+ All Categories
Home > Documents > Accessible BRT: Getting It Right From the Start Cosette Rees Lane Transit District Eugene, Oregon...

Accessible BRT: Getting It Right From the Start Cosette Rees Lane Transit District Eugene, Oregon...

Date post: 19-Jan-2016
Category:
Upload: lorena-jones
View: 215 times
Download: 0 times
Share this document with a friend
Popular Tags:
12
Accessible BRT: Getting It Right From the Start Cosette Rees Lane Transit District Eugene, Oregon 2009 Bus Rapid Transit Conference
Transcript
Page 1: Accessible BRT: Getting It Right From the Start Cosette Rees Lane Transit District Eugene, Oregon 2009 Bus Rapid Transit Conference.

Accessible BRT:Getting It Right From the Start

Cosette ReesLane Transit District

Eugene, Oregon

2009 Bus Rapid Transit Conference

Page 2: Accessible BRT: Getting It Right From the Start Cosette Rees Lane Transit District Eugene, Oregon 2009 Bus Rapid Transit Conference.

As you approach a large project, evaluate your:

• Reputation• Communication channels• Commitment

Page 3: Accessible BRT: Getting It Right From the Start Cosette Rees Lane Transit District Eugene, Oregon 2009 Bus Rapid Transit Conference.

Create your project advisorygroups and include:

• Broad thinkers• Transit-aware• Informed

Page 4: Accessible BRT: Getting It Right From the Start Cosette Rees Lane Transit District Eugene, Oregon 2009 Bus Rapid Transit Conference.

Involve your advisory groups.

• Conceptual phase• Design phase• Construction phase• Implementation and beyond

Page 5: Accessible BRT: Getting It Right From the Start Cosette Rees Lane Transit District Eugene, Oregon 2009 Bus Rapid Transit Conference.

Building the Concept

• Plan a high-profile field trip.

• Share relevant examples.• Keep your advisors involved

and informed.

Page 6: Accessible BRT: Getting It Right From the Start Cosette Rees Lane Transit District Eugene, Oregon 2009 Bus Rapid Transit Conference.

EmX Vehicle Design

• LTD Mock-up

Page 7: Accessible BRT: Getting It Right From the Start Cosette Rees Lane Transit District Eugene, Oregon 2009 Bus Rapid Transit Conference.

EmX Vehicle Design

• Throw a party!

Page 8: Accessible BRT: Getting It Right From the Start Cosette Rees Lane Transit District Eugene, Oregon 2009 Bus Rapid Transit Conference.

• Vehicle Preview

EmX Vehicle Design

Page 9: Accessible BRT: Getting It Right From the Start Cosette Rees Lane Transit District Eugene, Oregon 2009 Bus Rapid Transit Conference.

EmX Stations

• Insight Advisory Group

Page 10: Accessible BRT: Getting It Right From the Start Cosette Rees Lane Transit District Eugene, Oregon 2009 Bus Rapid Transit Conference.

Treat your advisors well.

• Treat them professionally.• Involve them early and often.• Keep them informed.• Give them “the scoop.”

Page 11: Accessible BRT: Getting It Right From the Start Cosette Rees Lane Transit District Eugene, Oregon 2009 Bus Rapid Transit Conference.

The results are worth it!

• Advocates• Champions• Consumer to Consumer

It’s never too early to get started!

Page 12: Accessible BRT: Getting It Right From the Start Cosette Rees Lane Transit District Eugene, Oregon 2009 Bus Rapid Transit Conference.

Questions?

Cosette ReesLane Transit DistrictEugene, [email protected]