RSUME1. PERSONAL
Full Name: BUI VAN LUONG
Date of Birth : 11 - 07-1969
Home Address: 35 Street 55A-Quarter 9- Ward TanTao- District Binh Tan- Ho Chi Minh City
Home phone : 08 - 37540901
Mobile phone : 0908 754 714 0908 256 854
Email : [email protected]
Career object: - I always want to develop myself professionally with a leading constructionconsultant company and learn new skills by meeting new challenges.- I am looking for an opportunity to utilize all my potential and maximize myexperience of working in the construction industry in the past 22 years.- In all given assignments, I work very hard with all my enthusiasm, ethic business
and integrity. I am well disciplined and honest.
2. FOREIGN LANGUAGE & COMPUTER SKILLS
English Certificate level B
Computer Auto CAD, Microsoft offices, Microsoft Project, SAP2000, Etab
3. Education - Qualification
1987-1989 College of Construction No.6 TuyHoa Town, Phu yen Province Civil & IndustriaTechnician .
1997-2002 Bach Khoa HCM City University Civil & Industry Engineer
08/2007 Construction Supervision & Consultant Certificate from VietNam Ministry of Construction
12/2008 Certificate of Construction Project Management from American Society Civil Engineer
12/2009 Certificate of Structure Design from Ho Chi Minh City Construction Department
08/2010 Certificate of Construction Management from Open University of Ho Chi Minh City
4. WORKING PROCESS - PROFESSIONAL EXPERIENCES
7/29/2019 2.Resume-Bui Van Luong
2/8
Bui Van Luong Resume Page 2 of 8
2010Now VMC Project Management- Level 6,Satra Building, 58 Dong Khoi Street, Dist 1, HCMC
1. Finishes Manager :Novotel Saigon Centre 63-65 Hai Ba Trung Street, District 3 Ho Chi Minh City. Thisproject divide into 24 packages.
- Participate to interview the ID tender packages such as Guestroom package,Ballroom package, Restaurant package, Swimming pool package,,,
- Manage all finish and fit-out works of all project works including BOH and FOH area.
- Attend the coordinated site meetings between the contractors such as Civilcontractor. Fit-out contractor, MEP contractor, etcPropose the solution deal withproblem.
- Review and approve the contractor shop drawings combine with specification,drawing in the contract, and MEP drawing.
- Supervise material sampling, testing compliance with contract.
- Supervise and inspect the site activities according to the approved shop drawing.
- Issue the NCRs when contractors failure to comply the contract.
- Compile, control, and close the Defect & Omissions List
- Track and evaluate each activity in the weekly progress.
- Issue the Site Instruction for the additional work out of the BOQ in contract.
20102011 VinaProjects Management Co.,Ltd. 16-20 Hai Ba Trung Str, Dist.1, HCMC, Viet Nam
1. Assistant Construction Manager :
Sheraton NhaTrang 26-28 Tran Phu Street Nha Trang City- Khanh HoaProvince.
- Manage all the Works of all contractors and coordinate to all contractor works suchas MEP works, Civil works and fix-out works
- Compile, control, and close the Defect & Omissions List
- Hold the coordinated site meetings between the contractors such as Civil contractor.Fit-out contractor, MEP contractor, etcPropose the solution deal with problem.
- Approve the civil shop drawings such as BOH shop drawing
- Combine with design consultant on order to approve the shop drawing especially fit-out shop drawings of FOH area.
- Inspect the site activities according to the approved shop drawing.
- Issue the Site Instruction for the additional work out of the contract.
- Check and evaluate each contractor activity in the contractor payment record prior totransmit CM issue the Payment Certification to contractor.
7/29/2019 2.Resume-Bui Van Luong
3/8
Bui Van Luong Resume Page 3 of 8
20072010HBP Project Management Co., Ltd.
4A Ben Van Don, Dist 4, Ho Chi Minh City, Viet Nam
1. Senior Engineer :
+Sunrise City Project PlotV Nguyen Huu Tho Boulevard District. 7 HCM City:
-Manage the Barrette Pile work, Diaphragm Wall work, Basement work (Construct by
the Top-Down method statement ):-Monitor and control the kingpost manufacture in workshop including the materialsampling, NDT the welds.
-Supervise and Inspect the barrette pile work and the kingpost erection on site.
-Warn the contractor aspect of the factors cause technical errors and propose thepreventives.
-Contribute the expert judgment aspect of the method statement prior CM approve it.
+Centre Point Project 106 Nguyen Van Troi District. Phu Nhuan HCM City:
-Manage all work of main contractor and nominated sub-contractor such as BoredPiles, Diaphragm Wall, Basements, Superstructure, STP, Finishing, landscaping workand coordinate the MEP work with these works.
- Uncover the conflicts of architect design and MEP design and send RFI aspect ofthese problems to the design consultant.
- Supervise material sampling, testing compliance with contract.
-Supervise and inspect the site activities according to the approved shop drawing.
- Contribute the expert judgment aspect of the method statement prior CM approve it.
- Compile, control, and close the Defect & Omissions List.
- Track and evaluate each activity in the weekly progress.
7/29/2019 2.Resume-Bui Van Luong
4/8
Bui Van Luong Resume Page 4 of 8
20042007 Cotecland Joint Stock Company
1. Site Manager :
+Aview Apartment Project Phong Phu commune, Binh Chanh Dist., HCM City
- Construct the piling work, Basement work, and superstructure Works such as toorganize all the work on site as per contract: distribute the civil works into the crews,teams, sub-contractors; organize the crew carry-out the HSE matters and monitoring& controlling them.
- Plan the Materials, Resources, Plants of project.- Organize, Arrange the site construction plan.- Create the method statement and submit to CM.- Track, evaluate, and adjust each activity of the sub-contractor in order to meet theproject master schedule.
- Assign the roles and responsibilities to each site management staff.- Monitor and Control the changed design and Additional work out of the contract.- Create and submit the VO, claims to the CM issuing the payment certification.
- Hold the coordinate meetings between the crews, sub-contractors aspect of the siteworks.
- Lead and Assign the site Safety & Security responsibilities to the Safety-Security
Manager.- Compile and Negotiate the contract with the material suppliers.
2. Vice Site Manager :
+The Lancaster Project 22 Le Thanh Ton Street District. 1 HCM City:
-Construct the Superstructure Work, Finishing work involve to create, organize theshop drawings, Method Statements, HSE matters on site .
- Find out the conflicts of the architectural drawing and MEP drawing and send RFIaspect of such problems to CM.
- Compile contracts of the teams, crews, sub-contractors.
- Manage and Control the teams, crews carrying out works on site.- Manage and Control the Safety & Security Team on site.
+The Golden Tower Project Nguyen Binh Khiem & Nguyen Thi Minh Khai corner
- Construct the Basement Work, Superstructure Work, Finishing work involve to create,organize the shop drawings, Method Statements, HSE matters on site .
- Find out the conflicts of the architectural drawing and MEP drawing and send RFIaspect of such problems to CM.
- Compile contracts of the teams, crews sub-contractors.
- Manage and Control the teams, crews carrying out works on site.
- Manage and Control the Safety & Security Team on site.
20012004 HOA BINH CORPORATION COMPANY
Construct some projects :
+The Long Thanh Golf Villa: Construct the Structure work, Finishes work and Fit-outwork.
+The My Khanh Apartment Phu My Hung New City Park: Construct the structure &Finishes work
+Park Hyatt hotel: Construct the finishes work in swimming pool & BOH area (HoaBinhis China States Construction Engineering Corporations sub-contractor):
7/29/2019 2.Resume-Bui Van Luong
5/8
Bui Van Luong Resume Page 5 of 8
- Supervise the brickwork, water proofing work. plastering work, painting work, tilingwork, door work and inspect these work with CM
19992001 PROTECT-AIM COMPANY (Special to Ironmongeries Door Hardware)
+ Golden Sand Hotel in HoiAn town, QuangNam Province: Supply and Support thetechnical aspect of door hardware of all project areas.
+ Park Hyatt Saigon Hotel: Supply, Install, and support technique aspect of doorHardware such as smartcard lock of all the guest room, and all the hardware of otherareas.
19961999SINHNAM INDUSTRIAL SinhNam is sub-contractor of the LE glass-door-windowcontractor undertaken the installation all doors.Construct all the Steel, Glass, Aluminium doors and windows of some projects:
+Sheraton Saigon hotel: Construct the Glass, Aluminum Door & Window especially
canopy area.
+Sofitel Saigon Plaza Construct the Aluminum & Door & Window .
19931996A&B ENGINEERING Specialize to Glass & Aluminium:Construct some projects such as:
+Focal Fiber Optic Cable factory National road #1, Binh An Hamlet, NgaiThangCommune, DiAn District, BinhDuong Province.
+SunWah Tower 115 NguyenHue street, Dist 1, HCMC : Construct all aluminum
doors and windows especially the Curtain Wall Faade.
19911993 HAI THANH COMPANY- Specialize to pre-engineering+Design, Fabricate and construct the pre-engineering projects in HCM city
19891991 No.1 Construction Company A middle-size Construction Company in BinhDinhProvince
+Phu Phong Unravel Silk Cocoon Factory, Phu Phong Town, Tay Son Dist, Binh DinhProvince
+BinhDinh AC-Bagexco Granite Processing Plant National Road #19 , Nhon ThoCommune, AnNhon Dist., BinhDinh Province
+Villa & House Park of foreign expert of Vinh Son Hydroelectricity Plant, Vinh Kimhamlet, VinhSon commune, VinhThanh Dist, BinhDinh Province
7/29/2019 2.Resume-Bui Van Luong
6/8
Bui Van Luong Resume Page 6 of 8
5. PROFESSIONAL SKILL
Project Managementfor all project stages :
Analysis to structuralsolutions, Manage theproject contracts,perform QA/QC
system, Control costand schedule,Inspecting ConsultantCivil Work andFinished work4C. PROFESSIONALSKILL
+ Knowledge in respect of building materials for exterior and interiordecoration.
+Knowledge aspect of Fidic contract especially design by employer form(RedBook 1987, RedBook 1999)
+ Manage all designers example Architect, Structure and MEP design+Divide a large project into the work packages in accordance with each
contractor ability and manage them by the contract .
+ Estimate cost and control cost in the project execution stage during time+ Prepare tender document and conduct procurement for each work
package+ Carry out procedures of inspecting the construction site+ Inspecting and checking and taking over the buildings from contractors+ Inspecting and warning the contractor about technical errors/ issues,
safety issues regarding the operation of machines and equipments atthe site, and above all ensuring the labor safety at the site as well asthe their late Schedule.
+ Checking and confirming the interim payment certificate and finalpayment certificate as per contract.
+ Working in structure, finishing, and fit out work of the different projects.
+Managing the HSE matters and warning the factors cause accident onsite.