About us
www.stahlbaupichler.com for facts, trends, ideas.
This current publication of the Stahlbau Pichler reference book
provides a glimpse of our projects for over 30 years...
It demonstrates the willingness of our professional collaborators to commit to the company’s continued growth and significant suc-cess.
This book is a glimpse of what is to come, suggesting even more innovative steel constructions which we are determined to be the leading competitors in.
Stahlbau Pichler’s mission is to design, produce and build turnkey industrial buildings and plants, while using high-end technology solutions.
Our intention is to guarantee the quality of our steel structures and envelopes by constantly perfecting them to ensure the top quality and security performance of our buildings.
We wish to offer positive solutions answering to our customers’ requirements by means of close collaboration with engineers and clients from the preliminary design stage onward.
Our commitment to promote the advantages of a ‘one project-one vision’ partner has resulted in considerable energy savings for and excellent relationships with our customers all over Europe.
ENGINEERING
One Project - One VisionStahlbau Pichler is proud to present to its costumers a unique integrated
merger between steel structures and envelopes, leading to the generation of
a Value Added Process to be shared among all partners throughout various
phases of the project.
From the preliminary concept to the final certificate of completion, we mana-
ge your project. Whether it’s a high rise building with a unitized curtain wall
or an industrial steel structure with metal cladding, working with one manu-
facturer - Stahlbau Pichler - delivers significant improvements and savings.
CONSTRUCTION
Office Building Fiera Milano Rho, Milano (I), 5+1 Architetti Associati
Pichler Stats
Employees Turnover Production Value Turnover Countries
200
150
100
50
0
80
60
40
20
0
Façades
Italy
Russia
Other
GermanyAustria
Steel Structures
Mio
. Eur
o
2005 2006 2007 2008 2009 2010 2005 2006 2007 2008 2009 2010
45%
55% 62%
15%10%
8%5%
Pichler International
Bolzano
Stahlbau Pichler Ges.m.b.H.Grabenweg 67/III, 6020 Innsbruck
AUSTRIA
Stahlbau Pichler D. GmbHZettachring 8, 70567 Stuttgart
GERMANY
000 Pichler RusUl. Mal. Pirogovskava 18, 119435 Moscow
RUSSIA
Stahlbau Pichler GmbH/Srlvia Edison Str. 15, 39100 Bozen/Bolzano
ITALY
Pichler I&S GmbH/Srlvia Edison Str. 15, 39100 Bozen/Bolzano
ITALY
Office LienzMuchargasse 5, 9900 Lienz
Office Milanovia Pietro Rondoni 11, 20146 Milano
100%100% 100%
100%
LienzInnsbruck
Stuttgart
Milano
Moscow
Sales / Technical Administrative Department
Board of Directors
Company Organization Chart
Administrative Department
Company Lawyer
Construction Purchasing
Maintenance
Production
Marketing
Sales / Project Management
External offices
(VK, PLG, TE, EK, MO, VW)
Technical Office Management Steel
Technical Office Management
Steel and Facade
Structural Engineering
Technical Office Management Facade
Facade Engineering
Project Management
Installation/ Assembly on site
Sales ItalySales / Project Management
Parent company
Head of Production Facades
Head of Production Steel
Supervisory Board Controlling/EDV
Health & Safety
Quality Management
H & S on site
Quality Assurance/Quality Control Facades
Quality Assurance/Quality Control Steel
Sales / Technical Administrative Department
Board of Directors
Branch offices
Branch Office GERMANY
Branch OfficeRUSSIA
Branche Office AUSTRIA
Sales/Project Management Headquarters
Sales/Project Management Headquarters
Sales/Project Management Headquarters
Supervisory Board Controlling/EDV
Health & Safety
Quality Management
H & S on site
Quality Assurance/Quality Control Facades
Quality Assurance/Quality Control Steel
REFERENZEN
INDUSTRIAL PLANT
ENEL SpATORREVALDALIGA NORDCOAL FIRED POWER PLANTCIVITAVECCHIA (I) 2007-2009
Steel structure: over 10.000 tCladding: 65.000 m²Total amount: € 40.000.000,00
workers on site: ca. 3.500total amount: ca. 1.500 mio. EURbuilding site area: ca. 35 hasmokestack: 250 m hight
present companies at building site: ca. 300150 Stahlbau Pichler workers were present in peak-periods
HEADQUARTERS & PRODUCTION
SangalliGlass Furnance
San Giorgio di Nogaro (I), 2010
Client: Sangalli Vetro SpA / Zippe Italia Srl
Steel structures:
3.100 t
Total amount:
8.600.000 €
PRODUCTION HALL
Fiat CassinoCassino / Naples (I), 2008
Client: Costruzioni Generali Gillardi SpA
Steel structures:
3.500 t
Erection on site:
4 months
Total amount:
7.000.000 €
PRODUCTION HALL
Voest AlpineSteeel Mill
Linz (A), 2008
Client: Voest Alpine Anarbeitung GmbH
Steel structures:
2.000 t
Total amount:
4.600.000 €
INDUSTRIAL PLANT
MemcSilicium Manufacture
Merano/Meran (I), 2010
Client: Evonik Degussa Itaila SpA / Co-ver
Holding Srl / Memc Electronic Materials SpA
Steel structures:
2.200 t
Cladding:
1.500 m²
Total amount:
9.300.000 €
INFRASTRUCTURES
ÖBB WienMain Train Station
Wien (A), 2012
Client: ARGE HBF-WIEN-BL01 STRABAG-
ALPINE-PTU-P+B
Steel structures:
800 t
Total amount:
1.650.000 €
INFRASTRUCTURES
The SquaireConnecting Bridge THE SQUAIRE
Airport Frankfurt (D), 2012
Client: IVG THE SQUAIRE Parking Betriebs GmbH
Steel structures:
500 t
Cladding:
550 m²
Total amount:
3.680.000 €
HEADQUARTERS & LOGISTIC CENTRE
WuerthEgna/Neumarkt (I), 2001
Client: Würth Italia Srl
Architect: Walter Pichler & Partner
Steel structures:
1.200 t
Cladding:
19.000 m²
Total amount:
4.100.000 €
HEADQUARTERS
Eli LillyPhamaceutical Company
Firenze (I), 2008
Client: Eli Lilly Italia SpA
Architect: Jacobs Italia SpA
Steel structures:
900 t
Total amount:
4.600.000 €
INDUSTRIAL PLANT
Incinerator PadovaPadova (I), 2011
Client: Edilbasso SpA
Steel structures:
1.100 t
Cladding:
4.000 m²
Total amount:
3.500.000 €
INDUSTRIAL PLANT
Zippe ApriliaConveyor belts for glass manufacture
Aprilia (I), 2010
Client: Zippe Italia Srl
Steel structures:
230 t
Total amount:
670.000 €
INDUSTRIAL PLANT
Water treatment plant ZueblinZagreb (HR), 2008
Client: Zueblin AG
Steel structures:
130 t
Cladding:
7.500 ²
Total amount:
1.050.000 €
INCINERATOR
Incinerator BolzanoBolzano/Bozen (I)
Client: Autonome Provinz Bozen
Architect: Claudio Lucchin
Steel structures:
2.500 t
Total amount:
4.800.000 €
Projekt
Atzw
angerSholkow
oBesch
reibung
-Bearbeiter
-
POWER PLANT
ShelkovoElectrical power plant
Moscow (RUS)
Client: IPK Planung / Shelkovo
Steel structures:
700 t
Total amount:
3.000.000 €
HEADQUARTERS & PRODUCTION
AtzwangerBolzano/Bozen (I)
Client: Atzwnager AG - SpA
Architect: Walter Pichler & Partner
General Contractor: Stahlbau Pichler Srl
Total Amount:
4.850.000 €
Steel structures:
220 t
Cladding:
450 m2
HEADQUARTERS & PRODUCTION
Rizzoli CucineTrodena (I), San Lugano
Client: Rizzoli Cucine Srl
Architect: Walter Pichler & Partner
General Contractor: Stahlbau Pichler Srl
Total Amount:
5.450.000 €
Steel structures:
900 t
Cladding:
1.600 m2
CERTIFICATES
UNI EN ISO 9001:2000
valid until: 2013/02/12
entity: TÜV ITALIA SRL
Design, manufacture and installation of steel
and metal structures, continuos facade, metal
coatings, roofing and wall elements; building
construction (EA 28a, 17)
SOA NordEst
valid until: 2013/02/03
entity: TÜV ITALIA SRL
Cat. OS18 Class. VIII
Cat. OG1 Class. VIII
Cat. OG3 Class. III
Cat. OS6 Class. IV
EUROPEAN FEDERATION
FOR WELDING, JOINING
AND CUTTING
valid until: 2014/03/16
entity: IIS GENOVA“Großer Eignungsnachweis” SLV München
valid until: 2013/02/20
entity: SLV MÜNCHEN
Welding certificate
DIN 18800-7
DIN 18801
DIN 18808
CERTIFICATES
ANKÖ - EINTRAGUNG
valid 2012
entity: Auftragnehmerkataster Österreich
GOST - RUSSIA QUALITY
valid until: 2012/09/26
entity: Spezstroyzertifikazija
Page 1/2
Construction Permission / Certificate Design Permission / Certificate
CERTIFICATES
Quality Certificate: Welding Swiss
Entity: SIA
valid until: 2014/09/01
OHSAS 18001:2007
valid until: 2014/04/28
entity: TÜV SÜD, SWISS TS
Design, manufacture and installation of steel
and metal structures, continuos facade, metal
coatings, roofing and wall elements; building
construction
HEALTH & SAFETY CERTIFICATES