AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview
Transcript
Page 1: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

AASHTO SUBCOMMITTEE ON

CONSTRUCTION

AUGUST 2010

SHRP 2 Renewal Program Overview

Page 2: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

What Questions will be addressed?

What is Highway Renewal? Why is it important? What is the SHRP 2 Renewal Program? How can I use the SHRP 2 Products?

Page 3: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

What are we facing

Heavy Traffic Volumes

Concern to maximize the movement of traffic

Restrictions on the time and length of traffic lane closures

Need to maximize service life of facilities

Need to minimize impacts to the community

Page 4: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

What is Highway Renewal?The reconstruction or substantial rehabilitation of deteriorating highway infrastructure to new standards of service, while the infrastructure continues to serve the traveling public.

Rapid Renewal implies accelerated construction but also includes project delivery, design, and operational & maintenance features that minimize the total project length and produces long lasting facilities

Page 5: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

R09. Risk ManualR09. Risk Manual

R06. High-Speed NDT*

R06. High-Speed NDT*

R04. Innovative Bridge DesignsR04. Innovative Bridge Designs

R01. Locating Utilities*

R01. Locating Utilities*

R02. Geotech Solutions

R02. Geotech Solutions

R05. Modular Pavement

R05. Modular Pavement

R07. Performance Specs

R07. Performance Specs

R16. Railroad-DOTMitigation Strategies

R16. Railroad-DOTMitigation Strategies

R15. Integrating Utility and

Transportation Agency Priorities*

R15. Integrating Utility and

Transportation Agency Priorities*

R23. Using Existing

In-place Pavement & Achieving long

Life

R23. Using Existing

In-place Pavement & Achieving long

Life

R21. Composite Systems

R21. Composite Systems

R26. Preservation Approaches

R26. Preservation Approaches

R19. Bridges for Service Life of 100 Years*

R19. Bridges for Service Life of 100 Years*

Rapid Approaches Long-Lived FacilitiesMinimize Disruption

28 Research Projects - $32 Million

R11. Strategic Approaches at

Corridor/Network Level

R11. Strategic Approaches at

Corridor/Network Level

R10. Project Management for Large Projects

R10. Project Management for Large Projects

R03. Worker FatigueR03. Worker Fatigue

Technology Related

Project Delivery RelatedIndicates Multiple Projects

*

Page 6: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

Prime contractor: Battelle InstituteProject Completion: March 31, 2012

R03. Identifying and Reducing Worker, Inspector, and Manager Fatigue in Rapid Renewal Environments

Anticipated Outcomes

• Techniques to reduce worker fatigue• Strategies to incorporate fatigue reducing practices into

rapid renewal projects• Strategies to educate the transportation community and

leaders on the importance of mitigating fatigue.

2009 2010 2011

Phase 1Phase 1 Phase 2Phase 2

2012

Page 7: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

R07. Performance Specifications for Rapid Highway Renewal

– Guidelines for ranking performance parameters (e.g., time, quality, cost, risk, complexity) based on project type

– Specifications for different highway renewal scenarios and guidelines for their implementation

– Electronic version of Specifications available for use by practitioners

Anticipated Outcomes

2007 2008 2009 2010 2011

Phase 2 Phase 3 Phase 4Phase 1

2012

Prime contractor: Trauner Consulting Services, Inc Project Completion: February 2012

Page 8: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

Prime contractor: Golder Associates Inc

Project Completion: Fall 2010

R09. Guide for the Process of Managing Risk on Rapid Renewal Contracts

• Guide for conducting risk management on rapid renewal contracts

• Materials to aid SHAs with the implementation of the Guide, including two test workshops

Anticipated Outcomes

2007 2008 2009 2010 2011 2012

Phase 1Phase 1

Page 9: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

2007 2008 2009 2010 2011 2012Project R09

Completed Assessment of Guide to Risk Assessment and

Allocation for Highway Construction Management for applicability to Rapid Renewal Contracts.

Development of components of the risk report that need to be further developed for Rapid Renewal application.

Guide, Training Materials and Workshops Workshop with NCDOT in October 2009 2nd Workshop May 2010 in Redmond Washington

R09. Guide for the Process of Managing Risk on Rapid Renewal Contracts

Phase 1Phase 1

Page 10: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

Prime contractor: Iowa State UniversityProject Completion: February 2012

R10. Project Management Strategies for Complex Projects

Anticipated OutcomesTools that transportation agencies can be use to develop innovative and effective project management strategies to accelerate sound decision-making during rapid renewal projects.• A guidebook for innovative project management• Example Case studies of project management strategies for

complex projects• Workshop and training packages to support adoption of these

management strategies by all stakeholders

2009 2010 2011

Phase 1Phase 1 Phase 2Phase 2 Phase 3Phase 3

2012

Page 11: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

Current Project Management ModelQuality

Cost ScheduleTraditional “Iron

Triangle” of Project Management

Page 12: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

Proposed Project Management Framework

Quality (Technical)

Context

Schedule

Cost Financing

Page 13: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

SHRP 2 Products – How do they fit

R06E

R06B

R05

R21

R02

R06C

R23R06D

R07 R2

6

Page 14: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

SHRP2 Renewal Solutions

R05

R07R06E

R02

R23R21

R06C R06B

R06D R26

Page 15: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

SHRP 2 Renewal The Life Cycle Approach

Procurement

Design

Planning

Operations & Maint

Construction

Page 16: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

Planning Design

SHRP 2 Renewal The Life Cycle Approach

DOT/Railroad Successful Practices and Model Agreements

DOT/Utility Successful Practices

Guidelines and tools for:• Project Management• Risk Management• Corridor and Network Level planning for Renewal Projects

DOT Utility Successful Practices

Tools and Guidelines for Utility Location and Relocation

NDT tools for gathering data for input into Design

Design Guidelines and tools for:• Long Life Pavements• Geotechnical Solutions• Long life Bridges

Page 17: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

SHRP 2 Renewal The Life Cycle Approach

DOT Railroad Model Agreements

DOT Utility Best Practices

Guidelines and tools for:• Performance Specifications• Project Management• Risk Management and Transfer

• Worker and Manager Fatigue Management

Construction Guidelines and tools for:• Long Life Pavements

Modular Pavements Composite Pavements Using Existing Pavement

in place• Geotechnical Solutions• Long life Bridges• Worker Fatigue

NDT tools for Construction QA/QC

ProcurementProcurement ConstructionConstruction

Page 18: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

SHRP 2 Renewal The Life Cycle Approach

NDT tools to assess the ongoing condition of roadways, bridges, and Tunnels

Guidelines and tools for:• Preservation approaches for

High Traffic Volume

Roadways

• Maintenance and

preservation of 100 year

bridges

Operations & Maint.Operations & Maint.

Page 19: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

Construction Quality Assurance Tools

Operations & Maint.

Construction

Nondestructive Testing Tools

Evaluation of Field Spectroscopy Devices

Real-Time Smoothness Measurements of PCC Pavements

Infrared and GPR for Uniformity Measurement of New HMA Layers

Page 20: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

What SHRP 2 is doing … Condition Assessment

Nondestructive Testing Tools

Planning DesignOperations & Maint.

NDT to Identify Delaminations between HMA Layers

NDT to Identity Bridge Deck Deterioration

NDT for Tunnel Linings

Page 21: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

Long Life Pavements

Design guidelines

Focusing on tools for the design, construction, and preservation of long life pavements.

Construction guidelines

• New composite pavement systems• Using the existing pavement structure in place

for use during new pavement construction• Modular Pavement Systems• Soil Stabilization• Guidelines for assesses real-time PCC

Pavement Smoothness During Construction

Guidelines for pavement presentation on High Traffic Volume Roadways

NDT tools for condition assessment

Planning Design ConstructionProc. Operations and Maint.

Page 22: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

Service Limit State Design Focus on developing

new design codes that incorporate a rational approach based on SLS for durability and performance of bridges

performance measures that utilize full probability-based service life design criteria

Long Life Bridges

• Recommendations for LRFD Design and LOAD RATING Specs

• SLS approach, method for re-calibration, toolbox database, examples

• Implementation plan

Planning Design ConstructionProc. Operations and Maint.

Page 23: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

• Recommendations for LRFD Design Specs

• Analysis methods• Details

Innovative systems

Focus onImproving existing and prove promising concepts for systems, subsystems, and components that historically limit the service life of bridges

Long Life Bridges

Recommendations for LRFD

CONSTRUCTION Specs

Stand-alone guide devoted to Design for Life.

Planning Design Operations & MaintConst.Proc.

Page 24: AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

www.trb.org/shrp2Thank you for listeningThank you for listening