04 c Ressourcengruppen
Transcript
Page 1: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

04 c Ressourcengruppen

Page 2: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 2

This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any way acknowledged or endorsed by SAP. For SAP Business One, only the documentation and training officially released by SAP shall be binding upon SAP. SAP shall not be responsible for any content of this documentation and training and this documentation and training shall not be binding upon SAP in any way.

The official current SAP Business One documentation and training for SAP Business One is available at http://service.sap.com/sbocustomer/documentation and http://service.sap.com/sbocustomer/training.

Page 3: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 3

Voraussetzungen für diese Lerneinheit

Was Sie sicher beherrschen sollten

Gute Kenntnisse in SAP und be.as Gute Kenntnisse über allgemeine Fertigungsprozesse und Kapazitätsplanung

Page 4: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 4

Lern-Ziele

Nach Bearbeiten der Lektion können Sie:

Ressourcengruppen erstellen Unterschiede zwischen Ressourcengruppen verstehen Einfache Ressourcen planen Feinplanung für Maschinen und Ressourcengruppen vornehmen

Page 5: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 5

Agenda

Ressourcengruppen

1: Einleitung

2: Einfache Ressourcengruppe

3: Ressourcenbereich

4: Maschinengruppen: Feinplanung

Page 6: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 6

RessourcengruppenAllgemein

Was sind Ressourcengruppen?

Ressourcengruppen sind Kombinationen verschiedener Ressourcen.

Dies können Maschinen oder Mitarbeiter sein.

Page 7: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 7

Ressourcengruppen Arten von Ressourcengruppen

Für verschiedene Anwendungen bietet be.as unterschiedliche Typen von Ressourcengruppen:

Eine einfache Ressourcengruppe besteht aus mehreren Maschinen/Personen. Nur die Gruppe als Ganzes wird geplant, die Einzelteile werden nicht geplant.

Verschiedene Ressourcen, die nicht zu einer Gruppe zusammengefasst werden, um die Kapazität zu berechnen, werden Ressourcenbereich genannt.

Eine Ressourcengruppe, für die eine Gesamtkapazität berechnet wird, deren Element aber einzeln geplant werden: Für diese Gruppe wird durch eine Ressource repräsentiert. Diese heisst Maschinengruppe kann aber genauso eine Gruppe von Menschen sein.

Page 8: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 8

Agenda

Ressourcengruppen

1: Einleitung

2: Einfache Ressourcengruppe

3: Ressourcenbereich

4: Maschinengruppen: Feinplanung

Page 9: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 9

Ressourcengruppen einfache Ressourengruppe

Eine einfache Ressource-Gruppe wird als normale Ressource erstellt.

Im Reiter Terminierung in der Spalte "Anzahl von Masch |. Pers" wird die Anzahl der einzelnen Ressourcen dieser Gruppe hinterlegt.

Eine weitere detaillierte Aufteilung in einzelne Maschinen / Personen ist nicht möglich. Nur die Gruppe als Ganzes wird geplant.

Page 10: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 10

Ressourcengruppen einfache Ressourengruppe

Bei der Terminierung können Sie festlegen, auf wie viele der einzelnen Ressourcen dieser Gruppen zugegriffen werden kann.

Basierend auf dem Maximum der verfügbaren Ressourcen, kann eine Zahl oder ein Prozentsatz bestimmt werden.

Page 11: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 11

Ressourcengruppen einfache Ressourengruppe

Bei Erstellung einer Ressourcengruppe wird die Kapazität für alle Tage festgelegt. Im Planungskalender ist es möglich, abweichende Tageskapazitäten einzutragen oder die Anzahl der verfügbaren Ressourcen zu ändern. Zum Beispiel: Urlaubsplanung aus einer Gruppe von Personen auf einem Montage-Arbeitsplatz.

Unten wird die Kapazität angezeigt

Abweichung (Beispiel) Standard

Mehr (48) 32

Gleich (32) 32

Weniger (16) 32

Page 12: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 12

Ressourcengruppen einfache Ressourengruppe

Planung für einfache Ressourengruppen

Die Planung erfolgt minutengenau.

Für Zeit-Reservierungen wird ein täglicher Pool verwendet, das heißt, es wird nicht geprüft, in welchem Zeitraum Ressourcen frei sind, sondern nur, wie viel Kapazität an diesem Tag noch verfügbar ist.

Page 13: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 13

Ressourcengruppen einfache Ressourengruppe

• Beispiel: Ressource mit 2 Personen, jede arbeitet 8 Stunden

• Zwei Fertigungsaufträge werden gleichzeitig eingeplant, Start: 8:00, benötigte Zeit: 4 Stunden. Mehrmaschinenbedienung aktiv. ( Personen parallel).

• Ergebnis: Beide beginnen um 8:00 und wären um 10:00 fertig.

• Grund für das „falsche Ergebnis“: nur der tägliche Kapazitätspool wird geprüft. 8 Stunden Kapazität reicht für beide Fertigungsaufträge.

Page 14: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 14

Ressourcengruppen einfache Ressourengruppe

Anwendung:

Verwenden Sie einfache Ressourcengruppen, wenn auf die grafische Plantafel und Feinplanung verzichtet werden kann, und keine Detailplanung bis auf die Ebene einzelner Maschinen oder Personen benötigt wird.

Einfache Ressourcengruppen ermöglichen eine schnelle Berechnung des Liefer- oder Starttermins, ohne minutengenaue Planung.

Page 15: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 15

Agenda

Ressourcengruppen

1: Einleitung

2: Einfache Ressourcengruppe

3: Ressourcenbereich

4: Maschinengruppen: Feinplanung

Page 16: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 16

Ressourcengruppen Ressourcenbereich

Ein Ressourcenbereich ist eine Gruppe von Ressourcen, die nicht für die Kapazitätsplanung zusammengefasst wird. Zum Beispiel kann eine Liste von Ressourcen, die von einem Mitarbeiter gesteuert werden.

Eine solcher Bereich wird Ressourcengruppe erstellt und jede einzelne Ressource wird zu dieser Gruppe zugeordnet.

Page 17: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 17

Ressourcengruppen Ressourcenbereich

Eine Gruppenkennung vergeben und den Bereich benennen. Den Schalter „direkt planbar“ nicht aktivieren. Dann können neue Ressouren eingetragen und der Gruppe zugeordnet werden.

Page 18: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 18

Agenda

Ressourcengruppen

1: Einleitung

2: Einfache Ressourcengruppe

3: Ressourcenbereich

4: Maschinengruppen: Feinplanung

Page 19: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 19

Ressourcengruppen Maschinengruppen

Für detaillierte Planung kann jede Maschine einer Maschinegruppe ist separat geplant werden. Beispiel: 5 gleiche Fräsmaschinen

Vorgehen:

1. Gruppe erstellen

2. Erstellen der zugehörigen Ressourcen - „direkt planbar„ wählen

3. Eine Planungs-ID vergeben, diese ID wird bei den Arbeitsfolgenangezeigt. Üblicherweise die gleiche wie die Gruppen-ID.

4. Nachdem die ID eingegeben wurde, öffnen sich die Resourcen-Stammdaten. Nun die zu verwendende Ressource für die Arbeitsfolge bestimmen.

Page 20: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 20

Ressourcengruppen Maschinengruppen: Feinplanung

Eine Ressourcengruppe besteht aus einzelnen Ressourcen und einer Planungsressource, welche die Ressourcen im Moment der Planung repräsentiert (zB. in der Vorkalkulation)

Ressourcengruppe

Masch. 1Masch. 1

Masch. 2Masch. 2

Masch. 3Masch. 3

Geplante RessourceGeplante

Ressource

Page 21: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 21

Ressourcengruppen Maschinengruppen: Feinplanung

Die Planungsressource repräsentiert alle Ressourcen der Gruppe: Diese beinhaltet die Summe aller geplanten Kapazitäten der Gruppe. Für die Berechnung muss der Planungsressource der durchschnittliche Kostensatz aller einzelner Ressourcen zugewiesen werden. Dieser muss zuvor berechnet und manuell eingegeben werden.

Auf die Planungsressource können keine Zeitrückmeldungen erstellt werden, dafür muss eine echte Ressource gewählt werden.

Ressource

Masch. 1Masch. 1

Masch. 2Masch. 2

Masch. 3Masch. 3

Geplante RessourceGeplante

Ressource

Page 22: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 22

Ressourcengruppen Maschinengruppen: Feinplanung

In der graphischen Ansicht wird die Arbeitsfolge auf die Planungsressource eingelastet (Grobplanung, also Zeitreservierung über Tagespool).

In der APS Ansicht kann die Planungsressource ganz einfach durch die echte Ressource ersetzt werden.

In diesem Beispiel wurde für beide Arbeitsfolgen dieselbe Maschine gewählt.

Nach einer Neuberechnung werden die Arbeitsfolgen nacheinander angeordnet, da nur eine Maschine frei ist.

Page 23: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 23

Ressourcengruppen Maschinengruppen: Feinplanung

Automatische Optimierung:Für diese Gruppen kann die automatische Optimierung aktiviert werden. Dazu in der Ressourcengruppe den entsprechenden Schalter wählen.Dann wird das Programm immer die optimale Ressource verwenden.Für weitere Informationen: siehe Trainingseinheit „Ressourcenoptimierung“

Page 24: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 24

RessourcengruppenMaschinengruppen: Feinplanung

Anmeldung Fertigungsauftrag: Wenn die Planungsressource in der Arbeitsfolge hinterlegt ist, muss zuerst die echte Ressource gewählt werden.

Page 25: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 25

Ressourcengruppen Maschinengruppen: Feinplanung

Verwenden Sie die Feinplanung, wenn eine minutengenaue Planung für jede Maschine erforderlich ist.

Dies ermöglicht eine optimale Auslastung, erfordert aber eine sehr sorgfältige Pflege der Daten und Planzahlen.

Einschränkung: Feinplanung für mehrere parallel laufende Maschinen einer Ressource-Gruppe ist nicht möglich. Parallele Einlastungen sind nur bei Grobplanung mit einem täglichen Pool möglich.

Page 26: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

© beas group 2011 / Page 26

Zusammenfassung

Jetzt können Sie:

Ressourcengruppen erstellen Unterschiede zwischen Ressourcengruppen verstehen Einfache Ressourcen planen Feinplanung für Maschinen und Ressourcengruppen vornehmen

Page 27: 04 c Ressourcengruppen. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.

Vielen Dank für Ihre Aufmerksamkeit!