+ All Categories
Home > Documents > UNIVERSITY OF CALIFORNIA, SAN DIEGOrmp-public.ucsd.edu/fdc/Job Bids/UREY HALL AIR HANDLER...SANTA...

UNIVERSITY OF CALIFORNIA, SAN DIEGOrmp-public.ucsd.edu/fdc/Job Bids/UREY HALL AIR HANDLER...SANTA...

Date post: 13-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
7
UNIVERSITY OF CALIFORNIA, SAN DIEGO sE!tKELEY • DAVIS• IRVINS LOS ANGELES • MERCED• RIVERSIDE• SAN DIEGO• SAN F'.RANC!SCO OFFICE OF THE ASSOCIATE VICE CHANCELLOR CAPITAL PROGRAM MANAGEMENT TEL; (858) 534-2177 FAX: (858) S34-4363 WWW.PLANDESIGNBUILD.UCSD. EDU December 11, 2018 TO: ALL HOLDERS OF BIDDING DOCUMENTS SANTA BARBARA •SANTACRUZ 9500 GILMAN DRIVE #0916 LA JOLLA, CALIFORNIA 92093-0916 UREY HALL AIR HANDLER REPLACEMENT AND VAV SYSTEM UPGRADES PROJECT NO. 1000419186/P4L-173 UNIVERSITY OF CALIFORNIA, SAN DIEGO Enclosed are the following: 1. Addendum No. 1 dated December 11, 2018, to the Construction Documents. 2. Revised Drawing Sheets M101, M102, and MD101 dated 12/10/2018. 3. Clarifications dated 12/11/2018. Sincerely, Rhonda C. Mitchell Contracts Manager Capital Program Management Enclosures
Transcript
Page 1: UNIVERSITY OF CALIFORNIA, SAN DIEGOrmp-public.ucsd.edu/fdc/Job Bids/UREY HALL AIR HANDLER...SANTA BARBARA •SANTACRUZ 9500 GILMAN DRIVE #0916 LA JOLLA, CALIFORNIA 92093-0916 UREY

UNIVERSITY OF CALIFORNIA, SAN DIEGO

sE!tKELEY • DAVIS• IRVINS • LOS ANGELES • MERCED• RIVERSIDE• SAN DIEGO• SAN F'.RANC!SCO

OFFICE OF THE ASSOCIATE VICE CHANCELLOR CAPITAL PROGRAM MANAGEMENT TEL; (858) 534-2177 FAX: (858) S34-4363 WWW.PLANDESIGNBUILD.UCSD.EDU

December 11, 2018

TO: ALL HOLDERS OF BIDDING DOCUMENTS

SANTA BARBARA •SANTACRUZ

9500 GILMAN DRIVE #0916 LA JOLLA, CALIFORNIA 92093-0916

UREY HALL AIR HANDLER REPLACEMENT AND VAV SYSTEM UPGRADES PROJECT NO. 1000419186/P4L-173 UNIVERSITY OF CALIFORNIA, SAN DIEGO

Enclosed are the following:

1. Addendum No. 1 dated December 11, 2018, to the Construction Documents.

2. Revised Drawing Sheets M101, M102, and MD101 dated 12/10/2018.

3. Clarifications dated 12/11/2018.

Sincerely,

Rhonda C. Mitchell Contracts Manager Capital Program Management

Enclosures

Page 2: UNIVERSITY OF CALIFORNIA, SAN DIEGOrmp-public.ucsd.edu/fdc/Job Bids/UREY HALL AIR HANDLER...SANTA BARBARA •SANTACRUZ 9500 GILMAN DRIVE #0916 LA JOLLA, CALIFORNIA 92093-0916 UREY

UREY HALL AIR HANDLER REPLACEMENT AND VAV SYSTEM UPGRADES PROJECT NO. 1000419186/P4L-173 UNIVERSITY OF CALIFORNIA, SAN DIEGO

UCSD – CPM Page 1 of 1

ADDENDUM NO. ONE TO THE CONSTRUCTION DOCUMENTS December 11, 2018 General:

The following changes, additions or deletions shall be made to the following documents; all other conditions shall remain the same. I. DRAWINGS ITEM#

1. SHEETS M101, M102, AND MD101

Delete Sheets M101, M102, and MD101 in its entirety and substitute with the enclosed Sheets M101, M102, and MD101 dated 12/10/2018.

II. CLARIFICATIONS ITEM #

1. Consolidated Contractor questions and University responses.

Page 3: UNIVERSITY OF CALIFORNIA, SAN DIEGOrmp-public.ucsd.edu/fdc/Job Bids/UREY HALL AIR HANDLER...SANTA BARBARA •SANTACRUZ 9500 GILMAN DRIVE #0916 LA JOLLA, CALIFORNIA 92093-0916 UREY

KEYNOTES

GENERAL NOTES

(E)CONDUIT BANK

1. FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OFCONSTRUCTION.

2. SEE CONSTRUCTION PHASING PLANS ON SHEET G002.

1

(E)4" HWS&R DN

(E)8" CHWR(E)8" CHWS(E)4" HHWR(E)4" HHWS

2

(E)4" CHWS/R

14

3 (E)8" CHWS/R17'-5" TO U/S OF PIPE

4

(E)6" CHWS/R UP5

(E)3" HHWS/R UP6

7

(E)1-1/2" CHWS/R(E)1-1/2" HHWS/R

8

(E)8" CHWS/R DN9

(E)4"HHWS/R DN11

(E)4" CHWS/R DN10

(E)SF W/REHEAT COIL12

FSD-1. FOR INSTALLATION, REFER TO & .13 3M600

30x12" DN. CAP VERTICAL SECTION OF DUCT INCORRIDOR FOR FUTURE TENANT FITOUT.

3/4"HHWS/R

PHOENIX VALVES SHALL RAMP DOWN TO MINIMUM WHENROLL-UP DOOR SENSORS HAVE BEEN ACTIVATED. FOR

CONTROLS DETAILS, REFER TO .

15

16

1-1/2"HHWS/R DN17

18 STATIC PRESSURE SENSOR FOR AH-1 SUPPLY FAN.

5M700

60X18" DUCT CONVERSION. DUCT WIDTH CHANGE FROM60" TO 50" AND DUCT DEPTH CHANGE FROM 18" TO 36"UPSTREAM OF THE CONVERGING DUCT FITTING.

19

(E)32x18". CLEAN AND SEAL ALL UPSTREAM ANDDOWNSTREAM EXISTING SUPPLY AIR DUCT.

20

24

REFER TO PHASING SEQUENCE. TEMPORARILYCONNECT NEW SUPPLY DUCT TO EXISTING S-1COLD DUCT FOR PHASE 2 & 3.

21A 50024x12"

22VEV

B0102

23VEV

B0222

VAVB0504

25 DUCT STATIC PRESSURE SENSOR

26

26x26" SA DN (TYP 2). OFFSET AS SHOWN ON .27

(E)4" ICHWS/R28

3M303

DUCT DOWN. REFER TO FOR

CONTINUATION OF DUCT.

291

M102

4M601

1" CONDENSATE AND MOISTURE ELIMINATOR DRAINSIZE.

30

FD

24x14"

FOR CONTINUATION, REFER TO .1M103A

(E)6

0x24

(E)4

2x16

(E)42

x16

(E)30

x12

(E)30x12 DN

(E)12x12 DN

(E)3/4 HHWS/R

(E)12x20 SA DN(E)20x14 SA DN

(E)14x14 SA DN

(E)24x12

FOR CONTINUATION, REFER TO .2M200

(E)PIPING TO MACHINE SHOPMEZZANINE AH UNIT

7

(E)4" HHWS/R

(E)1-1/2" CHWS/R(E)1-1/2" HHWS/R

(E)1-1/4" DW (E)1-1/2" AIR

(E)1-1/2" IHWR(E)1-1/4" GAS

(E)2" ICW(E)2" IHW

2

3

4

5

6

8

10

1M103B

FOR CONTINUATION, REFER

TO .

(E)12x12"UP & DN

D

11

30x3

0"

(E)FD

(E)8"CHWS/R STACKED(E)8"CHWS/R DN

(E)35x22" 20

36x36"

32x18"

35x22"

(E)12x12

(E)24x12"

9

(E)2

4x16

(E)4

2x16

15

(E)36x36" UPINTO MECH

CORE

30x16"30x16" DN

14 1413

13

A 50024x12"

A 50024x12"

12"Ø

12"Ø

(E)2

6x10

1"HHWS/R DN

(E)2-1/2"HHWS DN(E)2-1/2"HHWR DN(E)8"CHWR DN(E)8"CHWS DN

(E)FD

(E)FD(E)FD

18x14"

12"Ø

14x1

4"

18x14"1-1/4"HHWS/RFOR CONTINUATION, REFER TO .1

M103A

12

16x2

4"

30x10" DN

16

17

1-1/4"HHWS/R

1-1/2"HHWS/R

1

VAVB0001-1

21

23

VEVB0220-1

24

EAVB0220-2

SP

25

RL/RS UP & DN

20

26

30x30"

(E)24x12

(E)24x12" DN

(E)24x18

(E)14x16

(E)24x12

(E)10x10

(E)30x18

(E)24x18

(E)60x18

(E)18"Ø DN

13

36x26" SA

58x3

0"

3M303

27

3M301

2" CHWS/R

AH1

28

1M103B

60x60" OA

FOR CONTINUATION, REFER TO .40x26" OA(9,500 CFM)

(E)20X18" OA(2,000 CFM)

(E)30x12"FOR CONTINUATION, REFER TO .

1M103A

EF9

VFDEF-9

48x14" PLENUM60x16" DN

30x12" DN

3M302

36x36"

30x12" DN

(E)FLOOR SINK

1" CD

1" CD DN TO (E)FLOOR SINK

24x1

2"

(E)VVR-B0221B

(E)VVR-B0222

(E)18"Ø DN

SP

25

SP25

2%

2924x10" DN29 29 29

(E)CVE-0205

(E)CVE-0205B

VFDEF-9

22

30

19

60x18"

60x18" 50x4

4"

50x44"

(E)AIR HANDING UNITMAU-1

5M300

4M300

LOCATION OF NEW CONTROLS NAE

VAV-0504

LOCATION OF DAIKIN GATEWAY CONTROLLER1

(E)72x14 COLD DUCT AND(E)46x14 HOT DUCT BELOW

FOR CONTINUATION, REFER TO .1M200

(E)4" HHWS&R

(E)1-1/2" CHWS&R(E)1-1/2" HHWS&R

(E)1-1/2" CHWS&R(E)1-1/2" HHWS&R

(E)PIPING TO MACHINE SHOPMEZZANINE AH UNIT

4

(E)5

0x44

"

2

5

7

6

3

(D)50x44 HOT DUCT

(D)2" HHWS&R

(E)60x18"

(E)60x18"

(E)AIR HANDING UNITMAU-1

30x3

0"

(E)FD(E)35x22"

36x36"

(E)32x18"

(E)30x16"

8

58x3

0"

50x44"

(E)60x18

1

9

KEYNOTES

GENERAL NOTES

(E)CONDUIT BANK

1. FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OFCONSTRUCTION.

2. SEE CONSTRUCTION PHASING PLANS ON SHEET G002.

3. REFER TO FOR COMPLETE DEMOLITION SCOPE.

4. REFER TO FOR COMPLETE RENOVATION SCOPE.

1

(E)4" HWS&R DN

(E)8" CHWR(E)8" CHWS(E)4" HHWR(E)4" HHWS

2

(E)4" CHWS/R

3 (E)8" CHWS/R17'-5" TO U/S OF PIPE

4

(E)6" CHWS/R UP5

(E)3" HHWS/R UP6

7

FSD-1. FOR INSTALLATION, REFER TO & .3M600

5M7008

DEMOLISH TEMPORARY 70x42 COLD DUCT, 46x42 HOT DUCT,REHEAT COIL, PIPING, AND BALANCING DAMPERS. TIE IN NEW50x44" DUCT TO (E)50x44" DUCT, FSD, AND CONTINUE DUCTREPLACEMENT INTO EAST CORRIDOR. REFER TO PHASINGPLAN ON G002 FOR MORE INFORMATION.

9

1MD101

1M101

M101

PARTIAL MEZZANINE

LEVEL - RENOVATION

BMLLAD ANA

LR

Integrated Services - MEP Engineering | Technical Services | Building Sciences |

Building Commissioning | Clean Energy Solutions | Energy Services |

SAN DIEGO - SAN FRANCISCO

(619) 713-5700

Fax (619) 713-5701

4757 Palm Avenue

La Mesa, California 91942-9252

RH

File path: Z

:\S

D14152.00\C

AD

\A

utocad\M

\ M

101.dw

g 12/10/18 15:55 R

L rham

rick

SHEET NO.:

SHEET TITLE:

DESIGN BY:

DRAWN BY:

CAD DWG FILE:

PROJECT NO:

SD14152.00

CHECKED BY:

RH

SCALE:

DATE:

10/05/2018

REVISIONS:

N0. Description Date

10/26/2018BID SET

FACILITY:

PROJECT:

UREY HALL

BASEMENT AIR

HANDLER AND VAV

UPGRADES

PROJ: 1000419186 / RL-15-3

KEY PLAN

1

AS NOTED

M101.dwg

UREY HALL

UCSD UREY HALL

9500 Gilman Drive, La Jolla, CA 92093

University of California, San Diego

STATE FIRE MARSHALL STAMP:

ONLY VALIDWHEN INITIALED

FIRE AND PANIC ONLY

CONSTRUCTION SERVICESSTATE FIRE MARSHAL

APPROVED

CF

12/10/2018BID ADDENDUM #12

NO: 36676

REEN

GINE

LANOISSEFORPDEREST

G IE R

ANROFILAFOE

ATS

CT

I

A NHCEM

I C

LA

CA

L

I

N

A

F

E

R

R

A

R

O

PARTIAL MEZZANINE LEVEL - RENOVATION

SCALE: 1/8"=1'-0"

1

NORTH

FD FD FDFD

FE

PARTIAL MEZZANINE LEVEL - RENOVATION - TEMP S-1 SERVICE

SCALE: 1/8"=1'-0"

2

NORTH

Page 4: UNIVERSITY OF CALIFORNIA, SAN DIEGOrmp-public.ucsd.edu/fdc/Job Bids/UREY HALL AIR HANDLER...SANTA BARBARA •SANTACRUZ 9500 GILMAN DRIVE #0916 LA JOLLA, CALIFORNIA 92093-0916 UREY

F.E.C

FD FD FDFD

FE

(E)24x16

(E)3 CHWS&R

(E)36x18 UP

(E)4" HHWS&R

(E)30x10 SA

(E)3

0x10

SA

T

T

(E)6x10 EA

(E)28x10 EA DN(E)24x10 EA DN

(E)24x12 EA UP

(E)28x10 EA

(E)12x12 EA UP

(E)30x12 UP

(E)30x12

(E)60x16 EA PLENUM

(E)EG1,550 CFM

(E)2

0x10

SA

(E)12x8 SA

(E)12x16 SA (E)10Ø SA(E)10x16 SA

(E)10Ø SA (E)10Ø SA (E)10Ø SA (E)10Ø SA

(E)20x14 UP

(E)12x20 SA

(E)12x12 EAFIRE WRAPPED DUCT

(E)12x12" UP

1"HHWS&R UP

1

24x1

0"

B 1,20034x12

C 31010"

(TYP 4)

B 31012x8"

C 31010"

(TYP 6)

18x16"

18x12"12x12"

D 37510"

(TYP 4)

10"Ø(TYP 6)

10"Ø(TYP 4)

18x14"

12x1

2"

18x16"

18x16" D 32010"

(TYP 3)

D 2908"

10"Ø

(TYP 2)

10"Ø

D 3108"

18x1

6"

12"Ø10"Ø

12"Ø

10"Ø(TYP 6)

B 31012x8"

4

(TYP 3)

6 75

1-1/2"HHWS&R UP

30x1

0"

8

VAVB0207A

13

30x20" & 26x26" UP TO AH-1.

OFFSET AS SHOWN ON .

14

1Ø EATO PUMP

T

(E)CHEMICAL STORAGE CABINET(E)1-1/2"Ø EA DN TO CABINET

(E)4' FUME HOODDN TO PUMP

DN TO PUMP

(E)1-1/2Ø EADN TO PUMP

(E)6Ø EA

(E)8Ø EA

(E)8Ø EA

(E)2Ø

(E)12x12 EA

(E) 12x12 EA

(E)12"Ø

(E)FUME HOOD

(E)FUME HOOD

(E)14x40" UP

DN TO PUMP

USER EQUIPMENT

USER EQUIPMENT

USER EQUIPMENT

17

FC3-1

FC2-1

FC2-2

FC1-2

FC1-1

FC1-3

FC1-4

FC1-5

FC1-7

19 20

16

1" CD DN TO TAILPIECE OF LAV

1" CD

16

16

21

11

1912

9

4M300

16"Inle

t 24"Wi

dth

(E)18"Ø

(E)18"Ø UP(E)18"Ø UP

(E)VVR-B0220.2

(E)VVR-B0220.1

3M303

3M303

26x26"

30x16"

EAVB0242

20x10"(2)34x12" EA OPEN TO ABOVECEILING - REUSE (E)OPENINGS.COVER WITH 1/2" WMS.

3M302

3M301

R40x14" 40x10"

34x14" PLENUM60x16" UP

(E)8"Ø

(E)30x12 UP

(E)3

0x10

"

(E)3

4x10

"(E

)24x

10"

(E)2

4x10

"

C 33510"Ø

19

VAV-B0242

FC1-6

(E)LAB GAS CABINET.PROVIDE BACKDRAFT DAMPERIN DUCT EXHAUSTING HOOD

(E)LAB GAS CABINET.PROVIDE BACKDRAFT DAMPERIN DUCT EXHAUSTING HOOD

(E)LAB GAS CABINET.PROVIDE BACKDRAFT DAMPERIN DUCT EXHAUSTING HOOD

10

20

20

20

DUCT OPEN TO SPACE.COVER WITH 1/2" WMS.

SP

21

TVAV-0207A

TVAV-0207

TVAV-B0240 T

VAV-B0246-1&2

T(E)VVR-B0220.1

T(E)VVR-B0220.2

(E)VVR-B0222

(E)SF

T

(E)VVR-B0102

(E)FD

(E)EXHAUST GRILLEBALANCE TO 1,100 CFM

30x16 UP

22

22

(E)18x14 VEVB0505

1

1

KEYNOTES

GENERAL NOTES

30X12" UP. CAP VERTICAL SECTION OF DUCT IN CORRIDORFOR FUTURE TENANT FITOUT.

1

(E)DOOR. REMOVE DOOR TO ALLOW PERMANENTOPENING FOR TRANSFER AIR.

2

3/4"HHWS&R3

1"HHWS&R4

30x10" UP6

30x12" UP7

24x10" UP5

8VAV

B0207

9VAV

B0240

10

11VAV

B0246-1

12VAV

B0246-2

13VAV

B0242

14EAV

B0207

15 REFRIGERANT PIPING UP TO CONDENSING UNITADJACENT TO FIRST FLOOR OFFICE ANNEX

16 1" CD. ROUTE CD AS HIGH AS PRACTICAL TO BE OFFSETFROM WALL ABOVE WALKWAY TO AVOID RUNNING ABOVEELECTRICAL PANELS OR WALL MOUNTED LAB EQUIPMENT.

PROVIDE FILTERS OVER THE FACE OF ALL SUPPLY &RETURN GRILLES AND DIFFUSERES WITHIN THIS LABDURING PHASE II OF CONSTRUCTION.

17

ALL ACCESS AND WORK WITHIN THIS LAB MUST BECOORDINATED WITH THE LAB MIN 1 WEEK IN ADVANCE.

18

ABANDON (E)RHC & PIPING. DRAIN PIPING AND CAPOUTSIDE OF LAB.

19

10"Ø DUCT OPEN TO ABOVE CEILING. CONNECT NEW 10"ØDUCT TO (E)6"Ø DUCT. PROVIDE BACKDRAFT DAMPER INDUCT. COVER DUCT OPENING WITH 1/2"WMS. BALANCEDUCT TO 300 CFM.

30x16" DISCHARGE AIR DUCT C/W REHEAT COIL.

1. FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OFCONSTRUCTION.

2. SEE CONSTRUCTION PHASING PLANS ON SHEET G002.

NO WORK SHALL OCCUR ABOVE USER EQUIPMENT.PROTECT EQUIPMENT FROM DUST OR DAMAGE DURINGCONSTRUCTION.

20

21 DUCT STATIC PRESSURE SENSOR

22 12X8" DNTURN DUCT AT MEZZANINE SLAB EDGE AND KEEP TIGHTTO UNDERSIDE OF SLAB ABOVE.

M102

PARTIAL BASEMENT

LEVEL - RENOVATION

BMLLAD ANA

LR

Integrated Services - MEP Engineering | Technical Services | Building Sciences |

Building Commissioning | Clean Energy Solutions | Energy Services |

SAN DIEGO - SAN FRANCISCO

(619) 713-5700

Fax (619) 713-5701

4757 Palm Avenue

La Mesa, California 91942-9252

RH

File path: Z

:\S

D14152.00\C

AD

\A

utocad\M

\ M

102.dw

g 12/10/18 15:55 R

L rham

rick

SHEET NO.:

SHEET TITLE:

DESIGN BY:

DRAWN BY:

CAD DWG FILE:

PROJECT NO:

SD14152.00

CHECKED BY:

RH

SCALE:

DATE:

10/05/2018

REVISIONS:

N0. Description Date

10/26/2018BID SET

FACILITY:

PROJECT:

UREY HALL

BASEMENT AIR

HANDLER AND VAV

UPGRADES

PROJ: 1000419186 / RL-15-3

KEY PLAN

1

AS NOTED

M102.dwg

UREY HALL

UCSD UREY HALL

9500 Gilman Drive, La Jolla, CA 92093

University of California, San Diego

STATE FIRE MARSHALL STAMP:

ONLY VALIDWHEN INITIALED

FIRE AND PANIC ONLY

CONSTRUCTION SERVICESSTATE FIRE MARSHAL

APPROVED

CF

12/10/2018BID ADDENDUM #12

NO: 36676

REEN

GINE

LANOISSEFORPDEREST

G IE R

ANROFILAFOE

ATS

CT

I

A NHCEM

I C

LA

CA

L

I

N

A

F

E

R

R

A

R

O

PARTIAL BASEMENT LEVEL - RENOVATION

SCALE: 1/8"=1'-0"

1

NORTH

FD FD FDFD

FE

Page 5: UNIVERSITY OF CALIFORNIA, SAN DIEGOrmp-public.ucsd.edu/fdc/Job Bids/UREY HALL AIR HANDLER...SANTA BARBARA •SANTACRUZ 9500 GILMAN DRIVE #0916 LA JOLLA, CALIFORNIA 92093-0916 UREY

KEYNOTES

GENERAL NOTES

(E)CONDUIT BANK

1. FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OFCONSTRUCTION

2. SEE CONSTRUCTION PHASING PLANS ON SHEET G002.

3. CONTROLS CONTRACTOR TO LOCATE AND DEMOLISH ALLUNUSED OR ABANDONED CONTROLS EQUIPMENT.

1

DEMOLISH (E) ABANDONED CONTROL PANEL3

DEMOLISH EXISTING REHEAT COILS. DEMOLISHHEATING HOT WATER BACK TO NEAREST MAIN ANDCAP.

4

DEMOLISH (E) ABANDONED ELEVATOR CONTROL BOX2

(E)4"HHWS&R DN5

(E)48x16" DN6

REFER TO PHASING SEQUENCE. PROVIDE A STANDALONE CAV BOX FROM S-1 COLD DUCT FORMAKE-UP/VENTILATION IN PHASE 2. SET TO 3000CFM.

REFER TO PHASING SEQUENCE. TEMPORARILYREMOVE DOORS AND PROVIDE NEW DOORS W/36x24" FILTERED TRANSFER GRILLES.

REFER TO PHASING SEQUENCE. PROVIDETEMPORARY COOLING (MOVIN COOL OR SIMILAR)FOR ELECTRICAL ROOM IN PHASE 2/3.

7

8

9

TAKE AIRFLOW READINGS AT TRAVERSE LOCATION NOTEDON PLAN. SUBMIT AIRFLOW READINGS TO MEOR PRIOR TODEMOLITION.

10

FD

(D)7

2x20

COL

D DU

CT A

ND(D

)46x

20 H

OT D

UCT

BELO

W

(E)72x14 COLD DUCT AND(E)46x14 HOT DUCT BELOW

(D)34x18

(E)32x18

(E)6

0x24

(E)4

2x16

(E)42

x16

(D)2

(D)36Ø

(E)36x36 UP

(E)24x12

(E)24x12 (E)3/4 HHWS&R

(E)12x20 SA DN(E)20x14 SA DN

(E)14x14 SA DN

(E)SF W/RH COIL

(D)1

(E)24x12

(E)8" CHWS&R17'-5" TO U/S OF PIPE

(D)FD

(D)RHC

(E)HHWCAPPED

1MD103A

(D)40x14"FOR CONTINUATION, REFER TO . 1

MD103A

(D)24x14". FOR CONTINUATION,

REFER TO .1MD103A

(D)40x14 OAFOR CONTINUATION, REFER TO .

(D)46x42HOT DUCT

24x10 SA DNTYP

(E)8" CHWR (E)8" CHWS(E)4" HHWR(E)4" HHWS

FOR CONTINUATION, REFER TO .1M200

(E)4" HHWS&R(E)6" CHWS&R UP

(E)3" HHWS&R UP

(E)4" CHWS&R

(D)2" HHWS&R

(E)8" CHWS&R DN

(E)1-1/2" CHWS&R(E)1-1/2" HHWS&R

(E)1-1/2" CHWS&R(E)1-1/2" HHWS&R

(E) PIPING TO MACHINE SHOPMEZZANINE AH UNIT

(E)1-1/4" DW (E)1-1/2" AIR

(E)1-1/2" IHWR(E)1-1/4" GAS

(E)2" ICW(E)2" IHW

1M103B

FOR CONTINUATION, REFER

TO .

(D)AH-1

(D)48x48

(D)S-1

3

4

(D)3" HHWS&R (D)4" CHWS&R

(D)FD(D)FD

(E)FD

2

5

(E)8"CHWS&R STACKED(E)8"CHWS&R DN

6

(E)30x12 DN

(E)12x12 DN(E)12x12

(E)30x12 DN

(E)12x12 DN(E)12x12

(E)30

x12

(E)24x12" DN

(E)2

4x16

(E)2

6x10

(E)4

2x16

(E)FD

(E)FD(E)FD

1

(D)EXHAUST PLENUM(2)(D)30x10" DN(D)12"Ø DN

8

7

9

(E)24x18

(D)18"Ø(E) 14x16

(E)24x12

(E)10x10

(E)30x18

(E)24x18

(E)60x18

(E)18"Ø DN

(D)FD

1 & 2M303

1 & 2M302

1 & 2M301

(E)4" ICHWS/R

(E)20X18" OA

(D)EF-9

1MD103A

(D)30x12". FOR CONTINUATION,

REFER TO .

10

(E)AIR HANDING UNITMAU-1

10

(E)7

2x20

COL

D DU

CT A

ND(E

)46x

20 H

OT D

UCT

BELO

W

(E)72x14 COLD DUCT AND(E)46x14 HOT DUCT BELOW

(E)34x18

FOR CONTINUATION, REFER TO .1M200

(E)4" HHWS&R

(D)2" HHWS&R

(E)1-1/2" CHWS&R(E)1-1/2" HHWS&R

(E)1-1/2" CHWS&R(E)1-1/2" HHWS&R

(E) PIPING TO MACHINE SHOPMEZZANINE AH UNIT

(D)S-1

(D)3" HHWS&R (D)4" CHWS&R

(E)FD

(E)FD

(E)FD

4

(E)FD

(T)70x42COLD DUCT

50x4

4"

8

2

5

7

6

3

50x4

4"

(T)50x44 HOT DUCT2" HHWS&R

60x18"

60x18"

(E)AIR HANDING UNITMAU-1

1

9 10

KEYNOTES

GENERAL NOTES

(E)CONDUIT BANK

1. FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OFCONSTRUCTION

2. SEE CONSTRUCTION PHASING PLANS ON SHEET G002.

3. REFER TO FOR COMPLETE DEMOLITION SCOPE.

4. REFER TO FOR COMPLETE RENOVATION SCOPE.

1

2 (E)8" CHWR(E)8" CHWS(E)4" HHWR(E)4" HHWS

3 (E)8" CHWS/R17'-5" TO U/S OF PIPE

(E)6" HWS&R UP5

(E)3" CHWS/R UP6

(E)4" CHWS/R7

60X18" DUCT CONVERSION. DUCT WIDTH CHANGE FROM60" TO 50" AND DUCT DEPTH CHANGE FROM 18" TO 36"UPSTREAM OF THE CONVERGING DUCT FITTING.

8

(E)4" HWS&R DN4

BALANCE DAMPERS TO MATCH PRE-DEMOLITION AIRFLOWREADING.

9

1MD101

1M101

10RH

TEMP

MD101

PARTIAL MEZZANINE

LEVEL - DEMOLITION

BMLLAD ANA

LR

Integrated Services - MEP Engineering | Technical Services | Building Sciences |

Building Commissioning | Clean Energy Solutions | Energy Services |

SAN DIEGO - SAN FRANCISCO

(619) 713-5700

Fax (619) 713-5701

4757 Palm Avenue

La Mesa, California 91942-9252

RH

File path: Z

:\S

D14152.00\C

AD

\A

utocad\M

\ M

D101.dw

g 12/10/18 15:56 R

L rham

rick

SHEET NO.:

SHEET TITLE:

DESIGN BY:

DRAWN BY:

CAD DWG FILE:

PROJECT NO:

SD14152.00

CHECKED BY:

RH

SCALE:

DATE:

10/05/2018

REVISIONS:

N0. Description Date

10/26/2018BID SET

FACILITY:

PROJECT:

UREY HALL

BASEMENT AIR

HANDLER AND VAV

UPGRADES

PROJ: 1000419186 / RL-15-3

KEY PLAN

1

AS NOTED

MD101.dwg

UREY HALL

UCSD UREY HALL

9500 Gilman Drive, La Jolla, CA 92093

University of California, San Diego

STATE FIRE MARSHALL STAMP:

ONLY VALIDWHEN INITIALED

FIRE AND PANIC ONLY

CONSTRUCTION SERVICESSTATE FIRE MARSHAL

APPROVED

CF

12/10/2018BID ADDENDUM #12

NO: 36676

REEN

GINE

LANOISSEFORPDEREST

G IE R

ANROFILAFOE

ATS

CT

I

A NHCEM

I C

LA

CA

L

I

N

A

F

E

R

R

A

R

O

PARTIAL MEZZANINE LEVEL - DEMOLITION

SCALE: 1/8"=1'-0"

1

NORTH

FD FD FDFD

FE

PARTIAL MEZZANINE LEVEL - DEMOLITION - TEMP S-1 SERVICE

SCALE: 1/8"=1'-0"

2

NORTH

Page 6: UNIVERSITY OF CALIFORNIA, SAN DIEGOrmp-public.ucsd.edu/fdc/Job Bids/UREY HALL AIR HANDLER...SANTA BARBARA •SANTACRUZ 9500 GILMAN DRIVE #0916 LA JOLLA, CALIFORNIA 92093-0916 UREY

UREY HALL AIR HANDLER REPLACEMENT AND VAV SYSTEM UPGRADES Project No.: 1000419186/P4L-173 UNIVERSITY OF CALIFORNIA, SAN DIEGO

1 of 2

ADDENDUM NO. 1 QUESTIONS & ANSWERS (As of December 11, 2018)

Q1: Please provide a lab controls specification section.

A1: Refer to DDC Spec section 230923, and mechanical controls drawings for control requirements. Q2: Please confirm the Hot ceiling containing asbestos in room B0242 will be removed by the

University. A2: Per abatement notes on sheet M000 and division 1 specs, the asbestos abatement shall be the

responsibility of the contractor. Q3: Spec section 23013051 HVAC Air-Distribution system cleaning indicates to clean the majority of

the buildings ductwork. This is not clearly shown on the plans. Please confirm that no duct cleaning is required. If required please indicate the areas on the plans and show the existing ducts to be cleaned.

A3: Per keynote 2 on 1/M103B all existing ductwork within the machine shop is to be cleaned and sealed. All new ductwork is to be installed using best practices for protection against dust and other construction contamination/debris. Additional precautions need to be taken for rooms B0240, B0246, B0222, B0206, and B0102 per spec section 230130.51-J.1 & 2.

Q4: G001 indicates drawing MD101, this drawing is missing please provide. A4: See MD101, now included. Q5: The heating hot water coil specification 23821611 indicates coils to be copper tube with aluminum

fins, Please confirm you do not want copper tube with copper fins. A5: Provide HHW coils with copper tube/aluminum fin as scheduled and specified. Q6: Please confirm as indicated on G001 the Fire Alarm and Fire protection/Suppression work scope

will be a differed submittal and costs associated with this will be a future change order. A6: Confirmed, fire alarm and fire protection work/scope is to be a deferred submittal. Q7: Please confirm the main Fire Alarm Control panel does not need upgrading and is not part of this

bid. A7: Confirmed. The FACP does not need upgrading within the scope of this project. Q8: Please confirm existing legacy pneumatic controls devices will need to be upgraded to JCI

Metasys BACnet field controllers per current UCSD Campus Master Specification division 230923 for DDC?

A8: Confirmed. All legacy pneumatic devices being affected in this project shall be upgraded to JCI Metasys BACnet controllers. Refer to mechanical control drawings and Section 230923.

Q9: Please clarify whether any scope of work will be required for existing Fume Hoods equipment. A9: No scope will be required regarding the existing fume hoods. Q10: Please clarify scope regarding existing terminal unit reheat coils? On M102, it appears that the

RH coils were mislabeled as Keynote #21 which has to do with duct static pressure sensors. Was there to be a Keynote for RH coils?

A10: Keynote #21 pointing to the RHC’s was intended to be keynote #19 – “Abandon (E)RHC & piping. Drain piping and cap outside of lab.”

Q11: Please clarify extent of scope required for existing exhaust from chemical storage? A11: There is no scope required for the existing exhaust from chemical storage within this project, at

this time. Q12: Please clarify what existing Controls devices, if any, can be reused such as: control wiring,

communication wiring, transformers, panels, controllers, etc. A12: Provide new controls, wiring, and all other controls accessories as needed for the new equipment

installation. Q13: Will JCI Metasys be required to tie-in Lab Area Control System gateway controller / panel to the

network via single-point BACnet connection? Or will Controls Contractor instead run BACnet

Page 7: UNIVERSITY OF CALIFORNIA, SAN DIEGOrmp-public.ucsd.edu/fdc/Job Bids/UREY HALL AIR HANDLER...SANTA BARBARA •SANTACRUZ 9500 GILMAN DRIVE #0916 LA JOLLA, CALIFORNIA 92093-0916 UREY

UREY HALL AIR HANDLER REPLACEMENT AND VAV SYSTEM UPGRADES Project No.: 1000419186/P4L-173 UNIVERSITY OF CALIFORNIA, SAN DIEGO

2 of 2

MSTP to each Phoenix air valve and then tie back into the JCI Metasys NAE directly, without the use of any 3rd Party Gateway Device?

A13: Phoenix valves operate through the use of local controllers only. Controls contractor shall daisy chain the valve controllers together and tie back into the NAE. No LACS gateway controller required.

Q14: Please clarify whether Controls Contractor and/or Lab Area Control Systems Contractor responsible for scope regarding lab air valves such as install/wiring/temp. sensors? See M601 & M602.

A14: Air valves to be provided with factory mounted controller. Controls contractor shall integrate all valves into BMS system. All control points not factory provided with the air valve shall be provided by the controls contractor.

Q15: Please clarify that Controls Contractor to provide JCI Metasys thermostats in all spaces, and not Phoenix Controls thermostats, for all room level temperature sensing / controls and HVAC Controls Devices / Thermostats?

A15: Confirmed. Provide JCI Metasys controls equipment and interface with Phoenix controls systems. Refer to Section 230923.

Q16: Where will the VRF system controller(s) be located? A16: VRF controller is located in mechanical room B0070. Refer to revised sheet M101. Q17: Please clarify/confirm that YORK VRF is an acceptable alternate manufacturer for the VRF

system, as has been permitted / allowed on other recent UCSD Construction Projects? A17: VRF systems and the system design/installation requirements vary substantially between

manufacturers. Therefore, should the contractor submit a VRF system other than the basis of design, the contractor shall be responsible for all coordination and redesign fees associated with implementing an alternate VRF manufacturer. Re-design fees shall be agreed upon with the design team prior to submitting the bid. Contractor shall include with his bid the amount to be deducted from the bid amount if the alternate is accepted by the owner.

Q18: Will Controls Contractor be required to demo the existing control panels (incl. the pneumatic tubing) that are no longer in use?

A18: Confirmed. Demo all obsolete controls equipment per general note 3 on sheet MD101 (all unused or abandoned controls equipment to be demolished).

Q19: Will there need to be any demo regarding existing panels, wiring and pneumatic tubing in the mechanical room that serve existing AH-1? Also, there are four 48”x48” JCI panels in the mechanical room and two of these seem obsolete. Will these need attention regarding demo?

A19: Confirmed, demo all obsolete controls equipment per general note 3 on sheet MD101 (all unused or abandoned controls equipment to be demolished).

Q20: How can the Contractor schedule the work for the occupied spaces? Will this need to be completed during afterhours? Or will it be a construction zone?

A20: Construction activities are permitted from 7:00 AM to 3:30 PM Monday through Friday only. Do not perform construction activities on weekends or during other hours, without advance written authorization from the University's Representative. Allow for after-hours work (identify rooms)

Q21: M000 – Please confirm that UCSD shall be responsible for any necessary abatement of asbestos in work affected areas.

A21: Per abatement notes on sheet M000 and division 1 specs, the asbestos abatement shall be the responsibility of the contractor.

Q22: Spec 230130.51 – Please confirm duct cleaning scope of work. A22: Per keynote 2 on 1/M103B all existing ductwork within the machine shop is to be cleaned and

sealed. All new ductwork is to be installed using best practices for protection against dust and other construction contamination/debris. Additional precautions need to be taken for rooms B0240, B0246, B0222, B0206, and B0102 per spec section 230130.51-J.1 & 2.