UREY HALL Q-810 RMS 6120 & 6124 UNIVERSITY OF CALIFORNIA, SAN DIEGO
Project No.: 4963/MS-031/962460
ADDENDUM NO. THREE TO THE
REQUEST FOR PROPOSAL (RFP) DOCUMENTS March 6, 2015
General:
The following changes, additions, or deletions shall be made to the following documents; all other conditions shall remain the same.
I.
Item#
11.
Item#
1.
SPECIFICATIONS
Delete Design Criteria revised 3/4/2015 and substitute Design Criteria revised 3/6/2015.
CLARIFICATIONS
1. QUESTION: There is no mention of duct removal in the RFP, only that new duct is required per item b. Mechanical/Plumbing i. New Ductwork and Grilles. Will UCSD be removing the existing duct work or is that a contractor scope?
ANSWER: Any modification to the existing duct work including the demolition or installation of Phoenix valves, electrical, control wiring, occupancy sensors, fume hood sash sensors, fire dampers, smoke detectors, thermostats and wall penetrations, is the responsibility of the contractor and is part of their scope of work. This includes existing zones and new zones in the classroom/meeting room and tissue culture room and reconfiguration of main lab ducting. UCSD will not be removing any of these systems.
2. QUESTION: Per items c. Electrical iii. and iv. on page 4 of 13 under Design Criteria providing emergency power is required. During the job walk there was discussion on this topic and we request clarification. Is emergency power required?
ANSWER: No e-Power required this project. Referenced noted here has now been removed with Addendum #2 to the Bid Documents.
3. QUESTION: In Design Criteria, page 2 of 13, at 6. Finishes d. CSWK "No new cabinets beyond sinks, Some enclosed wall cabinets." Is stated, but there is also the drawing on 1 O of 13 that shows casework well past the sinks and fume hood. What is the desired amount of counter top space with casework?
ANSWER: There are 15 ft. of continuous lower cabinets and counters to the left (west) side of the fume hood. With the exception of the sink base, all lower cabinets are drawer units with no knee spaces. There are 3 ft. of glass door upper cabinets directly to the left of the fume hood and 9 ft. of glass door upper cabinets to the left of the sink. Referenced section of design criteria document will be edited to reflect this clarification and issued as part of Addendum #3.
UCSD-FD&C Page 1 of 3
UREY HALL Q-810 RMS 6120 & 6124 UNIVERSITY OF CALIFORNIA, SAN DIEGO
Project No.: 4963/MS-031/962460
4. QUESTION: Is a specification available for the curtain?
ANSWER: Curtain spec will be part of Addendum #3 and shall read as follows:
"Curtain shall be similar to Black Dura-Pro fire rated vinyl lab curtains with weighted bottom hems, 5" sweep skirts with snaps and Velcro closures- on an HH5250 track system."
(See attached photos of curtain installation at similar lab on Campus.) The curtain and track system shown was provided by: Louis H. Hill http://louishhill.com.
5. QUESTION: Is the hazardous report available?
ANSWER: The test samples were collected on Tuesday morning (313) and report will be distributed as soon as it is made available.
6. QUESTION: Will the popcorn ceiling be removed during the hazardous abatement?
ANSWER: Only if the HazMat report indicates that it requires special treatment.
7. QUESTION: Please confirm that all items deemed to be hazardous in the space will be abated and disposed of by UCSD.
ANSWER: Confirmed.
8. QUESTION: Does the alternate for new storefront need to match the existing adjacent classrooms with infill panels?
ANSWER: The new panels should match in appearance with the rest of the floor's exterior. New panels should have glazing to the top with mullions aligned to neighboring existing spaces and flush opaque panels below. See line item 11 below regarding meeting current energy compliance at the new storefront.
9. QUESTION: Does the floor power outlet need to be cut and capped back to the panel?
ANSWER: Yes. There are at least 2 existing floor receptacle locations in this project; one in each existing space.
10. QUESTION: Please confirm LEED certification is required on this project.
ANSWER: All new construction projects must meet Leadership in Energy & Environmental Design Silver certification or better; however, no formal certificate is required for this project.
UCSD-FD&C Page 2 of 3
UREY HALL Q-810 RMS 6120 & 6124 UNIVERSITY OF CALIFORNIA, SAN DIEGO
Project No. : 4963/MS-031/962460
11 . QUESTION: Assuming exercising the Enhancement to replace the storefront: Will the panels require glazing that complies with new T24 codes or should we aim to replace with glazing similar to that already in place?
ANSWER: All new construction and renovations on campus require adherence to current codes including T24 (Spec Section 01410, Part 1.2.A.8) so new storefront should meet these requirements.
12. QUESTION: Design Criteria sketch on page 10 labels a room as 6126 A whereas the written descriptions note room 6124 A - please clarify if room 6126 A is actually 6124 A?
ANSWER: Plan reference to Rm #6126 should be changed to 6124 and reference to 6126A should be changed to 6124A respectively to match the write-up. - This correction will be noted in Addendum #3.
13. QUESTION: The written description of lighting on page 4 of Design Criteria is considerably different than the plan notes on page 10. Please provide a written description of lighting requirements for rooms 6120 and 6124 A (noted as 6126 A on page 10)?
ANSWER: Page 4 of Design Criteria will be updated to coordinate with plan in Addendum #3.
14. QUESTION: The existing wall has a textured finish. Please confirm what type of drywall finish is required.
ANSWER: Match texture of existing.
15. QUESTION: It appears the existing lab waste into the space is Pyrex glass pipe. Please confirm that the glass mechanical joint system will be utilized on this project.
ANSWER: All new work on the lab waste piping system should be in conformance with the University Master Spec 15221Section3.3.
16. QUESTION: The floor plan calls for wood base cabinets. The specification section provided in the sample spec section index calls for plastic laminate laboratory casework. Please confirm what type of cabinets are required.
ANSWER: Wood core with laminate veneer.
UCSD-FD&C Page 3 of 3
Attachment
---.->-' -- No Vallance needed on Q-Bio Project
UCSanDiego Facilities Design & Construction
University of California, San Diego
Contents
DESIGN CRITERIA
Urey Hall Q-Bio Rms 6120 & 6124 Project No. 4963
01 Project General Information .............................. .......... ... ...... ..... .... ............... .. ..... .. .. ... ...... ........ ... .. .. .. ....... ...... 1
02 Schedule ... ... .. .......... ...... ........ ...... .... ....... ... .... ... ... ....... ...... .. ..... .... ... .. ... ....... ....... .. .... ...... ... ... ....... ..... ... ....... ...... 1
03 Technical Program ....... ... ...... ....... ....... .. ............ .. ..... ............ ... .. .. .. ... .... ......... .... .... ..... .. .. ........... .. .... .. ...... .. ... ... 2
Base Program .... ... ..... ....... ..... .............................. ... ....... .............. .. ...................... ... .... ... ... ...... ... ... .............. ...... 2
Enhancements: ...... .. .... .... ....... .... ........... ... ..... ...... .... .... ........... .. ............. .. .. ..... .. ... .... ................... .. ......... .... ...... 5
Contractor Exclusions: .......... ..... ....... ................ ..... ....... .... ........................ .. ....... ..... .. ... ........... .... ... ................ .. 5
04 Construction Document Format ....... ...... .. .. ................. .. .................................................... ..... ... ...... ..... .......... 6
Sample List of Drawings .. ... ...... ... .... .. .................. .......... ... ............................................................ .. ............. ... .. 6
Sample Spec List (Divisions 2-16) to Be Edited by Design-Build Team from University Master Specs (where
available, otherwise supplied in accordance with Master Spec Editing Criteria.) ........................................... 7
05 Concept Plans ..... ....... .. ............ .. ............. .. ......................... .. ................... ......... .... ................... .. ....................... 9
01 Project General Information Project#: 4963 Project Name: Urey Hall Q-Bio Rms 6120 & 6124 Project SF: 2029sf
Provide a Graduate Lab and Meeting Space for recently approved Graduate Program in Q-Bio.
02 Schedule FALL '15: Classroom and Lab to be operational for new Graduate program. Fall Quarter Begins Monday,
Sept 21, 2015
1 of 13
Design Criteria Revised 3/6/2015 per Addendum 3
University of California, San Diego Urey Hall Q-Bio Rms 6120 & 6124 Project No. 4963
03 Technical Program Concept Plans provided for reference at the end of this document.
Base Program 1. Demolition
a. Remove existing wall between Rms 6120 and 6124
b. Remove 2 existing Doors at West Side of Lab.
i. Door to 6130B
ii. Door to 6130
c. Demo All Electrical (Fixtures, Devices, and Conduit) in both spaces.
d. No (E) Casework to be removed
e. (E) Ceiling and (E) Flooring should already be abated by University prior to start of
Construction. (See Contractor Exclusions)
2. New Construction
a. Architectural
i. New Q-Bio Lab-Rm6124 (1383sf)
1. Relocated Existing Wall to Expand Lab to 46' length (exist ing co lumn).
2. Close Openings at West Side of Lab where doors had been removed. ·
a. Door to 6130B (GypBd, Paint, and Base Wall Patch Finishes at
6130B side to Match Existing that space)
b. Door to 6130 (GypBd, Paint, and Base Wall Patch Finishes at
6130 side to Match Existing that space)
3. EQUIPMENT:
a. CFCI New 8ft Fume Hood with Combo Sash, Half Corrosive/ Half
Flammable Cabinet with House Water, Vacuum, Ai r, and
Nitrogen Lines. (See Plumbing).
i. Hood Facilities off Building Core (No tanks required)
b. OFOI (GC to provide Utilities) : 4 Degree Fridge
c. OFOI (GC t o provide Util it ies) : -20 Freezer
4. Provide New eye wash/shower (See Plumbing)
5. Provide (2) New 6' long Sink base cabinets (Wood Core) with Trespa
Countertops (1 ADA Compliant) (See Plumbing)
a. Drying Racks above Sink Counters
6. FINISHES
a. CLNG : Paint Ceiling at Lab
b. FLR: New VCT at Lab, Rubber Base
c. WALLS: GypBd. Paint
d. CSWK: There are 15 ft of continuous lower cabinets and
counters to the left (west) side of the fume hood. With the
exception of the sink base, all lower cabinets are drawer units
with no knee spaces. There are 3 ft of glass door upper
2of13
Design Criteria Revised 3/6/2015 per Addendum 3
University of California, San Diego Urey Hall Q-Bio Rms 6120 & 6124 Project No. 4963
cabinets directly to the left of the fume hood and 9 ft of glass
door upper cabinets to the left of the sink.
e. Window Coverings: Provide hand-operated roller shades at
windows.
7. FURN: User to Provide all New Air Tables, Lab Benches, Computer
Desks, and Chairs (not included in Contractor Scope)
8. Provide Unistrut Shelving at perimeter walls of Lab with supports at 24"
O.C. - Shelving will be OFOI but supports are by contractor.
9. Provide Overhead Suspended UniStrut Utility Rack over 6 workstations
and along west wall. (See Electrical). Ht= 7'-0"
a. Hanging/Retractable Curtains at Work Stations
(Blackout/Opaque). Hang from Suspended Unistrut.
i. Curtain shall be similar to Black Dura-Pro fire rated
vinyl lab curtains with weighted bottom hems, 5"
sweep skirts with snaps and Velcro closures- on an
HH5250 track system.
ii . New Classroom/Lounge -Rm6120 (393sf)
1. Finishes
a. CLNG: New Lay-in Grid {2'x2' tiles)
b. FLR: New Carpet Tile, Rubber Base
c. Walls: GypBd, Paint
d. FURN: OFOI Tables/Chairs for 12-15 ppl.
e. Window Coverings: Provide hand-operated roller shades at
windows.
2. Equipment:
a. Black Boards (South Wall) - Wall to Wall
b. White Boards (East Wall) - Wall to Wall
c. Pull-Down Screen with Projector (see electrical)
iii. BSL-2 (Tissue Culture)Lab - Rm6124A (262sf or 144sf if Enhancement#2 is
realized):
1. FINISHES
a. CLNG: Paint Ceiling at Lab
b. FLR: New VCT at Lab, Rubber Base
c. WALLS: GypBd. Paint
d. CSWK: No new.
e. Provide Unistrut (no Shelving) at East wall with supports at 24"
o.c. 2. Separate VAV/Controls
3. Phone
4 . Entry Door: With Glazing. No Special Access Control.
5. Provide drying rack at new sink (see Plumbing).
b. Mechanical/Plumbing
i. New Ductwork and Grilles
3 of 13
Design Criteria Revised 3/6/2015 per Addendum 3
University of California, San Diego
1. New FCU at Classroom/Lounge
Urey Hall Q-Bio Rms 6120 & 6124 Project No. 4963
2. Building Supply System to service new Lab
a. 2 Hepa Filters
i. (2) Workstation pods in lab
ii. (1) BSL-2
b. New Ducts/Grilles/Zoning
i. Stainless Steel Duct at Lab Hood . Flexible elsewhere.
3. Provide VAV (Phoenix) Valves (3 existing to be reused, others new).
a. (1-Reused Existing) at Hood at Lab
b. (1-Reused Existing) at Central Workstation Pod at Lab
c. (1-Reused Existing) at West Wall Workstations
d. (1 new) Classroom
e. (lnew) at BSL-2 .
4. Provide Flexible Hose connections at exhaust Locations over Work
Stations.
5. No need for special ized temperature/humidity control
a. (2) New Sinks at Lab and (1) New Sink at BSL-2 (ea . 6' long Sink wood base cabinet with
Trespa Countertop)
ii. Confirm (E) plumbing/drain locations/capacit ies.
1. Stainless Steel with Hot/Cold/DI Water.
2. (1) Millipore over-sink water purificat ion unit above ADA sink.
ii i. Provide House Water, Vacuum, Air, and Tanked Nitrogen to new 8ft Fume Hood .
Lines to run parallel to electrical and data raceways.
1. Provide tank rack for three (3) N2 tanks.
iv. Provide Plumbing for new Emergency eyewash/shower.
c. Electrical
i. 2 (1 New/1 Relocated) Panels- (Requires 36" clear at front, may be able to
utilize existing panel. Confirm capacity)
ii. All New Lighting divided into 11 circuits - See Concept Plan
1. 6 Circuits @ Lab
a. Suspended Fixtures
2. 4 Circuits @ Classroom/Lounge
a. (6) Spot Lights
b. (8) Recessed
3. 1 Circuit BSL-2
iii. THIS ITEM DELETED PER ADDENDUM NO. 2.
iv. THIS ITEM DELETED PER ADDENDUM NO. 2.
v. Provide new 3-channel Aluminum Raceway (Electrical and Data) along all 4 walls
of Main Lab (Including South windows) and BSL-2.
vi. Overhead Suspended UniStrut Utility Rack:
1. Provide 2x20Amp Circuits per work area (4 Gang Outlets)
2. 4 Data Lines Per Work Area
vii. Provide Power/Data to Classroom Overhead Projector.
4 of 13
Design Criteria Revised 3/6/2015 per Addendum 3
University of California, San Diego
d. Fire/Life Safety
Urey Hall Q-Bio Rms 6120 & 6124 Project No. 4963
i. Relocate Existing single-wide Storefront Door to provide separation of exits.
1. New door location to receive new door with vision panel. (see
Enhancement #1 for option).
ii. Relocate Sprinklers and FECs within space. Fire Marshal Review Required .
iii. Lever-style Hardware at all doors (E) and (N) in space.
Enhancements: 1. Enhancement #1: Replace existing Storefront with new along new lab and classroom exterior
walls.
2. Enhancement #2: Anteroom -Rm6124B (118sf)
a. Provide Unistrut (no Shelving) at North and South wall with supports at 24" O.C.
b. Provide new 3-channel Aluminum Raceway (Electrical and Data) along North and South
wall.
c. 1 Additional VAV/Controls
i. 1 new Hepa Filter
ii. 1 New Phoenix Valve
d. + 1 Lighting Circuit/Zone/Controls
e. Entry Door: With Glazing. No special Access Control (No Card Reader).
f. FINISHES
i. CLNG: Paint Ceiling at Lab
ii. FLR: New VCT at Lab, Rubber Base
iii. WALLS: GypBd. Paint
iv. CSWK: with Tespa top at North and South Walls
3. Enhancement #3: BSL-2 Lab Room Extras-Rm6124B
a. Casework with Trespa Tops
Contractor Exclusions: 1. Data Installation to be by University Reps. CLARIFICATION: Data boxes to be provided by GC at
locations shown on plans; wires to be installed by University Rep.
2. HazMat Disposal by University Rep
a. Asbestos VCT and Mastic Removal
b. Acoustical Ceiling Treatment
c. Storage Closet at SW Corner of Lab
3. ADA Compliance outside the immediate project area
5 of 13
Design Criteria Revised 3/6/2015 per Addendum 3
University of California, San Diego
04 Construction Document Format
Discipline Prefix Group Numbers Sequence Numbers
G=General O=General xx C=Civil l=Plans
L=Landscape 2=Elevations
A=Architectural 3=Sections
S=Structural 4=Large Scale Views
M=Mechanical S=Details/Sections
P=Plumbing 6=Schedules
E=Electrical 7=Diagrams
F=Fire/CodeStudy 8=User Defined
9=3D Representations
Sample List of Drawings G-OXX G-OXX G-OXX A-lXX A-lXX.6 A-2XX A-2XX A-4XX.6 A-4XX.6 A-4XX.6 A-SXX A-SXX A-SXX A-6XX A-6XX M-OXX M-4XX.6 M-4XX.6
M-SXX M-8XX P-OXX P-4XX.6
P-SXX E-OXX E-4XX.6
E-4XX.6 E-4XX.6 E-6XX E-7XX E-8XX F-OXX F-lXX.6
Cover Sheet/Title Sheet Site Plan General Notes Reference Site Plan Overall Floor Plan Interior Lab Elevations Exterior Lab Elevations Enlarged Floor Plan Enlarged Plan - RCP
Lab Furnishings/Equipment Plan Interior Details/Sections (Framing, Ceiling) Interior Details/Sections (Doors, Windows) Interior Details/Sections (Casework) Door/Window/Finish Schedules Lab Furnishings/Equipment Schedule Mechanical Notes and Legend Enlarged Plan Mechanical Demolition Enlarged Plan Mechanical New Work
Mechanical Details Mechanical Controls and Sequence of Operations Plumbing Notes and Legend Enlarged Plan Plumbing (Demolition and New)
Plumbing Details Electrical Symbols Abbreviations Enlarged Plan - Lighting Enlarged Plan - Power (Demo) Enlarged Plan - Power (New)
Panel Schedule Single Line Diagram T24 Forms Fire Protection and Alarm Drawings Exit Plan
6 of 13
Urey Hall Q-Bio Rms 6120 & 6124 Project No. 4963
Suffix (Where Applicable)
O=Basement
l=lst Floor
2-2nd Floor
3=3rd Floor
4=4th Floor
S=Sth Floor
6=6th Floor
7= 7th Floor
R=Roof
Design Criteria Revised 3/6/2015 per Addendum 3
University of California, San Diego Urey Hall Q-Bio Rms 6120 & 6124 Project No. 4963
Sample Spec List (Divisions 2-16) to Be Edited by Design-Build Team from University Master Specs (where available, otherwise supplied in accordance with Master Spec Editing Criteria.)
02222
NOT USED
NOT USED
5120
5500
06402
7210
07840
07920
08111
08114
08121
08211
18300
08712
08800
19116
09260
19600
19511
09651
19680
19720
09912
10101
10431
10440
11521
11610
12210
12241
12363
13850M
13930M
NOT USED
DIVISION 2 - SITE CONSTRUCTION
DSELECTIVE DEMOLITION
STEEL FRAMING
METAL FABRICATIONS
DIVISION 3 - CONCRETE
DIVISION 4 - MASONRY
DIVISION 5 - METALS
DIVISION 6 - WOOD AND PLASTICS
INTERIOR ARCHITECTURAL WOODWORK
DIVISION 7 - TH ERMAL AND MOISTURE PROTECTION
THERMAL INSULATION
FIRESTOPPING
JOINT SEALANTS
DIVISION 8 - DOORS AND WINDOWS
STANDARD STEEL DOORS AND FRAMES
CUSTOM STEEL DOORS AND FRAMES
INTERIOR ALUMINUM FRAMES
FLUSH WOOD DOORS
ACCESS DOORS
DOOR HARDWARE
GLAZING
DIVISION 9 - FINISHES
NON-STRUCTURAL METAL FRAMING
GYPSUM BOARD ASSEMBLIES
FLOORING
ACCOUSTICAL PANEL CEILINGS
RESILIENT FLOOR TILE
CARPETING
WALL COVERINGS
PAINTING
DIVISION 10 - SPECIALTIES
VISUAL DISPLAY SURFACES
SIGNS
FIRE PROTECTION SPECIALTIES
DIVISION 11- EQUIPMENT
PROJECTION SCREENS
LABORATORY FUME HOODS
DIVISION 12 - FURNISHINGS
WINDOW BLINDS
ROLLER WINDOW SHADES
PLASTIC-LAMINATE LABORATORY CASEWORK
DIVISION 13 - SPECIAL CONSTRUCTION
FIRE DETECTION AND ALARM SYSTEM MODIFICATIONS
FIRE PROTECTION SYSTEMS
DIVISION 14 - CONVEYING SYSTEMS
7 of 13
Design Criteria Revised 3/6/2015 per Addendum 3
University of California, San Diego Urey Hall Q-Bio Rms 6120 & 6124 Project No. 4963
15050
15060
15075
15080
15110
15140
15141
15211
15212
15221
15222
15400
15410
15412
15815
15820
15837
12540
15855
15860
15861
16010
16050
16051
16055
16060
16072
16075
16120
16130
16132
16140
16145
16444
16499
16511
16745
17200
DIVISION 15 - MECHANICAL
BASIC MECHANICAL MATERIALS AND METHODS
HANGERS AND SUPPORTS
MECHANICAL IDENTIFICATION
MECHANICAL INSULATION
VALVES
DOMESTIC WATER PIPING
DISINFECTION OF POTABLE WATER SYSTEMS
GENERAL SERVICE - COMPRESSED AIR PIPING
LABORATORY AIR AND VACUUM PIPING
CHEMICAL WASTE PIPING
PROCESSED-WATER PIPING
BASIC PLUMBING REQUIREMENTS
PLUMBING FIXTURES
EMERGENCY PLUMBING FIXTURES
METAL DUCTS
DUCT ACCESSORIES
CENTRIFUGAL FAMS
AIR TERMINAL UNITS
DIFFUSERS, REGISTERS, AND GRILLES
LABORATORY AIRFLOW
AIR FILTERS
DIVISION 16 - ELECTRICAL
ELECTRICAL GENERAL PROVISIONS
BASIC ELECTRICAL MATERIALS AND METHODS
ELECTRICAL DEMOLITION
SHORT CIRCUIT AND OVERCURRENT PROTECTIVE DEVICE COORDINATION
GROUNDING AND BONDING
ELECTRICAL SUPPORTS AND SEISMIC RESTRAINTS
ELECTRICAL IDENTIFICATION
CONDUCTORS AND CABLES
RACEWAYS AND BOXES
SURFACE RACEWAY
WIRING DEVICES
LIGHTING CONTROL DEVICES
PANELBOARDS
ACCEPTANCE TESTING OF ELECTRICAL DISTRIBUTION EQUIPMENT
INTERIOR LIGHTING
TELECOMMUNICATION PATHWAYS AND SPACES
DIVISION 17 - ENERGY MANAGEMENT
TESTING, ADJUSTING, AND BALANCING
8of13
Design Criteria Revised 3/6/2015 per Addendum 3
University of California, San Diego
05 Concept Plans
Urey Hall Q-Bio Rms 6120 & 6124 Project No. 4963
The following pages provide conceptual level plans to indicate intended scope of this project.
To Page 10
Addendum #3: • "Main Lab" room number to read 6124 • "Small Lab" Room# to read 6124A.
UPDATES:
9 of 13
Design Criteria Revised 3/6/2015 per Addendum 3
0 0 -w
:::0 CD < Ui" CD Q_
w ~ N 0 --" CJ1 -0
~o )> CD Q_ ~c._CO CD :::i :::i () Q_..., c - · 3 Cii wiii·
D fi9
D -~ L
... --- -~ I ·- --.. -~
2C1JV 30amp
Outlet
1 sq.ft
Unusable Space
Counters
4-Port Data Hub
Hanging Retractable Curtains
QBio Lab Space Layout Version 8 (drawing D: electrical & gas placement)
Mi ll i-Q Ultra-Pure
- Repair storefront and Replace missing wall com ponents. -Prep and paint interior and exterior of entire storefront per material requirements - Add ADA signage to doors
Demo door and fill to match exist ing Storefront
208V
t -
110V Electrical (2 ft O.C.) dual channel Alum Raceway
House Air &Vac, & N2 6' 0.C (N2 requires connection point to in-lab so urceto left side of main double doors) 208 V Electrica I
0 DataDrop& 5.0. Cord 11 OV Quad Elec Drop (1 circuit ea.) x 6
rev.022415
208V JO amp
Outlet
-i :::r iii' 'C iii' :I :::r DI Ill
c 'C Q. DI it Ill
(/) CD CD
iJ DI IC CD <D
c :::i ;::· CD ..., en ;::::;: '< 0 -() Ill
~ ..., :::i Qi "
(/) Ill :::i
0 (D" co 0
c ro '< I Ill
0 I
OJ c;·
-u :::0 ..., 3 o en w· m () --" ....,.N zo 9 Ro
""" ()) CD --" O> N
w """
_,.
0 -_,. w
:::0 CD < u;· CD a. w en N 0
U1
"O
~o )>CD a.!!!. a.CO CD :::I :::I () a....., c - · 3 ro wiii·
D 1 sq . tt
- Unusable Space
: • • • • ·: Hanging Retractable Curtains ·------
QBio Lab Space Layout Version 8 (drawing C: lighting)
All existing light fixtures to be replaced with new
rev.022415 c :::I <" CD Ul ~ 0 -() Q)
~ ...., :::I _w· (/) Q) :::I
0 Cii"
co 0
c Ci> '< I !!!. 0
I
OJ er
-a :::0 ...., 3 o en qj" CJ) 0 _,. ...... N z o (J s;>c> .j:>.(J) CD _,. O>N W .J:>.
.....>.
N 0 -w
:;o CD < u;· CD Q_
w 05 ..._ N 0 .....>. (Jl
-c ~o )> CD Q_ !:!!. a_CC CD :::J :::J () Q_..., c - · 3 ro wii:i·
I ,_ +
+- __._ +-
I
• -t
D 1 sq. ft
- Unusable Space
C::::J Mounted Fixtures
~ .,
:· • - - ·: Hanging Retractable Curtains .. -.. -.
QBio Lab Space Layout Version 8 (drawing E: unistrut)
upper framework
11 I
• • t
t..
,.
• 1 • I 1 .. _ f-T ..-+. I -+-I
~=r • ; '
Support points
---+-+
Upper Uni strut framework to made of 1 5/8" back to back
'
CLASSROOM I LOUNb EI (21' x 18' )
,.
strut and supported by hangers from center beans and end walls
rev.022415 c :::J :;::· CD Ul ~ 0 -() ~
~ ..., :::J i:ii" (J) ru :::J
0 (ti" cc 0
c ro '< I ~
0 I
CD 5·
"U :;o ..., 3 0 (J) ro· m () .....>. -N zo 9 I(<> .i::.. 0) (0 .....>. O)N w.i::..
University of California, San Diego Urey Hall Q-Bio Rms 6120 & 6124 Project No. 4963
ENHANCEMENTS:
The plan below is to illustrate the general idea of the Enhancements on th is Project:
1. Enhancement #2 : Anteroom -Rm6124B (118sf)
a. Provide Unistrut (no Shelving) at North and South wall with supports at 24" O.C.
b. Provide new 3-channel Aluminum Raceway (Elect rical and Data) along North and South
wall.
c. 1 Additional VAV/Controls
i. 1 new Hepa Filter
ii. 1 New Phoenix Valve
d. + 1 Lighting Circuit/Zone/Controls
e. Entry Door: With Glazing. No special Access Control (No Card Reader)
f . FINISHES
i. CLNG: Paint Ceiling at Lab
ii. FLR: New VCT at Lab, Rubber Base
iii. WALLS: GypBd. Paint
iv. CSWK: with Tespa top at North and South Walls
2. Enhancement #3: BSL-2 Lab Room Extras-Rm6124B
a. Casework with Trespa Tops
Counler Space plus shelving
- v--/
f
I -
Counter Space
- 5 shelving
I I I I I I I
- Future BioSafety n - (NIC)
Comrter Space plm shelving
---I I I I I I I I I I I I
End of Section
13 of 13
Design Criteria Revised 3/6/2015 per Addendum 3