+ All Categories
Home > Documents > 2.Resume-Bui Van Luong

2.Resume-Bui Van Luong

Date post: 03-Apr-2018
Category:
Upload: nguyen-chi-thanh
View: 215 times
Download: 0 times
Share this document with a friend

of 8

Transcript
  • 7/29/2019 2.Resume-Bui Van Luong

    1/8

    Bui Van Luong Resume Page 1 of 8

    RSUME1. PERSONAL

    Full Name: BUI VAN LUONG

    Date of Birth : 11 - 07-1969

    Home Address: 35 Street 55A-Quarter 9- Ward TanTao- District Binh Tan- Ho Chi Minh City

    Home phone : 08 - 37540901

    Mobile phone : 0908 754 714 0908 256 854

    Email : [email protected]

    Career object: - I always want to develop myself professionally with a leading constructionconsultant company and learn new skills by meeting new challenges.- I am looking for an opportunity to utilize all my potential and maximize myexperience of working in the construction industry in the past 22 years.- In all given assignments, I work very hard with all my enthusiasm, ethic business

    and integrity. I am well disciplined and honest.

    2. FOREIGN LANGUAGE & COMPUTER SKILLS

    English Certificate level B

    Computer Auto CAD, Microsoft offices, Microsoft Project, SAP2000, Etab

    3. Education - Qualification

    1987-1989 College of Construction No.6 TuyHoa Town, Phu yen Province Civil & IndustriaTechnician .

    1997-2002 Bach Khoa HCM City University Civil & Industry Engineer

    08/2007 Construction Supervision & Consultant Certificate from VietNam Ministry of Construction

    12/2008 Certificate of Construction Project Management from American Society Civil Engineer

    12/2009 Certificate of Structure Design from Ho Chi Minh City Construction Department

    08/2010 Certificate of Construction Management from Open University of Ho Chi Minh City

    4. WORKING PROCESS - PROFESSIONAL EXPERIENCES

  • 7/29/2019 2.Resume-Bui Van Luong

    2/8

    Bui Van Luong Resume Page 2 of 8

    2010Now VMC Project Management- Level 6,Satra Building, 58 Dong Khoi Street, Dist 1, HCMC

    1. Finishes Manager :Novotel Saigon Centre 63-65 Hai Ba Trung Street, District 3 Ho Chi Minh City. Thisproject divide into 24 packages.

    - Participate to interview the ID tender packages such as Guestroom package,Ballroom package, Restaurant package, Swimming pool package,,,

    - Manage all finish and fit-out works of all project works including BOH and FOH area.

    - Attend the coordinated site meetings between the contractors such as Civilcontractor. Fit-out contractor, MEP contractor, etcPropose the solution deal withproblem.

    - Review and approve the contractor shop drawings combine with specification,drawing in the contract, and MEP drawing.

    - Supervise material sampling, testing compliance with contract.

    - Supervise and inspect the site activities according to the approved shop drawing.

    - Issue the NCRs when contractors failure to comply the contract.

    - Compile, control, and close the Defect & Omissions List

    - Track and evaluate each activity in the weekly progress.

    - Issue the Site Instruction for the additional work out of the BOQ in contract.

    20102011 VinaProjects Management Co.,Ltd. 16-20 Hai Ba Trung Str, Dist.1, HCMC, Viet Nam

    1. Assistant Construction Manager :

    Sheraton NhaTrang 26-28 Tran Phu Street Nha Trang City- Khanh HoaProvince.

    - Manage all the Works of all contractors and coordinate to all contractor works suchas MEP works, Civil works and fix-out works

    - Compile, control, and close the Defect & Omissions List

    - Hold the coordinated site meetings between the contractors such as Civil contractor.Fit-out contractor, MEP contractor, etcPropose the solution deal with problem.

    - Approve the civil shop drawings such as BOH shop drawing

    - Combine with design consultant on order to approve the shop drawing especially fit-out shop drawings of FOH area.

    - Inspect the site activities according to the approved shop drawing.

    - Issue the Site Instruction for the additional work out of the contract.

    - Check and evaluate each contractor activity in the contractor payment record prior totransmit CM issue the Payment Certification to contractor.

  • 7/29/2019 2.Resume-Bui Van Luong

    3/8

    Bui Van Luong Resume Page 3 of 8

    20072010HBP Project Management Co., Ltd.

    4A Ben Van Don, Dist 4, Ho Chi Minh City, Viet Nam

    1. Senior Engineer :

    +Sunrise City Project PlotV Nguyen Huu Tho Boulevard District. 7 HCM City:

    -Manage the Barrette Pile work, Diaphragm Wall work, Basement work (Construct by

    the Top-Down method statement ):-Monitor and control the kingpost manufacture in workshop including the materialsampling, NDT the welds.

    -Supervise and Inspect the barrette pile work and the kingpost erection on site.

    -Warn the contractor aspect of the factors cause technical errors and propose thepreventives.

    -Contribute the expert judgment aspect of the method statement prior CM approve it.

    +Centre Point Project 106 Nguyen Van Troi District. Phu Nhuan HCM City:

    -Manage all work of main contractor and nominated sub-contractor such as BoredPiles, Diaphragm Wall, Basements, Superstructure, STP, Finishing, landscaping workand coordinate the MEP work with these works.

    - Uncover the conflicts of architect design and MEP design and send RFI aspect ofthese problems to the design consultant.

    - Supervise material sampling, testing compliance with contract.

    -Supervise and inspect the site activities according to the approved shop drawing.

    - Contribute the expert judgment aspect of the method statement prior CM approve it.

    - Compile, control, and close the Defect & Omissions List.

    - Track and evaluate each activity in the weekly progress.

  • 7/29/2019 2.Resume-Bui Van Luong

    4/8

    Bui Van Luong Resume Page 4 of 8

    20042007 Cotecland Joint Stock Company

    1. Site Manager :

    +Aview Apartment Project Phong Phu commune, Binh Chanh Dist., HCM City

    - Construct the piling work, Basement work, and superstructure Works such as toorganize all the work on site as per contract: distribute the civil works into the crews,teams, sub-contractors; organize the crew carry-out the HSE matters and monitoring& controlling them.

    - Plan the Materials, Resources, Plants of project.- Organize, Arrange the site construction plan.- Create the method statement and submit to CM.- Track, evaluate, and adjust each activity of the sub-contractor in order to meet theproject master schedule.

    - Assign the roles and responsibilities to each site management staff.- Monitor and Control the changed design and Additional work out of the contract.- Create and submit the VO, claims to the CM issuing the payment certification.

    - Hold the coordinate meetings between the crews, sub-contractors aspect of the siteworks.

    - Lead and Assign the site Safety & Security responsibilities to the Safety-Security

    Manager.- Compile and Negotiate the contract with the material suppliers.

    2. Vice Site Manager :

    +The Lancaster Project 22 Le Thanh Ton Street District. 1 HCM City:

    -Construct the Superstructure Work, Finishing work involve to create, organize theshop drawings, Method Statements, HSE matters on site .

    - Find out the conflicts of the architectural drawing and MEP drawing and send RFIaspect of such problems to CM.

    - Compile contracts of the teams, crews, sub-contractors.

    - Manage and Control the teams, crews carrying out works on site.- Manage and Control the Safety & Security Team on site.

    +The Golden Tower Project Nguyen Binh Khiem & Nguyen Thi Minh Khai corner

    - Construct the Basement Work, Superstructure Work, Finishing work involve to create,organize the shop drawings, Method Statements, HSE matters on site .

    - Find out the conflicts of the architectural drawing and MEP drawing and send RFIaspect of such problems to CM.

    - Compile contracts of the teams, crews sub-contractors.

    - Manage and Control the teams, crews carrying out works on site.

    - Manage and Control the Safety & Security Team on site.

    20012004 HOA BINH CORPORATION COMPANY

    Construct some projects :

    +The Long Thanh Golf Villa: Construct the Structure work, Finishes work and Fit-outwork.

    +The My Khanh Apartment Phu My Hung New City Park: Construct the structure &Finishes work

    +Park Hyatt hotel: Construct the finishes work in swimming pool & BOH area (HoaBinhis China States Construction Engineering Corporations sub-contractor):

  • 7/29/2019 2.Resume-Bui Van Luong

    5/8

    Bui Van Luong Resume Page 5 of 8

    - Supervise the brickwork, water proofing work. plastering work, painting work, tilingwork, door work and inspect these work with CM

    19992001 PROTECT-AIM COMPANY (Special to Ironmongeries Door Hardware)

    + Golden Sand Hotel in HoiAn town, QuangNam Province: Supply and Support thetechnical aspect of door hardware of all project areas.

    + Park Hyatt Saigon Hotel: Supply, Install, and support technique aspect of doorHardware such as smartcard lock of all the guest room, and all the hardware of otherareas.

    19961999SINHNAM INDUSTRIAL SinhNam is sub-contractor of the LE glass-door-windowcontractor undertaken the installation all doors.Construct all the Steel, Glass, Aluminium doors and windows of some projects:

    +Sheraton Saigon hotel: Construct the Glass, Aluminum Door & Window especially

    canopy area.

    +Sofitel Saigon Plaza Construct the Aluminum & Door & Window .

    19931996A&B ENGINEERING Specialize to Glass & Aluminium:Construct some projects such as:

    +Focal Fiber Optic Cable factory National road #1, Binh An Hamlet, NgaiThangCommune, DiAn District, BinhDuong Province.

    +SunWah Tower 115 NguyenHue street, Dist 1, HCMC : Construct all aluminum

    doors and windows especially the Curtain Wall Faade.

    19911993 HAI THANH COMPANY- Specialize to pre-engineering+Design, Fabricate and construct the pre-engineering projects in HCM city

    19891991 No.1 Construction Company A middle-size Construction Company in BinhDinhProvince

    +Phu Phong Unravel Silk Cocoon Factory, Phu Phong Town, Tay Son Dist, Binh DinhProvince

    +BinhDinh AC-Bagexco Granite Processing Plant National Road #19 , Nhon ThoCommune, AnNhon Dist., BinhDinh Province

    +Villa & House Park of foreign expert of Vinh Son Hydroelectricity Plant, Vinh Kimhamlet, VinhSon commune, VinhThanh Dist, BinhDinh Province

  • 7/29/2019 2.Resume-Bui Van Luong

    6/8

    Bui Van Luong Resume Page 6 of 8

    5. PROFESSIONAL SKILL

    Project Managementfor all project stages :

    Analysis to structuralsolutions, Manage theproject contracts,perform QA/QC

    system, Control costand schedule,Inspecting ConsultantCivil Work andFinished work4C. PROFESSIONALSKILL

    + Knowledge in respect of building materials for exterior and interiordecoration.

    +Knowledge aspect of Fidic contract especially design by employer form(RedBook 1987, RedBook 1999)

    + Manage all designers example Architect, Structure and MEP design+Divide a large project into the work packages in accordance with each

    contractor ability and manage them by the contract .

    + Estimate cost and control cost in the project execution stage during time+ Prepare tender document and conduct procurement for each work

    package+ Carry out procedures of inspecting the construction site+ Inspecting and checking and taking over the buildings from contractors+ Inspecting and warning the contractor about technical errors/ issues,

    safety issues regarding the operation of machines and equipments atthe site, and above all ensuring the labor safety at the site as well asthe their late Schedule.

    + Checking and confirming the interim payment certificate and finalpayment certificate as per contract.

    + Working in structure, finishing, and fit out work of the different projects.

    +Managing the HSE matters and warning the factors cause accident onsite.

  • 7/29/2019 2.Resume-Bui Van Luong

    7/8

    Bui Van Luong Resume Page 7 of 8

  • 7/29/2019 2.Resume-Bui Van Luong

    8/8

    Bui Van LuongResume Page8of 8


Recommended