage – 30,808 sf
Efficiency Factor – 69.7 %
• ProsLoop corridor improves circulation
Forms courtyard for outdoor teaching area
Natural light in all spaces
Less demolition of existing classrooms
(4 total)
• ConsSingle loaded corridor is inefficient (cost)
Forms courtyard requiring maintenance
Some classrooms have courtyard views
42
Academic AdditionPE/Music Addition
TAKOMA PARK MIDDLE SCHOOLProject Schedule
Feasibility Study
• Meeting #1 – September 10, 2015, 7:00pm
• Meeting #2 – September 16, 2015, 3:20pm
• PTA Presentation – October 13, 2015, 7:00 pm
43
TAKOMA PARK MIDDLE SCHOOLQuestions / Comments
WE WELCOME AND APPRECIATE YOUR FEEDBACK!
This process is oriented around the collaboration of all involved. Please feel free to ask us questions.
44