“MEASURES NECESSARY WHERE APPARATUS IS AFFECTED BY MAJOR WORKS
(DIVERSIONARY WORKS)”
Undertaker:
Scheme:
Estimate Summary:
C3 ESTIMATE
Date of Estimate:
CL. 18/1218/gt.dkt
Victoria, Cornwall
18th December 2018
To install new ducts and chambers following the new road layout to
the new Tregoss Roundabout. This will require a cable outage for
the new section. All works will be monitored by the GNOC.
TBC
3 Months
Estimate to be reviewed on completion by CenturyLink – surplus sums
credited to client – additional sums invoiced to client.
Contract Labour £ Plant Costs £ Material Costs/Direct Labour £
138,714.93 CenturyLink professional costs £ 7,800.00 CenturyLink
overhead £ 43,954.48 Estimated Project Costs: £ 190,469.41
Less deductions for: Deferment of Renewal £ Betterment £ Materials
Recovered £ Local Authority discount at 18% £ 34,284.49 Total
Deductions: £ 34,284.49
£ 156,184.92
PLEASE NOTE: A standard lead time of between 12 and 16 weeks may
apply from the date payment, or part payment, is received if a
cable diversion is required.
Page 1 of 1
“MEASURES NECESSARY WHERE APPARATUS IS AFFECTED BY MAJOR WORKS
(DIVERSIONARY WORKS)”
Undertaker:
Scheme:
Estimate Summary:
Project No. CL. 19/0208/gt.dkt (to be quoted on all
correspondence)
Undertaker Ref: Cornwall (to be quoted on all correspondence)
Date of Estimate: 8th February 2019
CenturyLink
Victoria on the B3274
Slew and lower ducts that are in the verge, this is to allow for
the widening of the footway for a new cycle/footway to be created.
TM is not included in this quote above chapter 8.
TBC
3 Months
Estimate to be reviewed on completion by CenturyLink – surplus sums
credited to client – additional sums invoiced to client.
Contract Labour £ Plant Costs £ Material Costs/Direct Labour £
30,824.28 CenturyLink professional costs £ 4,025.00 Outsourced
Services £ 10,454.78 Estimated Project Costs: £ 45,304.06
Less deductions for: Deferment of Renewal £ Betterment £ Materials
Recovered £ Local Authority discount at 18% £ 8,154.73 Total
Deductions: £ 8,154.73
£ 37,149.33
PLEASE NOTE: A standard lead time of between 12 and 16 weeks may
apply from the date payment, or part payment, is received if a
cable diversion is required.
Page 1 of 1
National Grid House Warwick Technology Park Gallows Hill, Warwick
CV34 6DA
James Bale Wayne Smith Cormac Solutions Asset Protection Assistant
Higher Tranent Road Business & Operation Support Wadebridge Gas
Transmission Asset Management Cornwall
National Grid PL27 6TW Warwick Direct Tel: 01926 656102 Email:
[email protected]
Planning Work?
(*Calls may be recorded and monitored)
E-mail:
[email protected]
0800 111 999*
*Available 24 hours, 7 days/week. Calls may be recorded and
monitored. www.nationalgrid.com
Date : 12/7/2018 Our Reference: XX_TW_Z4_3FWP_044411
Your Reference: A30 Link (NC)
Dear Mr Bale,
Ref: A30 Link, Austell, PL26 8LX
National Grid has no objections to the above proposal which is in
close proximity to a High Voltage Transmission Overhead Line.
I have enclosed a location map to show the location of National
Grid’s Overhead Lines within the vicinity of your proposal and
associated information below.
Yours sincerely Wayne Smith
Asset Protection Assistant EAGLES (Electricity And Gas Location
Enquiry System)
Is now available to use simply click on the link to register
www.beforeyoudig.nationalgrid.com, submit details of your proposed
works and
receive instant guidance and if appropriate maps showing the
location of National Grid gas and electric apparatus.
National Grid is a trading name for: National Grid Electricity
Transmission plc Registered Office: 1-3 Strand, London WC2N 5EH
Registered in England and Wales, No 2366977
PLEASE READ CAREFULLY
National Grid’s Overhead Line/s is protected by a Deed of
Easement/Wayleave Agreement which provides full right of access to
retain, maintain, repair and inspect our asset.
National Grid requires 3D drawings to be provided at the earliest
opportunity (DWG, DGN or DXF)
Statutory electrical safety clearances must be maintained at all
times. National Grid recommends that no permanent structures are
built directly beneath our overhead lines. These distances are set
out in EN 43 –8 Technical Specification for “overhead line
clearances Issue 3 (2004) To view EN 43 – 8 Technical Specification
for “overhead line clearances Issue 3 (2004).
The statutory minimum safety clearance is 7.6 metres to ground and
8.1 metres to a normal road surface. Further detailed information
can be obtained from the Energy Networks Association’s
(www.energynetworks.org.uk) Technical Specification E-43-8 for
“Overhead Line Clearances”, Issue 3 (2004)
Any changes in ground levels which are proposed either beneath or
in close proximity to our existing overhead lines would serve to
reduce safety clearances. Safety clearances to existing overhead
lines must be maintained in all circumstances.
To view the Development Near Overhead Lines Document.
http://www2.nationalgrid.com/WorkArea/DownloadAsset.aspx?id=23713
The relevant guidance in relation to working safely near to
existing overhead lines is contained within the Health and Safety
Executive’s (www.hse.gov.uk) Guidance Note GS 6 “Avoidance of
Danger from Overhead Electric Lines.”
Plant, machinery, equipment, buildings or scaffolding should not
encroach within 5.3 metres of any of our high voltage conductors at
the point where the conductors are under their maximum ‘sag’ or
‘swing’ conditions. Overhea d Line profile drawings should be
obtained using the above contact details.
If a landscaping scheme is proposed as part of the proposal, we
request that only slow and low growing species of trees and shrubs
are planted beneath and adjacent to the existing overhead line to
reduce the risk of growth to a height which compromises statutory
safety clearances.
Drilling or excavation works should not be undertaken if they have
the potential to disturb or adversely affect the foundations or
“pillars of support” of our towers. These foundations extend beyond
the base are of the tower. Pillar of Support drawings should be
obtained using the contact details above.
Due to the scale, bulk and cost of the transmission equipment
required to operate at 275kV or 400kV we only support proposals for
the relocation of existing high voltage overhead lines where such
proposals directly facilitate a major development or infrastructure
project of national importance which has been identified as such by
government.
To promote the successful development of sites crossed by existing
overhead lines, and the creation of well- designed places, National
Grid has produced ‘A Sense of Place’ guidelines, which look at how
to create high quality development near overhead lines and offer
practical solutions which can assist in avoiding the unnecessary
sterilisation of land in the vicinity of high voltage overhead
lines.
• Further information regarding our undergrounding policy and
development near transmission overhead lines is available on our
website at: http://www.nationalgrid.com/uk/LandandDevelopment
12th February 2019
Dear Mr Bale,
NEW ROADS AND STREET WORKS ACT 1991 - SECTIONS 83 AND 84 – C3 DRAFT
LOCATION: VICTORIA, CORNWALL
Thank you for your recent enquiry and associated plans.
We are pleased to confirm our estimated costs for the diversion of
our fibre optic cable necessitated by the above proposed works in
accordance with your latest advised design to be £38,521.64,
comprising: £32,101.37 plus VAT. This figure can be taken as
current for 3 months from the date of this letter and is based upon
the diversion and changeover of our apparatus. We would stress that
this is a budgetary estimate based upon information derived from
the infrastructure owner, (Level 3) and is intended as a guide. The
actual amount could be significantly different and you / the
project sponsor will be charged for the full cost of the
diversion.
Prior to any works involving Sky apparatus being undertaken, we may
agree a specification and provide a detailed C4 estimate of costs.
The costs incurred for producing this are chargeable - and will
apply whether or not the scheme proceeds. For this scheme, the cost
for producing a detailed C4 estimate is £1500.00 excluding
VAT.
Payment is required in advance and should be made payable to Sky
Telecommunications Services Limited and forwarded to the address in
Slough as noted below, marked for the attention of myself. An
appropriate invoice shall be issued in recognition upon receipt but
should you require an invoice to be raised prior to your
remittance, please advise accordingly.
For the avoidance of doubt, you are reminded that under the
Telecommunications Act 1984, it is a criminal offence to alter or
disturb any telecommunications apparatus without the owner's
written consent or a Court order.
We therefore await your payment and further instruction.
Yours Faithfully,
Chris Birch Project Manager Sky Network Services 70 Buckingham
Avenue Slough SL1 4PN
Tel: 07718 511 591 Fax: 0207 0323160
70 Buckingham Avenue, Slough SL1 4PN
Instalcom 1 of 2
Appendix D – C3 Responses from Statutory Undertakers
BT C3 Response Instalcom C3 Response National Grid C3 Response Sky
C3 Response South West Water C3 Response Virgin C3 Response
Vodafone C3 Response Wales and West C3 Response WPD C3
Response
-Page Left Intentionally Blank
Project No. CL. 18/1218/gt.dkt
Project No. CL. 18/1218/gt.dkt
Project No. CL. 18/1218/gt.dkt
APPARATUS IS AFFECTED BY MAJOR
APPARATUS IS AFFECTED BY MAJOR
WORKS (DIVERSIONARY WORKS)”
WORKS (DIVERSIONARY WORKS)”
TR
Undertaker:
Undertaker:
CenturyLink
Scheme:
Scheme:
Diversion Ref/Description:
Diversion Ref/Description:
To install new ducts and chambers following the new road
TR
layout to the new Tregoss Roundabout. This will require a
TR
cable outage for the new section. All works will be
TR
Estimate to be reviewed on completion by CenturyLink –
surplus
TR
Estimate Summary:
Estimate Summary:
TR
£ 156,184.92
PLEASE NOTE: A standard lead time of between 12 and 16 weeks may
apply from the date payment, or part payment, is received if a
cable diversion is required.
Page 1 of 1
Form
Artifact
Project No.
Project No.
Project No.
CL. 19/0208/gt.dkt
APPARATUS IS AFFECTED BY MAJOR
APPARATUS IS AFFECTED BY MAJOR
WORKS (DIVERSIONARY WORKS)”
WORKS (DIVERSIONARY WORKS)”
TR
Diversion Ref/Description:
Diversion Ref/Description:
Slew and lower ducts that are in the verge, this is to allow
TR
for the widening of the footway for a new cycle/footway to
TR
be created. TM is not included in this quote above chapter 8.
Anticipated duration:
Anticipated duration:
Estimate to be reviewed on completion by CenturyLink –
surplus
TR
Estimate Summary:
Estimate Summary:
£ 8,154.73
TR
£ 37,149.33
PLEASE NOTE: A standard lead time of between 12 and 16 weeks may
apply from the date payment, or part payment, is received if a
cable diversion is required.
Page 1 of 1
Artifact
National Grid House Warwick Technology Park Gallows Hill, Warwick
CV34 6DA
James Bale Wayne Smith Cormac Solutions
Asset Protection Assistant Higher Tranent Road
Business & Operation Support
Business & Operation Support
[email protected]
Planning Work?
Contact us on 0800 688 588* Mon-Fri 8am-4pm (*Calls may be recorded
and monitored)
E-mail:
[email protected]
[email protected]
Electricity Emergency Number: 0800 40 40 90* National Gas Emergency
Number: 0800 111 999*
*Available 24 hours, 7 days/week. Calls may be recorded and
monitored.
www.nationalgrid.com
www.nationalgrid.com
www.nationalgrid.com
Dear Mr Bale,
Ref: A30 Link, Austell, PL26 8LX
Ref: A30 Link, Austell, PL26 8LX
National Grid has no objections to the above proposal which is in
close proximity to a High Voltage Transmission Overhead Line.
I have enclosed a location map to show the location of National
Grid’s Overhead Lines within the vicinity of your proposal and
associated information below.
Yours sincerely Wayne Smith
EAGLES (Electricity And Gas Location Enquiry System)
Is now available to use simply click on the link to register ,
submit details of your proposed works and
www.beforeyoudig.nationalgrid.com
www.beforeyoudig.nationalgrid.com
receive instant guidance and if appropriate maps showing the
location of National Grid gas and electric apparatus.
National Grid is a trading name for: National Grid Electricity
Transmission plc Registered Office: 1-3 Strand, London WC2N 5EH
Registered in England and Wales, No 2366977
PLEASE READ CAREFULLY
Statutory electrical safety clearances must be maintained at all
times. National Grid recommends that no permanent structures are
built directly beneath our overhead lines. These distances are set
out in EN 43 – 8 Technical Specification for “overhead line
clearances Issue 3 (2004) To view EN 43 – 8 Technical Specification
for “overhead line clearances Issue 3 (2004).
http://www.nationalgrid.com/uk/LandandDevelopment/DDC/devnearohl_final/appendixIII/appIII-part2
http://www.nationalgrid.com/uk/LandandDevelopment/DDC/devnearohl_final/appendixIII/appIII-part2
http://www.nationalgrid.com/uk/LandandDevelopment/DDC/devnearohl_final/appendixIII/appIII-part2
http://www2.nationalgrid.com/WorkArea/DownloadAsset.aspx?id=23713
http://www2.nationalgrid.com/WorkArea/DownloadAsset.aspx?id=23713
http://www2.nationalgrid.com/WorkArea/DownloadAsset.aspx?id=23713
http://www2.nationalgrid.com/UK/Services/Land-and-Development/A-sense-of-place/
http://www2.nationalgrid.com/UK/Services/Land-and-Development/A-sense-of-place/
http://www2.nationalgrid.com/UK/Services/Land-and-Development/A-sense-of-place/
high voltage conductors at the point where the conductors are under
their maximum ‘sag’ or ‘swing’
Drilling or excavation works should not be undertaken if they have
the potential to disturb or adversely
affect the foundations or “pillars of support” of our towers. These
foundations extend beyond the base are
Due to the scale, bulk and cost of the transmission equipment
required to operate at 275kV or 400kV we only support proposals for
the relocation of existing high voltage overhead lines where such
proposals directly facilitate a major development or infrastructure
project of national importance which has been identified as such by
government.
•
•
http://www.nationalgrid.com/uk/LandandDevelopment
http://www.nationalgrid.com/uk/LandandDevelopment
Artifact
12February 2019
We are pleasedtoconfirmourestimatedcosts forthe
diversionofourfibreopticcablenecessitatedbytheaboveproposed works
inaccordance plusVAT. Thisfigure canbetakenascurrentfor3
monthsfromthe date ofthis letterandisbased upon the diversion and
changeover ofourapparatus. We wouldstress that this is a budgetary
estimate based upon information derived from the infrastructure
owner, (Level 3)and is intendedas a guide. The actual amount could
be significantly different and you /the project sponsorwill be
charged for th
with your latest advised design to be £38,521.64,
comprising:£32,101.37
Prior to any works involving Sky apparatus being undertaken, we may
agreea specification and providea detailed C4 estimate of costs.
The costs incurred for producing this arechargeable -and will apply
whetheror not the scheme proceeds. Forthis scheme,the cost for
producing a detailed C4 estimate is £1500.00 excluding VAT.
Payment is required in advance and shouldbe madepayable to Sky
Telecommunications Services Limited andforwarded to the address in
Slough as noted below, markedfor the attention of myself. An
appropriate invoice shall be issued in recognition uponreceipt but
should you require an invoice to be raised prior to your
remittance, please advise accordingly.
Forthe avoidance of doubt, youare reminded that under the
Telecommunications Act 1984,itis a criminal offence to alter or
disturb any telecommunications apparatus without the
owner'swrittenconsent ora Court order.
We therefore awaityour payment and further instruction.
Yours Faithfully,
Tel: 07718511 591 Fax: 0207 0323160
70 Buckingham Avenue,Slough SL1 4PN
Form
Form
Form
Form
Form
Form
Form
Wnte your cheque number here:
Wnte the cheque amount here:
ST AUSTELL TO A30 LINK ROAD ST AUSTELL TO A30 NEW:
Row1:
undefined:
1:
2:
undefined_2:
Client_3:
Post:
NOTES:
IMPORTANT WARNING Exlcltlng BT plant moy not bo recorded
rllormatlon regarding he location of BT apparatus Is rllormalon
valld at time of proparatloo given for your osslstance and Is
Intend or general ouldance only No guarantee Is given ol ls
accuracy FOR FREE ONSITE LOCATION MARKING SERVICE II should nol bo
rollod upon In the event of excavallons CALL THE EXCHANGE OPERATOR
AND ASK FOR or other works being made near lo BT apperotus which
may exltt al varlout dept ird mny dovlate from the marked roule
FREEPHONE DIALBEFOREYOUDIG:
fill_2:
I:
NOTES_2:
fill_3:
undefined_4:
undefined_5:
B9mAcR:
270876:
undefined_13:
undefined_14:
NOTES_8:
IMPORTANT WARNING Exlcltlng BT pont moy not be rncorded lnlormatlon
regarding the location ol BT apparatu Is lnformotlon valid ot tlmo
of proparalon given for your assistance and Is Intend lorgonrol
guidance only No guarantee Is olven of Its accuracy FOR FREE ONSITE
LOCATION MARKING SERVICE It should not bo rolled upon ln tho ovont
of oxcavatlolI CALL THE EXCHANGE OPERATOR AND ASK FOR or other work
being mode near to BT apparatus which may exit at variom depths and
may deviate rem the marked route FREEPHONE DIALBEFOREYOUDIG:
fill_4_2:
IMPORTANT WARNING Exlcltlng BTpant may not be recorded lnormntlon
roonrdlna lho location ol BT npP3flltu 1 lnlormatlon valid at tlmo
of preparation given lor your as5lstnnce nnd ls lnlond lor general
guidance only No guarantee ls given ol l1t accuracy FOR FREE ONSITE
LOCATION MARKING SERVICE 11 should not be rolled upon In tho oven
of oxcavatlons CALL THE EXCHANGE OPERATOR AND ASK FOR or other
works being mnde neor 10 BT opparilus which may exct al varlouc
depths nnd may deviate lrom the marked roue FREEPHONE
DIALBEFOREYOUDIG:
undefined_15:
NOTES_9:
IMPORTANT WARNING Exlcltlng BT plant mny not be recorded lnormatlan
regarding Iha Jacatlan al BT opporalu I Information valid at limo o
preparation givenforyourascistanceandsntand for general guidance
only No guarantee Is given ol lll accuracy FOR FREE ONSITE LOCATION
MARKING SERVICE t houd nol be railed upon In the event o
excavations CALL THE EXCHANGE OPERATOR AND ASK FOR or other works
being made near to BT appamtus which may exlct ot vorlouc dep1hc
and moy devla1e from the marked route FREE PHONE
DIALBEFOREYOUDIG:
fill_2_2:
undefined_16:
undefined_17:
undefined_18:
undefined_19:
undefined_20:
undefined_21:
cTUNNEL:
NOTES_10:
IMPORT ANT WARNING Exlltlng BT plnnt miy no bo rocordod lnlormaJon
regarding the ocaJon or BT appnratus I lnlormatlon valid at time o
proparatlcm given for your assistance and is intend for general
guidance only No guarantee Is given ol ltn accuracy FOR FREE ONSITE
LOCATION MARKING SERVICE 11 should not bo rolled upon n tho event a
oxcavatans CALL THE EXCHANGE OPERATOR AND ASK FOR or other works
being made near ta BT apparatus which may exist at varlau deplhi
and may devlale ram the marked route FREE PHONE
DIALBEFOREYOUDlG:
fill_9:
undefined_22:
undefined_23:
undefined_24:
DRAPBY JOIIEIU:
undefined_29:
COUNCIL:
VIYwcormacltdcouk:
undefined_30:
PLAN11000A1:
YOY a patmsN loun1bd1l 10etJloruth lo rnlOtdlo 0t tlle
lheag1rlsa10n pt1klld JUJ 11 lhed31 You rol emltedlop51ents
crbthaOI el31 ollhbcfib lo thld1rlit111ryomRow1:
fill_15:
tJo Stltta:
2 Do not scale from this drawing provided by the utility provider 4
Refer lo drawing Proposed design ExlsUng ground 111 Aff c t t
hRow1:
2 Do not scale from this drawing provided by the utility provider 4
Refer lo drawing Proposed design ExlsUng ground 111 Aff c t t
hRow1_2:
2 Do not scale from this drawing provided by the utility provider 4
Refer lo drawing Proposed design ExlsUng ground 111 Aff c t t
hRow1_3:
Row1_6:
Peoliol:
2 Do not scale from this drawing provided by the utility provider 4
Refer lo drawing Proposed design ExlsUng ground 111 Aff c t t
hRow2:
Fhtluoo:
COAll:
H 11000 V1200 Datum 2100m AOD:
ChainageRow1:
PROJECT TITLE ST AUSTELL TO A30 LINK ROAD DRAWING TITlE UTILITY
PROFILES SWW DISTRIBUTION PIPE SHEET 05 OF 09:
fill_10:
161116: