Flood Profile Modeling with Split Flows and Weirs Objective: To become familiar with RAS split flow and weir options.
Transcript
Page 1: 13 Split Flow and Weirs

Flood Profile Modeling with Split Flows and Weirs

Objective: To become familiar with RAS split flow and weir options.

Page 2: 13 Split Flow and Weirs

Split Flows

• General Modeling Guidelines

• Flow Around an Island

• Divided Flow Approach

Page 3: 13 Split Flow and Weirs

Weirs

• Inline Spillways and Weirs• Entering Inline Spillway/Weir Data• Lateral Spillways and Weirs• Entering Lateral Spillway/Weir Data• Controlling Inline and Lateral Gate Settings• Inline and Lateral Spillway/Weir Output

Page 4: 13 Split Flow and Weirs

Flow Around an Island

High Ground

1

2

3

4

5

6

7

8

Q

Q

T

T

Stagnation Point

Stagnation Point

Q Q12

Page 5: 13 Split Flow and Weirs

Separate River Reaches

8

West

7

6

5

4

3

2

Sp

r u ce

Cre

ek

1

East

7

6

5

4

3

2

Sp

ruc

e

Lower

Upper

Page 6: 13 Split Flow and Weirs

Splitting the Cross Sections

0 20 40 60 80 100 120 140 16060

65

70

75

80

85

90

Divided Flow Plan: Divided Flow Opening River Mile 3

Station (ft)

Ele

vatio

n (f

t)

Legend

EG PF#1

WS PF#1

Ground

Ineff

Bank Sta

.035 .025 .035

0 20 40 60 80 100 120 140 16060

65

70

75

80

85

90

Divided Flow Plan: Divided Flow Opening River Mile 3

Station (ft)

Ele

vatio

n (f

t)

Legend

EG PF#1

WS PF#1

Ground

Ineff

Bank Sta

.035 .025 .035

Page 7: 13 Split Flow and Weirs

Split Flow Optimization

RAS can optimize flow splits at: • Lateral weirs• Hydraulic connections• Stream junctions

1. Program calculates a water surface profile with flows given in flow data file

2. Using computed profiles new flows are determined and profile is re-run

3. Process continues until flows match

Page 8: 13 Split Flow and Weirs

Turning on the Split Flow Optimizer

From Steady Flow Analysis screen, select Options, Flow Optimizations…

Page 9: 13 Split Flow and Weirs

What is saved by RAS

• Flow data are not changed after optimization• You should input computed flows into the flow

data editor and run the program again to see if the answer changes

Page 10: 13 Split Flow and Weirs

Modeling Weirs in HEC-RAS

Two types of weirs:• Inline weirs• Lateral gated spillways

Can be used to model the following:• Large Dams• Run of the river structures• Drop Structures or natural drops• Lateral storage facilities• Natural overflows to ponding areas• Levee breaching or dambreaks

Page 11: 13 Split Flow and Weirs

Inline Weirs and Gated Spillways

0 200 400 600 800 1000-20

-10

0

10

20

30

Inline Weir and Gated Spillay - Ex 12 Plan: Gated Spillway

Station (ft)

Ele

vatio

n (f

t)

Legend

Ground

Ineff

Bank Sta

Page 12: 13 Split Flow and Weirs

Cross Section Locations

FLOW

1

234

EXPANSIONREACH REACH

CONTRACTION

Gated Spillways

Overflow Weir

FLOW

Inline Weir River Stationing is 2.5

Page 13: 13 Split Flow and Weirs

Cross Section 2

• Cross section 2 is located a short distance downstream from the structure.

• The computed water surface at this cross section will represent the tailwater elevation of the weir and the gated spillways.

• This cross section should not include any of the structure or embankment, but represents the physical shape of the channel just downstream of the structure.

Ineffective Flow Area Stations and Elevations

Page 14: 13 Split Flow and Weirs

Cross Section 3

• Located a short distance upstream of the embankment

• Represents the physical configuration of the upstream channel.

• The structure and the roadway embankment are described by combination of the deck/road embankment data, cross section 3, and the gated spillway data

Page 15: 13 Split Flow and Weirs

Sluice and Radial Gates

Sluice Gate

Broad Crested Spillway

Radial Gate

Ogee Spillway Crest

Up to 10 gate groups can be used at any one river crossing. Each gate group can have up to 25 identical gate openingsEither gate type can be used with an ogee crest shape or a broad crested weir

Page 16: 13 Split Flow and Weirs

Setting the Gate Opening

Page 17: 13 Split Flow and Weirs

Inline Spillways and Weirs

• Radial gates (often called Tainter gates)• Vertical lift gates (Sluice gates)• Ogee or Broad Crested Weir shapes for both gated

spillways and overflow weirs• Gate equations can handle low flow, normal gate

flow (upstream submerged) or fully submerged gate flow (both ends submerged)

• Up to 10 gate groups• Up to 25 identical gates per group.

Page 18: 13 Split Flow and Weirs

Radial Gates

HEBETE HBTWgCQ 2

TH

Z sp

U

D

Z

ZB

Where: H = ZU - Zsp

C = Discharge Coefficient, typically 0.6 – 0.8

Page 19: 13 Split Flow and Weirs

Submerged Radial Gates

When the downstream tailwater increases to the point at which the gate is no longer flowing freely (downstream submergence is causing a greater upstream headwater for a given flow), the program switches to the Submerged Form of the equation:

HEBETE HBTWgCQ )(2

Where: H = ZU - ZD

Page 20: 13 Split Flow and Weirs

Fully Submerged Gate Flow

Orifice Equation

gHCAQ 2

Where: H = ZU – ZD

C = Discharge coefficient, typically 0.8

A = Area of gate opening

Page 21: 13 Split Flow and Weirs

Sluice Gates

BZ

Z

ZD

U

sp

gHBWCQ 2

Where: H = Upstream energy head (ZU – Zsp)C = Coefficient of discharge (0.5 to 0.7)W = WidthB = Vertical opening

Page 22: 13 Split Flow and Weirs

Submerged Sluice Gates

HgBWCQ 2

Where: H = ZU - ZD

gHCAQ 2

Transitions to fully submerged orifice flow at 0.8 submergence:

Submergence begins when the tailwater depth above the spillway divided by the headwater energy above the spillway, is greater than 0.67

Page 23: 13 Split Flow and Weirs

Low Flow Through Gates

Z sp

U

D

Z

Z

H

2/3HLCQ

Upstream water surface is equal to or less than the top of the gate opening

Page 24: 13 Split Flow and Weirs

Uncontrolled Over-Flow Weirs

• Can represent emergency spillway or flow over entire embankment.

• Uses standard weir equation• Can have Ogee or Broad Crested weir shape• Weir flow submergence is calculated

Page 25: 13 Split Flow and Weirs

Entering Inline Spillway/Weir Data

Page 26: 13 Split Flow and Weirs

Weir and Embankment Profile

Page 27: 13 Split Flow and Weirs

Gated Spillway Data

Page 28: 13 Split Flow and Weirs

Lateral Spillways and Weirs

• Radial and sluice gates• Uncontrolled overflow weir• Same hydraulic equations for gates as with

inline spillways• Lateral weir can handle a sloping water

surface as well as irregular weir profile.• Includes culvert flap gates (flow limited to one

direction)

Page 29: 13 Split Flow and Weirs

Cross Section Layout

5.3

5.2

5.1

MainChannel

LateralWeir

Page 30: 13 Split Flow and Weirs

Lateral Spillway and Weir Hydraulics

ChannelInvert

Main ChannelBank Elevation

OverflowWeir Gated

SpillwaysWaterSurface

Page 31: 13 Split Flow and Weirs

Lateral Weir Calculations

dQ

X1 X2

Yws = awsX + Cws

Yw = awX + Cw

dX

))()((5

2 2/5111

2/5121

121

CxaCxaa

CQ xx

See notes on next slide for definition of the constants

Page 32: 13 Split Flow and Weirs

Lateral Weir Calculation Equation

• The equation for a sloping line representing the water surface and the weir segment are shown on previous slide

• Constants aws and aw represent the slope of the water

surface and the weir segment, respectively

• Variables Cws and Cw are constants representing the

initial elevations • The standard weir equation assumes that the weir is

parallel with the water surface. The above general equation is derived for a sloping weir and water surface by integrating the standard weir equation

Page 33: 13 Split Flow and Weirs

Entering Lateral Spillway/Weir Data

Page 34: 13 Split Flow and Weirs

Lateral Weir Embankment Data

Page 35: 13 Split Flow and Weirs

Lateral Weir Gate Data

Page 36: 13 Split Flow and Weirs

Lateral Weir Culvert Data

Page 37: 13 Split Flow and Weirs

Lateral Diversion Rating Curve

Use for modeling irregular structures

Page 38: 13 Split Flow and Weirs

Controlling Inline and Lateral Gates

For steady flow simulations specify number of gates open and gate opening height

Page 39: 13 Split Flow and Weirs

Controlling Inline and Lateral Gates

For unsteady flow simulations the following gate controls are available from the HEC-RAS unsteady flow data editor:

• Time Series of Gate Openings

• Elevation Controlled Gates

Page 40: 13 Split Flow and Weirs

Time Series of Gate Openings

Page 41: 13 Split Flow and Weirs

Elevation Controlled Gates

Page 42: 13 Split Flow and Weirs

Inline and Lateral Spillway/Weir Output

The following types of output are available for inline and lateral spillways/weirs:

• Stage and Flow Hydrograph Plots

• Time Series Tables

• Profile Plots

• Cross Section Plots (Inline Spillways/weirs only)

• Detailed Output Tables

• Profile Summary Tables

Page 43: 13 Split Flow and Weirs

Example Profile Plot With a Lateral Spillway/Weir

Page 44: 13 Split Flow and Weirs

Cross Section Plot of Inline Spillway/Weir

Page 45: 13 Split Flow and Weirs

Detailed Output Table For a Lateral Weir

Page 46: 13 Split Flow and Weirs

Profile Output Table for Lateral Weir