+ All Categories
Home > Documents > APPENDIX 3: DISPLAY BOARDS - govTogetherBC

APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Date post: 11-Dec-2021
Category:
Upload: others
View: 4 times
Download: 0 times
Share this document with a friend
26
APPENDIX 3: DISPLAY BOARDS
Transcript
Page 1: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

APPENDIX 3: DISPLAY BOARDS

Page 2: APPENDIX 3: DISPLAY BOARDS - govTogetherBC
Page 3: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Tunn

el Co

nstr

uctio

n

1949

: Aer

ial p

hoto

grap

h of

Dea

s Isla

nd

and

surro

undi

ng a

rea

1958

: Bui

ldin

g th

e De

as S

loug

h Br

idge

to

conn

ect D

eas I

sland

to D

elta19

50 –

196

0: Th

e La

dner

Ferr

y do

cked

at

Woo

dwar

d’s L

andi

ng in

Rich

mon

d ne

ar N

o. 3

Roa

d

1958

: Low

erin

g th

e tu

nnel

se

ctio

ns in

to p

lace

1957

: Exc

avat

ing

and

build

ing

the

dry

dock

in R

ichm

ond

1959

: Nea

ring

com

plet

ion

of

tunn

el co

nstru

ctio

n

1957

: Tun

nel c

onst

ruct

ion

dry

dock

in R

ichm

ond

with

tunn

el

sect

ions

visi

ble

1959

: The

Tunn

el is

com

plet

ed

and

open

to u

se

1957

: Con

stru

ctin

g th

e Tun

nel

appr

oach

es

2014

: Aer

ial p

hoto

grap

h of

Hi

ghw

ay 9

9 Co

rrido

r

City

of R

ichm

ond

Arch

ives,

Phot

ogra

ph #

1984

3 1

City

of R

ichm

ond

Arch

ives,

Phot

ogra

ph #

1989

3 2

City

of R

ichm

ond

Arch

ives,

Phot

ogra

ph #

1984

6 1

3Ci

ty o

f Rich

mon

d Ar

chive

s, Ph

otog

raph

#19

86 2

7 1

19

49

19

58

19

50

19

58

19

57

19

59

19

57

19

59

19

57

TO

DAY

City

of R

ichm

ond

Arch

ives,

Phot

ogra

ph #

1984

6 4

City

of R

ichm

ond

Arch

ives,

Phot

ogra

ph #

1986

27

1Ci

ty o

f Rich

mon

d Ar

chive

s, Ph

otog

raph

#19

77 1

81

City

of R

ichm

ond

Arch

ives,

Phot

ogra

ph #

1984

6 1

3

Page 4: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Wel

com

eTh

ank

you

for a

ttend

ing

this

Open

Hou

se fo

r the

Brit

ish C

olum

bia

Envi

ronm

enta

l Ass

essm

ent O

ffice

(E

AO) P

re-A

pplic

atio

n Pu

blic

Com

men

t Per

iod.

The

B.C.

Min

istry

of T

rans

port

atio

n an

d In

frast

ruct

ure

(the

Prop

onen

t) pr

opos

es to

repl

ace

the

Geor

ge M

asse

y Tun

nel w

ith a

10-

lane

brid

ge, d

ecom

miss

ion

the T

unne

l, and

impr

ove

High

way

99

from

Brid

gepo

rt R

oad

in R

ichm

ond

to H

ighw

ay 9

1 in

Del

ta.

Abou

t the

Pro

pose

d Pr

ojec

t• C

onst

ruct

ded

icate

d tra

nsit/

HOV

lane

s bet

wee

n Br

idge

port

Roa

d in

Rich

mon

d an

d Hi

ghw

ay 9

1 in

Del

ta

• Con

stru

ct a

tran

sit-o

nly

ram

p at

Brid

gepo

rt R

oad

• Rep

lace

the W

estm

inst

er H

ighw

ay in

terc

hang

e

• Rep

lace

the

Stev

esto

n Hi

ghw

ay in

terc

hang

e,

inco

rpor

atin

g a

new

inte

grat

ed tr

ansit

stop

• Bui

ld a

new

10

lane

brid

ge (8

lane

s plu

s tw

o de

dica

ted

trans

it/HO

V la

nes)

that

:

- will

pro

vide

nav

igat

iona

l cle

aran

ces s

imila

r t

o th

ose

at th

e Al

ex Fr

aser

Brid

ge

- inc

lude

s a m

ulti-

use

path

way

for c

yclis

ts

and

ped

estri

ans

- will

be

built

to a

ccom

mod

ate

pote

ntia

l

f

utur

e ra

pid

trans

it

• Dec

omm

issio

n th

e Tun

nel a

nd re

mov

e in

-stre

am se

ctio

ns

• Rep

lace

the

High

way

17A

inte

rcha

nge,

in

corp

orat

ing

a ne

w in

tegr

ated

tran

sit st

op

The

Prop

osed

Pro

ject

is n

ow in

th

e “Re

gula

tory

Rev

iew

” per

iod

of

the

sche

dule

. Thi

s inc

lude

s:• A

borig

inal

Gro

up C

onsu

ltatio

n

• Pub

lic C

onsu

ltatio

n

• Reg

ulat

ory

Agen

cy C

onsu

ltatio

n

• Stu

dies

and

Ass

essm

ents

• Env

ironm

enta

l Ass

essm

ent A

pplic

atio

n

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

Plan

ning

Envi

ronm

enta

l Rev

iew

Cons

truct

ion

Thre

e Ph

ases

of C

onsu

ltatio

n

Com

mun

ity &

Sta

keho

lder

Eng

agem

ent

Abou

t the

Pro

pone

ntTh

e Pr

opon

ent

is a

Min

istry

with

in

the

Briti

sh

Colu

mbi

a pr

ovin

cial

gove

rnm

ent,

with

a

man

date

to

pl

an

trans

port

atio

n ne

twor

ks,

prov

ide

trans

port

atio

n se

rvice

s an

d in

frast

ruct

ure,

de

velo

p an

d im

plem

ent

trans

port

atio

n po

licie

s, an

d ad

min

ister

rel

ated

act

s an

d re

gula

tions

as

wel

l as

fe

dera

l-pro

vinc

ial f

undi

ng p

rogr

ams.

Sinc

e 20

12, t

he P

ropo

nent

has

eng

aged

with

the

pub

lic,

Abor

igin

al G

roup

s, fe

dera

l an

d pr

ovin

cial

regu

lato

rs,

and

loca

l and

regi

onal

gov

ernm

ents

to su

ppor

t Pro

ject

pla

nnin

g an

d pr

elim

inar

y en

viro

nmen

tal a

sses

smen

t. Th

e Pr

opon

ent

is co

mm

itted

to

co

ntin

uing

su

ch

enga

gem

ent,

and

prov

idin

g on

goin

g up

date

s th

roug

hout

the

envi

ronm

enta

l as

sess

men

t an

d su

bseq

uent

Pr

ojec

t de

velo

pmen

t. Ba

ckgr

ound

inf

orm

atio

n ab

out

the

Prop

osed

Pro

ject

is

avai

labl

e at w

ww

.mas

seyt

unne

l.ca w

here

inte

rest

ed pa

rtie

s ca

n al

so si

gn-u

p to

rece

ive

upda

tes v

ia e

mai

l.

Page 5: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

This

Open

Hou

se is

par

t of E

AO’s

first

pub

lic co

mm

ent p

erio

d fo

r the

Geo

rge

Mas

sey T

unne

l Pr

ojec

t’s E

nviro

nmen

tal A

sses

smen

t pro

cess

, whi

ch ta

kes p

lace

from

Janu

ary

15 to

Febr

uary

15

, 201

6. W

e ar

e se

ekin

g in

put o

n th

e Pr

ojec

t and

the

prop

osed

stud

ies t

o su

ppor

t the

en

viro

nmen

tal a

sses

smen

t.

Toda

y w

e w

elco

me

you

to:

• Mee

t mem

bers

of t

he B

C En

viro

nmen

tal A

sses

smen

t Offi

ce a

nd th

e Ge

orge

Mas

sey T

unne

l Rep

lace

men

t Pr

ojec

t tea

m

• Lea

rn m

ore

abou

t the

Pro

ject

and

the

Envi

ronm

enta

l Ass

essm

ent p

roce

ss

• Ask

que

stio

ns a

bout

the

Proj

ect a

nd p

rovi

de co

mm

ents

on

the

Proj

ect D

escr

iptio

n an

d Ke

y Ar

eas o

f Stu

dy

• Lea

rn h

ow to

rem

ain

info

rmed

and

invo

lved

thro

ugho

ut th

e En

viro

nmen

tal A

sses

smen

t pro

cess

Lear

n ab

out t

he P

roje

ct:

Ope

n Ho

uses

:

Rich

mon

dTu

esda

y, Ja

nuar

y 26

, 201

6 2:

00 p

.m. t

o 8:

00 p

.m.

Sand

man

Sig

natu

re H

otel

Va

ncou

ver A

irpor

t, Ro

und

Room

1025

1 St

. Edw

ards

Driv

e Ri

chm

ond,

BC

Delta

Wed

nesd

ay, J

anua

ry 2

7, 2

016

2:00

p.m

. to

8:00

p.m

.De

lta To

wn

& Co

untr

y In

n, B

allro

om60

05 H

ighw

ay 1

7A

Delta

, BC

EAO

web

site

: http

://w

ww

.eao

.gov

.bc.c

a/

Prov

ide

your

com

men

ts b

y: Co

mpl

ete

an O

nlin

e Fo

rm:

At a

n iP

ad st

atio

n du

ring

an o

pen

hous

e or

at h

ome

http

://w

ww

.eao

.gov

.bc.

ca/p

cp/in

dex.

htm

l

Mai

l Writ

ten

Com

men

ts:

Mik

e Sh

epar

d, P

roje

ct A

sses

smen

t Man

ager

En

viro

nmen

tal A

sses

smen

t Offi

ce

PO B

ox 9

426

Stn

Prov

Gov

t Vi

ctor

ia, B

C V8

W 9

V1

Fax W

ritte

n Co

mm

ents

: 25

0-38

7-02

30

Abou

t thi

s Ope

n Hou

se

Page 6: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Envi

ronm

enta

l Ass

essm

ent P

roce

ss

Key A

reas

of St

udy

Base

d on

inte

rest

s ide

ntifi

ed b

y th

e pu

blic,

Abo

rigin

al G

roup

s, fe

dera

l and

pr

ovin

cial r

egul

ator

s, an

d lo

cal a

nd re

gion

al g

over

nmen

ts d

urin

g th

e 3

year

s of

cons

ulta

tion

to d

ate,

and

the

Min

istry

’s ex

perie

nce

on co

mpa

rabl

e pr

ojec

ts

in th

e Lo

wer

Mai

nlan

d, th

e fo

llow

ing

valu

ed co

mpo

nent

s, or

in th

e co

ntex

t of

this

proj

ect k

ey a

reas

of s

tudy

, hav

e be

en id

entifi

ed to

supp

ort t

he

asse

ssm

ent o

f pot

entia

l env

ironm

enta

l, eco

nom

ic, so

cial, h

erita

ge, a

nd

heal

th e

ffect

s of t

he P

roje

ct:

• Riv

er h

ydra

ulic

s and

mor

phol

ogy

• Sed

imen

t qua

lity

and

wat

er q

ualit

y

• Und

erw

ater

noi

se

• Fis

h an

d fis

h ha

bita

t

• Mar

ine

mam

mal

s

• Veg

etat

ion

• Am

phib

ians

• Ter

rest

rial w

ildlif

e

• Air

qual

ity

• Atm

osph

eric

noi

se

• Mar

ine

use

• Lan

d us

e

• Agr

icul

tura

l use

• Vis

ual q

ualit

y

• Hum

an h

ealth

• Her

itage

reso

urce

s

Publ

ic in

put d

urin

g th

is pu

blic

com

men

t per

iod

will

be

used

to re

fine

the

list o

f Key

Are

as o

f Stu

dy, w

hich

will

influ

ence

the

envi

ronm

enta

l as

sess

men

t for

the

Proj

ect.

Proj

ect s

taff

can

assis

t with

doc

umen

ting

your

feed

back

on

the

Key

Area

s of S

tudy

list

ed a

bove

.

Envi

ronm

enta

l Ass

essm

ent P

roce

ssTh

e Pr

opos

ed P

roje

ct is

dee

med

a re

view

able

pro

ject

und

er th

e Br

itish

Col

umbi

a En

viro

nmen

tal A

sses

smen

t Act

(BCE

AA) a

nd re

quire

s ass

essm

ent u

nder

BCE

AA p

rior t

o pr

ojec

t dev

elop

men

t. Th

e en

viro

nmen

tal a

sses

smen

t of t

he P

roje

ct u

nder

BCE

AA m

ust

prov

ide

for c

onsu

ltatio

n w

ith A

borig

inal

Gro

ups a

nd th

e Pu

blic.

To le

arn

mor

e ab

out t

he B

C EA

pro

cess

, or v

iew

the

EA d

ocum

ents

for t

his P

roje

ct, p

leas

e vi

sit th

e EA

O Pr

ojec

t Inf

orm

atio

n Ce

ntre

web

site,

at h

ttp:

//ww

w.e

ao.g

ov.b

c.ca

Oth

er P

erm

its a

nd A

ppro

vals

that

m

ay b

e re

quire

d fo

r the

Pro

ject

• BC

Wat

er A

ct A

ppro

val

• BC

Wild

life

Act P

erm

it

• BC

Herit

age

Cons

erva

tion

Act p

erm

its

• Fish

erie

s Act

Aut

horiz

atio

n

• Nav

igat

ion

Prot

ectio

n Ac

t App

rova

l

• Agr

icultu

ral L

and

Com

miss

ion

Act A

ppro

val

Page 7: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Hum

an H

ealth

Ratio

nale

Proj

ect-r

elat

ed ch

ange

s in

air q

ualit

y an

d no

ise co

nditi

ons h

ave

the

pote

ntia

l to

affec

t hum

an h

ealth

.

Pote

ntia

l Pro

ject

-rel

ated

effe

cts t

o be

stud

ied

• Hea

lth-re

late

d eff

ects

of e

xpos

ure

to n

oise

and

air

emiss

ions

from

co

nstru

ctio

n eq

uipm

ent,

mac

hine

ry, a

nd tr

affic

• Hea

lth-re

late

d eff

ects

of p

oten

tial c

hang

es in

noi

se a

nd a

ir qu

ality

co

nditi

ons d

ue to

chan

ges i

n tra

ffic c

ondi

tions

dur

ing

oper

atio

n

Asse

ssm

ent a

ppro

ach

• Rev

iew

lite

ratu

re a

nd e

xist

ing

data

• Rev

iew

pre

dict

ed P

roje

ct-re

late

d ch

ange

in a

mbi

ent n

oise

and

air

qual

ity co

nditi

ons

• Det

erm

ine

chan

ges i

n hu

man

hea

lth ri

sk a

ssoc

iate

d w

ith ch

ange

s to

noise

and

air

qual

ity

Herit

age R

esou

rces

Ratio

nale

The

Proj

ect i

nvol

ves g

roun

d w

orks

that

coul

d po

tent

ially

affe

ct h

erita

ge

sites

or a

rtifa

cts.

Pote

ntia

l Pro

ject

-rel

ated

effe

cts t

o be

stud

ied

• Pot

entia

l dist

urba

nce

of si

tes o

r obj

ects

of a

rcha

eolo

gica

l or h

istor

ical

signi

fican

ce d

urin

g Pr

ojec

t-rel

ated

act

iviti

es

Asse

ssm

ent a

ppro

ach

• Com

pile

and

revi

ew o

f inf

orm

atio

n on

kno

wn

arch

aeol

ogica

l and

he

ritag

e sit

es

• Fie

ld su

rvey

s to

dete

rmin

e if

any

prev

ious

ly u

nide

ntifi

ed a

rcha

eolo

gy

and

herit

age

sites

may

exi

st w

ithin

Pro

ject

Are

a

Page 8: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Mar

ine M

amm

als

Ratio

nale

Proj

ect c

onst

ruct

ion-

rela

ted

activ

ities

such

as

Tunn

el re

mov

al a

nd p

ile d

rivin

g co

uld

affec

t m

arin

e m

amm

als t

hat m

ay b

e pr

esen

t in

the

Proj

ect a

rea.

Pote

ntia

l Pro

ject

-rel

ated

eff

ects

to b

e st

udie

dEff

ects

of t

he fo

llow

ing

on m

arin

e m

amm

als:

• Und

erw

ater

noi

se g

ener

ated

by

activ

ities

such

as p

ile d

rivin

g an

d Tu

nnel

de

com

miss

ioni

ng

Asse

ssm

ent a

ppro

ach

• Rev

iew

lite

ratu

re a

nd e

xist

ing

data

• Und

erw

ater

noi

se m

odel

ling

to p

redi

ct n

oise

co

nditi

ons d

urin

g co

nstru

ctio

n

Fish

Ratio

nale

The

Proj

ect i

nvol

ves i

n-riv

er a

ctiv

ities

, suc

h as

rem

ovin

g Tu

nnel

com

pone

nts a

nd in

stal

ling

brid

ge

com

pone

nts,

whi

ch h

ave

the

pote

ntia

l to

affec

t fish

and

fish

hab

itat.

Pote

ntia

l Pro

ject

-rel

ated

effe

cts t

o be

stud

ied

Effec

ts o

f the

follo

win

g on

fish

and

fish

hab

itat,

with

a sp

ecifi

c foc

us o

n Sa

lmon

, Stu

rgeo

n (W

hite

and

Gre

en),

Eula

chon

, Tro

ut, a

nd C

har:

• Und

erw

ater

noi

se g

ener

ated

by

activ

ities

such

as p

ile d

rivin

g an

d Tu

nnel

dec

omm

issio

ning

• Inc

reas

e su

spen

ded

sedi

men

t and

turb

idity

leve

ls du

e to

cons

truct

ion

with

in o

r adj

acen

t to

wat

er

• Ove

rlap

of P

roje

ct co

mpo

nent

s with

fish

hab

itat

• Infl

uenc

e of

stor

mw

ater

runo

ff on

fish

hab

itat

Asse

ssm

ent a

ppro

ach

• Rev

iew

lite

ratu

re a

nd e

xist

ing

data

• Fie

ld st

udie

s to

addr

ess g

aps i

n da

ta

• Und

erw

ater

noi

se m

odel

ling

to p

redi

ct n

oise

cond

ition

s dur

ing

cons

truct

ion

Page 9: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Vege

tatio

nRa

tiona

leTh

e Pr

ojec

t is l

ocat

ed la

rgel

y w

ithin

an

activ

e tra

nspo

rtat

ion

corri

dor;

how

ever

, sm

all p

ortio

ns o

f the

Pr

ojec

t alig

nmen

t sup

port

nat

ive

vege

tatio

n, w

hich

m

ay in

clude

at-r

isk p

lant

spec

ies a

nd co

mm

uniti

es.

Pote

ntia

l Pro

ject

-rel

ated

eff

ects

to b

e st

udie

d• D

istur

banc

e of

at-r

isk p

lant

spec

ies o

r eco

syst

ems

durin

g sit

e pr

epar

atio

n

• Int

rodu

ctio

n of

inva

sive

plan

ts in

to se

nsiti

ve

ecos

yste

ms t

hrou

gh co

nstru

ctio

n ac

tiviti

es

• Ove

rlap

of P

roje

ct co

mpo

nent

s with

at-r

isk

ecos

yste

ms

Asse

ssm

ent a

ppro

ach

• Rev

iew

lite

ratu

re a

nd e

xist

ing

data

• Ter

rest

rial e

cosy

stem

map

ping

to p

rovi

de a

bas

elin

e m

ap o

f veg

etat

ion

type

s

• Rar

e pl

ant s

urve

ys

Amph

ibia

nsRa

tiona

lePr

ojec

t rel

ated

cons

truct

ion

activ

ities

hav

e th

e po

tent

ial t

o aff

ect a

t-risk

am

phib

ians

with

in th

e Pr

ojec

t alig

nmen

t.

Pote

ntia

l Pro

ject

-rel

ated

effe

cts

to b

e st

udie

dAn

ticip

ated

inte

ract

ions

of P

roje

ct co

mpo

nent

s and

act

iviti

es

with

am

phib

ians

that

will

be

stud

ied

inclu

de:

• Phy

sical

inju

ry d

urin

g ve

geta

tion

grub

bing

and

clea

ring

• Cha

nge

in a

rea

of a

t-risk

am

phib

ian

habi

tat

• Cha

nge

in h

abita

t con

ditio

ns a

ssoc

iate

d w

ith p

oten

tial

chan

ges i

n w

ater

qua

lity

Asse

ssm

ent a

ppro

ach

• Rev

iew

lite

ratu

re e

xist

ing

data

• Hab

itat s

uita

bilit

y as

sess

men

t

• Fie

ld sa

mpl

ing

and

envi

ronm

enta

l DNA

ana

lysis

to id

entif

y pr

esen

ce

Wild

life

Ratio

nale

Terre

stria

l wild

life

spec

ies a

nd th

eir h

abita

t hav

e th

e po

tent

ial t

o be

affe

cted

by

activ

ities

ass

ocia

ted

with

hi

ghw

ay w

iden

ing

and

inte

rcha

nge

repl

acem

ents

, and

Deas

Slo

ugh

Brid

ge d

ecom

miss

ioni

ng.

Pote

ntia

l Pro

ject

-rel

ated

effe

cts

to b

e st

udie

d• T

empo

rary

dist

urba

nce

durin

g sit

e-pr

epar

atio

n an

d co

nstru

ctio

n

• Noi

se a

nd li

ght d

istur

banc

e du

ring

cons

truct

ion

• Tem

pora

ry lo

ss o

f nes

ting

habi

tat

• Cha

nge

in a

vaila

ble

habi

tat

Asse

ssm

ent a

ppro

ach

• Rev

iew

lite

ratu

re a

nd e

xist

ing

data

• Hab

itat s

uita

bilit

y as

sess

men

t

• Fie

ld su

rvey

s for

a v

arie

ty o

f bird

spec

ies,

a w

ell a

s bat

s

• Env

ironm

enta

l DNA

ana

lysis

to id

entif

y sm

all m

amm

al

pres

ence

Page 10: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Air Q

ualit

yRa

tiona

lePr

ojec

t-rel

ated

chan

ges i

n tra

ffic c

ondi

tions

in th

e Hi

ghw

ay 9

9 co

rrido

r ar

e an

ticip

ated

to re

sult

in ch

ange

s in

traffi

c rel

ated

air

emiss

ions

with

in

the

High

way

99

corri

dor a

nd p

oten

tial c

hang

es in

loca

l and

regi

onal

air

qual

ity.

Pote

ntia

l Pro

ject

-rel

ated

effe

cts t

o be

stud

ied

• Cha

nge

in a

ir qu

ality

due

to co

nstru

ctio

n-re

late

d em

issio

ns

• Cha

nge

in th

e am

ount

and

dist

ribut

ion

of tr

affic e

miss

ions

alo

ng

High

way

99

durin

g op

erat

ion

Asse

ssm

ent a

ppro

ach

• Mod

ellin

g to

est

imat

e em

issio

ns fr

om tr

affic a

long

the

Proj

ect

alig

nmen

t und

er e

xist

ing

and

proj

ecte

d fu

ture

cond

ition

s with

and

w

ithou

t the

Pro

ject

• Ana

lyze

am

bien

t air

qual

ity m

onito

ring

data

from

Met

ro V

anco

uver

m

onito

ring

stat

ions

Noise

Ratio

nale

Proj

ect-r

elat

ed co

nstru

ctio

n an

d op

erat

ions

act

iviti

es h

ave

the

pote

ntia

l to

chan

ge e

xist

ing

noise

cond

ition

s.

Pote

ntia

l Pro

ject

-rel

ated

effe

cts t

o be

stud

ied

• Noi

se fr

om co

nstru

ctio

n-re

late

d ac

tiviti

es

• Pot

entia

l cha

nge

in n

oise

cond

ition

s at s

ensit

ive

loca

tions

due

to

Proj

ect-r

elat

ed ch

ange

s in

traffi

c con

ditio

ns d

urin

g op

erat

ion

Asse

ssm

ent a

ppro

ach

• Noi

se m

onito

ring

at n

oise

-sen

sitiv

e sit

es

• Com

pute

r mod

ellin

g to

pre

dict

pot

entia

l cha

nges

in n

oise

cond

ition

s w

ith a

nd w

ithou

t the

Pro

ject

Page 11: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Visu

al Q

ualit

yRa

tiona

leTh

e Pr

ojec

t will

intro

duce

a n

ew st

ruct

ure

into

som

e vi

ewsc

apes

with

in

this

area

of t

he Lo

wer

Mai

nlan

d.

Pote

ntia

l Pro

ject

-rel

ated

effe

cts t

o be

stud

ied

• Effe

cts o

f the

intro

duct

ion

of th

e ne

w B

ridge

on

loca

l visu

al q

ualit

y

Asse

ssm

ent a

ppro

ach

• Rev

iew

exi

stin

g in

form

atio

n

• Ide

ntify

key

view

poin

ts b

ased

on

revi

ew o

f lan

d us

e in

form

atio

n,

cons

ulta

tion

inpu

t, an

d vi

ewer

sens

itivi

ty

• Fie

ld su

rvey

s to

char

acte

rize

exist

ing

visu

al co

nditi

ons a

t key

vie

wpo

ints

• Com

pute

r mod

ellin

g to

crea

te si

mul

ated

imag

es sh

owin

g an

ticip

ated

vi

ews f

rom

key

view

poin

ts

Mar

ine U

seRa

tiona

leBr

idge

cons

truct

ion

and

Tunn

el d

ecom

miss

ioni

ng a

ctiv

ities

hav

e th

e po

tent

ial t

o aff

ect u

se o

f the

Fras

er R

iver

Sou

th A

rm a

nd D

eas S

loug

h by

co

mm

ercia

l and

recr

eatio

nal v

esse

ls as

wel

l as i

nter

fere

with

food

, soc

ial

and

cere

mon

ial fi

shin

g ac

tiviti

es b

y Ab

orig

inal

Gro

ups.

Pote

ntia

l Pro

ject

-rel

ated

effe

cts t

o be

stud

ied

• Tem

pora

ry in

terfe

renc

e w

ith m

arin

e us

e in

and

alo

ng Fr

aser

Riv

er

Sout

h Ar

m a

nd D

eas S

loug

h du

ring

barg

e-ba

sed

brid

ge co

nstru

ctio

n,

pile

driv

ing

with

in o

r adj

acen

t to

Deas

Slo

ugh,

Dea

s Slo

ugh

Brid

ge

deco

mm

issio

ning

, and

Tunn

el d

ecom

miss

ioni

ng

Asse

ssm

ent a

ppro

ach

• Rev

iew

lite

ratu

re a

nd e

xist

ing

data

• Con

sult

with

key

mar

ine

and

wat

er-b

ased

land

use

rs a

nd a

genc

ies

• Con

sider

how

use

of t

he Fr

aser

Riv

er S

outh

Arm

and

Dea

s Slo

ugh

by

com

mer

cial a

nd re

crea

tiona

l ves

sels

and

Abor

igin

al G

roup

s may

be

affec

ted

by sp

ecifi

c con

stru

ctio

n ac

tiviti

es

Page 12: APPENDIX 3: DISPLAY BOARDS - govTogetherBC
Page 13: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Land

Use

Ratio

nale

Land

use

in th

e vi

cinity

of t

he P

roje

ct co

uld

be a

ffect

ed b

y th

e Pr

ojec

t du

ring

and

afte

r con

stru

ctio

n.

Pote

ntia

l Pro

ject

-rel

ated

effe

cts t

o be

stud

ied

• Tem

pora

ry d

istur

banc

e du

e to

chan

ges i

n tra

ffic p

atte

rns a

nd a

cces

s to

facil

ities

• Pot

entia

l ove

rlap

of P

roje

ct a

lignm

ent w

ith sm

all p

ortio

ns o

f lan

d pa

rcel

s adj

acen

t to

the

exist

ing

right

-of-w

ay

Asse

ssm

ent a

ppro

ach

• Rev

iew

the

Offi

cial C

omm

unity

Pla

ns a

nd R

egio

nal G

row

th S

trate

gies

• Rev

iew

land

ow

ners

hip,

com

mun

ity p

lann

ing,

and

byl

aws

• Ana

lyze

info

rmat

ion

gath

ered

thro

ugh

the

publ

ic an

d st

akeh

olde

r co

nsul

tatio

n pr

oces

s

Agric

ultu

reRa

tiona

leTh

e m

ajor

ity o

f the

Pro

ject

bor

ders

pro

pert

ies w

ithin

the

Agric

ultu

ral

Land

Res

erve

and

Pro

ject

rela

ted

activ

ities

will

hav

e th

e po

tent

ial t

o in

tera

ct w

ith a

djac

ent p

rope

rty

uses

.

Pote

ntia

l Pro

ject

-rel

ated

effe

cts t

o be

stud

ied

• Pot

entia

l ove

rlap

of P

roje

ct co

mpo

nent

s with

agr

icultu

ral l

and

resu

lting

in

effe

cts o

n fa

rm in

frast

ruct

ure

Asse

ssm

ent a

ppro

ach

• Rev

iew

lite

ratu

re a

nd e

xist

ing

data

• Map

Agr

icultu

ral L

and

Rese

rve

boun

darie

s

• Fie

ld st

udie

s and

farm

er in

terv

iew

s to

colle

ct in

form

atio

n on

exi

stin

g in

frast

ruct

ure

Page 14: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Wat

er an

d sed

imen

t qua

lity

Ratio

nale

Chan

ges i

n w

ater

and

sedi

men

t qua

lity,

and

re-s

uspe

nsio

n of

rive

r se

dim

ents

hav

e th

e po

tent

ial t

o aff

ect fi

sh a

nd fi

sh h

abita

t, m

arin

e m

amm

als,

and

vege

tatio

n al

ong

shor

elin

es. T

he P

roje

ct in

volv

es a

ctiv

ities

su

ch a

s rem

oval

of T

unne

l com

pone

nts a

nd in

stal

latio

n of

brid

ge

com

pone

nts t

hat c

ould

dist

urb

river

sedi

men

ts.

Pote

ntia

l Pro

ject

-rel

ated

effe

cts t

o be

stud

ied

• Ind

uced

turb

idity

and

re-s

uspe

nsio

n of

pot

entia

lly co

ntam

inat

ed

sedi

men

t dur

ing

Tunn

el re

mov

al

• Infl

uenc

e of

stor

mw

ater

runo

ff on

are

as a

djac

ent t

o th

e ne

w B

ridge

Asse

ssm

ent a

ppro

ach

• Rev

iew

lite

ratu

re a

nd e

xist

ing

data

• Fie

ld st

udie

s to

char

acte

rize

sedi

men

t and

ass

ess w

ater

qua

lity

Rive

r hyd

raul

icsRa

tiona

leTu

nnel

dec

omm

issio

ning

and

rela

ted

activ

ities

coul

d in

fluen

ce ri

ver

proc

esse

s in

the

vicin

ity. C

hang

es in

wat

er le

vels,

velo

citie

s and

flow

co

nditi

ons,

and

cons

eque

nt ch

ange

s in

sedi

men

tatio

n an

d er

osio

n pa

ttern

s hav

e th

e po

tent

ial t

o aff

ect fi

sh a

nd fi

sh h

abita

t, m

arin

e m

amm

als,

and

land

and

mar

ine

use.

Pote

ntia

l Pro

ject

-rel

ated

effe

cts t

o be

stud

ied

• Sed

imen

t gen

erat

ion

durin

g Tu

nnel

dec

omm

issio

ning

• Cha

nge

in w

ater

leve

ls, sp

eed,

mov

emen

t of (

tidal

) sal

twat

er a

nd fl

ow

and

rate

of i

nfill

of th

e tre

nch

follo

win

g Tu

nnel

rem

oval

Asse

ssm

ent a

ppro

ach

• Rev

iew

lite

ratu

re, a

eria

l pho

togr

aphs

, and

exi

stin

g riv

erbe

d pr

ofile

dat

a

• Mod

el ch

ange

s in

curre

nt d

istrib

utio

ns, w

ater

leve

ls, se

dim

enta

tion

proc

esse

s, an

d m

ovem

ent o

f the

salt

wed

ge e

stua

ry b

ound

ary

Page 15: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Rive

rbed

Profi

le

DO

WN

STR

EAM

RIV

ERBE

DM

ETR

O V

ANC

OU

VER

WAT

ER M

AIN

UPS

TREA

M

FRAS

ER R

IVER

TUN

NEL

2.0

0m H

igh

high

wat

er 0

.00m

Mea

n se

a le

vel (

geod

etic

dat

um)

-1.8

4m L

ow lo

w w

ater

Page 16: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Rive

r Bat

hym

etry

APPR

OXIM

ATE

NAVI

GATI

ON C

HANN

EL

4 5 6321

1 2 3 4 5

6

1 2 3 4 5

6

5.5M

DEPT

H OF

COV

ER O

VER

TUNN

EL

2.2M

DEPT

H OF

COV

ER O

VER

TUNN

EL

0.8M

DEPT

H OF

COV

ER O

VER

TUNN

EL

0.8M

DEPT

H OF

COV

ER O

VER

TUNN

EL

2.2M

DEPT

H OF

COV

ER O

VER

TUNN

EL

5.0M

DEPT

H OF

COV

ER O

VER

TUNN

EL

DOW

NSTR

EAM

RIVE

RBED

TUNN

EL

METR

O VA

NCOU

VER

WAT

ER M

AIN

UPST

REAM

RICH

MON

D

DELT

AMETRO VANCOUVER WATER MAIN

GEORGE MASSEY TUNNEL

Page 17: APPENDIX 3: DISPLAY BOARDS - govTogetherBC
Page 18: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

1. R

emov

e sa

nd

2. R

emov

e ro

ck p

rote

ctio

n la

yer a

long

subm

erge

d

T

unne

l sec

tions

3.

Rem

ove

conc

rete

mat

tres

s, sa

nd a

nd g

rave

l 4.

Lift

and

floa

t out

Tunn

el se

ctio

ns

Tunn

el D

ecom

miss

ioni

ngTh

e Tun

nel i

s mad

e up

of s

ix se

gmen

ts th

at w

ere

sunk

into

pla

ce in

a

dred

ged

trenc

h, jo

ined

and

cove

red

with

sand

and

rock

. In

a re

vers

al o

f th

is pr

oces

s, al

l or p

arts

of t

he Tu

nnel

coul

d be

rem

oved

as f

ollo

ws:

Sect

ions

of t

he Tu

nnel

prio

r to

plac

emen

t und

er th

e rive

r (19

57)

Geor

ge M

asse

y Tun

nel

cons

truct

ion

(195

8)

Grav

el

Sand

Road

way

Page 19: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Cum

ulat

ive Eff

ects

Cum

ulat

ive

Effec

ts• R

efer

s to

chan

ges t

o th

e en

viro

nmen

t tha

t are

caus

ed b

y th

e eff

ects

of a

pro

pose

d pr

ojec

t in

com

bina

tion

with

the

effec

ts o

f ot

her p

rese

nt a

nd fo

rese

eabl

e fu

ture

pro

ject

s and

act

iviti

es

Cum

ulat

ive

effec

ts a

sses

smen

t• C

onsid

ers p

oten

tial i

ncre

men

tal e

ffect

s of o

ther

pre

sent

, an

d re

ason

ably

fore

seea

ble

proj

ects

that

coul

d in

tera

ct w

ith

pote

ntia

l effe

cts o

f con

stru

ctio

n an

d op

erat

ion

of th

e Ge

orge

M

asse

y Tun

nel R

epla

cem

ent P

roje

ct

• Will

be

inclu

ded

in th

e en

viro

nmen

tal a

sses

smen

t

A pr

elim

inar

y lis

t of p

rese

nt a

nd re

ason

ably

fore

seea

ble

proj

ects

to b

e co

nsid

ered

in th

e Cu

mul

ativ

e Eff

ects

As

sess

men

t for

this

Pro

ject

incl

udes

• Tilb

ury

Liqu

efied

Nat

ural

Gas

(LNG

) Fac

ility

Exp

ansio

n Pr

ojec

t

• Mai

nten

ance

Dre

dgin

g of

the

Low

er Fr

aser

Riv

er

• Fra

ser S

urre

y Do

cks D

irect

Tran

sfer C

oal F

acili

ty (T

exad

a Co

al)

• Van

couv

er A

irpor

t Fue

l Del

iver

y Pr

ojec

t

• Wes

Pac T

ilbur

y M

arin

e Je

tty P

roje

ct

• Pat

tullo

Brid

ge R

epla

cem

ent

• Rob

erts

Ban

k Ter

min

al 2

Pro

ject

• Lad

ner H

arbo

ur R

evita

lizat

ion

Proj

ect

Page 20: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

New

Brid

ge Sa

fety

Ben

efits

MEE

T CU

RREN

TSE

ISM

ICST

ANDA

RDS

SAFE

R M

ERGI

NG

BETT

ER

EMER

GENC

YRE

SPON

SE T

IMES

DECR

EASE

INCO

LLIS

IONS

35%

Page 21: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Your

feed

back

is

impo

rtan

t dur

ing

this

pu

blic

com

men

t per

iod.

Yo

u ar

e in

vite

d to

subm

it co

mm

ents

to E

AO

until

Mon

day,

Febr

uary

15,

201

6. E

AO a

ccep

ts

publ

ic co

mm

ents

thro

ugh

the

follo

win

g w

ays:

How

to su

bmit

your

feed

back

: By

Onl

ine

Form

at:

http

://w

ww

.eao

.gov

.bc.c

a/pc

p/in

dex.h

tml

By M

ail:

Mik

e Sh

epar

d, P

roje

ct A

sses

smen

t Man

ager

En

viro

nmen

tal A

sses

smen

t Offi

ce

PO B

ox 9

426

Stn

Prov

Gov

t Vi

ctor

ia, B

C V8

W 9

V1

By Fa

x:

250-

387-

0230

Wha

t’s N

ext

Com

men

ts w

ill b

e co

nsid

ered

in th

e de

velo

pmen

t of t

he E

nviro

nmen

tal A

sses

smen

t App

licat

ion.

Mem

bers

of t

he P

ublic

will

be

invi

ted

to re

view

and

pro

vide

com

men

ts o

n th

e Ap

plica

tion.

An

ticip

ated

tim

ing

for t

his c

onsu

ltatio

n is

Sprin

g 20

16.

Stay

ing

Info

rmed

Th

ere

are

a nu

mbe

r of w

ays f

or p

eopl

e to

rem

ain

info

rmed

thro

ugho

ut th

e En

viro

nmen

tal A

sses

smen

t Rev

iew

:

Onl

ine:

Visi

t the

EAO

web

site

at:

http

://w

ww

.eao

.gov

.bc.

ca/ t

o vi

ew P

roje

ct E

nviro

nmen

tal A

sses

smen

t doc

umen

ts

Visi

t the

Pro

ject

Web

site

at:

htt

p://w

ww

.mas

seyt

unne

l.ca

to v

iew

Pro

ject

bac

kgro

und

docu

men

ts, fi

nd o

ut

abou

t cur

rent

stat

us a

nd re

gist

er to

rece

ive

Proj

ect U

pdat

es b

y em

ail

In P

erso

n:Dr

op in

at t

he P

roje

ct O

ffice

in R

ichm

ond

at: 2

030-

1166

2 St

eves

ton

High

way

(Iro

nwoo

d Pl

aza)

Plan

to a

ttend

upc

omin

g Op

en H

ouse

s for

EAO

's Ap

plica

tion

Revi

ew P

ublic

Com

men

t Per

iod

Than

k yo

u fo

r you

r par

ticip

atio

n an

d fo

r pro

vidi

ng y

our i

nput

.Th

e Pr

opon

ent,

Min

istry

of T

rans

port

atio

n an

d In

frast

ruct

ure,

will

pro

vide

resp

onse

s to

com

men

ts,

as d

irect

ed b

y EA

O, a

nd w

ill p

repa

re a

Pub

lic

Cons

ulta

tion

Repo

rt fo

r EAO

follo

win

g th

e pu

blic

com

men

t per

iod.

The

repo

rt w

ill b

e po

sted

to E

AO’s

web

site

whe

n co

mpl

ete.

Feed

back

and N

ext S

teps

Page 22: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Wes

tham

Isl

and

Delta

Tsaw

was

sen

First

Nat

ion30

MIN

UTE

TIM

E SA

VING

SPE

R DA

Y

2.5

HOUR

SPE

R W

EEK

2.5

100

HOUR

S P

ER Y

EAR

4 DA

YS

30 MIN

UTES

A D

AY

EQUA

LSNE

WBR

IDGENe

w Br

idge

Trav

el Ti

me S

avin

gs

Estim

ated

savin

gs fo

r a co

mm

uter

Page 23: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

ENVI

RONM

ENTA

L BE

NEFI

TS

TRAN

SIT

ENHA

NCEM

ENTS

ENCO

URAG

E CY

CLIN

G &

WAL

KING

REDU

CE ID

LING

BIOF

ILTR

ATIO

NOF

STO

RMW

ATER

ENVI

RONM

ENTA

LEN

HANC

EMEN

TS

Page 24: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

BRID

GE

SOU

TH A

PPRO

ACH

AN

D

HAB

ITAT

EN

HAN

CEM

ENTS

GRE

EN S

LOU

GH

CH

ANN

EL R

ESTO

RATI

ON

MIL

LEN

NIU

M T

RAIL

POTE

NTI

AL R

IVER

RO

AD E

XTEN

SIO

N

DEA

S S

LOU

GH

G R E E N S LO U G H

(CO

RPO

RATI

ON

OF

DELT

A PR

OJE

CT)

Sout

h App

roac

h Enh

ance

men

t Opp

ortu

nity

1938

2014

PA

ST

PRES

ENT

CURR

ENT

HIG

HW

AY 9

9 CO

RRID

OR

G R E E N S LO U G H

G R E E N S LO U G H

DEA

S S

LOU

GH

DEA

S S

LOU

GH

The

Proj

ect w

ill a

llow

us t

o en

hanc

e th

e ar

ea u

nder

the

new

br

idge

, res

tore

Gre

en S

loug

h to

its o

rigin

al ch

anne

l and

im

prov

e th

e su

rroun

ding

hab

itat.

FU

TURE

Page 25: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Hour

s of D

elay

at th

e Tun

nel

With

out I

mpr

ovem

ents

2014

2021

2031

# HOURS (MILLIONS)

024 3 15

1.1

2.0

4.5

MILLION

MILLION

MILLION

Page 26: APPENDIX 3: DISPLAY BOARDS - govTogetherBC

Com

paris

on of

Lowe

r Mai

nlan

d Brid

ges

GEOR

GE M

ASSE

Y TU

NNEL

REP

LACE

MEN

T

PORT

MAN

N BR

IDGE

ALEX

FRA

SER

BRID

GE

~3.3

KM

~1.3

KM


Recommended