7/29/2019 ASAP templayte http://slidepdf.com/reader/full/asap-templayte 1/60 GlobalASAP Implementation Methodology
Transcript
  • 7/29/2019 ASAP templayte

    1/60

    GlobalASAPImplementation

    Methodology

  • 7/29/2019 ASAP templayte

    2/60

    Title of Presentation, Speaker Name / 2

    Objectives

    Present an overview of the GlobalASAP methodology

    Review changes to the GlobalASAP Roadmap

    Discuss key work streams of the multi-site implementation

    Introduce Key Deliverables

    Discuss use of GlobalASAP Roadmap in SAP Solution Manager

  • 7/29/2019 ASAP templayte

    3/60

    GlobalASAP in detail

    Tool time

    GlobalASAP overview

    GlobalASAP concept

  • 7/29/2019 ASAP templayte

    4/60

    Title of Presentation, Speaker Name / 4

    Goals of Corporate Template Project

    Drive for quick, repeatable project

    implementations

    Define common core business processes

    Allow transfer of leading practices across all

    lines of business Deliver flexible business solutions that utilize

    integrated applications, common technology andstandardized data

    Minimize investment in redundant systemsdevelopment, interfaces, and support

  • 7/29/2019 ASAP templayte

    5/60

    Title of Presentation, Speaker Name / 5

    Delivering Successful Solutions

    GlobalASAP Methodology

    Description

    http://service.sap.com/roadmaps

    GlobalASAP delivers a process-oriented, clear, andconcise methodology the GlobalASAP Roadmap to

    provide step by-step direction throughout your

    global or multi-site SAP implementation.

    More info

    http://service.sap.com/roadmapshttp://service.sap.com/roadmaps
  • 7/29/2019 ASAP templayte

    6/60

    Title of Presentation, Speaker Name / 6

    GlobalASAP Methodology at a glance

    GlobalASAP Methodology Covers implementation of the entire SAP Solution

    portfolio

    Provides detailed steps for the template project and shellroadmap structure for the individual rollout projects

    Pilot site brought live during the template project

    Project and Program Management content aligned with

    industry standards (Project Management Institute)

    Roadmap structured into logical work streams supportingall aspects of multi-site project

    Structural changes enabling true deliverable basedapproach in implementations

    Both Business Process Management and TechnicalSolution Management content included in the Roadmap

    Improvement of roadmap attributes to enable users tofind the right information fast

  • 7/29/2019 ASAP templayte

    7/60

    Title of Presentation, Speaker Name / 7

    GlobalASAP Roadmap Phases

    GlobalProgram

    Preparation

    Initiate and

    plan entire

    program and

    template

    project

    GlobalBusinessBlueprint

    Document the

    business

    requirements

    for entire

    enterprise

    Global

    Realization

    Implement business

    process

    requirements and

    develop template for

    subsequent rollout

    PilotFinal

    Preparation

    Finalize cutover

    preparation and bring

    pilot site live

    Global Templateon-goingRollout,

    Support andMaintenance

    Fine tune the

    template before

    conducting

    subsequent

    rollouts

  • 7/29/2019 ASAP templayte

    8/60

    GlobalASAP in detail

    Tool time

    GlobalASAP overview

    GlobalASAP concept

  • 7/29/2019 ASAP templayte

    9/60Title of Presentation, Speaker Name / 9

    GlobalASAP Roadmap

    ASAP Roadmap

    Blueprint Realization Prep to Go LiveGo Live &

    Support

    Project

    PreparationASAP Roadmap

    Blueprint Realization Prep to Go LiveGo Live &

    Support

    Project

    Preparation ASAP Roadmap

    Blueprint RealizationPrep to Go Live Go Live &

    Support

    Project

    Preparation

    Global (Global ASAP) Implementation Charts the Overall Program

    Defines the Enterprise wide Requirements

    Creates the Global Template Defines the Program Rollout Plans

    Local Implementation Projects Starts with the Enterprise-wide Requirements

    Adds the local Requirements

    Completes the configuration

    Local Implementations

    GlobalASAP traditional approach

  • 7/29/2019 ASAP templayte

    10/60Title of Presentation, Speaker Name / 10

    NEW GlobalASAP Concept

    Template Project

    Global Template

    Pilot

    Rollout #1

    Rollout #2

    Rollout #n

    Pilot site operations

    GlobalProgram

    Preparation

    GlobalBusiness

    Requirements

    GlobalRealization

    PilotFinal

    Preparation

    Global

    Template

    On-goingRollout,

    Supportand

    Maintenan

    ce

    Ongoing Template Maintenance

    Rollout Projects

    Rollout #1 Operation

    Rollout #2 Op.

    Ongoing template maintenance

    and rollouts

    Gl b lASAP i t t ffi l l f j t d

  • 7/29/2019 ASAP templayte

    11/60Title of Presentation, Speaker Name / 11

    GlobalASAP approximate staffing levels for projects andCustomer Center of Excellence

    Template Project

    Global Template

    Pilot

    Rollout #1

    Pilot site operations

    Ongoing Template Maintenance

    Rollout Project #1

    Rollout #1 Operation

    Pilot site operations

    Rollout #1 operations

    Pilot site

    Program Timeline

    Staffing levels

  • 7/29/2019 ASAP templayte

    12/60Title of Presentation, Speaker Name / 12

    GlobalASAP flow from template to rollout projects

    Program Management

    Project Management

    Organization Change Management

    Solution Management

    Lifecycle Data Management

    Technical Solution Management

    Security

    User Roles

    Training and Documentation

    Solution

    Package

    Rollout

    Package

    Templateconsists of

    Template project creates Rollout projectsleveragethe template

    Rollout

    ProjectsRollout

    ProjectsRollout

    ProjectsRollout

    ProjectsRollout

    ProjectsRolloutProjects

  • 7/29/2019 ASAP templayte

    13/60Title of Presentation, Speaker Name / 13

    Key differences between traditional and new approaches

    In new approach template is developed and fine tuned during

    the template project, at the same time the pilot site is brought

    live

    In the new approach the template project team needs to

    consist of the template team

    Fully aligned with process supported by SAP Solution

    Manager

  • 7/29/2019 ASAP templayte

    14/60

    GlobalASAP in detail

    Tool time

    GlobalASAP overview

    GlobalASAP concept

  • 7/29/2019 ASAP templayte

    15/60Title of Presentation, Speaker Name / 15

    Template

    RoadmapWork

    Streams

  • 7/29/2019 ASAP templayte

    16/60Title of Presentation, Speaker Name / 16

    Program Strategic Framework and Business Case

    This deliverable group is included for sites that have not

    completed the business case for the program. It walks throughthe key steps needed to define a solid program business case

    prior to initiating the program.

  • 7/29/2019 ASAP templayte

    17/60Title of Presentation, Speaker Name / 17

    Program Management

    Program Management stream

    covers the entire program.

    Fully aligned with Project

    Management Institute standard

    for Program Management.

    Covers Program Initiation,

    Planning, Monitoring and Control

    as well as Program Closing

    activities.

    Program Performance and

    Benefits Management is key areaof the program management

    stream.

  • 7/29/2019 ASAP templayte

    18/60Title of Presentation, Speaker Name / 18

    Project Management

    Project Management activities

    for the template project.

    Fully aligned with Project

    Management Institute

    standards (PMI PMBOK).

    Covers Initiation, Planning,

    Monitoring and Control as well

    as Closing activities.

    Provides consistent project

    management approach.

    Open and extendable to

    accommodate specific project

    management process that is

    aligned with PMI standards.

  • 7/29/2019 ASAP templayte

    19/60Title of Presentation, Speaker Name / 19

    Implementation Program Standards

    Specific recommendations for the program how to establish

    efficient standards for both the template project as well as allrollout projects.

    Leverages SAP Solution Manager as key toolset for

    implementation, operations and continuous enhancements of the

    implemented solution.

  • 7/29/2019 ASAP templayte

    20/60Title of Presentation, Speaker Name / 20

    Business Process Management

    Covers all aspects of

    business process

    requirementsgathering, business

    process design and

    testing.

    Fully aligned structurewith SAP Solution

    Manager

    representation of

    business scenarios.

    Flexible structureeasing the creation of

    project specific WBS.

  • 7/29/2019 ASAP templayte

    21/60Title of Presentation, Speaker Name / 21

    Organization Change Management

    This stream discusses

    the deliverables

    necessary to support asmooth organizational

    transition from the

    existing solution to the

    newly implemented SAP

    Solution.

    This area has been

    completely updated for

    this release of

    GlobalASAP template

    roadmap.

  • 7/29/2019 ASAP templayte

    22/60Title of Presentation, Speaker Name / 22

    Training

    This stream covers all deliverables, activities and tasks related to

    project team training and the end user documentation and

    training.

  • 7/29/2019 ASAP templayte

    23/60Title of Presentation, Speaker Name / 23

    Lifecycle Data Management

    This stream covers the required analysis, preparation and actual transfer

    of data from legacy systems to the newly built SAP Solution.

    To highlight the importance of this topic the required deliverables are

    presented in separate area of the roadmap instead of being incorporated

    in other sections of the roadmap.

    I t t d S l ti R di M t

  • 7/29/2019 ASAP templayte

    24/60Title of Presentation, Speaker Name / 24

    Integrated Solution Readiness Management

    This stream represents

    the integrated solution

    that is created during thetemplate project.

    The Integrated Solution

    Management covers all

    aspects of assuring theintegration of individual

    parts of the newly built

    solution.

    Solution Design,

    Solution IntegrationTesting and other key

    integration topics are

    covered in this area.

    Global Security Management & User Roles and

  • 7/29/2019 ASAP templayte

    25/60Title of Presentation, Speaker Name / 25

    Global Security Management & User Roles andAuthorizations

    This stream

    covers all

    aspects ofsecurity

    management,

    user roles and

    overall enterprise

    security and risk

    management.

    Detailed template

    with required

    steps are

    provided for allEnterprise Risk

    Management

    areas.

    D l t St d d

  • 7/29/2019 ASAP templayte

    26/60Title of Presentation, Speaker Name / 26

    Development Standards

    This deliverable group discusses the specifics of how to establish the

    development standards and assure that the project team has sufficient

    development resources to accomplish the required development work.

    P f d S t T ti

  • 7/29/2019 ASAP templayte

    27/60

    Title of Presentation, Speaker Name / 27

    Performance and System Testing

    Template project team

    needs to get ready to

    assess the quality of thesolution by planning the

    performance and system

    tests in phase 3.

    Later in phase 4 theproject team conducts

    the system and

    performance tests to

    assure that the pilot site

    will provide sufficient

    performance throughputfor the pilot organization.

    C t C t f E ll

  • 7/29/2019 ASAP templayte

    28/60

    Title of Presentation, Speaker Name / 28

    Customer Center of Excellence

    Customer Center of

    Excellence (CoE) is key to

    success of the program, theCoE assumes the role of:

    1. Owner of the template

    once the pilot site is live

    2. Organization supporting

    the live solution in terms of

    operational support as well

    as continuous

    enhancements and

    maintenance

    T h i l I f t t M t

  • 7/29/2019 ASAP templayte

    29/60

    Title of Presentation, Speaker Name / 29

    Technical Infrastructure Management

    This work stream covers all activities and tasks related to

    planning, sizing, setup and maintenance of the technical

    infrastructure.

    S pport and stabili e pilot prod ction

  • 7/29/2019 ASAP templayte

    30/60

    Title of Presentation, Speaker Name / 30

    Support and stabilize pilot production

    The purpose of this deliverable group is to establish the productionsupport for the pilot site that includes the daily support desk operations,ongoing end user training plans and volume and system monitoringactivities.

    With this set of activities the team concludes the transition from theproject support organization to the production support organization(CoE).

    Global Template Rollout and Solution Package

  • 7/29/2019 ASAP templayte

    31/60

    Title of Presentation, Speaker Name / 31

    Global Template Rollout and Solution Package

    The template project team develops the corporate template that consistsof two key elements:

    Rollout package all project guidelines, standards, procedures, templates,etc.

    Solution package pre-defines set of scenarios, processes including pre-configuration, developments, data migration routines, etc.

    The rollout team then takes the template and implements it according toguidelines provided in both solution and rollout package.

    Global Template Maintenance and Support

  • 7/29/2019 ASAP templayte

    32/60

    Title of Presentation, Speaker Name / 32

    Global Template Maintenance and Support

    The purpose of this work package is to provide global template

    maintenance and support for installed SAP sites while additional

    template enhancements, new versions of the global template and

    additional rollouts are in development phases.

    This is activity that the Customer Center of Excellence performs

    as part of the on-going maintenance of the template.

    Key MILESTONES

  • 7/29/2019 ASAP templayte

    33/60

    Title of Presentation, Speaker Name / 33

    Key MILESTONES

    Key milestones mark completion of major accomplishments during theproject.

    It is recommended to conduct formal review and acceptance of thedeliverables that are to be completed by the time the milestone isreached.

    SAP provides Q-gate concept and templates in the roadmap to facilitatethe review and acceptance process.

    SAP Safeguarding

  • 7/29/2019 ASAP templayte

    34/60

    Title of Presentation, Speaker Name / 34

    SAP Safeguarding

    SAP Safeguarding is a

    portfolio of assessments,

    tools, and services thatreduce technical risk and

    costs in implementation,

    upgrade, migration, and

    operations of your IT

    landscape.

    SAP Safeguarding

    services can help you

    manage your core

    business processes and

    provide you with a riskmanagement and service

    plan.

  • 7/29/2019 ASAP templayte

    35/60

    Title of Presentation, Speaker Name / 35

    Rollout

    Roadmap

    NEW GlobalASAP Local Rollout Roadmap

  • 7/29/2019 ASAP templayte

    36/60

    Title of Presentation, Speaker Name / 36

    NEW GlobalASAP Local Rollout Roadmap

    Final

    PreparationLocal Project

    Preparation

    Local

    Business BlueprintRealization

    Project Mgt OCM + Training System PrepProcesses Data Cutover

    Setup of Local Project

    Organization

    Adaption ofStrategic Framework

    Establish OCM

    Procedures + Responsibles

    Infrastructure Requirements

    and Design

    Early Adoption of Best

    Business Practice Proceesses

    Training and

    Documentation Strategy

    Data ManagementStandards Implementation

    Data Cleansingand Data Preparation

    Completion Check &

    Prepare for Next Phase

    General

    Project Management

    Global Blueprint Review &

    Fitgap Analysis

    Local Business Blueprint

    Documentation

    Security Requirements

    Infrastructure Planning

    System Operation Stategy

    Early Adoption of Best

    Business Practice Processes

    Training Planning

    Data Cleansingand Data Preparation

    Completion Check &

    Prepare for Next Phase

    OCM OrganizationalAlignment + Change Analysis

    General

    Project Management

    OCM

    Training Preparation

    Configuration &

    Development

    Unit / Process / Integration /

    Business Acceptance Testing

    Early Adoption of Best

    Business Practice Processes

    Infrastructure

    Implementation

    Data Preparation & DataMigration Simulation

    Completion Check &

    Prepare for Next Phase

    Cutover Planning

    & Preparation

    Business Transition

    Planning for Cutover

    General

    Project Management

    OCM

    End User Training

    End User Practice in the

    System

    Data Migration toProduction

    Infrastructure Finalization

    Cutover Management

    Business Simulation

    Pre-Go-Live Operations

    Completion Check &

    Prepare for Next Phase

    Final Cutover and

    Controlled Process GoLive

    GoLive and

    Support

    General

    Project Management

    OCM

    Project Closing

    System Support

    Business Support

  • 7/29/2019 ASAP templayte

    37/60

    Title of Presentation, Speaker Name / 37

    Roadmap

    Navigation

    Roadmap Adds Value to the Implementation

  • 7/29/2019 ASAP templayte

    38/60

    Title of Presentation, Speaker Name / 38

    Roadmap Adds Value to the Implementation

    What to do,

    and when to

    do it

    Who

    participates

    When used properly, a roadmap will provide guidance on the following:

    KnowledgeArea

    Why and how you

    should do it

    Accelerators,

    Samples,

    Templates

    GlobalASAP Roadmap Structure

  • 7/29/2019 ASAP templayte

    39/60

    Title of Presentation, Speaker Name / 39

    GlobalASAP Roadmap Structure

    Each deliverable comprises several activities.

    Activities contain the tasks that project teammembers need to carry out, in order to fulfill theproject goals. At this level, you can find moreaccelerators containing information relevant foryour implementation project.

    Activity

    (Level 4)

    Each roadmapphase is made up of several

    logical groups of deliverables that are produced

    during the phase.

    Deliverable Group

    (prefix DG:)

    (Level 2)

    Roadmap is divided into five phases.Phase

    (Level 1)

    DescriptionStructure

    Activityis made up of several tasks. The taskdescribes the detailed steps project teammembers are required to perform.

    Task

    (Level 5)

    Phase

    DeliverableGroup

    Deliverable

    Output

    In eachphase the project team produces

    several deliverables. The deliverablesrepresent the main objects within a project.

    Deliverable

    (Level 3)

    Each deliverable comprises several outputs.Outputs are documents or tangible items that are

    results of a process. The outputsupports the

    completion of a desired deliverable as a

    standalone component

    Output (prefix O: )

    (Level 4)

    Task

    Activity

    Outputs

    prefixO:

    Methods

    prefixM:

    Roadmap Views Display What You Need

  • 7/29/2019 ASAP templayte

    40/60

    Title of Presentation, Speaker Name / 41

    Roadmap Views Display What You Need

    Showing only relevant areas of the roadmap

    Fast switching between the views

    Cross-references between the views

    Complete View

    Methods View

    Output View

    Roadmap Attributes find what you need fast

  • 7/29/2019 ASAP templayte

    41/60

    Title of Presentation, Speaker Name / 42

    Roadmap Attributes find what you need fast

    Attributes classify roadmap nodes and accelerators to

    enable easy navigation and user specific views.

    Following attributes are used

    Flavors represent SAP Solutions

    (mySAP ERP, mySAP CRM, .)

    Subject Areas knowledge domains in the implementation project (Project

    Management, Org. Change Management, Technical Implementation,

    )

    Project Roles filter activities, tasks or outputs by project role

    User specific views can be created by applying filters

    Project Roles and Subject Areas

  • 7/29/2019 ASAP templayte

    42/60

    Title of Presentation, Speaker Name / 43

    Project Roles and Subject Areas

    Phase

    Deliverable Group 1Deliverable

    O: Output .1

    O: Output .2

    M: Activity 1.1

    Task 1.1.1

    Task 1.1.2

    M: Activity 1.2

    Deliverable Group 2

    Milestone A

    Subject Area

    deliverable is partof a discipline,

    domain or subject

    area in the project

    AttributeStructure

    Project Roles

    - project role is

    involved or performs

    the activity producing

    an Output

    Project Roles assigned to

    Outputs and Tasks (or

    Activity where tasks not

    available)

    Roadmap Flavor Solution Relevant Nodes

  • 7/29/2019 ASAP templayte

    43/60

    Title of Presentation, Speaker Name / 44

    Roadmap Flavor Solution Relevant Nodes

    Phase

    Deliverable Group 1Deliverable

    O: Output .1

    O: Output .2

    M: Activity 1.1

    Task 1.1.1

    Task 1.1.2

    M: Activity 1.2

    Task 1.2.1

    Deliverable Group 2Milestone A

    Flavor assigned

    to all nodes

    applicable for given

    solution (flavor)

    AttributeStructure

    Flavor assigned to each

    individual node with exception

    of Outputs and Methods node

    (gray nodes)

  • 7/29/2019 ASAP templayte

    44/60

    GlobalASAP in detail

    Tool time

    GlobalASAP overview

    GlobalASAP concept

    Delivering Successful SolutionsEnabling Toolset

  • 7/29/2019 ASAP templayte

    45/60

    Title of Presentation, Speaker Name / 46

    Best Practices built into the SAP toolset

    Management of the implementation project and SAP solution

    Aligned with industry standards and procedures (PMI PMBOK,ITIL)

    Specific to implementation of SAP solutions

    Enabling Toolset

    Aligns customers business

    requirements to SAP

    solutions

    SAP Solution Composer

    Offers AcceleratedSAP

    roadmap composed to fit

    specific project needs

    SAP Roadmaps

    Facilitates efficient solution

    design, documentation,

    configuration, testing and

    operations of SAP solutions

    SAP Solution Manager

    AcceleratedSAP Toolset

    SAP Solution Manager

    the toolset supporting entirel ti lif l

  • 7/29/2019 ASAP templayte

    46/60

    Title of Presentation, Speaker Name / 47

    solution lifecycle

    Solution

    Directory

    mySAP

    CRMOther

    mySAP

    ERPmySAP

    APO

    Implementation and DistributionSolution Monitoring

    Service plan

    and Execution

    Service Desk

    Upgrade

    Change Management

    Testing

    E-Learning

    Management

    SAP Solution Manager

    Global Template

    and Rollout

    Businessprocesses

    Toolset enabling delivery of Successful Solutions

    SAP Solution Manage Adoption Scenarios

  • 7/29/2019 ASAP templayte

    47/60

    Title of Presentation, Speaker Name / 48

    SAP Solution Manage Adoption Scenarios

    Plan Build Run

    Map business

    requirements and

    perform initial

    scoping with SAP

    Solution Maps from

    SAP Solution

    Composer

    Design, Configure,

    Document, Test and Go

    Live with SAP Solution

    using SAP Solution

    Manager with ASAP

    Roadmaps covers new

    implementation and

    upgrade

    Manage Solution Changes

    with Change Request

    Management in

    SAP Solution Manager

    Manage internal support

    using Support Desk in

    SAP Solution Manager

    Run, Monitor and Operate

    SAP Solution with

    SAP Solution Manager

    2

    3

    4

    1

    Global Roll-out

    Use of SAP Solution ManagerProcess in Detail

  • 7/29/2019 ASAP templayte

    48/60

    Title of Presentation, Speaker Name / 49

    Enterprise Requirements

    Local Systems Requirements finalized in Local Implementation Projects

    Local Unit 1 Local Unit 2 Local Unit 3

    Process in Detail

    T1V1Define globaltemplate

    1

    Global Template become

    Reference System

    2 Roll out global template

    T1V1 T1V1T1V1

    3 Implement

    template

    Global Roll-out

    Use of SAP Solution ManagerProcess in Detail (II)

  • 7/29/2019 ASAP templayte

    49/60

    Title of Presentation, Speaker Name / 50

    Local Systems Requirements adapted in Local Implementation Projects

    Local Unit 1

    T2

    T3

    Local Unit 2

    T3

    Local Unit 3

    T2

    Process in Detail (II)

    Enterprise Requirements

    T2 T3

    Global Template(s) become

    Reference System

    6 Roll out new

    template version

    T1V2 T1V2 T1V2

    7 Implement new template

    version via comparison

    and adjustment

    4 Roll in

    template

    requirements

    T1V25 Create new

    template

    version

    Global Templates From Definition to Shipment

  • 7/29/2019 ASAP templayte

    50/60

    Title of Presentation, Speaker Name / 51

    p p

    Template Project

    TemplateZBANK

    TemplateZHUMRES

    S2

    MSS

    S1

    Accounting

    S3

    LSO

    Create templates

    and scenarios

    1

    Template ZHUMRES

    Template ZBANK

    Assign scenarios

    to template

    2 Collect

    templates into

    transport

    4Release templates

    for:

    current SAP Solution

    Manager system

    another SAP Solution

    Manager system

    (transport)

    3

    S1

    Accounting

    S3

    LSO

    S2

    MSS

    Using SAP Solution Manager in a Template Project

  • 7/29/2019 ASAP templayte

    51/60

    Title of Presentation, Speaker Name / 52

    g g p j

    VisibilityControls template use

    Open for public useClosed for public use, template under construction

    Global Rollout FunctionalityControls the use of global attributes

    Project PreparationSetup template project framework

    Create a template project

    Import SAP Best Practices pre-configuration to the system

    Create required of template definitions (in the project) containers used forrollout

    Select standard scenarios from the process library (BPR) as starting point fordefining template-specific business scenarios

    Using SAP Solution Manager in a Template Project

  • 7/29/2019 ASAP templayte

    52/60

    Title of Presentation, Speaker Name / 53

    g g j

    Business BlueprintDefine global requirements

    Document business requirements in customer-specific process structure

    Assign scenarios to individual template containers

    Set global attributes to determine scope of process changes in local roll-out projects

    Describe global business and technical requirements

    Global Attributes Changes to scenarios, processes and process steps allowed? If so, to what extent?

    Using SAP Solution Manager in a Template Project

  • 7/29/2019 ASAP templayte

    53/60

    Title of Presentation, Speaker Name / 54

    Note! Re-use of existing configuration possible Translation or process structure can be triggeredusing SAP standard translation tools.

    g g j

    Global RealizationPrepare reference template

    with preconfiguration Assign related configuration (IMG) activities, create and assign BC Sets

    Assign global customer-specific developments (programs, transactions etc.)

    Record sample / master data as CATTs

    Create standard test cases (manual test cases, CATTs, eCATTs )

    Using Solution Manager in a Roll-out Project

  • 7/29/2019 ASAP templayte

    54/60

    Title of Presentation, Speaker Name / 55

    Project PreparationSetup roll-out project framework Create a local roll-out project (type: implementation)

    Select one or multiple templates and related scenarios

    Business BlueprintScope & enhance global template Adapt harmonized and local processes to local-specific requirements

    Document local specific requirements of harmonized/local processes

    RealizationConfigure global & local requirements Apply template-specific customizing (related BC Sets) for global processes

    Perform final configuration via IMG activities based on local-specific

    requirements Re-use master data samples recorded in global template

    Apply global customer developments (reports, ...)

    Re-use standard test cases to test standard processes anduse as template to create test cases for local-specific requirements

    Template vs. Implementation Project

  • 7/29/2019 ASAP templayte

    55/60

    Title of Presentation, Speaker Name / 56

    Template Project

    Template ZBANKS1

    Accounting

    Template ZHUMRES

    S1

    LSO

    S1

    MSS

    Implementation Project

    Template ZBANKS1

    Accounting

    Template is copied

    into implementation

    project

    Template content with pre-

    configuration is basis

    for local configuration

    Template original ZBANKand copy ZBANK are

    decoupled

    Copytemplate

    Implementation Project: Adding Processes

  • 7/29/2019 ASAP templayte

    56/60

    Title of Presentation, Speaker Name / 57

    Copytemplate

    Template Project

    Template ZBANKS1

    Accounting

    Template ZHUMRES

    S3

    LSO

    S2

    MSS

    Implementation Project

    Template ZBANKS1

    Accounting

    P3

    Budgeting

    P1

    TPM

    P3

    BudgetingP2

    Planning

    Business Process Repository:

    Library of SAP referenceprocesses

    Global Roll-out in Different Stages

  • 7/29/2019 ASAP templayte

    57/60

    Title of Presentation, Speaker Name / 58

    Versioning concept to control/track changes in templates

    Roll-out Stage 2: Mass roll-outRoll-out Stage 1: Pilots

    Templ. ZBANKV1

    S1

    Accounting

    Pilot feedback

    Enhancements

    Templ. ZBANKV2

    S1

    Accounting

    Global Roll-Outs Benefits in Detail

  • 7/29/2019 ASAP templayte

    58/60

    Title of Presentation, Speaker Name / 59

    Support of process standardization projects

    Methodology

    Efficient centralized definition and pre-configuration of global /harmonized elements

    Setup of multiple templates in parallel

    Eased implementation at local sites

    Re-use of customizing on local components Compliance check

    Documentation of standards

    Reduced effort for standard adaptation

    Version management Comparison and adjustment of template versions

    How SAP delivers ASAP roadmaps

  • 7/29/2019 ASAP templayte

    59/60

    Title of Presentation, Speaker Name / 60

    GlobalASAPRoadmap deliveredvia SAP ServiceMarketplace andSAP SolutionManager

    Resources

  • 7/29/2019 ASAP templayte

    60/60

    GlobalASAP Roadmaps on SAPService Marketplace:General Information about ASAP and GlobalASAPRoadmaps:http://www.service.sap.com/roadmaps

    Related SAP Education Classeshttp://www.sap.com/usa/education/

    SMI210 ASAP Implementation Methodology

    Overview

    http://www.service.sap.com/roadmapshttp://www.sap.com/usa/education/http://www.sap.com/usa/education/http://www.service.sap.com/roadmaps

Recommended