Part of the BRE Trust Pre-development Audits, Reuse and BREEAM UK Gilli Hobbs, Strategy Director BRE (Building Research Establishment)
Transcript
Page 1: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK

Part of the BRE Trust

Pre-development Audits, Reuse

and BREEAM UK

Gilli Hobbs, Strategy Director

BRE (Building Research Establishment)

Page 2: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK

How much demolition waste is there in the UK?

19.3 million tonnes in 2011 from NFDC members

– around 70% of industry by value

Page 3: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK

Reclamation in the UK

• The UK has one of the

most active and diverse

architectural salvage

sector in the world

• Mainly small, local

companies

• Amount of materials being

reclaimed has decreased

• Salvo (network)

http://www.salvo.co.uk/

Page 4: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK

Potential CO2 savings from using reclaimed materials

Page 5: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK

PRE Demolition/Refurbishment audits

• Requirement in BREEAM

Page 6: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK

An examination of existing structures to:

– establish the types & amounts of waste materials likely to arise

– provide recommendations for optimal resource use

– look for opportunities to reuse/recycle on same site

– pre-refurbishment and pre-demolition

What are pre-development audits?

Page 7: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK

Pre-demolition/pre-refurbishment audits methodology

– Desk study to examine photos and plans of existing structures

and proposed work

– Carry out site visit to

• Measure building elements

• Assess the condition of materials and suitability for reuse or

recycling

– Determine the amounts of Key Demolition Products likely to arise

from the demolition or refurbishment

– Provide recommendations for management of Key Demolition

Products e.g. options for reuse and recycling

– Provide guidance for clients to set targets for diversion of waste

from landfill

Page 8: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK

Case 1 - Whipps Cross Hospital PDA – focus on £ and

environmental quantification

ALL PRODUCTS

(m3)

STTOD - sold

to the trade,

own

dismantling

STTG - sold to

the trade at the

gate

SOS - sold on

SalvoWeb

RVO - reuse

value on-site

Ecopoints Hectares

pristine

Amazonian

rainforest per

year

Hectares heavily

logged,

sustainably

managed

rainforest per year

24,515 m3 £456,995 £2,107,442 £6,952,402 £4,227,529 119,121 2,516 1,060

Reclamation Valuation Environmental Quantification

Page 9: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK

Case 2 - More typical case study – School in NE England

– A pre-demolition audit of

three school buildings

was carried out in Hull

– Using drawings and

data gathered during a

site survey the types

and amounts of

materials likely to arise

from the demolition

were estimated.

Page 10: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK

Case 2 - School - Pre-demolition audit results

62.2%

30.5%

3.4%

1.5% 0.7%0.3% 0.3%

1.0%

Key Demolition products (by weight)

Concrete

Bricks

Steel

Plaster

Flooring

Timber (softwood)

Glass

Other

– The major demolition

products were

concrete, bricks and

metal (steel)

– Waste management

recommendations

showed that 95% of the

waste could be diverted

from landfill

Page 11: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK

Case 3 - University Buildings pre-demolition audit

• Pre-refurb audit of 2 buildings

• Removing doors, some internal partitions,

heating and wiring and re-roofing

• Victorian fittings (with value)

• Reuse target of 75%

• Recycling target of 25%

Page 12: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK

Case 4 – Pre-refurbishment audit London

– Pre-refurbishment audit of a 4-storey

town house due to undergo major

refurbishment to Passivhaus standard

– Using drawings and data gathered

during a site survey, the types and

amounts of materials likely to arise from

the refurbishment were estimated

Page 13: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK

Case 4 - Pre-refurbishment audit results

- Major materials to be removed

during the refurbishment are brick

and plaster, timber, glass, metal

and floorcoverings

- Over 90% of materials can be

recycled offsite (no space on site

for crushing of bricks)

- Limited potential for reuse due to

poor condition of doors and

windows

Page 14: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK

Pre-demolition option on SMARTWaste

Page 15: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK

Developing better guidance

– BRE have carried out 50 + audits, ideally:

– Before contractor appointed – performance

specification

– Independent of project

– Post demolition evaluation of performance

– Advertise reusable items (e.g. Salvo MIE)

– Closer link to design of new/replacement – what

can be retained/reused?

– Will circular economy thinking help?

– Design for Disassembly/ Adaptability to facilitate

future recovery (learn from PDAs today)

– Link this into BIM to track assets and cascade

warranties/ reduced risk (www.bamb2020.eu)

Page 16: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK

BREEAM update

BREEAM = building level sustainability

standard

> 550K BREEAM certified developments,

and > 2.25 million buildings registered for

assessment (1990 +)

PDAs related to credits in:

– New construction, communities, non

domestic refurb, infrastructure, home

quality mark

Updated New Construction 2017

(hopefully):

– Tighten requirements for pre-

demolition audit, linked to code of

practice being finalised

Page 17: 20161130  Booosting Circular Demolition Erasmus MC - Presentation Gilli Hobbs Building Research Establishment UK