ASME Boiler and Pressure Vessel Code SECTION XI
INTERPRETATIONS Volume 37
The Interpretations to the Code will be issued twice a year up to the publication of the 1998 Edition of the Code: each July (designated 7/95, 7/96, and 7/97) and with each Addenda (designated A95, A96, and A97). The Interpretations for each individual Section are published separately and are part of the update service to that Section; Interpretations of Section 111, Divisions 1 and 2, are part of the update service to Section Ill, Subsection NCA. Interpretations are not part of the Code or the Addenda.
Interpretations Volumes 30 through 35 were included with the update service to the 1992 Edition of the Code; Volume 36 is the first Interpretations volume to be included with the update service to the 1995 Edition.
Section Vol. 36 Vol. 37 Vol. 38 Vol. 39 Vol. 40 Vol. 41 ~~~ ~ _ _ _ ~ ~ _ _ _ _
I It-A Il-B Il-c Il-D Ill-NCA IV V VI VI I v111-I Vlll-2 IX X XI
7/95 7/95 7/95 ...
7/95 7/95
. . .
. . .
. . .
. . . 7/95 7/95 7/95 7/95 7/95
A95 . . . ... ... A95 A95 A95
...
. . .
. . . A95 A95 A95 . . . A95
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
INTERPRETATIONS NO. 37 - SECTION XI
Replies to Technical Inquiries January 1, 1995 through June 30,1995
FOREWORD
General Information This publication includes all written interpretations issued between the indicated dates by the ASME
Staff on behalf of the ASME Boiler and Pressure Vessel Committee in response to inquiries concerning interpretations of the ASME Boiler and Pressure Vessel Code. A contents is also included which lists subjects specific to the interpretations covered in the individual volume. These interpretations are not a part of the Addenda or the Code.
These interpretations are taken verbatim from the original letters, except for a few typographical and editorial corrections made for the purpose of improved clarity. In some instances, a review of the interpretation revealed a need for corrections of a technical nature. In these cases, a revised interpretation is presented bearing the original Interpretation Number with the suffix R and the original file number with an asterisk. Following these revised interpretations, new interpretations and revisions to them issued during the indicated dates are assigned Interpretation Numbers in chronological order. Interpretations applying to more than one Code Section appear with the interpretations for each affected Section.
ASME procedures provide for reconsideration of these interpretations when or if additional information is available which the inquirer believes might affect the interpretation. Further, persons aggrieved by an interpretation may appeal to the cognizant ASME committee or subcommittee. As stated in the Statement of Policy in the Code documents, ASME does not “approve,” “certify,” “rate,” or “endorse” any item, construction, proprietary device, or activity.
Each interpretation applies to the Edition and Addenda stated in the interpretation, or if none is stated, to the Edition and Addenda in effect on the date of issuance of the interpretation. Subsequent revisions to the Code may supersede the interpretation.
For detailed instructions on preparation of technical inquiries to the ASME Boiler and Pressure Vessel Committee, refer to Appendix V in Division 1, Appendix I11 in Division 2, and Appendix VI in Division 3.
Subject and Numerical Indexes Subject and numerical indexes have been prepared to assist the user in locating interpretations by
subject matter or by location in the Code. They cover interpretations issued from Volume 12 up to and including the present volume, and will be updated with each volume.
305
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
SECTION XI
Subject
Appendix I, 1-2220, 1-2300, and Table 1-2000-1 and Appendix VIR Ultrasonic Examination Qualification - Piping (1989 Edition With 1990 Addenda, and Later Editions and Addenda Through 1993 Addenda) ................................
Appendix VII, VII-4310 Qualification Examination - Random Selection Process (1992 Edition Through 1994 Addenda) ................................................
Appendix VII, VII-4310 and Appendix VIII; Practical Examination - Test Specimen .......... Appendix VIII, VIII-4OOO (1989 Edition With 1989 Addenda, and Later Editions
and Addenda Through 1995 Edition) .................................................. Code Case N-416-1; NDE Requirements ................................................. Code Case N-458, Para. 4.0 procedure Qualification - Material Used for
IWA-2213 and Table IWB-2500-1; Examination of Spaces Within the Reactor
IWA-4000f7000; RepairlReplacement Program, Initiation of (1977 Edition With
IWA/IWB/IWC/WD/IWE/-4000 and IWA-4120 Defect Removal and
............................................................ Specimen (1992 Edition)
Vessel (1977 Edition, and Later Editions and Addenda Through 1995 Edition) .............. Summer 1978 Addenda, and Later Editions and Addenda Through 1989 Edition) ............ Examination of the Removal Cavity (1974 Edition With Summer 1974 Addenda, and Later Editions and Addenda Through 1987 Addenda) ................................ With Summer 1983 Addenda, and Later Editions and Addenda Through
IWA-4170, IWA-4300, IWA-4500; Defect Removal - Examination of Removal 1989 Addenda)
Cavity (1988 Addenda Through 1990 Addenda); ....................................... IWA-5250 and IWB-3122; Pressure Retaining Encapsulations and Material -
Use of a Sealant (1983 Edition and Later Editions and Addenda Through 1994 Addenda) .................................................................... Interval; Inspectioon Completion Percentages, Calculation of (1983 Edition With Summer 1983 Addenda)
Examinations - Percentage Requirements (1983 Edition with Summer 1983 Addenda) .......
Addenda Through Winter 1978, and Later Editions and Addenda Through 1989 Addenda) ....................................................................
Table IWB-2500-1; Visual Examination - Below the Core (1977 Edition With Summer 1978 Addenda, and Later Editions and Addenda Through 1995 Addenda) ...........
IWA-4130, IWA-4140, RepairlReplacement Activities - Off Site (1983 Edition
....................................................................
IWB-2200(c) and Tables IWB-2412-1, IWC-2412-1, and IWD-2412-1; Inspection
........................................................ IWF-2410@), IWB-2410, IWC-2410, and IWD-2410 Inspection Interval; Support
IWF-2430, Component Supports - Additional Examinations (1977 Edition With
Interpretation
XI-1-95-24
XI-1-95-22 XI-1-95-23
XI-1-95-21 XI-1-95-20
XI-1-95-15
XI-1-95-27
XI-1-95-16
XI-1-95-25
XI-1-95-17
XI-1-95-29
XI-1-95-26
XI-1-95-19
XI-1-95-18
XI-1-95-30
XI-1-95-28
File No.
IN94426 IN94416 and IN94022
IN94013 and IN94-0 19
IN94-025 IN94-028
IN93-019
IN94006A
IN93429
IN95401
IN94014
IN95-001B
IN95-002
IN94424
IN94023
IN95-004A
IN94006B
307
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Section XI - Interpretations No. 37 XI-1-95-15, XI-1-95-16
Interpretation: Xl-1-95-15
Subject: Section XI, Code Case N-458, Paca. 4.0; Procedure Qualification - Material Used For Specimen (1992 Edition)
Date Issued: February 7, 1994
File: IN93-0 19
Question: Code Case N-458, para. 4.0 states, “The material used for the specimen shall be the same as the coated ferromagnetic material to be examined.” Can this be interpreted to mean that the ferromagnetic properties of the specimen must be the same as the material to be examined, that is, any P-No. 1, group 1, 2, or 3 material may be used for the specimen if the material to be examined is P-No. 1 material?
Reply: No. The material must be the same material specification and heat treatment.
Note: This Interpretation should have been included with Volume 35, covering the period from January 1, 1994 through June 30, 1994.
Interpretation: Xl-1-95-16
Subject: Section XI, IWA-4000/7000; RepaidReplacernent Program, Initiation of (1977 Edition With Summer 1978 Addenda, and Later Editions and Addenda Through 1989 Edition)
Date Issued: December 21, 1994
File: IN93-029
Question (1): Does Section XI specify when to begin a repair or replacement activity?
Reply (1): Section XI provides rules for specific repair and replacement activities but not when to begin a repair or replacement activity.
Question (2): Is it a requirement of IWA-4OOO and IWA-7000 that a repair or replacement plan be initiated for obtaining items intended to be installed, at a later date, in Section XI components or systems?
Reply (2): No.
Note: This Interpretation should have been included with Volume 36, covering the period from July 1, 1994 through December 31, 1994.
309
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
XI-1-95-17, XI-1-95-18 Section XI - Interpretations No. 37
Interpretation: XI-1-95-17
Subject: Section XI, IWA-4130 and IWA-4140; Repair/Replacement Activities, Off Site (1983 Edition With Summer 1983 Addenda, and Later Editions and Addenda Through 1989 Addenda)
Date Issued: December 21, 1994
File: IN94-014
Question (1): When a vendor performs off-site Section XI repair/replacement activities (e.g., repair welding) on existing plant equipment which has been removed with the intention of reinstallation, and further Section XI repair/replacement activities (e.g., nondestructive examination or hydrostatic testing) will be performed by the Owner prior to or concurrent with reinstallation, is the Owner responsible for imposing Section XI requirements on the vendor?
Reply (1): Yes.
Question (2): When a vendor performs repair/replacement activities off site on removed plant equipment and further repair / replacement activities by the Owner or repair organization prior to reinstallation of the item will not be required, is the Owner responsible for imposing Section XI requirements on the vendor?
Reply (2): Yes, for items removed from systems which have been placed in operation (see Interpretation XI-1-83-10).
Note: This Interpretation should have been included with Volume 36, covering the period from July 1, 1994 through December 3 1, 1994.
Interpretation: Xl-1-95-18
Subject: Section XI, IWF-2410(b), IWB-2410, IWC-2410, and IWD-2410; Inspection Interval; Support Examinations - Percentage Requirements (1983 Edition With Summer 1983 Addenda)
Date Issued: December 21, 1994
File: IN94-023
Question: Does IWF-2410(b) require support examinations be subject to the requirements of IWB- 2410, IWC-2410, and IWD-2410?
Reply: No.
Note: This Interpretation should have been included with Volume 36, covering the period from July 1, 1994 through December 3 1, 1994.
310
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Section XI - Interpretations No. 37 XI-1-95-19, XI-1-95-20
Interpretation: XI-1-95-19
Subject: Section XI, IWB-2200(c) and Tables IWB-2412-1, IWC-2412-1, and IWD-2412-1; Inspection Interval; Inspection Completion Percentages, Calculation of (1983 Edition With Summer 1983 Addenda)
Date Issued December 21, 1994
File: ~ IN94024
Question (1): When new components are added to the inspection program, at what time are new examinations to be included in the inspection program for the purpose of calculating completion percentages in accordance with Tables IWB-2412-1, IWC-2412-1, and IWD-2412-1?
Reply (1): Section XI does not address addition of new components to the inspection program. However, requirements were added to the 1994 addenda of the 1992 edition.
Question (2): When new components are added to the inspection program, does preservice examination performed in accordance with IWB-2200(c) count as a completed examination in calculating completion percentages in accordance with Table IWB-2412-)?
Reply (2): No.
Note: This Interpretation should have been included with Volume 36, covering the period from July 1, 1994 through December 31, 1994.
Interpretation: Xl-1-95-20
Subject: Section XI, Code Case N-416-1; NDE Requirements
Date Issued: December 21, 1994
File: IN94-028
Question: When using Code Case N-416-1 is it a requirement that, in addition to the NDE specified in the Case, the NDE requirements specified in the Owner’s requirements shall also be met?
Reply: Yes. The Owner’s requirements are defined in the 1993 addenda to the 1992 edition.
Note: This Interpretation should have been included with Volume 36, covering the period from July 1, 1994 through December 31, 1994.
311
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
XI-1-95-21, XI-1-95-22, XI-1-95-23 Section XI - Interpretations No. 37
Interpretation: Xl-1-95-21
Subject: Section XI, Appendix VIII, VIII-4000 (1989 Edition With 1989 Addenda, and Later Editions and Addenda Through 1995 Edition)
Date Issued: February 13, 1995
File: IN94-013 and IN94-025
Question: Is it the intent of Section XI, VI114000 that the tolerances need not be considered when using a search unit of the same manufacturer’s make, model, and nominal frequency as the search unit originally qualified?
Reply: Yes.
Interpretation: Xl-1-95-22
Subject: Section XI, Appendix VII, VII-4310; Qualification Examination - Random Selection Process (1992 Edition Through 1994 Addenda)
Date Issued: February 13, 1995
File: IN94-016 and IN94-022
Question: Is it the intent of Section XI, VII-4310(a) that the random selection process be controlled by the employer’s written practice, such that no individual takes the same examination more than once?
Reply: Yes.
Interpretation: XI-1-95-23
Subject: Section XI, Appendix VII, VII-4310 and Appendix VIII; Practical Examination - Test Specimen
Date Issued: February 13, 1995
File: IN94-019
Question: Is it the intent of Section XI VII-4310(b) (1989 Edition, and later editions and addenda through 1993 Addenda) to allow a “grading unit” as defined by Appendix VI11 (1989 Edition with 1989 Addenda, and later editions and addenda through 1993 Addenda) to be considered a “test specimen” for Appendix VI1 practical examinations?
Reply: Yes.
312
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Section XI - Interpretations No. 37 XI-1-95-24, XI-1-95-25
Interpretation: XI-1-95-24
Subject: Section XI, Appendix I, 1-2220, 1-2300, and Table 1-2000-1. and Appendix VIII; Ultrasonic Examination Qualification - Piping (1989 Edition With 1990 Addenda, and Later Editions and Addenda Through 1993 Addenda)
Date Issued: February 13, 1995
File: IN94-026
Question: Is it the intent of Section XI, Appendix I, that the Supplements for ultrasonic examinations of bolts, studs, and welds in piping provided under the columns “Vessels S 2 in. & Piping 1-2200” & “Bolts and Studs 1-2300” of Table 1-2000-1 be required for examination in addition to those attributes that were used in an Appendix VI11 qualified performance demonstration?
Reply: No.
Interpretation: XI-1-95-25
Subject: Section XI, IWAIMrBlIWCIIWDIIWEl-4OOO and IWA-4120; Defect Removal and the Examination of the Removal Cavity (1974 Edition With Summer 1974 Addenda, and Later Editions and Addenda Through 1987 Addenda)
Date Issued: March 30, 1995
File: IN95-001
Question: Are the requirements of IWB-4OOO for defect removal and examination of the removal cavity applicable to repair activities performed in accordance with the Construction Code or Section 111, when the alternative weld repair methods of IWB/IWC/IWD/IWE-4000 (e.g., half bead welding) are not used as an alternative to the Construction Code or Section I11 requirements imposed by IWA- 4120?
Reply: No.
313
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
XI-1-95-26, XI-1-95-27 Section XI - Interpretations No. 37
Interpretation: XI-1-95-26
Subject: Section XI, IWA-5250 and IWB-3122; Pressure Retaining Encapsulations and Mate- rial - Use of a Sealant (1983 Edition, and Later Editions and Addenda Through 1994 Addenda)
Date Issued: March 30, 1995
File: IN95-002
Question (1): Does Section XI prohibit use of a sealant to stop leakage in flanged joints, valve stuffing boxes, engineered structural clamps, or other pressure retaining encapsulations constructed in accordance with an applicable Construction Code, when the sealant functions like a gasket or packing and is not required for structural integrity, as determined by the evaluation required by IWA-5250 or IWB-3122.4 (IWA-5250, and IWB-3142.4 or IWC-3132.3 in the Winter 1983 or later addenda)?
Reply (1): The use of sealants is neither required nor prohibited by Section XI.
Question (2): Does Section XI prohibit use of a sealant to stop leakage through pressure retaining material, when the sealant functions like a gasket and is not required for structural integrity, as determined by the evaluation required by IWA-5250 or IWB-3122.4 (IWA-5250, and IWB-3142.4 or IWC-3132.3 in the Winter 1983 or later addenda)?
Reply (2): The use of sealants is neither required nor prohibited by Section XI.
Interpretation: XI-1-95-27
Subject: Section XI, IWA-2213 and Table IWB-2500-1; Examination of Spaces Within the Reactor Vessel (1977 Edition, and Later Editions and Addenda Through 1995 Edition)
Date Issued: June 26, 1995
File: IN94-006A
Question (1): Does the VT-3 examination required by Table IWB-2500-1, Examination Category B-N-1, Note 1, for spaces within the reactor vessel, include examination for loose or missing parts and debris as required by IWA-2213?
Reply (1): Yes.
Question (2): If in-vessel items, other than core support structures, addressed by Table IWB-2500- 1, Examination Category B-N-1, are within the accessible spaces described by Note 1, are those in- vessel items themselves included in Examination Category B-N-l?
Reply (2): No.
3 14
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Section XI - Interpretations No. 37 XI-1-95-28, XI-1-95-29
Interpretation: Xl-1-95-28
Subject: Section XI, Table IWB-2500-1; Visual Examination - Below the Core (1977 Edition with Summer 1978 Addenda, and Later Editions and Addenda Through 1995 Addenda)
Date Issued: June 26, 1995
File: IN94-006B
Question: Is it a requirement of Table IWB-2500- 1, Examination Category B-N-1, or Examination Category B-N-2, and Note 1, to perform VT-3 visual examinations in spaces below the core when they are made accessible by removal of components even if those components are not normally removed during refueling outages?
Reply: No.
Interpretation: Xl-1-95-29
Subject: Section XI, IWA-4170, IWA-4300, IWA-4500; Defect Removal - Examination of Removal Cavity
Date Issued June 26, 1995
File: IN95-00 1 B
Question (1): Are the requirements of IWA-4300, for defect removal and examination of the removal cavity, in the 1988 Addenda through the 1990 Addenda, applicable to repair activities performed in accordance with the Construction Code or Section 111, when the alternative weld repair methods of IWA-4500 or IWB/IWC/IWD/IWE-40oO (e.g., half bead or temper bead welding) are not used as an alternative to the Construction Code or Section I11 requirements imposed by IWA-4120?
Reply (1): No.
Question (2): Are the requirements of IWA-4300, for defect removal and examination of the removal cavity, in the 1991 Addenda through the 1995 Edition, applicable to repair activities performed in accordance with the Construction Code or Section 111, when the alternative weld repair methods of IWA-4400 or IWA-4500 (e.g., temper bead welding) are not used as an alternative to the Construction Code or Section I11 requirements imposed by IWA-4170(b)?
Reply (2): No.
315
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
XI-1-95-30 Section XI - Interpretations No. 37
Interpretation: XI-1-95-30
Subject: Section XI, IWF-2430; Component Supports - Additional Examinations (1977 Edition With Addenda Through Winter 1978, and Later Editions and Addenda Through 1989 Addenda)
Date Issued June 26, 1995
File: IN95-004A
Question: When results of examinations require corrective measures, does IWF-2430 require additional examinations of adjacent component supports when the adjacent components or portions of piping are exempt?
Reply: Yes.
316
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Location
Subsection I M A IMA-5200 IMA-5210
Subsection IMB Table IMB-2500-1 IMB-5000 IMB-5100
Subsection IMC IMC-2500
Subsection IMF IMF-1500 IMF-2500
Subsection IWA IWA-1200 IWA-1310 IWA-1320
I WA-1400
IWA-2000
I WA-2 1 00 IWA-2120
IWA-2130 IWA-2200 IWA-2213 IWA-2214 IWA-2222 IWA-2232
IWA-2240 IWA-2300
Interpretation
XI-3-89-02 XI-3-89-02
XI-3-89-01 XI-3-89-01 XI-3-86-01
XI-3-89-01
XI-3-83-01 XI-3-83-01
XI-1-86-07 XI-1-83-78 XI-I -83-44 XI-1-83-77 XI-I -83-78 XI-I -89-64 XI-I -89-64R XI-I -92-02 XI-I -83-71 XI-1-83-71 R XI-I -86-22 XI-I -83-48 XI-1-86-64 XI-1-83-79 XI-1-89-02 XI-I -95-27 XI-I -83-69 XI-I -83-64 XI-1-83-29 XI-I -83-31 XI-I -83-84 XI-I -86-71 XI-I -86-72 XI-I -89-09 XI-I -89-1 3 XI-1-89-49 XI-1-86-28 XI-1-83-1 6 XI-1-83-18 XI-1-83-23 XI-I -83-24 XI-1-83-29
NUMERICAL
File No. -
lN86-0248 IN86-0246
IN86-024C IN86-024C IN86-024A
IN86-024C
BC81-330 BC81-330
BC85-481. BC84-682 BC83-448 BC84-603 BC84-682 IN89-0176 IN89-0178* IN91-012 BC80-583 BC80-583* IN86-010 BC84-177 IN87-028A BC84-684 IN88-001 IN94-006A BC84-616 BC84-562 BC82-050 BC82-630 BC83-654 IN87-005A lN87-0058 IN87-019 lN89-005 IN90-013 lN86-008 BC82-775 BC83-060 BC83-056 BC83-178 BC82-050
Page No. -
21 1 21 1
169 169 153
169
11 11
94 76 50 76 76
231 241 242
71 90
108 52
147 77
165 314 69 60 32 33 80
156 156 168 176 21 7 111 20 21 29 29 32
INDEX
Location
IWA-2300(a) IWA-2300(a)(l)
IWA-2300(~) IWA-2300(d) IWA-2300(e)
IWA-2324 IWA-2325
IWA-2400
IWA-2410 IWA-2430(d) IWA-2600
IWA-3100
IWA-3200 IWA-3400
IWA-3410 IWA-4000
Interpretation XI-1-83-40 XI-1-83-40R XI-1-83-45 XI-1-83-63 XI-1-83-82 XI-I -86-40 XI-I -86-56 XI-I -86-66 XI-1-89-06 XI-1-89-26 XI-1-92-39 XI-I -92-42 XI-I -92-70 XI-I -86-1 6 XI-I -86-1 9 XI-1-86-73 XI-1-92-28 XI-1-86-1 9 XI-1-83-01 XI-1-83-36 XI-1-92-54 XI-1-92-54 XI-1-92-70 XI-1-86-54 XI-1-89-58 XI-1-83-41 XI-I -92-57 XI-I -92-06 XI-I -95-05 XI-1 -89-1 6 XI-I -89-45 XI-I -92-38 XI-I -86-52 XI-1-86-52R XI-1-83-1 7 XI-1-83-1 0 XI-1 -83-1 3 XI-I -83-28 XI-I -83-28R XI-I -83-50 XI-1-83-50R XI-I -83-65 XI-I -83-66 XI-1-86-13R XI-1-86-36 XI-1-86-41 XI-1-86-44 XI-1-86-47 XI-I -86-44R XI-I -86-59
File No. -
BC84-043 BC84-043* BC83-535 BC84-310 BC83-176 BC85-571 lN86-028 IN87-015 lN88-006 BC80-231* lN92-032 lN92-030 lN93-022 BC85-142 BC85-071 IN87-029 lN92-019 BC85-071 BC80-582 BC83-585 IN93-015 IN93-015 lN93-022 IN87-001 IN90-025 BC84-064 lN93-002 IN91 -01 9 lN93-035 IN89-0016 IN90-006 lN92-031 BC85-524 BC85-524' BC82-597 BC82-277 BC82-407 BC83-344 BC83-344* BC84-175 BC84-175* BC84-647 BC84-652 BC85- I l l * lN86-021 lN86-005 IN86415 lN86-0258 IN86-015* BC85-550
Page No.
42 67 50 60 78
123 137 153 167 194 267 268 293 105 106 157 257 106
5 40
276 276 293 136 228
43 282 244 301 178 209 266 135 187 20 17 18 31
185 54 68 61 61
225 121 124 126 127 144 145
-
Cumulative Index - Interpretations Vols. 12-37
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Location Interpretation
Subsection IWA (Cont'd)
IWA-4100
IWA-4120
I WA-4 1 30
IWA-4150 IWA-4170 IWA-4200
I WA-42 1 0 IWA-4300
IWA-4310 IWA-4330 IWA-4400
IWA-44OO(a)
IWA-4400(b)(5)
IWA-4500
IWA-4600
(b)
XI-1-86-55 XI-I -86-55R XI-1-89-28 XI-I -89-30 XI-I -89-40 XI-I -89-56 XI-I -89-64 XI-I -89-641 XI-1-92-21 XI-I -92-31 XI-I -92-68 XI-I -95-09 XI-I -95-1 4 XI-81 -1 1 R XI-I -83-26 XI-I -83-26R XI-I -83-40 XI-I -83-40R XI-I -83-57 XI-I -86-38 XI-I -92-32 XI-I -92-60 XI-I -83-57 XI-I -92-06 XI-I -95-01 XI-I -95-29 XI-I -83-57 XI-I -92-35 XI-1-92-35R XI-1-89-01 XI-1-83-43 XI-1-83-55 XI-1-83-81 XI-I -89-01 XI-I -92-08 XI-I -92-59 XI-I -95-29 XI-I -83-83 XI-I -89-35 XI-I -83-05 XI-1-83-28 XI-I -83-34 XI-1-83-35 XI-1-83-37 XI-I -83-37R2 XI-I -83-54R XI-I -83-58 XI-I -86-25 XI-I -86-75 XI-I -89-1 8 XI-1-89-1 9 XI-1-83-35R XI-1-89-31 XI-1-83-35R XI-I -83-58 XI-I -86-35 XI-I -86-51 XI-1 -95-29 XI-I -83-26 XI-I -83-26R XI-1-83-54R XI-I -83-85
File No. -
lN87-002 lN87-002* lN89-021 IN89-011 IN8941 7A IN90422 IN89-017B IN89-017Bt IN92409B IN91 -01 8 lN94-005 IN94414 lN93-029 BC81-369* BC83-244 BC83-244' BC84-043 BC84-043' BC84-392 BC85-141 IN91-031 lN93-024 BC84-392 IN91 -01 9 lN93-003 IN95-001 B BC84-392 lN92-023 lN92-023. lN87-036 BC84-179 BC84-322 BC84-687 lN87-036 lN91-024 lN93-023 IN95-001 B BC83-179 lN89-006 BC82-425 BC83-344 BC83-587 BC83-588 BC82-425 BC82-425** BC84-321* BC84-422 BC85-528 lN87-032 lN86-031 lN88-009 BC83-588* lN89-023 BC83-588' BC84-422 lN86-019 lN86-027 IN95-001 B BC83-244 BC83-244. BC84-321* BC84-683
Page No. -
137 153 195 202 207 227 231 241 254 263 292 302 304 87 30 87 42 67 57
122 263 283 57
244 299 31 5
57 265 289 165 44 56 78
165 245 282 31 5
79 204
7 31 39 40 41
185 186 57
110 158 188 188 67
203 67 57
120 129 31 5 30 87
186 81
Location
IWA-5OOO
IWA-5200
Table IWA-5210-1
IWA-5211
IWA-5212 IWA-5213 IWA-5214
IWA-5220 IWA-5224
IWA-5240
IWA-5241 IWA-5242
IWA-5244
IWA-5250
Interpretation
XI-1-83-86 XI-I -83-86R XI-I -86-51 XI-I -92-65 XI-I -83-05 XI-1-83-54 XI-1-86-35 XI-1-89-08 XI-I -89-1 8 XI-I -83-35 XI-I -86-1 3 XI-I -83-70 XI-1-83-70R XI-1-92-1 9 XI-1-83-1 9 XI-1-83-34 XI-1-83-49 XI-I -83-63 XI-I -83-70 XI-I -83-70R XI-I -86-03 XI-I -86-03R XI-I -86-1 3R XI-1-86-34 XI-I -86-53 XI-I -89-1 5 XI-1-89-33 XI-I -92-04 XI-I -92-1 8 XI-1-92-23 XI-I -86-46 XI-I -86-46 XI-1-83-63 XI-1-83-63R XI-1-83-70 XI-1-83-70R XI-1-86-1 3R XI-I -86-27 XI-1-86-27R XI-I -86-29 XI-1-86-29R XI-I -89-08 XI-1-89-37 XI-1-89-42 XI-I -89-52 XI-I -92-30 XI-I -89-45 XI-1-83-67 XI-I -89-54 XI-1-83-63 XI-I -92-34 Xi-1-92-64 XI-1-89-39 XI-1-89-39R XI-1-92-64 XI-1-92-47 XI-1-92-64 XI-1-83-1 9 XI-1-92-52 XI-1-89-64 XI-1-89-64R XI-I -92-01 XI-I -92-03
File No. -
BC85-113A BC85-113A* lN86-027 IN94-001 BC82-425 BC84-321 IN86-019 IN87-018 lN86-031 BC83-588 BC85-111 BC84-198 BC84-198* lN92-005 BC82-607 BC83-587 BC82-776 BC84-310 BC84-198 BC84-198* BC83-112 BC83-112* BC85- I l l * IN86-0178 IN86-017A IN88-002A IN88-017 IN91 -009 lN92-003 IN86-0176 lN86-023 lN86-023 BC84-310 BC84-310' BC84-198 BC84-198* BC85- I l l * lN86-007 lN86-007* lN86-009 lN86-009* IN87-018 IN88-002C IN90-001 IN88-0026 IN92-015 IN90-006 BC82-606 IN90-0188 BC84-310 lN92-020 lN93-038 IN89-013A IN89-013A* lN93-038 lN92-046 lN93-038 BC82-607 lN93-005 IN89-0178 IN89-0178* lN90-023 IN91-017
Page No. - 82
102 129 290
7 55
120 168 188 40
104 70
201 253
27 39 53 60 70
201 92
103 225 120 136 178 203 243 253 255 127 127 60
101 70
201 225 111 187 112 143 168 205 208 21 9 258 209 62
226 60
264 290 206 289 290 274 290 27
2 76 231 241 242 242
Cumulative Index - Interpretations Vols. 12-37
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
IWA-5260
IWA-5262
IWA-5265
IWA-5300 IWA-5350 IWAdOOO
IWA-6230
IWA-6300 IWA-7000
IWA-7120 IWA-7121 I WA-72 1 0
Location Interpretation
Subsection IWA (Cont'd) XI-1 -92-1 9 XI-I -92-31 XI-I -92-48 XI-I -92-64 XI-1-89-74 XI-I -92-1 0 XI-1-83-49 XI-I -83-49R XI-1-86-75 XI-1-89-54 XI-1-89-66 XI-1-95-07 XI-I -92-51 XI-I -86-14 XI-I -86-1 4R XI-I -89-64 XI-1-89-64R XI-1-92-02 XI-I -83-03 XI-I -83-08 XI-1-83-1 5 XI-1-89-48 XI-1-83-28 XI-1-83-28R XI-1-83-38 XI-1-83-42 XI-1-83-46 XI-1-83-47 XI-I -83-50 XI-I -83-50R XI-1-83-52 XI-I -83-54 XI-I -83-65 XI-1-83-66 XI-1 -86-1 3R XI-1-86-44 XI-1-86-44R XI-I -86-47 XI-1-86-55 XI-1-86-55R XI-I -86-58 XI-1 -86-65 XI-I -89-22 XI-I -89-40 XI-1-89-56 XI-1-89-64 XI-1-89-64R XI-1-92-31 XI-1-95-09 XI-1-95-1 3 XI-1-89-34 XI-I -83-83 XI-I -83-20 XI-? -83-21 XI-I -83-21 R XI-I -83-40 XI-1-83-40R XI-I -83-72 XI-I -86-08 XI-I -86-1 2 XI-1-86-59 XI-1-89-07
File No. -
lN92-005 IN91 -01 8 IN93-001 lN93-038 IN91-008 lN91-029 BC82-776 BC82-776* lN87-032 IN90-0186 IN90-018A IN9441 1 IN9341 1 BC85-112 BC85-112* IN89-0178 IN89-017B* IN91 -01 2 BC82-406 BC82-523 BC62-610 IN90-011 BC83-344 BC83-344* BC84-122 BC84-123 BC83-595 BC84-197 BC84-175 BC84-175* BC83-625 BC84-321 BC84-647 BC84-652 BC85- I l l * IN86-015 IN86-015* IN86-025B lN87-002 lN87-002* IN87-010 lN87-031 lN89-009 IN89-017A lN90-022 IN89-017B IN89-0176" IN91-018 lN94-014 IN93-0276 IN89-012 BC83-179 BC82-430 BC82-434 BC82-434* BC84-043 BC84-043. BC81-568A BC81-5686 BC85-098 BC85-550 IN88-011
Cumulative Index - Interpretations Vols. 12-37
Page No. -
253 263 2 74 290 235 246 53 89
158 226 232 301 275 104 118 231 241 242
6 9
19 21 7
31 185 41 43 51 52 54 68 55 55 61 61
225 126 144 127 137 153 138 148 191 207 227 231 241 263 302 304 204
79 27 28
117 42 67 72 94
103 145 167
Location
IWA-7220
IWA-7300
IWA-7310 IWA-7320 IWA-7330
IWA-7400
IWA-7400(d)
IWA-7520
IWA-7530
Subsection IWB IWB-l22O(a)
IWB-I220(b) IWB-2200
IWB-2410 IWB-2412 Table IWB-2412-1
IWB-243O(a) IWB-2430
IWB-2500
Interpretation
XI-1-89-20 XI-1-89-24 XI-I -89-29 XI-1-89-34 XI-I -89-46 XI-I -89-461 XI-I -89-68 XI-I -86-1 8 X1-1-86-38 XI-1-86-38R XI-I -86-39 XI-I -86-391 XI-1-89-41 XI-1-92-1 5 XI-1-95-02 XI-1-83-72 XI-1-86-03 XI-I -86-03R XI-1-86-08 XI-1-83-50R XI-1-83-72 XI-I -83-02 XI-1-83-46 XI-1-83-72 XI-1-89-24 XI-1-83-37 XI-1 -83-37R2 XI-I -83-54R XI-I -89-36 XI-1-92-27 XI-1-83-26 XI-I -83-83 XI-1-83-85 XI-1-83-86 XI-I -83-86R XI-I -86-65 XI-I -89-04 XI-I -92-32 XI-I -92-44 XI-I -92-66 XI-I -83-38 XI-1-86-68 XI-1-83-37 XI-1-86-51 XI-I -89-36
XI-I -92-40 XI-1-92-45 XI-1-86-45 XI-I -86-20 XI-I -86-50 XI-1-89-63 XI-1-86-24 XI-1-83-71 XI-1-95-1 1 XI-1-95-10 XI-I -86-74 XI-I -92-1 2 XI-1-92-24 XI-I -92-61 XI-I -95-1 3 XI-I -92-40
File No. -
IN8841 4 IN89-014 lN89-008 IN89-012 IN90-008 IN90-008* IN90-015 BC85-254 BC85-141 BC85-141* BC85-525C BC85-525C' lN89-025 IN91-040 lN93-026 BC81-568A BC83-112 BC83-1 12* BC81-5688 BC84-175' BC81-568A BC81-476 BC83-595 BC81-568A IN89-014 BC82-425 BC82-425** BC84-321* lN89-024 IN92-016 BC83-244 BC83-179 BC84-683 BC85-I 13A BC85-113A' lN87-031 lN88-004 IN91-031 IN91-031 B lN93-041 BC84-122 lN87-024 BC82-425 IN86427 lN89-024
IN92-022A lN92-0228 lN86-020 lN86-006 IN86-026C IN90-034 BC85-526 BC80-583 lN94-024 lN94-023 IN86-003A lN91-025 IN91-014 IN93-027A IN93-027B IN92-022A
Page No. - 189 193 202 204 21 0 225 232 106 122 143 123 144 207 252 299
72 92
103 94 68 72 6
51 72
193 41
185 186 205 257
30 79 81 82
102 148 166 263 273 291 41
154 41
129 205
267 273 126 107 128 230 109
71 303 303 157 251 255 283 304 267
(C)
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Location interpretation
Subsection IWB (Cont'd) Fig. IWB-2500-7 XI-1 -86-71 Fig. IWB-2500-8 XI-1 -83-75
Fig. IWB-2500-13 XI-1 -83-75 XI-1 -89-49
XI-1 -89-21 XI-1 -89-27
Fig. IWB-2500-14 XI-1 -89-21 Fig. IWB-2500-15 XI-1 -89-21
Table IWB-2412-1 XI-1 -95-1 1 Table IWB-2500-1 XI-1 -83-1 1
XI-1 -89-27
XI-1 -83-1 2 XI-1-83-33 XI-1-83-39 XI-1 -83-40R XI-1 -83-51 XI-1-83-56 XI-1-83-69 XI-1-83-76 XI-1 -86-04 XI-1 -86-1 0 XI-1-86-20 XI-1 -86-21 R XI-1-86-24 XI-1 -86-34 Xi-1 -86-45 XI-1 -86-62 XI-I -86-71 XI-1 -86-74 XI-I -89-1 1 XI-1 -89-1 4 XI-1 -89-21 XI-1 -89-27 XI-1-89-33 XI-1-89-43 XI-1-89-49 XI-1 -89-50 XI-1 -92-05 XI-1 -92-09 XI-I -92-1 2 XI-1 -92-1 3 XI-1-92-23 XI-1 -92-43 XI-1-92-46 XI-1-92-56 XI-1-95-28 XI-1-95-27
Table IWB-2600-1 XI-1-83-51 XI-1 -86-1 0
IWB-3000 XI-1 -86-07 XI-1-86-52R XI-1 -89-67 XI-1 -92-19 XI-1 -92-35 XI-1-92-35R
IWB-3112 XI-1 -86-37 1WB-3142 XI-1-86-62 IWB-3144 XI-1 -86-62 Table iWB-3410-1 XI-1 -92-24 IWB-3500 XI-1 -83-29
XI-I -86-52 XI-1-86-52R
( 4
File No. -
IN87-005A BC83-055 IN90-013 BC83-055 IN89-004A IN89-004C IN89-004A IN89-004A IN89-004C lN94-024 BC82-304 BC82-230 BC83-589 BC83-527 BC84-043 * BC83-240 BC84-388 BC84-616 BC84-390 BC83-438 BC84-393 lN86-006 lN86-004* BC85-526 IN86-0176 lN86-020 lN86-032 IN87-005A IN86-003A iN88-016 IN86-0036 IN89-004A IN89-004C IN88-017 iN90-003 IN90-013 IN90-014 IN91 -01 6 IN91-027 IN91-025 IN91 -026 IN86-017B lN92-033 lN92-043 IN93-013 lN94-0068 IN94-006A BC83-240 BC84-393 BC85-481 BC85-524* IN89-017C IN92-005 lN92-023 lN92-023* lN86-022 lN86-032 1N86-032 IN91-014 BC82-050 BC85-524 BC85-524*
Page No. -
156 75
21 7 75
190 195 190 190 195 303
17 18 39 42 67 54 56 69 75 92 95
107 186 109 120 126 146 156 157 175 176 190 195 203 208 21 7 218 243 245 251 251 255 268 2 74 281 31 5 31 4 54 95 94
187 232 253 265 289 121 146 146 255
32 135 187
Location
Table IWB-3510-1 IWB-3512 IWB-3514.2 Table IWB-3514-2 IWB-3517.1 IWB-3600 IWB-4000
IWB-4212 IWB-4300 IWB-4340
IWB-4400
IWB-5000 IWB-5200
IWB-5210 IWB-5222
Subsection IWC IWC-1200 iwc-1220
IWC-1221
IWC-2000 IWC-2100 IWC-2200 IWC-2410 IWC-2411 IWC-2412 Table IWC-2412-1 IWC-2430
Table IWC-2500-1
interpretation
XI-1-83-06 XI-1-83-32 XI-1-92-58 XI-1 -83-07 XI-1 -89-45 XI-1 -83-29 XI-I -86-41 XI-1-92-21 XI-1-89-70 XI-1 -92-32 XI-1 -83-09 XI-1-83-09R Xi-1 -83-41 XI-1-83-41 R XI-1 -89-08 XI-1 -86-34 XI-I -92-23 XI-1-83-25 XI-1 -89-74
XI-1-83-27R XI-1-83-27 XI-1-86-43 XI-1-86-43R XI-1-89-53 XI-1-89-61 XI-1-86-05 XI-1-86-42 XI-1 -95-03 XI-1 -86-57 XI-1 -86-22 XI-1 -89-42 XI-1 -95-1 0 XI-1 -83-68 XI-1 -86-74 XI-I -95-1 1 XI-I -83-04 XI-1-92-24 XI-1 -95-06 XI-1 -92-61 XI-1 -95-1 3 XI-1 -83-39 XI-1 -83-40R Xi-1-83-51 XI-1-83-53 XI-1 -83-69 XI-1-83-80 XI-1-83-80R XI-1-86-57 XI-1-86-74 XI-1-89-21 XI-1 -89-30 XI-1 -89-43 XI-1-89-51 XI-1-89-53 XI-I -89-57 XI-I -89-58 XI-I -89-61 XI-1 -89-75 XI-1 -92-05 XI-1 -92-47 XI-1 -92-62
File No. -
BC82-428 BC82-437 lN93-021 BC82-429 IN90-006 BC82-050 lN86-005 IN92-009B IN91 -005 IN91 -03 1 BC82-604 BC82-604* BC84-064 BC84-064* IN87-018 IN86-0178 IN86-0178 BC83-219 IN91 -008
BC83-437* BC83-437 IN86-012 IN86-012* IN90-019 IN90-032 BC84-686 IN86-011 lN93-042 1N87-007 IN86-010 IN90-001 lN94-023 BC83-441 IN86-003A lN94-024 BC82-427 IN91-014 IN94-002A IN93-027A IN93-027B BC83-527 BC84-043* 8033-240 BC83-656 BC84-616 BC84-685 BC84-685* lN87-007 IN86-003A IN89-004A IN89-011 IN90-003 IN90-017 IN90-019 lN90-024 1N90-025 IN90-032 IN91-010 IN91 -01 6 lN92-046 lN93-030
Page No.
8 33
282 8
209 32
124 254 233 263
9 10 43 88
168 120 255
30 235
-
88 31
125 125 21 9 229 93
124 300 138 108 208 303 62
157 303
7 255 301 283 304 42 67 54 55 69 77
241 138 157 190 202 208 21 8 219 227 228 229 235 243 274 284
Cumulative index - interpretations Vols. 12-37
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Location Interpretation
Subsection IWC (Cont’d) Fig. IWC-2500-5 IWC-2520 Table IWC-2520
Table IWC-2600-1
IWC-3000
IWC-3112 IWC-4000 IWC-5000
IWC-5210
IWC-521O(a) IWC-5222
IWC-5223 IWC-7000
Subsection IWD IWD-1220 IWD-2000 IWD-2410 Table IWD-2412-2 Table IWD-2500-1
IWD-2600 IWD-2620 IWD-3000
IWD-4000 IWD-5000
IWD-5210 IWD-5223
IWD-7000
Subsection IWE Table IWE-2500-1
XI-1 -89-38 XI-1 -83-27 XI-1-83-51 XI-1-83-68 XI-1 -83-51 XI-1-83-68 XI-I -83-68R XI-I -89-67 XI-I -92-1 9 XI-I -92-24 XI-1-92-35 XI-I -92-35R XI-I -86-37 XI-1-86-27R XI-I -86-32 XI-I -89-08 XI-1-92-34 XI-1-83-25 XI-I -92-18 XI-I -92-62 XI-1 -83-67 XI-1 -86-09 XI-I -89-30 XI-1 -89-66 XI-1-89-74 XI-1-83-67 XI-1-86-27R
XI-I -89-47 XI-I -86-67 XI-I -95-1 0 XI-1 -95-1 1 XI-I -83-40R XI-I -83-69 XI-1 -86-1 5 XI-1 -86-1 5R XI-1 -86-69 XI-1-89-43 XI-1-89-58 XI-1-89-75 XI-1 -92-05 XI-1-83-27 XI-1-89-47 XI-I -89-67 XI-1 -92-1 9 XI-I -92-35 XI-I -92-35R XI-1-86-27R XI-I -86-32 XI-1 -89-08 XI-1 -92-34 XI-I -92-1 8 XI-1 -83-67 XI-1 -89-66 XI-1-89-74 XI-1-86-27R
XI-1 -86-70 XI-1 -89-43 XI-I -92-33
File No. -
lN89-007 BC83-437 BC83-240 BC83-441 BC83-240 BC83-441 BC83-441* IN89-017C lN92-005 IN91 -014 lN92-023 lN92-023* lN86-022 lN86-007* BC85-5258 lN87-018 lN92-020 BC83-219 lN92-003 lN93-030 BC82-606 BC84-391 IN89-011 IN90-018A IN91 -008 BC82-606 lN86-007*
IN90-009 lN87-022 lN94-023 lN94-024 BC84-043* BC84-616 BC85-130 BC85-130* lN87-008 IN90-003 IN90-025 IN91 -01 0 IN91 -01 6 BC83-437 IN90-009 IN89-017C lN92-005 lN92-023 lN92-023* lN86-007* BC85-5258 IN87-018 lN92-020 lN92-003 BC82-606 IN90-018A IN91 -008 lN86-007*
IN87-011 IN90-003 IN91 -043
Cumulative Index - Interpretations Vols. 12-37
Page No.
~
206 31 54 62 54 62
101 232 253 255 265 289 121 187 119 168 2 64
30 253 284 62 94
202 232 235
62 187
21 0 1 54 303 303 67 69
105 135 155 208 228 235 243
31 210 232 253 265 289 187 119 168 264 253
62 232 235 187
155 208 2 64
Location
IWE-3519.3
Subsection IWF IWF
IWF-1100 IWF-1300
IWF-2000 IWF-2200
IWF-241O(b) IWF-2430
IWF-2500
Table IWF-2500-1
Table IWF-2500-2 IWF-2510
Table IWF-2510(b) IWF-3000
IWF-4000
Subsection IWP IWP
IWP-3100 IWP-3210 IWP-3500 IWP-4110 Table IWP-4110-1
IWP-4120
Subsection I W V IWV
Interpretation
XI-1-92-33
XI-1 -86-02 XI-I -86-1 1 XI-I -86-1 7 XI-1-86-50 XI-1 -83-30 XI-1-89-69 XI-1-92-20 XI-1-92-22 XI-1-92-29 XI-1 -92-55 XI-1 -86-48 XI-I -89-44 XI-1-95-10 XI-I -86-30 XI-I -89-60 XI-1 -95-30 XI-1-83-12R XI-1-83-12R-2 XI-1-89-59 XI-1 -83-1 2 XI-I -83-1 2R XI-I -83-1 2R-2 XI-1-89-69 XI-1-86-48 XI-1-83-1 2 XI-1-83-1 2R XI-1-83-12R-2 XI-1-86-26 XI-1 -86-49 XI-1 -86-69 XI-1 -89-47 XI-1 -89-61 XI-1-89-72 XI-1 -86-63 XI-I -86-30 XI-I -89-60 XI-I -89-67 XI-I -92-35 XI-1-92-35R XI-I -92-55 XI-I -89-28
XI-82-06R XI-1 -83-08 XI-1 -86-21 R XI-1-92-63 XI-1-92-63 XI-1-92-63 XI-1-89-55 XI-1 -89-55 XI-I -92-1 4 XI-I -86-33 XI-I -89-55
XI-82-06R XI-1-83-08 XI-1 -83-59 XI-1 -86-21 R
File No. -
IN91 -043
BC82-753 BC85-253A BC85-2538 IN86-026C BC82-522 lN90-027 IN92-006B IN92-010 IN92-006A lN93-016 IN86-026A IN90-004 lN94-023 IN86-013 IN-90-029 IN95-004A BC82-230* BC82-230** lN90-026 8682-230 BC82-230* BC82-230** lN90-027 IN86-026A BC82-230 BC82-230* BC82-230** lN86-002 lN86-0268 lN87-008 IN90-009 lN90-032 lN90-035 IN87-004 IN86-013 lN90-029 IN89-017C lN92-023 lN92-023* IN93-016 IN89-021
BC82-340* BC82-523 lN86-004. lN93-036 lN93-036 lN93-036 IN90-021 IN90-021 IN91 -037 BC85-5298 IN90-021
BC82-340* BC82-523 BC83-439 lN86-004.
Page No. - 264
91 96
105 128 32
233 254 254 257 281 127 209 303 112 229 31 6 49 49
228 18 49 49
233 127 18 49 49
110 128 155 21 0 229 234 147 112 229 232 265 289 281 195
5 9
186 284 284 284 226 226 251 119 226
5 9
58 186
(e)
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Location Interpretation
Subsection IWV (Cont’d) IWV-lo00 IWV-1100
IWV-1200
IWV-1300 IWV-2200 IWV-3200
IWV-3300 IWV-3400 IWV-3410
IWV-3412
IWV-3413 IWV-3420 IWV-3426 IWV-3427 Table IWV-3510-1 IWV-3511 IWV-3512
IWV-3514 IWV-3520
IWV-3522
Subsection IWX IWX-2100 IWX-2500
Table IWX-2500-1 IWX-3100 IWX-4000
Appendix I I 1-2000
1-2220 1-2300 1-4421 1-4422 1-4430 1-4450 1-7000
Appendix II Form NIS-2
XI-I -89-36 XI-1-89-71 XI-I -89-71 R XI-I -83-59 XI-I -83-59R XI-1-83-1 7 XI-I -83-62 XI-I -83-14 XI-I -86-60 XI-I -92-1 6 XI-I -92-50 XI-I -89-1 0 XI-I -86-60 XI-I -83-1 7 XI-I -92-41 XI-I -92-41 R XI-I -83-74 XI-I -89-1 0 XI-I -92-50 XI-1-89-1 0 XI-1-83-62 XI-1-83-61 XI-I -83-60 XI-7 -89-25 XI-1-89-25 XI-I -89-65 XI-I -92-37 XI-I -89-65 XI-I -92-41 XI-I -92-41 R XI-I -83-73 XI-I -86-01
XI-I -83-75 XI-1-83-75 XI-I -86-52 XI-1-86-52R XI-1 -86-5213 XI-1 -92-59 XI-I -86-21 XI-1 -95-25
XI-I -89-62 XI-I -89-1 2 XI-1-89-1 3 XI-I -95-24 XI-1-95-24 XI-1-83-22 XI-1-83-22 XI-1-83-22 XI-1 -83-22 XI-I -83-22
XI-I -92-07
File No. -
IN89-024 lN90-036 lN90-036* BC83-439 BC83-439* BC82-597 BC84-178 BC82-626 IN86-001 lN91-045 lN92-041 IN88-015 IN86-001 BC82-597 IN92-025A IN92-025A* BC82-752 IN88-015 lN92-041 IN88-015 BC84-178 BC84-176 BC84-095 IN89-019 lN89-019 IN90-002 lN92-027 IN90-002 IN92-025A IN92-025A* BC82-665A BC82-6658
BC83-055 BC83-055 BC85-524 BC85-524* BC85-524* lN93-023 lN86-004 IN95-001
lN90-033 IN89-001 A lN89-005 IN94426 lN94-026 BC80-567 BC80-567 BC80-567 BC80-567 BC80-567
lN91-022
Page No. -
205 234 281
58 90 20 59 19
145 252 275 169 145 20
268 273
74 169 275 169
59 59 58
193 193 231 266 231 268 273
73 91
75 75
135 187 187 282 107 31 3
230 175 176 31 3 31 3 28 28 28 28 28
244
Location
Appendix 111 111
111-1 100 111-3230
Ill-3310 111-3320 111-3330 Ill-3400
Ill-3410 111-4420 111-4430
Ill-4500
Appendix IV IV-2300 IV-3000 IV-4000
Appendix VI1 Vll-3300 Vll-4240 Vll-4310(a)
Vll-43IO(b) Vll-4323 Vll-4342 Supplement 1, 9
Appendix Vlll VIII-11 OO(c) Vlll-2100 Vlll-3100 Supplement 4, 1 .I Supplement 6, 1 .I Vlll-4000
Code Cases N-98 N-308
N-408
N-416
N-458 N-460 N-481 N-498
Interpretation
XI-1-89-49 XI-I -92-58 XI-I -86-61 XI-I -89-1 1 XI-I -89-1 7 XI-1-89-21 XI-1 -89-23 XI-I -89-05 XI-1-92-1 7 XI-1 -92-1 7 XI-1-89-1 1 XI-1-89-1 1 XI-1-86-28 XI-1-89-23 XI-1-89-1 1 XI-1-89-21 XI-I -89-23 XI-1-83-84
XI-1-92-67 XI-1-92-67 XI-1-92-67
XI-I -92-42 XI-1-92-53 XI-1-92-1 1 XI-1-95-22
XI-1-95-23 XI-1-92-69 XI-1-92-53 XI-1-95-08
XI-1-92-49 XI-1 -92-39 XI-1-95-04 XI-1-92-09 XI-I -92-36 XI-1-92-36 XI-1-95-21
XI-I -89-09 XI-I -83-02 XI-I -83-47 XI-I -89-03 XI-1 -95-03 XI-1-92-25 XI-1-95-1 2 XI-1-95-15 XI-1-89-32 XI-1-92-26 XI-1-92-25 XI-1-92-26
File No. -
IN90-013 lN93-021 lN86-030 IN88-016 IN89-0046 IN89-004A IN89-010 IN88-005 IN92-001 IN92-001 IN88-016 IN89-001A lN86-008 IN89-010 lN89-016 IN89-004A IN89-010 BC83-654
lN94-004 IN94404 lN94-004
lN92-030 lN93-007 lN91-035 IN94-016 lN94-022 IN94-019 IN94-007 lN93-007 IN94-015
lN93-006 lN92-032 lN94-009 lN91-027 lN92-026 lN92-026 IN94-013 lN94-025
lN87-019 BC81-476 BC84-197 IN88-003 lN93-042 IN92-012 lN94-028 IN93-019 lN89-026 lN92-014 IN92-012 lN92-014
Page No. -
21 7 282 146 1 75 179 190 192 167 252 252 175 175 111 192 175 190 192 80
291 291 291
268 276 246 31 2
31 2 292 276 302
275 267 300 245 265 265 312
168 6
52 166 300 256 304 309 203 256 256 256
Cumulative Index - Interpretations Vols. 12-37
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
SUBJECT INDEX
Subject Interpretation
Acceptance Criteria applicable code .................................................... XI-I -83-75
XI-I -86-37 XI-I -89-1 6
Class 1 . reactor vessel ferritic material ................................ XI-1-83-06 constructed to 631.7 ............................................... XI-I -83-07 definition of flaw depth ............................................. XI-1-83-32 fabrication defects - additional examinations ........................... XI-I -83-04 flaw evaluation .................................................... XI-I -86-52
flaw evaluation . Section XI in lieu of construction code .................. XI-1-92-35
indications outside examination area ................................... XI-1-86-52
leakage .......................................................... XI-1-92-1 9 not specified ...................................................... XI-1-89-45
XI-I -86-52R
XI-1-92-35R
XI-1-86-52R
Applicability alternative weld repair . removal cavity ............................... corrective measures - of new bolting ................................. fabrication of replacements .......................................... flaws detected outside of an inservice examination ....................... installation requirements ............................................. instrumenttubing .................................................. leakage - not found during a system pressure test ....................... material removal process - nonwelded ................................ metal removal to prepare surface for NDE .............................. owner ........................................................... preventive maintenance ............................................. redundant canopy seal .............................................. repair program - installing replacements ............................... repair/replacement activities - off site ................................. repair subsequent to N-Stamping - prior to N.3 ......................... shot peening ...................................................... small items - replacement of ........................................ storage tank - examination .......................................... through wall leakage ................................................ use of AIA for installing replacements ..................................
XI-I -95-25 XI-I -95-29 XI-I -92-01 XI-I -83-72 XI-I -89-67 XI-I -83-85 XI-I -83-52 XI-I -92-03 XI-1 -89-70 XI-I -89-56 XI-I -83-83 XI-I -89-1 9 XI-I -89-1 9 XI-1-83-42 XI-1-95-09 XI-1-83-10 XI-1-83-46 XI-1-89-73 XI-1-92-60 XI-I -89-51 XI-I -89-64 XI-I -83-38
Brazing .......................................................... XI-1-86-47 procedures and personnel ........................................... XI-1 -83-85
XI-1 -83-86 XI-1 -83-86R
Repair/Replacement Program ........................................ XI-I -86-23
Calibration angle beam ....................................................... XI-I -89-1 1 confirmation - period of use ........................................ XI-I -89-05 demonstration of equivalence ........................................ XI-I -86-28
File No . BC83-055 lN86-022 IN89-0016 BC82-428 BC82-429 BC82-437 BC82-427 BC85-524 BC85-524* IN92-023 lN92-023* BC85-524 BC85-524" lN92-005 IN90-006
IN95-001 IN95-001 B lN90-023 BC81-568A IN89-017C BC84-683 BC83-625 IN91-017 IN91-005 lN90-022 BC83-179 lN88-009 lN88-009 BC84-123 lN94-014 BC82-277 BC83-595 IN91 -006 lN93-024 IN90-017 IN89-0176 BC84-122
IN86-0256 BC84-683 BC85-113A BC85-113A* BC85-525D
IN88-016 IN88-005 lN86-008
Page No . 75
121 178
8 8
33 7
135 187 265 289 135 187 253 209
313 31 5 242
72 232
81 55
242 233 227
79 188 188 43
302 17 51
234 283 218 231 41
127 81 82
102 108
175 167 111
Cumulative Index . Interpretations Vols . 12-37
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Subject Interpretation Calibration (Cont'd)
XI-1-86-61 electronic memoly ................................................. XI-1-92-1 7 interim check ..................................................... Xi-1-89-62 of gages .......................................................... Xi-1-83-49 series of test ...................................................... XI-1-83-49 standard ......................................................... XI-1-86-28
Calibration Blocks
material .......................................................... Xi-I -86-72 notch reflectors .................................................... XI-1 -89-09 reactor vessel ...................................................... XI-1-86-71 side drilled holes ................................................... XI-1-89-1 1 ultrasonic examination .............................................. XI-1-89-12
different specification ............................................... XI-I -86-61
V path ........................................................... XI-1 -89-21
Classification of Systems
instrument tubing ................................................... XI-1-83-78 high pressure safety injection ......................................... XI-I -86-42
penetrates the containment .......................................... XI-I -83-44 piping - visual examination ......................................... XI-I -86-67
Component Supports associated supports ................................................. coiled wire rope device ............................................. corrective measures - additional examinations .......................... examination requirements - exemptions ............................... integral attachments ................................................
integrally attached .................................................. multiple components ...............................................
Interfaces ......................................................... integrity by analyses ................................................
not constructed to Section 111 ......................................... preserviceexamination ..............................................
XI-1-86-49 XI-1-86-50 XI-1-92-55 XI-1-86-1 7 XI-1-95-30 XI-1-83-27 XI-1-92-22 XI-1-89-47 XI-1-89-59 xi-1-92-29 XI-1-86-69 XI-I -86-30 XI-I -86-26 XI-I -86-63 XI-I -83-30 XI-I -86-48 XI-1 -86-50 XI-I -89-44
removal of insulation ............................................... XI-1 -89-69 XI-I -92-20
Repair/Replacement Program ........................................ XI-1 -86-23 repair - requirements .............................................. XI-1 -89-28 representative sample ............................................... XI-1 -89-72 scope expansion ................................................... XI-1 -89-60 selection of supports for examination .................................. XI-1-83-12
XI-1-83-12R XI-1 -83-1 2R-2 XI-I -86-48 XI-1 -86-49 XI-1 -86-63 XI-1 -89-61
Construction Code hydrostatic test .................................................... XI-I -83-83
material manufacturers and suppliers .................................. XI-I -83-50R XI-I -89-24
reconciliation ...................................................... XI-I -89-41 repair activities - removal cavity ..................................... XI-1-95-25
XI-I -86-22 XI-I -86-52R
File No . lN86-030 IN92-001 lN90-033 BC82-776 BC82-776 IN86-008
lN86-030 IN87-005B lN87-019 IN87-005 IN88-016 IN89-001A IN89-004A
IN86-011 BC84-682 BC83-448 lN87-022
IN86-0266 IN86-026C IN93-016 BC85-2536 IN95-004A BC83-437 IN92-010 IN90-009 lN90-026 IN92-006A lN87-008 IN86-013 lN86-002 lN87-004 BC82-522 IN86-026A IN86-026C IN90-004 I N90-02 7 IN92406B BC85-525D lN89-021 IN90435 lN90-029 BC82-230 BC82-230' BC82-230** IN86-026A lN86-0266 lN87-004 IN90-032
BC83-179 IN86-010 BC85-524* BC84-175' lN89-014 lN89-025 IN95-001
Page No . 146 252 230
53 53
111
146 156 168 156 175 175 190
124 76 50
154
128 128 281 105 316 31
254 210 228 257 155 112 110 147 32
127 128 209 233 254 108 195 234 229 18 49 49
127 128 147 229
79 108 187 68
193 207 313
(h) Cumulative Index . Interpretations Vols . 12-37
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Subject Interpretation Construction Code (Cont’d)
repair/replacement . design requirements ............................. XI-I -95-01 replacement of Section 111 components ................................. XI-1-89-68 replacement pressure vessel .......................................... XI-I -89-46
surface examination . acceptance criteria .............................. XI-1-86-52 use of later editions of .............................................. XI-1-86-1 2
XI-I -95-29
XI-1-89-46R
XI-1-86-38R XI-1-86-39R XI-1-86-44R XI-I -89-20
use of later editions of . stamping .................................... XI-I -83-21 R
welding requirements ............................................... XI-1-86-51 XI-I -86-44R
Documentation (see Records and Reports)
Hydrostatic Test ( s e e also System Pressure Test) after a repair ...................................................... XI-1-83-66
XI-1-86-75 XI-1-89-1 8
after a replacement ................................................. XI-I -83-54
alternative test ..................................................... XI-I -86-25
core criticality ..................................................... XI-1-86-53 elevated temperatures .............................................. XI-1-86-34 exempt from ...................................................... XI-1-83-34 fabricated spool piece - Construction Code ............................ XI-1-86-58 impractical ........................................................ XI-1-86-25 induction stress improvement ......................................... XI-I -83-71 inspection interval extension ......................................... XI-I -89-58 nonwelded modification ............................................. XI-I -86-03R NPS 1 and smaller - component connected to .......................... XI-1-86-35 open ended portions of systems ...................................... XI-I -89-30 piping, pumps, and valves - preservice ................................ XI-I -86-22 pressurization pressure factors ........................................ XI-I -86-32 removal of a seal weld .............................................. XI-I -83-28 repair to a flange .................................................. XI-I -89-31 requirements ...................................................... XI-1-83-37R2
static head considerations ............................................ XI-I -89-54
system pneumatic test in lieu of ....................................... XI-1-92-04
test pressure ...................................................... XI-I -83-67
test pressure - gage accuracies ....................................... XI-I -89-74 test temperature ................................................... XI-I -92-23 through-wall leakage ................................................ XI-1-89-40 when performed - order ........................................... XI-1-89-63
XI-I -83-66
XI-1-92-30
XI-I -83-54R
XI-I -89-66
XI-I -92-1 8
XI-1-92-23
lnservice Inspection Summary Report
pressure retaining components and their supports ........................ XI-1-83-03 pumps and valves .................................................. XI-I -83-08 when performing preservice inspection ................................. XI-I -83-1 5
Inspection Interval extension of ...................................................... XI-1 -86-54 extended or decreased .............................................. XI-I -92-57 hydrostatic test - interval extension ................................... XI-I -89-58 inspection completion percentages - calculation of ...................... XI-I -95-1 1
additional examinations . similar components .......................... XI-I -95-1 3
File No .
IN95-001 B IN93-003 IN90-015 IN90-008 IN90-008* BC85-524 BC85-098 BC85-141* BC85-525C* IN86-015* IN88-014 BC82-434* lN86-015* lN86-027
BC84-652 lN87-032 lN86-031 BC84-321 BC84-652 BC85-528 IN92-015 IN86-017A IN86-0178 BC83-587 IN8741 0 BC85-528 BC80-583 IN90425 BC83-112* IN86-019 IN89-011 IN86410 BC85-5258 BC83-344 lN89-023 BC82-425** BC84-321* IN90-0188 IN90-018A IN91 -009 lN92-003 BC82-606 IN86-0178 IN91-008 IN86-0178 IN89-017A lN90-034
lN93-0278 BC82-406 BC82-523 BC82-610
IN87-001 lN93-002 IN90-025 lN94-024
Page No . 31 5 299 232 210 225 135 103 143 144 144 189 117 144 129
61 158 188
55 61
110 258 136 120 39
138 110
71 228 103 120 202 108 119 31
203 185 186 226 232 243 253
62 255 235 255 207 230
304 6 9
19
136 282 228 303
Cumulative Index . Interpretations Vols . 12-37
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Subject Interpretation Inspection Interval (Cont'd) multiple components . NDE ........................................ XI-I -86-26 scheduling requirements . applied by ................................. XI-I -86-74 support examinations . percentage requirements ........................ XI-I -95-10 visual examination . multiple stream ......................... , ........ XI-1-83-68R volumetric examination . successive .................... , , . . . . . . . . . . . . Xi-1-89-50
Instrument Tubing ................................................. XI-1 -83-52 XI-1-83-77 XI-I -83-86 XI-1-83-86R
Liquid Metal Cooled Plants inspection of inaccessible welds ....................................... XI-3-83-01 preservice system leakage test ........................................ XI-3-89-02 system leakage monitoring ........................................... XI-3-86-01
Material Manufacturer or Material Supplier qualification of .................................................... XI-I -83-50
Quality Assurance Program - update .................................. XI-1-86-44R
Metric Versus Customary ........................................... XI-I -86-76
XI-I -86-5512
Nondestructive Examination (see also Ultrasonic. Visual. and Volumetric Examinations) examination of dissimilar metal welds .................................. XI-1-89-57 induction stress improvement ......................................... XI-I -83-71 items NPS 1 and smaller ............................................ XI-I -83-86
XI-I -83-8613 XI-I -86-45
for installation welds ................................................ XI-I -86-51 liquid penetrant comparator blocks .................................... XI-I -83-64 longitudinal welds .................................................. XI-I -83-51 magnetic particle - material used for .................................. XI-I -95-23 multiple stream - pressure retaining bolting ............................ XI-1-83-68R
of emergency core cooling systems .................................... XI-I -92-45 of pipe lugs ....................................................... XI-I -89-38 performance demonstration - thermal fatigue crack ...................... XI-I -92-49 piping - pressure retaining welds ..................................... XI-I -86-57 reactor vessel ...................................................... XI-I -86-71 requirements ...................................................... XI-I -83-85 surface - flaw evaluation ........................................... XI-I -86-52
use of one examination to satisfy two Categories ......................... XI-1-83-33
multiple stream - pressure retaining nozzle weld ........................ XI-I -83-53 nonferromagnetic steam generator heat exchanger tubing . . . . . . . . . . . . . . . . . . XI-1-92-67
XI-1-86-52R
Nonpressure Retaining Welds ....................................... XI-1-83-28R
Nonwelded Work maintenance . requirements ........................................ XI-1-86-21
mechanical tube plugging ............................................ XI-1-86-41
modification - hydrostatic test ....................................... XI-I -86-03R pressure retaining material - requirements ............................. XI-1-86-21
repair program .................................................... XI-1-83-42 replacement - documentation ....................................... XI-I -86-1 4R sleeving of heat exchanger tubes ...................................... XI-1-92-32 sleeving of steam generator tubes ..................................... XI-1-86-41 use of an AIA ..................................................... XI-I -83-1 3
XI-I -83-38
XI-I -86-21 R
XI-1-92-44
XI-1-86-21 R
File No . lN86-002 IN86-003A lN94-023 BC83-441* IN90-014
BC83-625 BC84-603 BC85-113A BC85-113A'
BC81-330 IN86-024B IN86-024A
BC84-175 lN87-002* IN86-015*
lN87-035
lN90-024 BC80-583 BC85-113A BC85-113A* 1N86-020 lN86-027 BC84-562 BC83-240 IN94-019 BC83-441* BC83-656 iN94-004 IN92-0226 lN89-007 lN93-006 lN87-007 IN87-005A BC84-683 BC85-524 BC85-524* 8033-589
BC83-344*
lN86-004 lN86-004* lN86-005 IN91-031 B BC83-112* lN86-004 lN89-004* BC84-123 BC85-112* IN91-031 lN86-005 BC82-407 BC84-122
Page No .
110 157 303 101 218
55 76 82
102
11 211 159
54 153 144
158
227 71 82
102 126 129 60 54
312 101 55
291 273 206 275 138 156 81
135 187 39
185
107 186 124 2 73 103 107 186 43
118 263 124 18 41
Cj) Cumulative Index . Interpretations Vols . 12-37
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Subject Interpretation
NPS 1 and Smaller connected to a valve . hydrostatic test ................................ XI-I -83-58
exempted . pressure test ........................................... XI-1-83-85R
heat exchanger tube . sleeving ...................................... XI-1 -92-32 items . exempted from ............................................ XI-I -83-86
XI-I -86-35
XI-I -83-83 heat exchanger tube plugging ........................................ XI-1-92-44
XI-1 -83-86R XI-I -86-45 XI-1-92-66
piping, valves, and fittings . exemptions ............................... XI-1-83-26 XI-1-83-26R XI-1-89-04 XI-1-92-68
piping, valves, and fittings . supports for ............................... XI-1-86-65 valve replacements . exemptions ..................................... XI-1 -89-36
Piping component connected to NPS 4 and smaller . NDE ..................... XI-I-86-43R multiloop system . inspection ....................................... XI-I -86-1 5R NDE . installation welds ............................................ XI-1-86-51 pressure retaining welds - NDE ...................................... XI-1-86-57
supports - examination ............................................. XI-I -86-49
supports - exempted .............................................. XI-I -86-65 supports - multiloop system ......................................... XI-I -86-63 system - visual inspection ........................................... XI-1-86-67
XI-I -92-56
XI-I -86-63
Preservice Examination ............................................. componentsup ports ................................................ edition of Section V ................................................ exemptions - gasket replacements .................................... limited to ......................................................... of Class 2 vessel ................................................... of manways - bolting ..............................................
integrally cast steam generator nozzle ..................................
piping, pumps, and valves - hydrostatic testing ......................... pumps and valves - VT-3 prior to service .............................. ultrasonic examination - acceptance standards .......................... Pressure Retaining
bolting - manways ................................................ bolting - removal of insulation ....................................... bolting - visual examination .........................................
bolting . documentation ...........................................
bolts and studs . examination ....................................... boundary - alternative test .......................................... boundary 2 flaw evaluation ......................................... component - through-wall leakage ................................... components and their supports - summary report .......................
material - nonwelded work ......................................... components - exempt from visual ....................................
material . sealants ................................................. parts - hydrostatic test ............................................. parts . ordered as spares ........................................... welds . examination schedule requirements ............................ welds in piping - NDE .............................................
XI-I -86-24 XI-I -86-48 XI-I -86-50 XI-1-89-02 XI-I -89-36 XI-I -86-71 XI-I -86-24 XI-1 -89-42 XI-I -83-1 1 XI-I -86-22 XI-I -86-20 XI-I -86-37
XI-I -89-22 XI-1-83-1 1 XI-1-89-39R XI-1 -83-68R XI-1 -86-45 XI-1 -92-64 XI-1 -83-76 XI-1 -86-25 XI-1 -92-35 XI-I -89-64R XI-I -83-03 XI-1 -89-53 XI-I -86-21 XI-I -86-21 R XI-I -95-26 XI-I -83-83 XI-I -83-21 R XI-1 -89-14 XI-I -86-57 XI-I -92-56
File No .
BC84-422 IN86-019 BC83-588* BC83-179 IN91-031B IN91-031 BC85-113A BC85-113A* 1N86-020 lN93-041 BC83-244 BC83-244* lN88-004 1N94-005 lN87-031 lN89-024
lN86-012* BC85.130 * lN86-027 lN87-007 IN93-013 IN86-026B IN87-004 IN87-031 lN87-004 lN87-022
BC85-526 IN86-026A IN86-026C IN88-001 lN89-024 IN87-005A BC85-526 IN90-001 BC82-304 IN86-010 lN86-006 lN86-022
lN89-009 BC82-304 1N89-013A* BC83-441* lN86-020 lN93-038 BC84-390 BC85-528 lN92-023 IN89-017B* BC82-406 IN90-019 lN86-004 lN86-004* lN95-002 BC83-179 BC82-434' lN86-0038 lN87-007 IN93-013
Page No . 57
120 67 79
273 263 82
102 126 291
30 87
166 292 147 205
125 135 129 138 281 128 147 147 147 154
109 127 128 165 205 156 109 208
17 108 107 121
191 17
289 101 126 290
75 110 265 241
6 219 107 186 314
79 117 176 138 281
Cumulative Index . Interpretations Vols . 12-37
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Subject Interpretation welds in vessels . examination ....................................... XI-I -86-70 welds - preservice examination ...................................... XI-I -86-24
Procurement of material .......................................................... XI-I -86-55R material - MM and MS qualification .................................. XI-I -83-50R
parts as material ................................................... XI-1-83-21 R parts by non-Certificate Holder ....................................... XI-1-89-29 pipings. valves. and fittings - NPS 1 and smaller ......................... XI-1-89-04 pressure retaining part - Code Data Report ............................ XI-1 -83-21 R replacements - later edition ......................................... XI-1 -86-12 replacements - perform work on it ................................... XI-I -86-59 replacement - stamping ............................................ XI-I -83-20
spares - transfer of custody ......................................... XI-1 -89-07
XI-1-89-24
spares ........................................................... XI-1-83-21R XI-1-86-1 8
Pumps instrument accuracy ................................................ XI-1-89-55
testing of . inservice ............................................... XI-1-92-63 visual VT-3 . prior to service ........................................ XI-1-86-20
XI-I -92-1 4
vibration measurement instrumentation ................................. XI-1-86-33
Qualification of NDE Personnel certification date ................................................... XI-1-86-73 certification examinations ............................................ XI-1-86-56
XI-1-86-66 XI-1-86-73 XI-1-89-06
certified to a later edition of SNT.TC.1A ................................ XI-1-83-18 XI-1-83-24 XI-1-86-40
certified to an earlier edition of SNT.TC.1A ............................. XI-1-83-24 certified to SNT.TC.1A .............................................. XI-1-83-18
XI-I -83-23 XI-1-83-29 XI-1-83-82 XI-1-89-26
color vision examination - frequency ................................. XI-1-83-36 duties of Authorized Inspector ........................................ XI-1-83-48 examinations scoring ................................................ XI-1-92-54
XI-I -92-70 examinations - random selection ..................................... XI-I -95-22
examinations . use of grading unit ................................... XI-I -95-23 experience requirements ............................................ XI-1 -92-28 eye examination ................................................... XI-I -83-01 for pumps and valves ............................................... XI-82-06R
outside agency .................................................... XI-I -92-53 perform examinations to earlier editions ................................ XI-1 -86-40
performance demonstration .......................................... XI-1 -92-39
pressure loss, flow change and test .................................... XI-1-92-52 pumps and valves .................................................. XI-1-92-37
other than to SNT-TC-1 A ............................................ XI-1 -83-45
XI-1 -92-70
practical examination requirements - alternatives to ..................... XI-1 -92-69
recertification - ASNT certification .................................... XI-1 -86-66 recertification - examinations ........................................ XI-I -86-1 6 recertification - Level 111 ............................................ XI-1-86-19 supplemental training - Level 111 ..................................... XI-1-95-08 to another code ................................................... XI-1 -83-40R ultrasonic examination technicians ..................................... XI-1-92-39
File No . IN87-011 BC85-526
lN87-002* BC84.175 * lN89-014 BC82.434 * lN89-008 lN88-004 BC82-434* BC85-098 BC85-550 BC82-430 BC82-434* BC85-254 IN88-011
IN90-021 IN91-037 lN93-036 lN86-006 BC85-5298
lN87-029 lN86-028 lN87-015 lN87-029 lN88-006 BC83-060 BC83-178 BC85-571 BC83-178 BC83-060 BC83-056 BC82-050 BC83-176 BC80-231* BC83-585 BC84-177 IN93-015 lN93-022 IN94-016 lN94-022 IN94-019 IN92-019 BC80-582 BC82-340* BC83-535 lN93-007 BC85-571 lN93-022 lN92-032 lN94-007 lN93-005 lN92-027 IN87-015 BC85-142 BC85-071 IN94-015 BC84-043' lN92-032
Page No . 155 109
153 68
193 117 202 166 117 103 145 27
117 106 167
226 251 284 107 119
157 137 153 157 167 21 29
123 29 21 29 32 78
194 40 52
276 293 312
312 257
5 5
50 276 123 293 267 292 276 266 153 105 106 302 67
267
(1) Cumulative Index . Interpretations Vols . 12-37
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Subject Interpretation
Qualification of NDE Personnel (Cont'd) ultrasonic examination . annual training ............................... XI-I -92-1 1 used to perform repair examinations ................................... XI-I -83-40 visual examination - SNT-TC-1A ..................................... XI-1-83-16
Quality Assurance Program qualification of plant and contractor personnel ........................... XI-82-06R review of ......................................................... XI-I -86-64 updating to a later Construction Code .................................. XI-1-86-44
XI-I -86-4413
Records and Reports certificate of compliance and CMTR ................................... XI-I -83-21 R Code Data Report .................................................. XI-I -83-21 R design documents .................................................. XI-I -89-34 documentation - construction code .................................. XI-I -89-20
XI-I -89-34 XI-I -89-48
documentation - inservice degradation ................................ XI-I -89-64R documentation - installation of replacement ............................ XI-I -95-02 documentation - test temperature .................................... XI-I -95-07 for pressure retaining bolting ......................................... XI-I -89-22 inservice inspection plan - requirements ............................... XI-1-92-02 manufacturer's data report - NIS-2 ................................... XI-1-92-07 NIS forms - signature .............................................. XI-I -83-65
nonwelded replacement ............................................. XI-1-86-14R Owners data form .................................................. XI-1-83-02 replacements ...................................................... XI-1-86-68 retention of radiographs ............................................. XI-1-89-48 use of NIS-1 Form ................................................. XI-1-83-47
XI-1-83-79
XI-1-86-1 4R XI-I -86-31
use of NIS-2 Form ................................................. XI-1-86-31
weld reference system .............................................. XI-I -92-06
Repair/Replacement Program activities - off site ................................................. XI-I -95-09 applies to ......................................................... XI-1-86-36
XI-I -86-68
XI-I -86-41 XI-I -86-62
componentsuppo rts ................................................ XI-1-86-23 failure ........................................................... XI-I -92-1 5 impractical NDE - alternative examination ............................. XI-1-86-51 initiation of ....................................................... XI-I -95-1 4 items NPS 1 and smaller ............................................ XI-1-83-86
nonpressure boundary material ....................................... XI-I -86-23 Owner's responsibility .............................................. XI-1-95-09 Quality Assurance Program - review of ................................ XI-I -86-64 use of later rules ................................................... XI-I -86-25
XI-I -83-86R
XI-1-86-31
Sealants use Of ........................................................... XI-1-89-40
XI-1-95-26
Shutdown d d ............................................................. XI-1-83-73
XI-1-83-74 extended - valve testing ............................................ XI-1-92-41 R valve testing ........................................................ XI-1-83-74
Spares ( s e e Procurement 00
File No . lN91-035 BC84-043 BC82-775
BC82-340* IN87-028A IN86-015 IN86-015*
BC82-434* BC82-434* IN89-012 lN88-014 IN89-012 IN90-011 IN89-0178* lN93-026 IN94-011 lN89-009 IN91 -01 2 lN91-022 BC84-647 BC84-684 BC85-112* BC81-476 lN87-024 IN90-011 BC84-I 97 BC85-112* BC85-525A BC85-525A IN87-024 IN91 -01 9
lN94-014 lN86-021 lN86-005 lN86-032 BC85-525D IN91 -040 lN86-027 lN93-029 BC85-113A BC85-113A* BC85-525D lN94-014 IN87-028A BC85-528 BC85-525A
IN89-017A lN95-002
BC82-665A BC82-752 IN92-025A* BC82-752
Page No .
246 42 20
5 147 126 144
117 117 204 189 204 21 7 241 299 301 191 242 244
61 77
118 6
154 217
52 118 118 118 154 244
302 121 124 146 108 252 129 304 82
102 108 302 147 110 118
207 314
73 74
273 74
Cumulative Index . Interpretations Vols . 12-37
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Subiea
Stamping installation of replacement parts ...................................... of replacement parts . valves ........................................ Sedion Ill ........................................................ of replacement parts . ordered as spares ..............................
System Pressure Test (also see Hydrostatic Testing) after a repair or replacement ......................................... applies to .........................................................
corrective measures .............................................. exempted from . NPS 1 and smaller .................................. open ended portions of systems ...................................... pressurizing medium ................................................ leak test - core criticality ...........................................
reassembled components/breaking pressure boundary ..................
reduction of pressure . visual examination ............................. replacement of bolts. studs. and nuts .................................. systems not required to operate ....................................... through-wall leakage ................................................
through-wall leakage - corrective action ...............................
Temporary Repair .................................................
Ultrasonic Examination bolts and studs .................................................... calibration ........................................................ equalized sensitivity - recording of ................................... evaluation of flaws ................................................. full penetration weld of nozzles ....................................... material attenuation ................................................ nozzle-to-safe end welds - extent of .................................. performance demonstration .......................................... piping - outer surface ..............................................
detection specimens - orientation ....................................
procedure qualification - search unit .................................. qualified by performance demonstration ................................ reflectors ......................................................... requirements ...................................................... search unit overlap ................................................. sweep display ..................................................... three-point DAC ...................................................
Interpretation
XI-I -83-02 XI-I -83-21 R XI-I -83-20 XI-I -83-72
XI-1-83-05 XI-1-83-34 XI-1-83-37R2 XI-1-86-1 3 XI-1-86-1 3R XI-1 -86-21 XI-I -86-21 R XI-1 -92-1 9 XI-I -92-51 XI-1-83-35R XI-I -86-53 XI-1 -89-30 XI-I -83-25 XI-1 -86-34 XI-I -92-23 XI-I -83-63R XI-I -83-70 XI-I -83-70R XI-1 -86-1 3 XI-I -86-1 3R XI-1 -86-27 XI-1-86-27R XI-I -86-29R XI-I -89-1 5 XI-I -89-33 XI-I -89-37 XI-I -89-52 XI-I -86-46 XI-I -89-08 XI-I -92-65 XI-1-92-62 XI-I -89-64 XI-I -89-64R XI-1-92-31
XI-I -83-14 XI-I -83-57
XI-I -95-24 XI-I -92-1 7 XI-I -92-36 XI-I -83-22 XI-I -83-29 XI-1-83-56 XI-I -89-1 7 XI-I -89-49 XI-I -92-36 XI-I -92-58 XI-I -95-21
XI-I -92-09 XI-I -83-84 XI-I -83-84 XI-I -89-1 3 XI-I -89-23 XI-I -83-31
File No . BC81-476 BC82-434* BC82-430 BC81-568A
BC82-425 BC83-587 BC82-425** BC85-111 BC85- I l l * lN86-004 lN86.004 * lN92-005 IN93-011 BC83-588* IN86-017A IN89-011 BC83-219 IN86-0176 IN86-17Bf BC84-310* BC84-198 BC84-198' BC85-111 BC85-111* lN86-007 lN86-007* lN86-009* IN88-002A IN88-017 IN88-002C IN88-002B lN86-023 IN87-018 IN94-001 lN93-030 IN89-0176 IN89-0178* IN91 -01 8
BC82-626 BC84-392
lN94-026 IN92-001 lN92-026 BC80-567 BC82-050 BC84-388 IN89-0046 IN90-013 lN92-026 lN93-021 IN94-013 lN94-025 IN91-027 BC83-654 BC83-654 lN89-005 IN89-010 BC82-630
Page No . 6
117 27 72
7 39
185 104 225 107 186 253 275 67
136 202 30
120 255 101
70 201 104 225 111 187 143 1 78 21 3 205 219 127 168 290 284 231 241 263
19 57
313 252 265 28 32 56
179 217 265 282 312
245 80 80
176 192 33
(n) Cumulative Index . Interpretations Vols . 12-37
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Subject Interpretation
Ultrasonic Examination (Cont’d) welds in piping .................................................... Xi-I -95-24 V path ........................................................... XI-1-89-23
Use of Code Cases N-98 ............................................................ N-3 08 ........................................................... N-408 ........................................................... N-416-1 ......................................................... N-416 ........................................................... N-458 ........................................................... N-460 ........................................................... N-481 ........................................................... N-498 ...........................................................
ValW classification .......................................................
disc and seat . hard facing .......................................... examination . bolts and studs ....................................... exercising test ..................................................... full stroke exercising ................................................ inservice testing program - corrective action ............................ inservice testing - scope of .......................................... limiting values of stroke time ......................................... measured leakage rate ..............................................
packing adjustment - seat leakage testing .............................. replacements - NPS 1 and smaller ................................... set point adjustments ............................................... stroke time ....................................................... supervisor qualification - set point testing .............................. supports - exempted .............................................. test scheduling - extended shutdown ................................. test scheduling - outage ............................................ visual VT-3 - prior to service ........................................
XI-I -89-09 XI-I -83-02 XI-I -83-47 XI-I -89-03 XI-I -95-12 XI-I -92-25 Xi-I -95-1 5 Xi-I -89-32 XI-I -92-26 XI-I -92-1 0 XI-I -92-25 XI-1-92-26
XI-I -83-59 XI-I -83-62 IN91 -026 XI-1-92-35 XI-1-83-76 Xi-1 -89-1 0 Xi-1-92-50 XI-1-86-60 Xi-1-89-71 Xi-1-89-71 R XI-1-83-1 7 XI-1-83-60 XI-1-83-61 XI-1-92-38 XI-1-89-36 XI-1-89-65 XI-1-92-1 6 XI-1-92-37 XI-1-86-65 XI-1-92-41 R XI-1-89-25 XI-1-92-41 XI-1 -86-20
Visual Examinations
core support structure ............................................... Xi-I -92-46 exempt from ...................................................... XI-I -89-53 leakage .......................................................... XI-I -92-19
components exempt . volumetric and surface .......................... XI-1 -92-40
XI-I -92-48 XI-I -92-51
liquid-metal containing components ................................... XI-3-89-01 multiple stream - pressure retaining bolting ............................ XI-1-83-68R piping system - classification ........................................ XI-1 -86-67 pressure test - pressure requirements ................................. Xi-1-86-46 removal of insulated ................................................ Xi-I -89-39 reactor vessel - spaces below the core ................................ Xi-I -95-28 reactor vessel - spaces within ....................................... XI-1-95-27 vessels - pressure retaining welds .................................... Xi-1 -86-70
VT-1 - base metal ................................................. Xi-I -92-33 VT.l, VT-3 - interchangeable ....................................... Xi-I -83-69 VT-1 - pressure retaining bolting ..................................... XI-1 -86-45 VT-2 during a functional test ......................................... Xi-1-89-75 VT-2 of borated water systems ........................................ XI-I -89-39
VT categories . requirements ........................................ Xi-1-89-26
iN94-026 IN89-010
IN87-019 BC81-476 BC84-I 97 lN87-003 lN94-028 IN92-012 IN93-019 lN89-026 lN92-014 lN91-029 iN92-012 iN92-014
BC83-439 BC84-178 iN92-016 lN92-023 BC84-390 IN88-015 lN92-041 IN86-001 lN90-036 lN90-036* BC82-597 BC84-095 BC84-176 lN92-031 lN89-024 IN90402 IN91 -045 lN92-027 lN87-031 iN92-025A* iN89-019 IN92-025A lN86-006
IN92-022A lN92-043 IN90-019 iN92-005 IN93-001 IN93-011 IN86-024C BC83-441* lN87-022 lN86-023 IN89-013A IN94-0066 IN94-006A IN87-011 BC80-231* IN91 -043 BC84-616 lN86-020 IN91-010 IN89-013A
Page No . 313 192
168 6
52 166 304 256 309 203 256 246 256 256
58 59
251 265
75 169 275 145 234 281
20 58 59
266 205 231 252 266 147 273 193 268 107
267 274 219 253 2 74 2 75 169 101 154 127 206 315 314 155 194 264
69 126 235 206
Cumulative Index . Interpretations Vols . 12-37
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Subject Interpretation
Visual Examinations (Cont’d) VT-2 of buried components ..........................................
VT-2 - personnel ................................................. VT-2 - removal of insulation ........................................ VT.2, VT-3 - piping system ......................................... VT-3 - bolted connection ........................................... VT-3 - pumps and valves prior to service .............................. VT-3 - reactor vessel ..............................................
VT-3 - supports ................................................... VT-4 - pumps and valves ........................................... VTM-2 - Accessibility .............................................. welds on multiple components .......................................
Volumetric Examinations and surface - exemptions to ........................................
as an alternative to surface ...........................................
Code Case N.460 .................................................. fabrication defects - additional examinations ........................... or surface ........................................................
piping - outer surface .............................................. prior to hydrostatic test .............................................. required volume to be examined ..................................... successive inspection intervals ........................................
Weld
additional examinations - similar components .......................... between different P.numbers ......................................... connecting NPS 1 and less - hydrostatic test ........................... examination - dissimilar metal welds .................................. examination of integrally welded attachments ........................... examination of pipe ................................................
examination - partial ..............................................
accessible - preservice examination ...................................
examination - full penetration .......................................
examination - partial penetration .................................... examination schedule requirements ...................................
half bead weld repair - automatic .................................... items NPS 1 and smaller - requirements ............................... multiple components - NDE ........................................ multiple loop piping - inspection ..................................... NDE examination requirements ....................................... nonpressure retaining ............................................... overlay cladding to replacement parts .................................. piping - additional examinations ..................................... piping - examination of (calibration method) ........................... piping - NDE requirements ......................................... piping supports - examination ....................................... pressure retaining boundary - alternative test. .......................... procedure qualification record - sharing of ............................. procedures - qualification ...........................................
XI-I -83-1 9 XI-I -92-34 XI-1 -83-63R XI-1 -92-47 XI-1-86-67 XI-1-92-48 XI-1-92-51 XI-1 -86-20 XI-I -95-28 XI-1-95-27 XI-1 -89-26 XI-I -83-69 XI-3-89-01 XI-1-86-26
XI-1-86-43R XI-1-92-40 XI-1-92-45 XI-1-95-03 XI-1-89-21 XI-1-89-27 XI-1-89-32 XI-1-83-04 XI-1-89-1 1 XI-I -92-43 XI-1-92-58 XI-1 -89-63 XI-1-89-32 XI-1-89-50
XI-1-86-24 XI-1-92-61 XI-1-83-39 XI-1-86-35 XI-1-92-1 3 XI-1-89-43 XI-1-92-05 XI-1-83-80 XI-1-83-80R XI-1-92-12 XI-1-89-43 XI-I -89-1 4 XI-I -92-24 XI-1 -83-09 XI-1-83-09R XI-1-83-86 XI-I -83-86R XI-1-86-1 5R XI-1-86-26 XI-1-86-1 5R XI-1-86-51 XI-1-83-28R XI-1-86-36 XI-1-95-06 XI-1-95-04 XI-1-86-51 XI-1-86-57 XI-1 -86-49 XI-1 -86-25 XI-1-92-08 XI-1-83-41
File No . BC82-607 lN92-020 BC84-31 O* lN92-046 lN87-022 IN93-001 IN93-011 lN86-006 IN94-006B IN94-006A BC80-231* BC84-616 IN86-024C lN86-002
IN86-012* IN92-022A lN92-0228 lN93-042 IN89-004A IN89-004C lN89-026 BC82-427 IN88-016 lN92-033 lN93-021 lN90-034 lN89-026 IN90-014
BC85-526 IN93-027A BC83-527 lN86-019 lN91-026 IN90-003 IN91-016 BC84-685 BC84-685* lN91-025 IN90-003 IN86-0036 IN91-014 BC82-604 BC82-604* BC85-113A BC85-113AI BC85-130* lN86-002 BC85-130* lN86-027 BC83-344* lN86-021 IN94-002A lN94-009 lN86-027 lN87-007 IN86-026B BC85-528 lN91-024 BC84-064
Page No .
27 264 101 274 154 274 2 75 107 315 31 4 194 69
169 110
125 267 273 300 190 195 203
7 175 268 282 230 203 218
109 283 42
120 251 208 243
77 241 251 208 176 255
9 10 82
102 135 110 135 129 185 121 301 300 129 138 128 110 245 43
(P) Cumulative Index . Interpretations Vols . 12-37
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services
Subject Weld (Cont’d)
reference system . recording of .......................... reference system . identification of .......................
Interpretation
XI-1 -83-55 XI-I -83-81 Xi-I -89-01
. . . . . . . . . XI-I -92-06
......... XI-I -95-05 Repair/Replacement Program ........................................ XI-1-86-23 repair . internal wall thinning ....................................... XI-1-92-59 repair . steam generator tube plug ................................... Xi-1-92-21 temper bead method .............. , ................................ Xi-1-89-18 tungsten-inert gas process . automatic ................................ XI-I -83-09
vessels . examination .............................................. Xi-1 -86-70 Xi-I -83-09R
Welder
qualification of - simultaneously ..................................... XI-1-89-35 requalification - change in contractor ................................. XI-1-83-43 required qualification - Section IX .................................... Xi-1-89-01 supervision ....................................................... Xi-1-83-81
qualification ....................................................... Xi-1-83-55
Cumulative Index . Interpretations Vols . 12-37
BC84-322 BC84-687 IN87-036 IN91-019 lN93-035 BC85-525D lN93-023 iN92-0096 IN86-031 BC82-604 BC82-604* IN87-011
BC84-322 iN89-006 BC84-179 lN87-036 BC84-687
56 78
1 65 244 301 108 282 254 188
9 10
155
56 204 44
165 78
COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling ServicesCOPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services