Maintenance handbook for BSL-2 and BSL-3 laboratories In accordance with ContainO and PEMO Appendix 1 Safety level 3 laboratories Excel tables are provided as an Appendix to the maintenance handbook. They show the requirements for the maintenance and inspection journals, and give explanations and examples for consistent further development. Maintenance and inspection journals are given for all safety-relevant systems, structured according to safety level 2 and 3 laboratories. They may be completed with reference to the SWKI guidelines or in collaboration with the specialist companies. The Excel tables are weighted towards ventilation systems, as experience has shown that these are the priority for maintenance and inspection journals.
Transcript
Page 1: Appendix 1 Safety level 3 laboratories

Maintenance handbook for BSL-2 and BSL-3 laboratoriesIn accordance with ContainO and PEMO

Appendix 1

Safety level 3 laboratories

Excel tables are provided as an Appendix to the maintenance handbook. They show the requirements for the maintenance and inspection journals, and giveexplanations and examples for consistent further development.

Maintenance and inspection journals are given for all safety-relevant systems, structured according to safety level 2 and 3 laboratories. They may be completedwith reference to the SWKI guidelines or in collaboration with the specialist companies.

The Excel tables are weighted towards ventilation systems, as experience has shown that these are the priority for maintenance and inspectionjournals.

Page 2: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning

Sta

te

Cor

rosi

on

Tigh

tnes

sKey:

Func

tioni

ng

Cle

an

Lubr

icat

e

Rep

lace

Ven

t

Em

pty

Spe

cial

inst

ruct

ions

Maintenance / inspection plan

Cod

e

Individual part

Task Part no.Check

Adj

ust

Offi

cial

regu

latio

ns

Note

Z =

Function

Checks

Reliability

Safety measure

Disposal

Notes

W = Semi-annually

Annually

Maintenance and inspection Name of system / component

WeeklyMonthlyM =

T = 2J=

A = ……………As required

BienniallyDaily V =H =J =

Quarterly

Page 3: Appendix 1 Safety level 3 laboratories

Company:Person responsible:Place / date:

Code Part Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52

Maintenance and Inspection Schedule Year

Location:Facility:Commissioning

carried out by / signed:……………………………..

Date:……………………………..

Page 4: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

WallsCeilingFloorDoorsWindowsPenetrations

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

NotesObserve manufacturer's instructions.

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck surface conditions of epoxy resin on concrete wall / floor for damageCheck door seal (inflatable or rigid) for damageCheck windows (e.g. bulletproof, fire protection class etc.) for damageCheck seals to wall penetrations for damage

in work sheets forindividual parts

ReliabilitySafety can be ensured only if the supplier's instructions are observed.

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planIntegrity is necessary for the surfaces surrounding BSL-3 laboratories, so that theymay be fumigated / decontaminated.

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Surfaces surrounding BSL-3 lab areas

Page 5: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Wastewater deactivationEffluent tanksWater pipes and accessoriesShut-off deviceAnti-flooding devicesDrainage pumpCatch basinDecontaminationValve controlsHEPA filter

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck storage tank, catch basin and pipework for damage, corrosion and fasteningCheck for watertightnessCheck insulation for damageCheck drains for corrosion and damageCheck temperature and pressure gauges for damage and accuracy of display

in work sheets forindividual parts

ReliabilitySafety can be ensured only if the supplier's instructions are observed.

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planBSL-3 laboratories should generally be run as dry labs and not as wet labs.If a wastewater deactivation plant is necessary, it may be desgined as a thermal orchemical installation, depending primarily from the use of the laboratory formicrobiology.

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Wastewater deactivation plant

Page 6: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Holding tankWater heaterPressure boosterWater pipes and accessoriesShut-off deviceService water pumpEye showersEmergency showers

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck holding tank, water pipes and accessories for damage, (external) corrosion andfasteningCheck insulation for damage and completenessCheck for watertightness (visual check)Check sections of pipes for incrustation

in work sheets forindividual parts

ReliabilitySafety can be ensured only if the supplier's instructions are observed.

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planA holding tank should be provided for mains separation between drinking water andservice water (BSL-3 laboratory separate from remaining drinking water supply),according to the state of technology. A pressure booster and water heating for servicewater for lab sinks, eye showers and emergency showers may be needed, dependingon use.

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Service water network

Page 7: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

CompressorsBuffer tanksPressure monitoringCompressed gas cylindersAutomatic swtiching stations

Removal stationWhere applicable, HEPA filter

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck for damageCheck oil levelTop up oilReplace oilCheck functioning of compressor

in work sheets forindividual parts

In accordance withReliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planA compressed air supply system generally consists of compressors, buffer tanks,pressure monitoring equipment, compressed gas cylinders, automatic switchingstation, removal station, and where applicable, HEPA filter

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Compressed air supply

Page 8: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Compressed gas cylindersAutomatic switching stationGas failsafe deviceRemoval stationNon-return valveWhere applicable, HEPA filter

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck installation for damage, dirt, corrosionCheck oil levelTop up oilReplace oilCheck functioning of compressed gas cylinders

in work sheets forindividual parts

In accordance withReliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planCarbon dioxide supply systems generally consists of compressed gas cylinders,automatic switching station, gas failsafe device, removal station, non-return valve, and,where applicable, HEPA filter

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Carbon dioxide supply

Page 9: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Tank installationFilling level monitoringPipesOxygen deficiency warning system

Filling station

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck tank installation for damage, dirt, corrosionCheck functioning of filling level monitoringCheck functioning of pressure monitoringCheck pipes and check functioning of insulationCheck functioning of oxygen deficiency warning system

in work sheets forindividual parts

In accordance withReliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planLiquid nitrogen supply systems generally consist of the following components: Tankinstallation with filling level and pressure monitoring, pipes, shut-off valve and anoxygen deficiency warning system in the lab area.The filling station is situated outside containment

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Liquid nitrogen supply

Page 10: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Fire extinguishersSprinkler systemsSpraymist systems

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks In accordance withCheck sprinkler for coatingsCheck sprinkler settingsCheck pressure vessels for tightnessCheck functioning of shut-off device and safety equipmentCheck pressure relief and shut-off valves in the expansion line

manufacturer's instructions

ReliabilitySafety can be ensured only if the supplier's instructions are observed.

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planNational legislation on fire safety requires fire extinguishers to be provided. Sprinklersystems should be avoided if possible because of contamination through extinguishingwater. In some cases, coordination with the fire service responsible is necessary.Should the fire service require sprinkler or spraymist systems in addition to fireextinguishers, a wastewater deactivation plant should be planned for the extinguishingwater.

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Fire extinguishing system

Page 11: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Untreated steam generatorPure steam generatorHeat exchangerStainless steel pipesCondensation lineBurnerBurner fan

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck steam generator for dirt, damage and corrosionCheck functioning of solenoid valveCheck functioning of heating rodsCheck functioning of water supply, and check water levelCheck functioning of control valve

in work sheets forindividual parts

In accordance withReliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planA separate steam generator may be needed for autoclaves, if they do not have theirown electric steam generation. The steam quality must be coordinated with watertreatment. Heat extraction between untreated and pure steam generation may be usedfor autoclaves to save energy.

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Steam generator

Page 12: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

L01 Device / monobloc housingL11 Coarse dust filterL12 Fine dust filterL21 PWW fan heaterL24 Air coolerL33 Heat recovery grid systemL42 Radial fanL44 MotorL45 Belt driveL46 Fan/motor bearingsL47 Frequency converterL57 Steam humidifierL74 Volume flow controllerL81 Air duct systemL82 Air intake openingL83 WeatherproofingL84 Air outletL88 Fire damperL92 Electrical controlsL93 Measurement/control peripherals

L94 Switchgear combination

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck underpressure in lab areaCheck condensate tray and droplet separator for dirt, corrosion and functioningCheck directed air current into laboratoryCheck fan for dirt, damage and corrosionClean fan parts and drains that are in contact with air to preserve function

in work sheets forindividual parts

In accordance withReliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planConditioning of external air, temperature regulation of supply air to room conditions,regulating humidity of supply air to room conditions, filtering supply airSupply air systems possibly with redundancy (if user requires); air-conditioningsystems (heating, cooling, humidifying, dehumidifying); heat recovery; silencing; supplyair filter (2-level); pressure monitoring for filters and ducts; cooling pipes; volume flowcontroller for supply air.Users of BSL-3 laboratories may require a redundant second supply air system.

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Air-conditioning system (AC) Supply air

Page 13: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

L01 Device / monobloc housingL11 Coarse dust filterL33 Heat recovery grid systemL42 Radial fanL44 MotorL45 Belt driveL46 Fan/motor bearingsL47 Frequency converterL74 Volume flow controllerL81 Air duct systemL83 WeatherproofingL84 Air outletL88 Fire damperL92 Electrical controlsL93 Measurement/control peripherals

L94 Switchgear combination

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck heat exchanger for dirt, damage and corrosionCheck air filters for inadmissible dirt and damage (leakage); replace the air filter inquestion if filter stage was last replaced less than 6 months ago; otherwise replace theentire filter stageCheck differential pressure; if necessary replace filter stage

in work sheets forindividual parts

In accordance withReliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planExhaust air systems for BSL-3 laboratories should be designed with redundancy. Theexhaust air system should include heat recovery; silencing; exhaust air filter to protectheat recovery; pressure monitoring for filters and ducts; cooling pipes; volume flowcontroller for exhaust air

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Air-conditioning system (AC) Exhaustair

Page 14: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

L01 Device / monobloc housingL11 Coarse dust filterL12 Fine dust filterL13 HEPA filter

Gastight flapsBIBO filter exchangeFilter scanning device

L81 Air duct system

Key:

Maintenance and inspection AC system: HEPA filter ffor exhaust airsystem

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planBSL-3 laboratories should have at least a separate particulate filterbox (HEPA) for theexhaust air side.HEPA filter class may be H13 or H14 or higher, depending on workdone in lab.Prefilters should be provided to protect the HEPA filter and extend itsoperating life. There should be pressure monitoring for the filters.Gastight or airtightflaps with fumigation ports or filter replacements / filter testing devices should beprovided.

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

more detail neededCheck prefilter and HEPA filter for inadmissible dirt and damage (leakage)Replace the air filter in question if permissible differential pressure has been reached,or if filter stage was last replaced less than 6 months ago. Then replace the entire filterstageBefore replacing filter, decontaminate by fumigation or replace filter through BIBO

in work sheets forindividual parts

In accordance with

Checks

Reliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Notes

Safety measure

2J= Biennially

As requiredSemi-annually Z =

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Annually A = ……………

T = Daily V = QuarterlyW = Weekly H =M = Monthly J =

Page 15: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

K01 Alarm systemK02 Energy meterK12 Piping / fittingsK21 Expansion devicesK24 Pressure expansion tankK41 Frequency converterK45 Wet rotor pumpK67 Dry heat exchangerK92 Compressor piston

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck piston, screw and turbo compressors for external dirt, damage and corrosionCheck fastening and running noiseMeasure suction pressureMeasure suction gas temperature before compressorMeasure final compression pressure

in work sheets forindividual parts

In accordance withReliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planCold water generation with a recooling plant (and possibly split units) should beprovided for temperature control in the laboratory; possibly also with redundancy if userrequires.

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Refrigeration for air coolers in ACsystem

Page 16: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Emergency power supplyAccumulatorCharging deviceCables, pipes, railsElectrical protective measures

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck functioning of emergency power supply, check for damage, and checkenvironmental conditionsCheck accumulator and charging device for dirt, damage, corrosion and functioning,and check environmental conditionsClean

in work sheets forindividual parts

In accordance withReliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed.

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planAn emergency power supply should be provided for the safe operation of a BSL-3laboratory. Additionally, a UPS / battery system should be planned. Users should beconsulted in advance about which installations they require to be linked to theemergency power supply and which to the battery system.

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Emergency power supply, UPS / batterysystem

Page 17: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

GeneratorAccumulatorsLow-voltage switchgearReactive current compensation system

Electrical subdistributors

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck generator for functioning, dirt, damage and corrosionCleanLubricate bearingsCheck state of slip rings, carbon brushes and brush holdersCheck switchgears for dirt, damage and corrosion

in work sheets forindividual parts

In accordance withReliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planThe power supply for BSL-3 laboratories should include at least the followingcomponents: general power supply; standby power supply; safety power supply (user-specific); where applicable, generator or accumulators

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Power supply

Page 18: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Central batteryUPSEmergency lightingSafety lighting

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck work safety installation for completeness, damage and if necessary forfunctioning (e.g. voltmeter, actuating rods, replacement fuses, earthing components,warning signs)Check functioning of room lighting and safety lightingCheck that electrical connections including connections of busbars are mechanically

in work sheets forindividual parts

In accordance withReliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planCentral battery for safety lightingIndividual or group batteries for safety lightingUninterruptible power supply (UPS)Normal use (e.g. management, active components)

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Lighting / emergency lighting / safetylighting

Page 19: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

HandsetsSwitchboardJunction boxes

Key:

Maintenance and inspection Telephone system

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planA telephone system in BSL-3 containment should include the following components:handsets, switchboard and junction boxes

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

more detail neededCheck functioning of handsets, check speech intelligibilityCheck functioning of loudspeakersCheck cables for damage and perfect functioning in junction boxes

in work sheets forindividual parts

In accordance with

Checks

Reliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Notes

Safety measure

2J= Biennially

As requiredSemi-annually Z =

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Annually A = ……………

T = Daily V = QuarterlyW = Weekly H =M = Monthly J =

Page 20: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

LoudspeakerScannerCoderCard reader

Key:

Maintenance and inspection Door intercom and door openingsystems

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planA door intercom and door opening system in BSL-3 containment should include thefollowing components: loudspeaker, scanners, coder and card reader

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

more detail neededSee also telephone system, access control system in work sheets for

individual parts

In accordance with

Checks

Reliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Notes

Safety measure

2J= Biennially

As requiredSemi-annually Z =

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Annually A = ……………

T = Daily V = QuarterlyW = Weekly H =M = Monthly J =

Page 21: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Alarm systemMovement sensors

Key:

Maintenance and inspection Electroacoustic alarm system

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planAn electroacoustic alarm system in BSL-3 containment should include the followingcomponents: electroacoustic alarm, movement sensors(including those for access control, intruder detection and CCTV)

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

more detail neededCheck alarm switchboard for dirt, damage and corrosionCheck UPS for dirt, damage and corrosionCheck loudspeakers and connection boxes for damageCheck all loudspeakers for acoustic function, lack of distortion and speech intelligibilityCheck functioning of amplifiers

in work sheets forindividual parts

In accordance with

Checks

Reliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Notes

Safety measure

2J= Biennially

As requiredSemi-annually Z =

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Annually A = ……………

T = Daily V = QuarterlyW = Weekly H =M = Monthly J =

Page 22: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

sKey:

Maintenance and inspection Hazard alert and alarm systems

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planA hazard alert and alarm system in BSL-3 containment should include the followingcomponents: alarm systems for fire, attack, break-in, manned guarding systems,access control systems, and surveillance systems

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

more detail neededSee belowFire alarm systemIntruder detection systemAccess control system

in work sheets forindividual parts

In accordance with

Checks

Reliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Notes

Safety measure

2J= Biennially

As requiredSemi-annually Z =

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Annually A = ……………

T = Daily V = QuarterlyW = Weekly H =M = Monthly J =

Page 23: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Switch elementsTrigger elementsDisplay elementsSmoke and fire detectors

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck switch and display elements for dirt, damage and corrosionCheck functioning of trigger and display elements in the fire alarm systemCheck message transfer settings in the fire alarm system

in work sheets forindividual parts

In accordance withReliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planNew laboratory buildings should be equipped with a fire alarm system throughout. Itshould include a PA system for all lab areas, so that instructions can be given in theevent of an evacuation.

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Fire alarm system

Page 24: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

LoudspeakerAmplifierMovement sensors

Key:

Maintenance and inspection Intruder detection system

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planAn intruder detection system in BSL-3 containment should include the followingcomponents: surveillance of external doors; surveillance of ground-floor and first-floorwindows; surveillance of entrances to lab area and special areas

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

more detail neededCheck loudspeaker systemCheck functioning of amplifierCheck functioning of peripheralsCheck functioning of loudspeaker circuitsCheck speech intelligibility

in work sheets forindividual parts

In accordance with

Checks

Reliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Notes

Safety measure

2J= Biennially

As requiredSemi-annually Z =

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Annually A = ……………

T = Daily V = QuarterlyW = Weekly H =M = Monthly J =

Page 25: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

ScannersCoderCard reader

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck functioning of control panel, check for dirt, damage, corrosion andenvironmental conditionsCheck functioning of card readerCheck functioning of electrical door openersCheck card reader for dirt, damage, corrosion and environmental conditions

in work sheets forindividual parts

In accordance withReliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planMeasures should generally be taken to counter hazards caused by third parties, e.g.vandalism, sabotage or theft. Building security systems (intrusion and hold-updetection systems), intercoms, CCTV, and access control systems cover theserequirements.

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Access control system

Page 26: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

CamerasMovement sensorsVideo cable

Key:

Maintenance and inspection CCTV

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planA CCTV system in BSL-3 containment should include the following components:External CCTV; internal CCTV; movement sensors (including those for access controland intruder detection systems)

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

more detail neededCheck video cable for damage and perfect functioning in connection boxes with pivotframesMeasure parameters and record all connections from the camera boxes and all otherperipheral connection points to central engineering roomCheck movement sensors for each line for dirt, damage and fastening

in work sheets forindividual parts

In accordance with

Checks

Reliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Notes

Safety measure

2J= Biennially

As requiredSemi-annually Z =

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Annually A = ……………

T = Daily V = QuarterlyW = Weekly H =M = Monthly J =

Page 27: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Body of safety cabinetHEPA filterFanUV lighting

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck fan for dirt, damage and corrosion,Check differential pressure in HEPA filter; replace filter if necessary, observing safetyguidelinesCheck locking of sliding windows under UV lightCheck and measure air flow through sliding window into safety cabinet

in work sheets forindividual parts

In accordance withReliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed.

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planEN 12 469 certified; ISO 14644-1; depending on type, fixed connection to duct networkor discharge into laboratory; locking / control through AC system; locking slidingwindow with UV light; type with HEPA filter

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Class II safety cabinet

Page 28: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Body of safety cabinetHEPA filterHEPA FilterVentilatorProtective gloves

Key:

Maintenance and inspection Class III safety cabinet

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planEN 12 469 certified, ISO 14644-1Locking / control through AC system should be observed for Class III safety cabinetsPossible combination with Class II safety cabinet advantageous

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

more detail neededCheck protective gloves for damage and sealCheck differential pressure in HEPA filter; replace filter if necessary, observing safetyguidelinesCheck connections for supply and exhaust air to the AC system

in work sheets forindividual parts

In accordance with

Checks

Reliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed.

Notes

Safety measure

2J= Biennially

As requiredSemi-annually Z =

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Annually A = ……………

T = Daily V = QuarterlyW = Weekly H =M = Monthly J =

Page 29: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Door lockBody of lockany UV tubeControlsGastight doors

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck door lockingCheck connection for fumigation deviceCheck UV tube lock with door opening

in work sheets forindividual parts

In accordance withReliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planAttention should be paid to the following for pass-through locks: controls, gastightdoors, body (material + seal), any UV tubes, automatic fumigation device

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Pass-through locks

Page 30: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Door lockBody of lock

Key:

Maintenance and inspection Dunk tanks

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planAttention should be paid to the following fo dunk tanks: Locking of dunk tank doors;intercom system where applicable; drain for disinfectant

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

more detail neededCheck locking of flapsCheck intercom systemCheck disinfectant drain and clean where applicable

in work sheets forindividual parts

In accordance with

Checks

Reliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Notes

Safety measure

2J= Biennially

As requiredSemi-annually Z =

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Annually A = ……………

T = Daily V = QuarterlyW = Weekly H =M = Monthly J =

Page 31: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Body of autoclaveSteam steriliserDoor lock

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck sterilisation using bioindicatorCheck drainage of condensate waterCheck door lockingCheck filter for steam and exhaust air (type)Check temperature range to be used

in work sheets forindividual parts

In accordance withReliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed.

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planAttention should be paid to the following for pass-through autoclaves for BSL-3applications: Steam or electric steriliser; sterilisation of condensate; gastightinstallation (bioseal); door lock; filter for steam and exhaust air (type); temperaturerange up to 134 °C (prions); volumes for sterilisation

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Pass-through autoclaves

Page 32: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

sKey:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

Disposal

Safety measure

Checks In accordance withmanufacturer's instructions

Reliability

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planGenerally, separate devices coordinated with the particular ventilation systems.

Devices are not considered individually. Please refer to the instructions for use and thedeclaration of conformity supplied with the equipment.

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Fumigation devices

Page 33: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Door lockBody of lock

ControlsGastight doors

Key:

Maintenance and inspection Material airlocks for large equipment

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planAttention should be paid to the following for material airlocks: Controls / locking,gastight doors, connections, body (material + seal)

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

more detail neededCheck door lockingCheck connection for fumigation deviceCheck intercom system

in work sheets forindividual parts

In accordance with

Checks

Reliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Notes

Safety measure

2J= Biennially

As requiredSemi-annually Z =

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Annually A = ……………

T = Daily V = QuarterlyW = Weekly H =M = Monthly J =

Page 34: Appendix 1 Safety level 3 laboratories

Company: Location:Person responsible: Facility:Place / date: Commissioning:

Sta

te

Cor

rosi

on

Tigh

tnes

s

Master computerControl cabinetManual operating control

Key:

Annually A = ……………W = Weekly H = Semi-annually Z = As requiredM = Monthly J =

Notes

T = Daily V = Quarterly 2J= Biennially

DisposalDisposal must be carried out in a correct and environmentally sound way. Pleaseconsult supplier for advice on correct and environmentally sound disposal.

Safety measure

Checks more detail neededCheck control cabinets, control panels and controls for correct and appropriateinstallation, and check environmental conditionsCheck for dirt, damage and corrosionCheck protective covers for completeness and fasteningClean

in work sheets forindividual parts

In accordance withReliability manufacturer's instructionsSafety can be ensured only if the supplier's instructions are observed. In accordance with Swiss

Standard

Offi

cial

regu

latio

ns

NoteLubr

icat

e

Rep

lace

Ven

t

Em

pty

Adj

ust

Spe

cial

inst

ruct

ions

Function Maintenance / inspection planBuilding control technology should have, at least, interfaces to fire alarm and accesscontrol systems, measurement and control technology, and AC systems.For BSL-3 facilties, it is also advisable for information to be relayed to central buildingcontrol, doorman or safety control centre.

Cod

e

Individual part

Task Part no.Check

Func

tioni

ng

Cle

an

Maintenance and inspection Building automation


Recommended