Arulmigu Ekambaranathar Temple
Kancheepuram
Competitive Tender for the Selection of Architect and Engineering
Consultant
For The Proposed construction of Yatri Niwas and other
infrastructure facilities for Arulmigu Ekambaranathar Temple at
Kancheepuram
DUE DATE FOR SUBMISSION: ON OR BEFORE 21.1.2016 at 4.00 PM
TO BE SUBMITTED TO: The Executive Officer,
Arulmigu Ekambaranathar Temple
Kancheepuram, 631 502.
TENDER SUBMITTED BY: M/s.______________________________
Address___________________________
__________________________________
January- 2016
P a g e | 2
CONTENTS
Section 1 - Letter of Invitation .................................................5
Section 2 - Pre –Qualification Criteria......................................7
Section 3 - Project brief Description ........................................9
Section 4 - Request for proposal............................................13
Section 5 - Scope of Work......................................................16
Section 7 - Format A to E………………………………..........18
Section 8 - Financial Quote ………………………………........30
P a g e | 3
SECTION - 1
LETTER OF INVITATION
P a g e | 4
Letter of Invitation
To
Dear Sir/ Madam,
The Executive Officer, Arulmigu Ekambaranathar Temple, Kancheepuram Temple
invites proposals for the Selection of Architect and Engineering Consultant to prepare
feasibility report, Conceptual drawing and Master Plan for the proposed
construction of Yatri Niwas and other infrastructure facilities near Arulmigu
Ekambaranathar Temple ,Kancheepuram
Details on the project requirements and services required are detailed in the following
pages.
1. It is not permissible to transfer this invitation to any other firm.
2. A firm will be selected based on pre- qualification prescribed under this document
and on lowest quote basis.
3. This documents includes the following:
Section 1 ‐ Letter of Invitation
Section 2 ‐Pre –qualification criteria
Section 3 - Project brief description
Section 4 – Request for proposal
Section 5- Scope of work
Section 6- Financial quote
Section 7- Format A to E
Yours Sincerely,
Executive Officer, Arulmigu Ekambaranathar Temple, Kancheepuram,
P a g e | 5
SECTION - 2
PRE – QUALIFICATION CRITERIA
P a g e | 6
PRE QUALIFIACTION CRETERIA FOR SELECTION OF ARCHITECT AND
ENGINEERING CONSULTANT FOR PREPARATION OF FEASIBILITY REPORT AND
CONCEPTUAL DRAWING AND MASTER PLAN SERVICES.
The Executive officer, Arulmigu Ekambaranathar Temple Kancheepuram desires to
Construct Yatri Niwas and other infrastructure facilities in the available land of 16.50 acres
At Kancheepuram and invites tender for the Selection of Architect and Engineering
Consultant who can undertake the responsibility for the preparation of Feasibility report and
Conceptual drawings and Master Plan. The Architect should meet the following minimum
Qualification criteria as on 01/01/2016.
1) Should have done Comprehensive Consultancy for Architectural and Engineering services involving preparation of feasibility report, conceptual drawings and master Plan, development of detailed drawings for a hotel project during last three years.
2) Should have established in house Resources and provided all the Design, Engineering and Construction services from concept to project commissioning on the continued basis for the last three years.
3) Should have Experience in preparation architectural drawing and design of high storied building (minimum five floors) at least two projects during the last three years and the project must have provision for Auditorium, Library, Food Court activities.
4) Should have an annual turnover of one crore in any one of the last three financial years in consultancy work alone.
P a g e | 7
SECTION - 3
PROJECT BRIEF DESCRIPTION
P a g e | 8
PROJECT BRIEF DESCRIPTION
The Executive Officer, Arulmigu Ekambaranathar Temple Kancheepuram proposes to
take up construction of Yatri Niwas and other infrastructure facilities at Kanchipuram
near Arulmigu Ekambaranathar temple.
The Consultants shall prepare Feasibility report and Conceptual drawings and Master
Plan for the proposed Construction of Yatri Niwas and other infrastructural facilities near
Arulmigu Ekambaranathar Temple, Kancheepuram temple City to accommodate 500
persons. An extent of about 16.5 acres of land is earmarked and readily available for
this purpose near Arulmigu Ekambaranathar Temple, Kancheepuram which includes 5
to 6 acres for future expansion.
The above Yatri Niwas. will accommodate Admin building, cottages, rooms etc for the
pilgrims as detailed below and other facilities such as ATM, Audio visual program
theatre , book stall, Guides consultation space, forex, high end public convenience etc.
which will suite foreigners also .
Project Requirement:
1. Admin Block with Reception facilities with Grand lobby and must have provision
to accommodate
• Admin Office
• Audio/ Visual Room
• Book Stall
2. Pilgrims Accommodation
• Standard Rooms (double bedded) for Economical section to accommodate 100
to 110 persons.
• Dormitory for Economical section to accommodate 220 to 250 persons.
P a g e | 9
• Deluxe Rooms (double bed) for other Nationals to accommodate 100 to
110persons
• Cottages for VIP to accommodate 40 to 50 persons.
3. Banking facilities
• Forex
• ATM
4. Utility Block – For services to accommodate electrical panels and A/C facilities
5. Compound Wall with drain facilities
6. Info centre
• Tourist information office • travels facilities • language interpretation centre • Informatory / directional sign boards
7. Dining Facilities: Restaurants & Café
8. Security
• Cctv monitoring • Ibms installed • Cloak rooms
9. Safety: Health facilities, First aid room 10. Green approach to site:
• solar lights for streets • landscaped ,shaded roads • street furniture’s (seating’s, drinking
Water points, bollards)
• Lawns and Gardens in OSR facilities
P a g e | 10
11. Housekeeping
• Dry cleaning • Laundry
12. Telecommunication facilities
• WIFI hotspot • Telephone connections/rooms
P a g e | 11
SECTION - 4
REQUEST FOR PROPOSAL
P a g e | 12
REQUEST FOR PROPOSAL Proposals are invited from reputed Consultants at National level for rendering services
as Architect and Engineering Consultant for the preparation of feasibility report
Conceptual drawing and Master Plan and Rough cost estimate for the Proposed
construction of Yatri Niwas and other facilities at Arulmigu Ekambaranathar Temple
Kancheepuram under Asian development bank aided project.
.SUBMISSION OF PROPOSALS:
1. The tender shall be submitted in a single cover by furnishing their credentials to
satisfy the prequalification criteria and their quote in the format provided in this
document and cover super scribed as tender for the selection of Architect and
Engineering Consultant for the construction of Yatri Niwas at Kancheepuram.
On the day of opening the tender cover will be opened and the details furnished will be
evaluated with reference to prequalification criteria and the lowest tender will be
decided.
ii) Over-writing should be avoided. Correction, if any should be made by neatly crossing
out, initialling, dating and rewriting.
iii) The same should reach to the submission address on or before the time and date
stated specified. Any Proposal received after the closing time for submission shall be
rejected.
2. The tenderers are required to submit their sealed tenders before 4 pm on 21.1.2016
and the tender will be opened on the same day at 4.30 pm.
3. The lowest (L1) consultant will be invited to make a presentation in front of the
Executive officer ,Arulmigu Ekambaranathar Temple,Kancheepuram.
4. For satisfying the pre-qualification criteria , the consultant should submit the following
details in addition to the details required in pre qualification.
a. Company profile.
b. Details of past experience with his clients, list of similar projects completed
and in progress and work experience
c. Approach and Methodology
P a g e | 13
d. In-house resources available.
.
5. Technical information furnished in the format enclosed shall be evaluated for
prequalifying the tenderers.
6. The Executive Officer, Arulmigu Ekambaranathar Temple Kancheepuram reserves
the right to reject any or all tenders without assigning any reason whatsoever.
7. If it is found at any stage, that the tenderer has furnished false information, then the
tender is liable for rejection at any stage and tender security will be forfeited.
8. The tenderer shall bear all the costs associated with the preparation of the bid.
9. The tender submitted shall be valid for a period of 90 days from the date of opening.
In exceptional circumstances, the Executive Officer; Arulmigu Ekambaranathar Temple
Kancheepuram Temple may solicit the tenderer’s consent for an extension of the period
of validity.
11. Prior to submitting their proposals the consultant is advised to visit the site to have
their own assessment & ascertain for themselves the information required for the
assignment, at their own cost and expenses.
12. For any queries and further information required can be obtained from the web site
or from the office of the Executive office Arulmigu Ekambaranathar Temple
Kancheepuram 631 502.
P a g e | 14
SECTION - 5
SCOPE OF WORK
P a g e | 15
Scope of Consultant
a) Preparation of conceptual and comprehensive layout and Master Plan with
reference to the requirements given by the Executive Officer, Arulmigu
Ekambaranathar Temple Kancheepuram
b) Evolvement of conceptual design for the buildings based on the space
requirements &State of the Art specifications and in conformity with the National
Building Code
c) The buildings layout shall be planned incorporating modern architectural
concepts of Green Building and Barrier Free in good light & ventilation. A master
plan shall be developed including drainage, power supply, internal roads, future
expansion etc.
d) Preparation of Rough cost estimates for the works including the developmental
works and all components / features as per the specifications stipulated
e) To discuss the draft layout and conceptual designs and obtain the Executive
Officer, Arulmigu Ekambaranathar Temple Kancheepuram Temple’s approval
duly carrying out modifications as may be necessary including revised cost
estimate if required.
f) To prepare feasibility study and finalize the report after discussion with the client
The feasibility report will consist of the following.
i) Location and tourism importance.
ii) Concept of this project and layout in A3 size.
iii) How this project will improve tourism and local business.
iv) Rough cost estimate with break up.
v) Project viability.
P a g e | 16
a) The Consultants shall provide state-of-the-art creative conceptual designs
keeping in view the aesthetics and utilitarian aspects of the structures capable
of being constructed at an optimum cost. The designs shall be created
specifically for this project and shall not be replicated in to or partly from any
other project
Schedule for completion of tasks
stage details No of days 1 Preliminary works,
Concept drawing and Master Plan and Feasibility report
15 days From the date of award of work
REMUNARATION:
For rendering the above consultancy services, the Executive Officer, Arulmigu
Ekambaranathar Temple Kancheepuram Temple shall pay the fee as quoted in the
financial tender.
The amount payable is inclusive of all taxes and levies but excluding service tax.
The statutory taxes and other levy deductions as per income tax and relevant Acts will
be made by on the payments to be made to the consultants
MODE OF PAYMENT:
The payments shall be made in the form of crossed cheque in favour of the Consultants
SI.NO details Percentage of payment
Remarks
1 Preliminary works, Concept drawing and Master Plan and Feasibility report
100% On submission of Preliminary works, Concept drawing and Master Plan and Feasibility report
P a g e | 17
Output of the consultancy:
The output of the consultancy and any other details envisaged under scope of work
shall be supplied as specified below in appropriate scale:
Sl
.No.
Description No. of Copies
1 Initial Concept Plan, Including rough estimates 2 copies
3 Final Master plan, Preliminary Drawings and preliminary
estimate incorporating final version
3 copies
Responsibilities of the Executive officer
The responsibilities of the Executive Officer, Arulmigu Ekambaranathar Temple
Kancheepuram comprise the following:
a) To provide detailed area requirement of the buildings at site
b) To provide a site plan showing boundaries, existing physical features of site.
c) Payment of fee of the Consultants within fifteen days on submission of bills after
completion of the services.
P a g e | 18
Check List
Sub: Submission of Tender for selection of Architect and Engineering
Consultant for the proposed Yatri Niwas near Arulmigu Ekambaranathar
Temple Kancheepuram. We confirm that the following has been
enclosed or not.
S.no Description of item Enclosed Not enclosed
1 a. Application b. Letter of Transmittal c. Formats A to E.
2.
Copies of I.T. return certificate. For the past 3 years – Assessment Year
(as on 31st March 2015)
a.2012- 13 c.2013– 14 b. 2014– 15
3.
Certificate of Registration from. a .Registrar of companies. b. Association of Architects c. Govt/Public bodies. Specify
4.
Copies o Audited Balance Sheet and P&L statement forthepast3years. (as on 31st March 2015) a.2012- 13 b.2013– 14 c.2014– 15
5.
Copies of Service Tax Registration.
7.
Supporting certificates for technical and financial capability from relevant authorities/clients.
8.
Board of Directors/Partners.
9.
Organization Chart with responsibilities.
10.
Details of facilities available for performing the aid work.
P a g e | 19
11.
Details of tie ups, technical, financial with reputed foreign
organization/collaborator with copy of agreement if any
12
Supporting certificates for completion of works and satisfactory performance from clients.
13
Supporting certificates for on-going works Work order & date and stage of work.
14.
Annual Report for the last3years (as on 31st March2015) a.2012- 13 b.2013– 14 c.2014– 15
I/whereby agree to abide by the decisions of the Executive officer Arulmigu Ekambaranather temple Kancheepuram in all matters relating to this tender. Date of Submission Signature of Applicant with Official Seal
P a g e | 20
FORMAT-A
PERSONNEL Give details of key Technical and Administrative Personnel (who could be assigned for the works) in the following. Separate sheets may been closed
A.
Lists of Board of Directors Details of Each Director 1) Name of the Director 2) Organization(Represents) 3) Address
B.
Key Technical and Administrative Personnel and Consultants: 1)Individual's Name 2)Qualification(Degree/Postgraduate)3)Present position of office 4)Professional experience and details of works carried out 5)Years with the applicant 6)Language known 7)Additional information 8)Please enclose separate sheet for each category Architect, civil Engineer, Structural Engineer, Mechanical Engineer, ACMV, Electrical, DG, Lift, IBMS, Sewage Treatment, Environmental,
C.
Man Power Deployment Details of Personnel to perform the above aid work. Has to provide for each category of persons as per Format enclosed in the tender. Please note that this is mandatory in order to fulfil the requirement of PQ condition.
Date Signature of Applicant with Official Seal
P a g e | 21
FORMAT–B
Details required to be provided for fulfilling the qualification criteria under clause No.1
Should have done Comprehensive Consultancy for Architectural and Engineering services involving preparation of feasibility report, conceptual drawings and master Plan, development of detailed drawings for a hotel project during last three years.
1
Name of the Client
2
Address
3
Phone No. Fax No.
4
Value of the Project
Rs
5
Value of Consultancy work/ Fee paid
Rs.
6
Consultancy Agreement(Agreement Copies to been closed)
P a g e | 22
7 Project Details
a) Built–up Area
b) Ground floor and c) Upper floors d) Utility e) Others f) Total built up area
(Sqft.) -----------------------------------------------
-----------------------------------------------
----------------------------------------------
-----------------------------------------------
----------------------------
---------------------------------------------
B)Period of Consultancy
-----------------------to--------------------
C)Value of Work Building Utilities
Total Value of Project
Rs. In Lakhs
D)
Project Completion Date(enclose credentials)
8
Scope of consultants work as single point responsibility
Please confirm whether you have produced
A
Basic& concept designing
YES / NO
B
Detailed Engineering & Structural Designing
YES / NO
P a g e | 23
C
Detailed Drawings (Good for construction Drawings)
YES / NO
9
Details of project for which consultancy was provided
A
Is it an residential project
YES / NO
B
Is it non-residential project YES / NO
C
Brief the Nature of the project and also the purpose, activities and end use the building
Please specify the end use of building IT/ITEs, Commercial Complex / Mall, Hotel, Entertaining Complex, Office Space etc Any relevant details.
Date Signature of Applicant with Official Seal
P a g e | 24
FORMAT–C
Details required to be provided for fulfilling the qualification criteria for clause No.2
Should have established in house Resources and provided all the Design, Engineering and Construction services from concept to project commissioning on the continued basis for the last three years.
A) Resources based as per the Pay Roll of company (Number of persons)
Years ending as on
31stMarch,
2011
2012
2013
2014
2015
1.
Architect (B.Arch. with Experience of)
a.10 to 15 years b.5 to 10 years
2
Structural Engineering with experience of
a.10 to 15years b.5 to 10years
3
Civil Engineering with experience of
a.10 to 15years b.5 to 10years
4
Supervisor (Diploma in Civil Eng.) with experience of
a.10 to 15years b.5 to 10years
5
Electrical ( BE Elec. With Experience of)
a.10 to 15years b.5 to 10years
P a g e | 25
6
Mechanical (BE Mech. With Experience of)
a.10 to 15years b.5 to 10years
7
Electronics & Communications BE (ECE) with experience of
a.10 to 15years b.5 to 10years
8
Air-conditioning & Ventilation (BE Mech. With Experience of)
a.10 to 15years b.5 to 10years
9
Fire Fighting(BE with Experience of)
a.10 to 15years b.5 to 10years
10
Environment Engineering Eng .Degree /PG with Experience of
a.10 to 15years b.5 to 10years
(B) Number of Consulting Projects carried as Architect with single point responsibility with proof
Area of
Specialization
Name of Project
Value of
Project
Period of Contract
Please tick
2010-11
2011-12
2012-13
2013-14
2014-15
Basic and
Conceptual
Drawings
P a g e | 26
Structural
Designing,
Analyzing and
good for
construction
Drawings
Tendering
Work
Preparing
Document,
Evaluation,
Issue of LOA
and drafting
Agreement)
Area of Specialization
Name of Project
Value of
Project
Period of Contract
2012
-13
2013-14
2014-15
Site Supervision
Checking of
measurements
and billing
Bill certification
Post
Commissioning
Services
Preparing
O & M Manuals
Date Signature of Applicant with Official Seal
P a g e | 27
FORMAT–D
Details required to be provided for fulfilling the qualification criteria of clauseNo.3:
Should have Experience in preparation architectural drawing and design of high storied building (minimum five floors) at least two projects during the last three years and the project must have provision for Auditorium, Library, Food Court activities.
Sl. No 2012-13
2013-14
2014-15
1 Nature and activities of the of
the bui lding
2 Address of the Client
3 Value of the project
4 Area of the project
5 Number of stories
6 Details of facility provided
Date Signature of Applicant with Official Seal
P a g e | 28
FORMAT– E
Details required to satisfy the eligibility clause 4
Should have an annual turnover of 3 Crores in any one of the last three financial years
in consultancy work alone
S.no Year Annual turnover from buildings in India operations
Name of project Value in Indian Rupee
1
01/04/2014 to
31/03/2015
2
01/04/2013
to 31/03/2014
3
01/04/2012
to 31/03/2013
3
Note: The tenderer should submit documentary evidence for the above in the form of
income tax return /P&L statement certified by the registered chartered account.
Date Signature of Applicant with Official Seal
P a g e | 29
FINANCIAL QUOTE
Fees for Architectural and Engineering Consultancy services
S. No
Description
Fee to be quoted in Lump sum
1
Preliminary works, Concept drawing and Master Plan and Feasibility report
Total Quoted fee in
Rs ------------
(In words and figures.)
Terms of payment
a) The fee payable to the Consultant will be made on submission of conceptual plan, Master
Plan and feasibility report.
b) The period of time for submission of report will be 15 days from the date of letter of award.
c) We confirm that the rates quoted by us shall be deemed to be inclusive of all expenses
and income tax will be deducted from the quoted rate at source as per applicable law.
d) Service tax will be paid extra over the above quoted rate.
e) We agree that Conditional bid/offer will not be accepted.
Date Signature of Applicant with Official Seal