Applicant‘s seminar – Call 2
Munich | Germany | 21 June 2016
How to prepare a good
application form?
2
Quality requirements
Intervention logic
Guidance AF & eMS
Quality requirements
3
Transnational approach
• Topic fits to thematic and geographic context of Alpine Space
• Topic better addressed at the transnational level
(not only concerning one country, not only cross-border level)
• Joint solutions proposed
• Real transnational cooperation and added value for Alpine area
(not a mere collection of local / regional activities)
• Outputs of transnational character
4
Impact on wider strategies
• Contribution to EUSALP macro-regional strategy
• Policy addressing capacity
Strategic development
policy analysis, agenda setting, long-term broad impacts
Explorative / piloting
new tools / methodologies for implementation of strategy
Policy implementation
instruments for implementation / improvement of existing policies
5
Quality outputs and results
Specific, realistic, measurable, sustainable, transferable !
• Answering the needs of identified target groups
• Clear impact on target areas and groups
• Bringing added value, building on past projects’ achievements
• Realistically achievable with the project means
• Long term use of project outputs > durability!
• Transferable beyond the project partnership
6
Relevant partnership
• Competent partners able to tackle the
project’s objectives
• Relevant role in policy field addressed
• Balanced in terms of geographical
coverage, sectors and levels
• Targeted through early involvement of
relevant stakeholders
7
Intervention logic
8
Context
9
Solid project intervention logic
• Precise and explicit objectives
• Results capturing the intended change
• Clearly identified and measurable outputs
Project idea
• What are our common needs and potentials?
Project objectives & results
• What do we want to change?
• How will it be different?
Project outputs & indicators
• What do we need to deliver to obtain this change?
10
Solid project intervention logic
Structure and setup of an ASP project
+ target groups!
intended
change
product / vehicle 11
Link to ASP intervention logic
Contribution to programme objectives, results and outputs
12
Challenge: Sustainable cheese production in the Alpine Space is in decline.
Causes: not known, not valued, not eaten
Overall objective:
Increase the consumption of regional and sustainably produced cheese in the Alpine Space.
Specific objectives:
a) Increase knowledge on the assets and value of sust./reg. cheese among the consumers.
b) Promote the use of sust./reg. cheese in canteens.
Results:
Consumption of sustainably produced regional cheese increased by X%. Cheese used in all canteens of public
institutions in the programme area.
Target groups:
Public administrations, operators of canteens (SMEs, local authorities), general public
Outputs:
a) Concept and implementation of an annual cheese day in different locations all over the Alpine Space.
b) Introduction of a regional, sustainably produced Alpine cheese brand.
c) Guideline for the integration of cheese on the menus of public canteens.
CheeseAlps
13
If you don‘t get your message across to the right target groups,
COMMUNICATION support the management in reaching the project objectives based on the content work.
COMMUNICATION should be planned linked to the intervention logic: how do we develop and transfer our outputs to reach the expected results?
14
And communication is strategic for project success!
15
How do we get our target groups to eat/promote cheese?
Project specific objective:
Promote the use of regionally produced cheese in the canteens
Communication objective:
Change behaviour: get canteen menu planners to integrate
Sustainably produced cheese in the public canteen menus
Target groups:
Canteen operators (SMEs/local authorities)
Target groups:
Influencers: regional authorities, producers…
Approaches:
Practical guidance, education, media campaign…
Activity:
Individual meetings
Activity:
Site visits
Activity:
Press breakfast
=> For more info: factsheet 4.4: project communication
+ Internal communication (e.g. organisation of exchanges among
partners) => Management WP
+ Communication during the output development phase (e.g.
stakeholder workshops or co-creation) => Content WPs
+ Transfer of outputs and durability of results (e.g. individual
meetings to promote practical guidance) => Communication WP
16
In the application form:
Guidance for AF and eMS
17
Tips to create a high quality AF
• Presentation of the eMS boxes that should be filled in
• Common „mistakes“ in the EoI and the AF of call 1 and some
hints to avoid those mistakes
• Some tips to prepare a high quality document
18
Project overview
19
Project overview
• The project overview should give at one glance a good
understanding of the project
• Summary: should be easy to understand for outsiders, no jargon
• Double check the data in the overview, especially if the project
outputs…
• …contribute to the chosen programme output indicator?
(Consistency check of the intervention logic)
• …show the correct target value?
20
Partnership
21
Partnership
• Should be geographically balanced
• Should include relevant institutions from different administrative
levels (vertical integration) and sectors (horizontal integration)
• Why this partner? Each partner should have a clear role in the
project – sometimes institutions you already know might not be
the most relevant partners for the achievement of the project
objectives (dare to look beyond the usual suspects)
• Observers: strengthen the partnership
• Clear role (e.g. transfer of project results), should be presented
as precisely as possible for each observer (avoid copy/paste)
22
Project description - focus
23
Project description - focus
24
• This section contains an essential part of the intervention logic:
Check for relevance and coherence, both internally for your
project and for the contribution of the project to the programme
intervention logic
• Make sure that the outputs are relevant for your target groups
• Points to remember:
• The project results should refer to the envisaged change in
the area (not to be mixed up with the project outputs)!
• The project specific objectives should be formulated in a
precise and specific way; they should clearly be linked to one
(or more) output(s).
Project description - context
25
Project description - context
26
• This section should describe a realistic contribution of the project
to wider strategies and policies, both at EU, national and regional
levels
• Reference to the relevant action group of EUSALP, and
presentation of the concrete contribution of the project to the
respective action of the EUSALP action plan
• Synergies with relevant current and previous projects
• Link and added value of the project to knowledge already
available in the field
Project description – horizontal principles
27
Project description – horizontal principles
28
• For further details on the horizontal principles see section 8 of
the Cooperation Programme
• Be realistic:
• Will the project activities really contribute to the horizontal
principle
• If the principle is acknowledged by the project, but not a major
focus of the project activities, the contribution should be set to
neutral
Work plan – List of work packages
29
Work plan – List of work packages
• Work packages structure the activities within the project
• Mandatory work packages: Preparation, Management,
Communication
• It is not possible to have more than 5 implementation work
packages
30
Work plan – WP Preparation
31
Work plan – WP Management
32
Work plan – WP Management
• Take it seriously: a good management is key to success!
• Include provisions for project controlling, quality and risk
management
• Do not repeat activities
• Limit the deliverables, e.g. progress reports should not be
considered as a deliverable
33
Work plan – Implementation WP
34
• The implementation work packages structure the thematic
activities within the project
• What is the objective of the work package?
• How is it linked to other work packages?
• Points to remember:
• Ensure coherence between the involvement of partners in the
implementation work packages and in the budget
• I.e. the involvement of each PP and their main tasks should
be mentioned in the activities
• Keep focused: avoid having too many deliverables
Work plan – Implementation WP
35
Work plan – Implementation WP
36
• Create the right output in the right work package
• A work package does not necessarily need to have an output
Deliverables – outputs – results
37
Deliverables:
Tangible products,
intermediate step
Outputs:
Main tangible
products, used to
achieve the results
Results:
Change resulting from
project implementation
Points to remember:
• The output should clearly contribute to the chosen programme
output indicator
• The quantity of deliverables and outputs should be limited
• The delivery date should be early enough to ensure transferability
• The deliverables and outputs should have a transnational
purpose
Work plan – Implementation WP
38
• Target groups and stakeholders should be relevant for the outputs
and the specific objectives of the project
• Mention concrete measures to involve the target groups during
project implementation and in the phase of output development
(consulting loops etc.)
• Keep focused
Work plan – Implementation WP
39
• Mention concrete measures to make sure that the outputs will be
used and transferred in order to achieve sustainable results
• Link the aspect of durablility and transfer to the target groups
• Link to the work package Communication
Work plan - WP Communication
• 1 project => 1 communication officer => 1 communication
strategy
• Make sure to include the mandatory deliverables as stated in
subsidy contract:
• project logo
• project website
• final public event
• poster about the project (template provided by the programme)
40
Logo
• Work for graphic designer (for budget plan):
• Just project name: 1-2 hours
• With logo: depends on logo,
max. 1 day
41
Website
• Plan sufficient working
time for website updates.
• Do NOT include
project website hosting
in your budget plan
• Some sections are linked
with the eMS and will get
automatically updated.
42
Planning WP communication
43
Planning WP communication
• Clear and simple main WP objectives (summary):
How communication will support reaching project objectives => link with
project target groups and other WPs must be clear.
• Relevant communication objective(s) for each specific objective
They must be consistent with the project specific objectives and
expected results.
44
Possibility to fill in 1 to 2 communication objectives per project specific objective
Choose among the four communication objectives (drop-down list):
- Raise awareness (if target group knows nothing about the topic)
- Increase knowledge (if target group knows little about the topic)
- Influence attitude (if target group knows about but has a different opinion about the
topic)
- Change behaviour (if target group needs encouragement to use your output)
Planning WP communication
• Approach / Tactics
Sentences should read like: “We will – communication objective – of –
target group – by– approach and communication channels –
with/during the following activities: a, b, c.
• Activity description (pre-set activities type):
45
Activities: please choose among (drop-down list):
start-up activities including communication strategy and website set up; publications;
public events; digital activities including social media and multimedia; promotional
activities.
Please don’t forget the mandatory deliverables listed in the subsidy contract
Describe simply the activity linking precisely to the target groups.
Work plan – list of work packages
46
• Check the coherence of the time plan between WP, activities,
and the delivery of outputs and deliverables
Work plan - target groups
47
Work plan - target groups
48
• The target group tab has to be completed in the end (after
completion of outputs and target groups in the work plan): Do not
forget to fill in this tab!
• Countercheck that the selected groups match the intervention
logic of the project (relevant for the project outputs and
objectives) as well as the communication approach (WP
Communication)
Project budget
Tomorrow !
49
Short EMS walk-through
50
Step 1 - EoI
Step 2 - AF
Short EMS walk-through
51
Let‘s go online… eMS
Thank you! And good luck!