Introduction

This presentation covers the following topics:

UNCLASSIFIED

Introduction - Objectives

3

Note: The DRRS-N graphics used in this presentation contain notional data and are for illustration purposes only

At the end of this presentation, you will have a basic understanding of:

• The aviation squadron PESTO metrics and their authoritative data sources

• The aviation squadron PESTO data flow to DRRS-N

• The aviation squadron PESTO drill downs available in DRRS-N

UNCLASSIFIED

Overview - Authoritative Data Sources

DRRS-N compiles unit resource values (called FOMs or Figures of Merit), using authoritative data sources. These values and associated data are available to the Commander as a guide for making unit assessments.

4

UNCLASSIFIED

Overview - Authoritative Data Sources

5

In the following slides, we will introduce the three PESTO pillars which are calculated within DRRS-N for all Aviation Squadrons.

Each section will discuss a specific pillar using the following format:

• An overview of the pillar

• The metrics, which drive the calculations of that pillar

• The inputs (authoritative data source) and data flow to DRRS-N

• The drill down analysis provided within DRRS-N

UNCLASSIFIED6

The personnel (P) pillar represents a detailed capture of individual skills that affect the ability of a unit to perform its mission. The personnel metrics in DRRS-N tie the BUPERS process to Fleet readiness.

PESTO Pillars - Personnel - Overview

UNCLASSIFIED

PESTO Pillars - Personnel - Metrics

7

• Active (AC) and reserve (RC) component officer and enlisted rating Fit

• AC and RC enlisted NEC Fit• Government civilian Fit –generally not applicable

to fleet units (no civilian billets on AMD)• T&E school requirements (currently VP only)

PFOM – Calculated for each NMET. The unit’s overall “P number” is anaverage of all individual NMETs.

PFOM is the compilation of [requirements - gaps / requirements]in the following areas:

UNCLASSIFIED

PESTO Pillars - Personnel - Metrics

8

View a sample (No-Weight) PFOM Calculation on the next page.

UNCLASSIFIED

PESTO Pillars - Personnel - Metrics

Sample (No-Weight) PFOM Calculation:

Skill OFF CIV T&E NEC Total PFOM

Rs 16 0 74 145 235

66Gs 6 0 40 34 80

PFOM = (Rs – Gs) = (235 – 80) = Rs 235

66

UNCLASSIFIED

PESTO Pillars - Personnel - Inputs/Data Flow

10

View Explanation of Terms on the next page.

UNCLASSIFIED

PESTO Pillars - Personnel - Inputs/Data Flow

Explanation of Terms:

AQD Additional Qualification Designator

BA Billets Authorized

BIN Billet Identification Number

COB Currently On Board

DESIG Designator

FIT Billet to qualification match based on DESIG/NEC,

Rank/Pay band, and Subspecialty (AQD)

FLTMPS Fleet Training Management and Planning System

NEC Navy Enlisted Classification. A critical NEC manned less than

50% will automatically make a NMET red.

NOBC Navy Occupational Billet Code

RCN Rating Control Number

TFMMS Total Force Manpower Management System

UNCLASSIFIED

PESTO Pillars - Personnel - Drill Down

12

In DRRS-N , expand the Capability Areas to view individual METS. Click on the P-Pillar score in a given MET to see the PFOM drill down.

UNCLASSIFIED

PESTO Pillars - Personnel - Drill Down

9377

13

PFOM = (Rs – Gs) = (271– 62) = Rs 271

77

271 62

UNCLASSIFIED

PESTO Pillars - Equipment - Overview

• The equipment (E) pillar represents the equipment material condition for performing each assigned NMET and capability

• The E Pillar compares what equipment is authorized via the Current Readiness Standards to what is actually in the squadron

Authorized aircraft (flight line standard) Mission capable aircraft (RFT/RBA standard) Mission Systems (FLIR, Guns, PODS, etc)

• In DRRS-N, the E Pillar only considers the deployed standard for all equipment.

14

UNCLASSIFIED15

PESTO Pillars - Equipment - Standards

HSC CVN Current Readiness Standard

UNCLASSIFIED

PESTO Pillars - Equipment - Metrics

• Red, yellow and green bands have been established for equipment “assigned and “ready” using the deployment phase as the standard for an MCO

• Red, yellow and green bands have also been established for mission systems “assigned” and “ready”

Maintenance and Basic are red Intermediate and Sustainment are yellow Deployable is green

16

UNCLASSIFIED

PESTO Pillars - Equipment - Sample HS Metric

1. AMSRR supplies the data to the Aviation Data Warehouse (ADW) and AMFOM.

2. AMFOM uses the TMS-specific look up tables to determine aircraft and mission systems points-to-color relationships.

3. AMFOM also ties the equipment resources required to the capability (NTA). 4. DRRS-N displays the data in the E-pillar. Some drill down is available.

16

UNCLASSIFIED

PESTO Pillars - Equipment - Sample HS Metric

1. AMSRR supplies the data to the Aviation Data Warehouse (ADW) and AMFOM.

2. AMFOM uses the TMS-specific look up tables to determine aircraft and mission systems points-to-color relationships.

3. AMFOM also ties the equipment resources required to the capability (NTA). 4. DRRS-N displays the data in the E-pillar. Some drill down is available.

17

UNCLASSIFIED

PESTO Pillars - Equipment - Sample HS Metric

1. AMSRR supplies the data to the Aviation Data Warehouse (ADW) and AMFOM.

2. AMFOM uses the TMS-specific look up tables to determine aircraft and mission systems points-to-color relationships.

3. AMFOM also ties the equipment resources required to the capability (NTA). 4. DRRS-N displays the data in the E-pillar. Some drill down is available.

18

(Partial mapping - for illustration only)

UNCLASSIFIED

PESTO Pillars - Equipment - Sample HS Metric

1. AMSRR supplies the data to the Aviation Data Warehouse (ADW) and AMFOM.

2. AMFOM uses the TMS-specific look up tables to determine aircraft and mission systems points-to-color relationships.

3. AMFOM also ties the equipment resources required to the capability (NTA). 4. DRRS-N displays the data in the E-pillar. Some drill down is available.

19

UNCLASSIFIED

PESTO Pillars - Equipment - Inputs/Data Flow

21

UNCLASSIFIED

PESTO Pillars - Equipment - Drill Down

22

In DRRS-N , expand the Capability Areas to view individual METS. Click on the E-Pillar score in a given MET to see the AMFOM drill down.

UNCLASSIFIED

PESTO Pillars - Equipment - Drill Down

23

Deployed Entitlement(Point tables)

Available (AMSRR Data)

Calculated Readiness

72

Unit T/M/S Standard

UNCLASSIFIED

PESTO Pillars - Training - Overview

• The training (T) pillar represents the performance and experience of the Squadron for performing each assigned NMET and capability

• NTIMS (the Navy Training Information Management System) calculates the values that are displayed in the T pillar of DRRS-N

24

UNCLASSIFIED

PESTO Pillars - Training - Metrics

• The Capabilities-based T&R Matrix supports DRRS-N by providing the mapping and Training Figure of Merit (TFOM) scores for the T-Pillar.

TFOM is a function of two factors;

Performance (Pf) and Experience (Ef)

TFOM metric is a measure that describes a unit’s training capability in a given NTA

• SHARP allows squadrons to collect flight and training data and feed that data to the TYCOM and the DRRS-N T pillar via a Current Readiness Assessment (CRA) report every 15 days.

25

View Performance (Pf) and Experience (Ef) Metrics on the next page.

UNCLASSIFIED

PESTO Pillars - Training - Metrics

If Ef <1 and Pf is held at .80.

Note:

COB = Crews on Board

SRS = Squadron Requirements Section

Pf =Number of Skilled Crews Complete

Number of Skilled Crews Required

Ef =Number of SRS Items Completed

Number of SRS Items Required

Note: When Ef is less than 100, Pf is capped at 80. This prevents a unit from showing green in the T-Pillar unless all squadron level requirements have been completed.

UNCLASSIFIED

PESTO Pillars - Training - Inputs/Data Flow

27

UNCLASSIFIED

PESTO Pillars - Training - Drill Down

28

100100

In DRRS-N , expand the Capability Areas to view individual METS. Click on the T-Pillar score in a given MET to see the TFOM drill down.

UNCLASSIFIED

PESTO Pillars - Training - Drill Down

Performance Factor Tab Experience Factor Tab

UNCLASSIFIED

Summary

30

This presentation covered:

UNCLASSIFIED

Summary

31