+ All Categories
Home > Documents > 1 ESA Iris Programme workplan of activities [email protected] [email protected]...

1 ESA Iris Programme workplan of activities [email protected] [email protected]...

Date post: 27-Mar-2015
Category:
Upload: natalie-kidd
View: 220 times
Download: 4 times
Share this document with a friend
Popular Tags:
7
1 ESA Iris Programme workplan of activities [email protected] [email protected] [email protected]
Transcript
Page 1: 1 ESA Iris Programme workplan of activities franco.ongaro@esa.int nathalie.ricard@esa.int claude.loisy@esa.int.

1

ESA Iris Programme workplan of [email protected] [email protected]

[email protected]

Page 2: 1 ESA Iris Programme workplan of activities franco.ongaro@esa.int nathalie.ricard@esa.int claude.loisy@esa.int.

2

SESAR schedule vs Iris schedule

2015

DEFINITION PHASE

SESAR JOINT UNDERTAKING

CREATION OF IRIS PROGRAMME

ESA MINISTERIAL COUNCIL 2008

ESA MINISTERIAL COUNCIL 2011 1st SATELLITE LAUNCH

SESAR PROGRAMMEESA I ris ProgrammeMILESTONE

20092006

DEVELOPMENT PHASE

20142007 2008 2010 2011 2012 2013

PHASE 2

PHASE 3

DEPLOYMENT PHASE

PHASE 1

(Preparation)

Page 3: 1 ESA Iris Programme workplan of activities franco.ongaro@esa.int nathalie.ricard@esa.int claude.loisy@esa.int.

3

Objectives of Iris (ARTES 10) Phase 1

Emphasis on:

Preparation work to support the preparation of the SESAR Master Plano Initiate development of the communication standardo Initiate identification of the satellite system architecture

Consider non-technical issues from the start:o Business caseo Service provision and governance modelo ESA hand-over after development/deploymento Validation and qualification with SESAR

Support frequencies allocation

Phase A activities timing is aligned with SESAR ATM Master Plan release

Page 4: 1 ESA Iris Programme workplan of activities franco.ongaro@esa.int nathalie.ricard@esa.int claude.loisy@esa.int.

4

Page 5: 1 ESA Iris Programme workplan of activities franco.ongaro@esa.int nathalie.ricard@esa.int claude.loisy@esa.int.

5

Communication System Design activity

The activity includes:•Trade-off of existing and possible new standards•Analysis and consolidation of user requirements•Communication architecture design (incl. security requirements, handover procedures with terrestrial network)•Interfaces with SESAR terrestrial network (incl. interfaces at physical and networking layers)•Design of associated hardware and software, development, validation and qualification procedures. •Software simulator for validation•Preparation of ICAO standardisation and certification activities (Incl. support of ESA-Eurocontrol working group set-up to share information on the future standard with non-European ICAO Members)

Preparation of ICAO standard (technical basis and international support)

Page 6: 1 ESA Iris Programme workplan of activities franco.ongaro@esa.int nathalie.ricard@esa.int claude.loisy@esa.int.

6

Analysis and Definition of Satellite System

The activity includes:

•Analysis and consolidation of user requirements, including existing or projected commercial ones, and needs for possible ancillary services•All trade-offs on architecture, payload, platform, ground segment, deployment and operations schemes and provision of possible ancillary services•Assessment of the business case for the provision of services•Analysis of integration into SESAR’s overall infrastructure•Transfer of responsibilities between ESA and SESAR•Certification issues regarding the operators and operation of the satellite system •Definition of the operational responsibilities and liabilities.

Prepare all elements to define the satellite service provision

Page 7: 1 ESA Iris Programme workplan of activities franco.ongaro@esa.int nathalie.ricard@esa.int claude.loisy@esa.int.

7

ESA mandate: to support the adoption of satellite solutions where justified and for the benefit of the European Union policies;

Justified means a solid cost/benefits case, not technology for the sake of technology;

Although SESAR is the foundation of the programme, is very clear that we need to act regional but think global: we count on this group, and possibly a dedicated subgroup to help us identify the best new communication standard, open and standardised at European and ICAO;

In waiting for the SESAR JU to fully take its system architect role, we are counting on the support of an Expert group including Eurocontrol, ANSP's, EASA and aviation representatives to help us refine our system requirements

Our next milestones are the ATM Master Plan and our own Ministerial Conference at end 2008. Meanwhile the Invitation to Tender for the Ph A studies have been issued last week, with KO expected in December.