of 26
7/27/2019 2nd Sept
1/26
2nd Sept. 2010
1. The following method is used to make Obj-Save method not be effective
and hence not to be taken up by subsequent Commit method. Obj- Save-
Cancel
2. Generally routing activities are created in _____________________ Classes
inherited from Work-
3. The clipboard page which contains information about your access roles,
RuleSet list, and HTTP protocol parameters is the: Requestor Page
4. A flow can have none, one or many Flow End shapes. True
5. If your Assignment shape uses the standard rule Worklist, and your
Router uses the standard rule ToWorkbasket, what happens?
The flow will be suspended, and control will be transferred to the
FlowProblems flow
6. Which method will instantiate a new page in the clipboard? Page-New
7. What is the class of the top level clipboard page created by the Obj-List
method?
Code-Pega-List
8. Which of the following is true about step pages.(choose 2)
Steppages define the default pagecontext during the step execution.
StepPage is not required on each step of an activity.
9. A best practice for proper clipboard management is to match every Page-
New, Obj-Open,and Obj-List with a Page-Remove: True
10. According to PRPC best practices what is the maximum number of WOs
that can be included under a Cover before we should consider to group the
WOs under a Folder 20
11. Which is true about Model Chaining?
Calls super class model if super class modeling enabled
Use identical names for the model
12. Class group which is reusable? Framework Layer
7/27/2019 2nd Sept
2/26
13. 3 ques. on the uses of the standard Harnesses
14. 2 ques. on the functionalities of the PRPC slices
15. Project Implementation
Phases.Inception/Elaboration/Construction/Transition.---about their
functionality
16. 4 screen shot based ques. like the manner to trace a property in a
clipboard, class hierarchy
17. 01-27-01, 01-27-02..if u want to migrate only these.What will you
do?
Add both seperately
18. What happens if we create a property using Quick Create?
19. Ques. on Decision rules and Declarative rules.. more of true/false type.
1. Embedded pages cannot be nested in other embedded pages False
2. Flow Shapes..where can u call a decision treeDecision Shape
3. Which of the following is true about abstract classes? (ends with a
hyphen )
4. The tool required for monitor browser compatability Preflight
5. The tool used for make our design perfect Preflight
6. Which of the following is true about Concrete Class (Belongs to a
Class Group, Is a Class Group, dose not belongs to a class
group)
7. A Question on Auto-Generate HTML Feature
Should this feature always be enabled
Should it never be enabled
Should be disabled only when no other alternative is available
8. Declare Pages
Can be shared across Requestors
7/27/2019 2nd Sept
3/26
Cannot be shared
Refreshed for certain conditions
9. Circumstance ( Should a base rule exist for a circumstance
qualified rule)
10.Integrator shape can call only the activity type ofConnect
11.Obj-Browse..used to get an array of embedded pages on the
clipboard.
12.VOE related Questions .. for work parties.if VOE is checked it will be
displayed in work party section (Visible on Entry) screen shot
13.Which of the following shapes are used as an alternative for Cover
Processing - Split Join, Split For Each
14.Choose the statements that are correct for the tracer tool (any three)
a. Activity steps are shown.
b. When the activity fails in red color.
c. When click on the step activity is open.
15.The object created by Application Profile can be saved and accessed
later (True/False)
16.Both Application Profile Wizard and Enterprise Application Accelerator
can be used to create a work object. (True)
17.Node Declare Pages..Only a few in a work group can access the node
requestor pages(False)
18.SLA- Goal, Late, DeadLine
19.Assignment shape resolve the work object.
20.What is the class of the top level clipboard page created by the Obj-Listmethod?
Code-Pega-List
21. Work Party Roles and Access Group Roles are of same Class ? False
22.The following method is used to make Obj-Save method not beeffective and hence not to be taken up by subsequent Commit method
Obj- Save-Cancel
7/27/2019 2nd Sept
4/26
23.Where do we find a Non-numeric subscript? Page groupWhere can we specify new work object harness? FlowRule.
24.Which of the following is true about step pages.(choose 2)
a. Steppages define the default pagecontext during thestep execution.
b. Step pages are removed when the activity endedc. Steppage class is always equal to AppliesTo Key.
StepPage is not required on each step of an activity
26. Where .PropertyName is the name of a property, which of thefollowing is the correct syntax for a property reference directive thatwould allow the user to assign the property value?
a) (.PropertyName INPUT)b) c) [.PropertyName INPUT]d) {.PropertyName INPUT}
27. A ___ __________ rule when added to the access group becomes the workpool
Ans: class group
28. Properties that have prefix px can only be set only with following methodProperty-Set-Special
29. decision shape
30. ticket
31. Rule management
32. rule resolution
33. cover object and work object locking mechanism
34. screen shot with step page and the pages and classes tab
35. class inheritance diagram
36. direct parent class structure diagram
37. clipboard screen shot, to access a particular page list
38. when an application is created by default harness and section is created False
--- harness is created, section developer has to create39. conditions for which declare page is refreshed..
a. when condition
7/27/2019 2nd Sept
5/26
b. page is removed 40. sma is used to monitor clipboard only false
41. auto generate HTML
42. decision tree
43. declare pages---
44. wsdl is created before the connector and metadata accelaretor--- F
45. WSDL
46. properties of flow rule
47. page list and value list
48. screen flow types
49. screen shot of an activity with pages and classes tab,In clipboard the steppage with pages classes class that page isvisible50. availability types of rules51. when rule 03-02-01 and 03-02-02 is migrated , we have to selecta. 03-02 b. 03-02-01&03-02-0152. When rule is migrated availability types are Final/Locked53. ruleset version is given ---54. skimming
1. Which of the following method is used for viewing any step page's info in
XML format (especially for the purpose of debugging)
a. Show-XML
b. Show-Html
c. Show-page
d. Show-step-page
e. Show-Property2. A property Account Status is called in an activity belonging to some other
class,A page Count belonging to that class is called in Pages and Classes tab
which is also specified in StepPage.When this step is called by Activity,how do
you call the AccountStatus.
a. AccountStatus
7/27/2019 2nd Sept
6/26
b. Count.AccountStatus
c. StepPage.AccountStatus
d. .AccountStatus
e. Primary.AccountStatus
3.Select the Pega guardrails(choose 3)a.Intent-Driven processb.build for changec.Iterative approach
4.One question about the class Inheritance Diagram.A screenshot was givenand asked toidentify the diagram .(class Inheritance Diagram)
5.The primary key of a work object derives from which class(@baseclass)
6.In the List-to-List the source page is ..(A page list property of classCode-pega-List)
7.Which of these contains sections,buttons,text boxes etc..(harness)
8.One visio screenshot was given and asked to identify a particular shape(itwas subflow in my exam)9. Examination questions if answered 91-100 Grade A,71-90 Grade B,51-70
Grade C. What are the possible rules which can be used to achieve
this(Choose Three)
a.Decision tree
b.Decision Table
c.When
d.Map value
10.Declare Pages can be shared across the requestors
a.true
b.false
11.It is a best practice to lock the rulesets in the production environment(not
sure)
a.true
b.false
7/27/2019 2nd Sept
7/26
12. Identify standard local actions(choose 3)
a.AttachANote
b.AttachAURL
c.Attach ScreenShot
13.One Screenshot was given (exactly similar to the below screenshot) andasked to identify what it is (List-to-List)
14.All classes except @baseclass must have Directed
Inheritance(true/false)
15.Question about Data Table
16. Utility shape is placed on flow and in properties box on left side you
should specify the rule. How the smartprompt filter knows which activity
type it is
Specify in the Security tab.
17.A when rule can be referenced from
a.Correspondence
b.Flow Action
c.Activity
7/27/2019 2nd Sept
8/26
18.Pega has provided some predefined harnesses and
sections(true/false)
19. What are the possible fields we can give in an assignmentproperties (SLA and Local Action)
20.Which harness is used to Take Actions(Perform harness)
21.For design time issues we should start with which tool(Preflight)
22. What is shown in the Application Explorer(Class groups)
23. Which shapes can be used as alternative to cover processing(Split-joinand Split ForEach)
25.System Management Application shows only the clipboard details ofthe user who has currently logged in..(true/false)
25. User profile rule set list shows 10-27 Rule set version of a particular rule
set. Which of the rules those are in following versions accessible? (Choose 3)
a) 10-27-1 to 10-27-99
b) 10-27-1 to 10-99-99
c) 10-27-99
d) 10-26-1
26.StartDate property is a single value date property. When that property is
shown to the user in perform harness, customer says he/she wants to have
icon alongside that property. What is the Rule-HTML-Property that the
property needs to refer?
a) Dateb) Date-Iconc) Date-Calendar
d) Date-Time- Calendar
27) An operator enters through [email protected]. A rule LeaveAct
belongs to leave
ruleset, is checked out by the user. The rule is placed in which RuleSet?
http://172.22.201.21:9081/prhelp/basics/v5portal/v5basicsdeveloper/basicsruleformfieldsv5.htm7/27/2019 2nd Sept
9/26
a) Leave
c) LeaveAct
d) MyCo
28. How to initialize a property in a model rule? (Choose 3)
a. Property reference in value field
b. Literal Value
c. Using Property-Set method
d. Calling a Function
e. Boolean Expression
29. When a cover object has two covered work object as A, and B, then when
the A is open for transaction what the locking mechanism is
a. Both A and B is locked
b. B is only locked
c. A is only locked
d. Neither A nor B is locked
e. A and cover is locked
30. What would be the result when in a decision tables all rows evaluated to
false
a. Null value will be returned
b. Systems will redirect to one more cycle
c. System will display error massage
d. The value specified in Otherwise step will be returned
31.For which purpose precondition and transition are used??
mailto:[email protected]:[email protected]7/27/2019 2nd Sept
10/26
32. Embedded pages can be incorporated into a nested embedded
pages(true/false)
33.If integrator shape is used within a flow, what type of activity will it refer?
a. Route
b. Utility
c. Connect
d. Assign
e. Locate
34.When adding a connector to the Assignment, the likelihood value will
represent
a.It should be in between 1 and 100
b.If there is only one connector emanating from the assignment then
its likelihood value must be 100
35.Object in the memory is called as
a) Item
b) Object
c) Instance
d) Page
36.Stages in Project Implementation Methodology(choose 2)
a)Development
b)Inception
c)Elaboration-Construction
d)Testing
37.What is WSDL??
38.What are the options available while creating a class (choose 3)
7/27/2019 2nd Sept
11/26
a)is a class group
b)belongs to a class group
c)does not belong to a class group
39.Can we use Application Accelerator without running Application profilerwizard first(true/false)
40.Whether the end-user can modify his portal or not??
41.One question about the temporary work object
42. A user profile specifies RuleSet MyCoLoan:04-04. This user can access the
following RuleSets (select all that apply):
a) MyCoLoan:04-04-12
b) MyCoLoan:04-03-01
c) MyCoLoan:04-05-01
d) MyCoLoan:04-
43.Can we have a cover inside a cover??
44.What type of relationship is there between cover and covered work
object??
45.In case of UI exceptions which log files we need to check
a)System Log
b)Alert Log
c)Alert-System Log
46.Local Flow Action can be executed in the modal window(true /false)
47.Whether a section contains a harness or a harness contains sections??
1.object in memory
ans:page
2.a question related to case management
7/27/2019 2nd Sept
12/26
3.To show the XML format of a step in order to debug which method is used:
a) Show-HTMLb) Show-Pagec) Show-Harnessd) Rule-Obj-HTML
4.The Smart Shape is used to skip certain steps of a flow without affectingthe flow is:
Ticket.
5.In New PRPC, name where one can create a Microsoft Document in which ucan find all the Rule Sets.
a. Documentb. Applicationc. Preflight
d. Word DocumentAns:Application
6.What can we add in model ?
Ans: reference propertycall functionBoolean expressionliteral value
7.Integrator activity type
Ans: Connect
8.when login with work user, what he can do using clipboard
Ans: he doesnt have access to clipboard.
9.Which of the following is not the place where u can add rule sets as anaccess control mechanisma. Organizationb. Divisionc. Unitd. Access Groupe. Operator creation
Ans: c, e
10.Declarative rules need to be invoked either from an activity or from flow.(true or false)
Ans: False
7/27/2019 2nd Sept
13/26
11.a question related to where-am-I
12.some flow shapes are given asked to identify utility
13.which of the following is connected with SLA
Ans:Goal timeDeadline time
14.a question related to circumstance variance
15.what are the shapes in screen flowAns: screen
AssignmentDecision
16.An embedded page can contain nested embedded pages True
1. Select the applicable Guardrails? (Choose three)
a. Writing Java Routines
b. iterative approach
c. Intent driven process
d. Build for change
e. not easy flows to understand
2. All classes except @baseclass must have direct inheritance.
a)True
b)False
3. A property Account Status is called in an Activity belonging to some other
class, A page Count belonging to that class is called in Pages and Classes
tab which is also specified in Step Page. When this Step is called by
Activity, how do you call the Account Status.
7/27/2019 2nd Sept
14/26
a. .AccountStatus
b.StepPage. AccountStatus
c. .accountstatus
d. Primary. AccountStatus
4. What is the status when a new work object is created?
New
Resolved
Resolved complete
5. Object in a memory
a)Page
b)instance
c)class
6. Correspondence Types
a) Email
b)Fax
c) Letter
d) PhoneText (SMS
e)pager
7. By using Rules inspector which of the following rules will be traced
a. harness
b. section
c. Constraints
d. Property
7/27/2019 2nd Sept
15/26
e. Flow rules
8. A Decision Table was given and asked if A=600 and B=6000 then what
would be output?
Otherwise: Reject
Ans Reject
9. What are the shapes in screen flow?
1.Integrator
2.Decision
3.Connector
4.Split-join
5.Screen
10.What is true about data instances and rule instances?
1. they can be moved to other systems
A B>250
0
>900 500
7/27/2019 2nd Sept
16/26
2. rule instances and data instances are versioned
3. Only rule instances are versioned
4.rule belongs to rulest and where data do not
.11. Use the following diagram to answer the question
What shape is Test1?
a. Spin Offb. Split Joinc. Sub flowd. Flow start
12. When Condition can be used in
a. Activityb. Propertyc. Correspondenced. Flow actione. Harness
7/27/2019 2nd Sept
17/26
13. For the web service WSDL is generated prior to the service.True
False
14. which of the following shapes are used for cover processing (choose two)a. split for eachb. spin-offc. Assignmentd. Ticket
15. access group containsa. work poolsb. access rolesc. work groups
16. pagelist directly or indirectly inherits from which class??d. data-e. embed-f. assign-
17. Atomic UseCases: Select 2
a. They are small and granular.
b. Can be shared by multiple actors.
18. Application profile and application accelerator are real PRPC objets?
True
False
19. To declare expressions to work the "Enable Expression Calculation?" is
checked in which of the following rules. Ans Harness
20. Relationship between cover and covered object (choose two)
7/27/2019 2nd Sept
18/26
One->one
One->Many
21. When integrated with an external system and the PRPC as the server
which rule is to be created. Ans Service
22. What are the phases included in PRPC...?(Choose 2)
a)Devlopment phase
b)Inception
c)Cunstruction-Elaboration
23. Performance is checked using which of the following tools(Choose 3)
a)PAL
b)DBTrace
c)Preflight
1.Examination questions if answered 90-100 Grade A, 70-90 Grade B, 50 -70
Grade C. What are the possible rules which can be used to achieve
this?
(Choose Three)
a) Decision Table
b) Map value
c) When
d) Declarative Expression
2.To show the XML format of a step in order to debug which method is used:
a) Show-HTML
b) Show-Page
c) Show-Harness
7/27/2019 2nd Sept
19/26
d) Rule-Obj-HTML
3.What is true about concrete classes: (choose 2)
a. Can create instances of concrete classesb. Must have patterns & direct inheritance
c. Must have direct inheritance, need not have pattern
inheritance.
d. Need not have either pattern or direct inheritance
4.what can we place in a model (choose 4)
b. Property referencec. Literald. Functione. Boolean expressionf. Activity call
5. Questions related to the conditions of Model Chaining? (Choose two)
a. Models should be having the identical name
b. Call Super Class Model button be checked in all the models.
6. List at least 3 PRPC predefined data classes that serve the purposeof work parties
a. Data-Party-Person
b. Data-Party-Org
c. Data-Party-Operator
d. Data-party-Com
7/27/2019 2nd Sept
20/26
7. A Decision Table was given and asked if A=600 and B=6000 then whatwould be output?
Otherwise: Reject
Ans : Reject
8. If the WorkParty rule contains options as shown below, which of thefollowing fields will be displayed on the User Interface screen
CustomerCustomer, Reviewer, IntegratorCustomer, IntegratorReviewer, Integrator
Ans : c
9. You have to grade the marks according to the following rule marks>75Return Grade A marks>65 and 900
500
7/27/2019 2nd Sept
21/26
10.Question on Gaurdrails .
1. Adopt an iterative project approach2. Establish a robust foundation3. Do nothing that is hard4. Limit custom JAVA
5. Build for change6. Design intent-driven processes7. Create easy-to-read flows8. Monitor performance regularly (Use PAL)9. Calculate and edit declaratively, not procedurally10.Keep security object-oriented, too
11. The Smart Shape is used to skip certain steps of a flow without affecting
the flow is:
a) Ticket. (Four smart shape figures were
shown)
12. In order to execute a subflow on the current work object and immediately
continue with the current flow without waiting for the sub-flow to return,
which shape should you use?
a. Shape 1 (Decision)
b. Shape 2(Spin-Off)c. Shape 3(SplitJoin)
d. Shape 4 (SplitForEach)
13. 4. In the below screen how will you refer to the property inside thisembedded page pyPortal??? (similar Question)
7/27/2019 2nd Sept
22/26
Ans:Pyportal.pyGadget.pyGadget(WorkList).PyParams(1).pyPropertyName(see thediagram carefully)
14. ___________retrieves information from the database as an array of
embedded pages
a. Obj-Openb. RDB-Listc. Obj-Browsed. Connect SQL
15.Given a flow like this, (similar Question)
7/27/2019 2nd Sept
23/26
What is the Connector type of Reject ?
A) ElseB) StatusC) WhenD) Always
16. Activities can be called from (choose 3)
a. Flow
b. Model
c. Flow Actions
d. Constraints
e. Activity
17. There Is a cover Object called Display. It contains covered work objects of
type Transaction. When the covered work object transaction is opened in
perform harness, which of the locking mechanism is applicable?
a.Both Display and Transaction are locked
b.Neither are locked
c.Only Display is locked
d.Only transaction is locked
7/27/2019 2nd Sept
24/26
18. What all can be seen using Rules Inspector? (choose 3)
A.Properties
B.Constraints
C.Sections
D.Harness
E.Class
19. Question on what the below table type is
Ans: list to list
20. A property Account Status is called in an Activity belonging to some other
class, A page Count belonging to that class is called in Pages and Classes
tab which is also specified in Step Page. When this Step is called by
Activity, how do you call the Account Status.
a. .AccountStatus
b.StepPage. AccountStatus
c. .accountstatus
d. Primary. AccountStatus
7/27/2019 2nd Sept
25/26
21. Use the following diagram to answer the question
What shape is Test1?
e. Spin Offf. Split Joing. Sub flowh. Flow start
22. Which of the following shapes are used for cover processing (choose two)
e. split for eachf. spin-offg. Assignmenth. Ticket
23. Pagelist directly or indirectly inherits from which class?
g. data-
h. embed-i. assign-
24. To declare expressions to work the "Enable Expression Calculation?" is
checked in which of the following rules.
Ans Harness
7/27/2019 2nd Sept
26/26
25. Which of the following shapes is used to implement Rule-Declare-DecisionTable in a flow.
(Shape 1) (Shape 2) (Shape 3)
(Shape 4)
a) Shape 1b) Shape 2c) Shape 3d) Shape 4
e) Both a and b