  • 8/14/2019 Attach J.2 Anacostia

    1/21

    1010 wisconsinavenue,nwsuite 405washington,dc 20007

    T 202.466.6116F 202.466.6235E [email protected]

    coregroup,pc2006

    PROJECT DIRECTORY

    Architect

    MEP Engineer

    Owner

    Building AddressCORE

    1010 Wisconsin Avenue,NW

    Suite405

    Washington,D.C. 20007

    Contact: DavidCheney

    SabrinaCheung

    202.466.6116202.466.6235 fax

    [email protected]

    [email protected]

    DC PublicLibrary

    Martin Luther King,Jr. MemorialLibrary

    901 GStreet NW

    Washington,DC 20001-4599

    Contact: JeffBonvechio

    Telephone: 202.442.6070

    F ax : 2 02 .7 27 .4 79 2 Allen andShariff

    7061 DeepageDrive

    2ndFloor

    Columbia,MD21045

    Contact:FredBeam

    Telephone:410.381.7100

    F ax : 4 10 .3 81 .7 11 0

    DC Public Library1801 Good Hope Road SE

    Washington, DC 20020

    ANACOSTIA LOCATION

    [email protected]

    [email protected]

    1801 Good Hope Road SEWashington,DC 20020

    BID SET 6/15/06

  • 8/14/2019 Attach J.2 Anacostia

    2/21

    CB

    DT

    ISSUED

    FOR

    PN

    DB

    1010w

    iscons

    inavenue,

    nw

    suite

    405

    was

    hing

    ton,

    dc

    20007

    T

    202

    .466

    .6116

    F

    202

    .466

    .6235

    E

    [email protected]

    om

    coregroup,pc2006

    PERMITSET

    ICERTIFY THATTHESE DOCUMENTS

    WERE PREPARED OR APPROVED BYME,

    AND THATIAMADULYLICENSED

    ARCHITECTUNDER THE LAWS OF

    THE DISTRICTOFCOLUMBIA

    06015

    .00

    6/15/06

    A0.2Specifications

    FileName:"PROJECTS:06004DCLib-4200Wisconsin:06004DCPLdwgs

    :3sheetlayouts(.lbks):06004ModularCD.lbk:06004ModularCD.lbk"

    Layout:A0.2Specifications

    PrintedDate:6/15/06at12:54PM

    1801GoodHopeRoadSE

    Washington,DC,20020

    DCP

    ublicLibrary-Anacostia

    3. Glazing Channels:

    a. TopChannel:1" x 2" nominal

    b. BottomChannel: 1"x 1"nominal

    c . F inish: [StainlessSteel #4, satin brushed][ MatchBHMA#625(US26)]

    D. DOOR HARDWARE

    1. Overhead Closers:a.Concealedoverhead closers shall beheavy duty,fully hydraulic,full rackand pinionaction withadjustablespring power. Closers shall besized incompliancewith requirements for accessibilityforhandicappedandrecommendations ofmanufacturer.

    b. Acceptable Products:

    i . Do rma - RT S88

    ii. LCN- 6030 Seriesw/CP150pivot

    iii. Norton- 4900 Seriesw/490pivot

    2. Push/PullBars:Horizontal pushbar/offsetpull bar combination

    a . S ize :1 " d iame te r

    b. Projection:2 1/2"nominal

    c . Of fse t: 2 1 /4 " (n o mina l

    d . Mo un t in g :i. PullBar: 12" centerto center

    i i . Pu sh Ba r :3 3 " c e nte r to c en ter

    e . F inish: [BHMA #630(US32D)][ BHMA #625(US26)]

    f. Acceptable Products:

    i. BuildersBrass Works- 2960

    ii. Hiawatha- 658B x1081LBPiii. Rockwood- 15847

    E. INSTALLATION

    1. All-GlassEntranceSystem:

    a. Install all-glassentrance systemin compliancewithmanufacturer'sinstructions.

    b. Useamethod ofattachment to structureto permitsufficient adjustment to accommodate construction

    tolerancesand irregularities.c. Fit,align,andadjust doorassembliesplumb andlevel,toprovideasmoothoperation.

    2. Remove and replace defective work.SECTION 08450 - ALL-GLASS ENTRANCES

    A. SUBMITTALS1. Product Data:

    a. Submit manufacturer'sliterature describing productsto be provided.2. ShopDrawings:

    a.Submit shop drawings for systems. Show anchorage, field connections, and glazing for component parts and prepare coordinationdetailsforentire system including framing and bracing to structure.

    b. Shopdrawingsshall showscale elevationsand sections.Full size sectionsshallbe shownonlywhen needed forclarity.3. Samples:

    a. Submit 2 samplesoffinished metal materials:i.Extrusions: 12" lengthsii.Sheet orPlate Materials:6" squares

    b. Submit 2 samplesofglass.i.Sample Size:12" x 12"

    4. QualityAssurance Submittals:a. Certificates:

    i. Provide certificationbySafetyGlazing CertificationCouncilthat safety glazing materialsmeet specified requirements.ii. Provide certificationofHeat Checking of tempered glass.

    5. Contract Close-out Submittals:a.Submit instructions to be followed in cleaning and maintaining components of system. Include a copy of instruction in Operation and

    Maintenance DataManual.

    B. QUALITYASSURANCE1. RegulatoryRequirements:

    a.Provide glazing at Hazardous Locations as determined by CPSC 16 CFR 1201. Glazing shall be in compliance with ConsumerProduct SafetyAct and shallhave been tested and labeled.

    b. Safetyglazing shallconformto requirementsof ANSIZ97.1.C. MATERIALS

    1. Glass: Tempered;ASTMC1048a. Classifications:ASTMC1036; Type 1,class 1,qualityq 3b. Thickness: 1/2"c. Color: Clear

    ii. DoorSills:1/4"iii. Butt Glazing Joints:3/8", except betweensidelightsand glasstransoms,which shallbe 1/8"

    08700 HARDWAREA. Product Data:

    1. Submit manufacturer'sliterature describing productsto be provided.B. ShopDrawings:

    1.Submit a minimum of 3 copies of hardware schedule. Indicate location of hardware set, cross-referenced to indications on Drawings,manufacturer'sname and product number,finish,and othersimilar informationdescribing hardware to be provided.

    C. RegulatoryRequirements:1. FederalAccessibilityRegulations:

    a. AmericanswithDisabilitiesAct -ADAb. UniformFederalAccessibilityStandards-UFAS

    2. NationalFire ProtectionAssociation:a. NFPA80 Standard forFire Doorsand Windowsb. NFPA101 Life SafetyCodec. NFPA105 Smoke- and Draft-ControlDoorAssemblies

    D. GeneralRequirements:1.Items of hardware not definitely specified, but needed for satisfactory installation of hardware shall be provided. Such items shall be of

    type and qualitysuitable for service needed and comparable to adjacent hardware.

    2. Doorswithlocksets shallbe furnished withnon-removable pinshinges.3. Securelyinstallfinishhardware itemsin compliance withaccepted schedule and templatesfurnished withhardware.4. Installlocksets,surface mounted closers,and trimafterfinishing ofdoors and framesiscomplete.5. Verifykeying requirementswithOwner. Furnish2 keysperlock witha maximumof8 keysper keyed alike set.6.Before final completion, adjust hardware so that doors operate in perfect order. Test and adjust hardware for quiet, smooth operation, free

    ofsticking,binding,or rattling.Adjust closersforproper,smooth operation.

    7. At finalcompletion,properlytag and identifykeysand deliver to Owner.DIVISION 9 FINISHES

    09000 GENERALFINISH NOTESA. Submittals:

    1. The Contractorshallsubmit aminimumof three (3)12" x 12" square samplesofeach scheduled finishfor reviewbythe Architect.TheArchitect shallretaintwo (2)samples offinishes forrecord and returnaminimumof one sample to Contractor.

    2. The Contractor shall advise the Architect of locations of changes in dye lots, batches or similar color shifts.B. QualityAssurance:

    1. Before proceeding withprocurement offinishes, the Contractorshallfield verifydimensionsto assure that sufficient quantitiesofmaterialsare ordered to complete the work.

    2. The Contractorshallrefer to the Drawingsforspecific locationsoffinishes. Should the Contractorfind anydiscrepancies,omissions,ambiguitiesorconflictson the plans,the Contractorshallbring the item(s)to the attentionofthe Architect fordirection,before orderingmaterialsorproceeding withanywork inquestion.

    3. Finishesto be installed instrict accordance withthe manufacturer'sspecificationsand instructionsand ina mannerconsistent withthehighest qualitystandardsofworkmanship.

    4. Where there isa questionasto the acceptable levelofqualityfor the installationof anymaterials,the Architect shallact as mediator.5. Uponreceipt fromthe manufacturer,inspect materialsfordefects,flaws, shipping damage,correct colorand pattern. Priorto beginning

    work,damaged orwrong materialsshall be returned to the manufacturerforimmediate replacement to prevent delaysin the completionofthe work.

    6. Compliance withthe manufacturer'srequirementsforhandling, storage,installationand protectionisthe exclusive responsibilityoftheContractor.

    7. Finishesshallextend over,underand/orbehind anyitemof built-inmillwork,equipment,mirrors,etc.,asindicated onthe drawings.

    09250 GYPSUMBOARDA. General

    1. The ContractorshallnotifyArchitect ofdate forpartitionlayout. Layout shallbe reviewed byArchitect priorto construction.2. Allgypsumboard installationshallbe done bya qualified installerwithexperience incommercialapplicationssimilarin scope to this

    project.

    3. Gypsumboard installationshallconformto ASTMC840,the recommendationsofthe GypsumAssociation,the specificrecommendationsof the manufacturer,and the requirementsofthe UL Fire Resistance Directory(at fire rated partitions)

    4. At areaswhere existing partitionsare indicated to remain,repair and prepare existing gypsumboard surface to accept new finish.Qualityofrepaired and prepared surface ofexisting partitionshallbe equal to that ofnewly constructed partitions.

    B. MetalFraming1. Installationofmetalframing forinteriorgypsumboard shallconformto ASTMC754.2. Metalstud gauge forpartitionsshallbe 25 gauge minimumunlessnoted otherwise. Metalstudsat fire rated partitionsshallbe 20 gauge

    minimum.

    3. Metalstud framing shallconformto ASTMC754.

    4. Millwork covered inwood veneerorplastic laminate shallbe fabricated and assembled byskilled workmento the complete satisfactionofthe Architect.Reinforcing asrequired to ensure arigid and secure assemblyshallbe provided,even ifnot detailed onthe drawings.Exposed surfacesshall be free fromdents,tool marks,warpage,buckle,glue and openjoints. Alljoint cornersand miterconnectionsshallbe made tightlyso that threadsare entirelyconcealed. Allexposed laminate jointsshall be shownon shopdrawingsand reviewedbythe Architect.

    5. Formillworkindicating plasticlaminate exteriorfinished surfaces,provide white melamine asthe interiorcabinet and drawersurfacefinish(unlessotherwise noted inthe Drawings and details).

    6. Installmillwork to be plumb,level,true and straight withno distortions. Shimas required using concealed shims.7. Scribe and cut Workto fit adjoining Work and refinishcut surfacesorrepairdamaged finishat cuts. Provide clearsealant at alljoints.8. Anchormillworkto built-inblocking ordirectlyattachto substrate. Secure to grounds,strapping and blocking withcounter-sunk,

    concealed fastenersand blind nailing as required foracomplete installation.

    9. The Contractorshallbe responsible formaking certainthat millwork itemsare not delivered untilareasare sufficientlydry so that themillwork willnot be damaged byexcessive changesinmoisture content.All delivered unitsshall matchthe finalapproved shopdrawingsand samples. Unitswhichare marred,chipped orotherwise damaged shallbe repaired orreplaced asdetermined bytheArchitect.Units shallbe protected during shipment and installation.After installationofunits intheirproper location,allprotectionshallbe removed and allsurfacesthoroughlycleaned to the complete satisfactionofthe Architect. Surfacesshallthen be recovered andprotected.

    10. Repairorreplace damaged ordefective millwork whereverdeemed necessary.If millwork cannot be adequatelyrepaired,it shall bereplaced to the satisfactionofthe Architect.

    11. Allstanding and running trimpiecesshallbe plain sawnhardwood Grade Ilumberto meet AWIrequirementsforPremiumGrade.DIVISION 8 DOORSAND WINDOWS

    08100 STEELDOORS AND FRAMESA. Submittals

    1. ShopDrawings:a. Submit shopdrawingsthat showelevationsof eachdoor design,doorconstructiondetails,and methodsof assembling sections,

    hardware locations,and installationmethods,dimensions,and shapes ofmaterials,anchorage and fastening methods,doorframetypesand details,wall opening constructiondetails,and finish requirements.

    b. Indicate locationof eachunit inProject.c. Shopdrawingssubmittalshall be coordinated withshop drawingssubmissionofrelated portionsof Work,suchas:i.) Wood Doorsii.) Hardware

    B. QualityAssurance1. Qualifications:

    a. Single Source Responsibility:i.) To greatest extent possible,frames,anchors,etc. shallbe productsof asingle manufactureroritemsstandard with

    manufacturerofhollowmetal products.ii.) Provide secondarymaterialswhichare produced orare specificallyrecommended byhollowmetalproducts manufacturerto

    ensure compatibility.

    2. Certifications:a. Fire doorsshallbearlabels approved byUnderwritersLaboratories,Inc orWarnock HerseyInternational.Provide fire rated doors

    witha labelpermanentlyattached to eitherhinge stile orto toprail, showing testing agencyapprovalfor classificationscheduled.

    C. HollowMetalDoors1. Non-Rated Doors: Seamlesshollowsteeldoors

    a. Grade: SDIGrade II,HeavyDuty; Model2b. Gauge:18 gaugec. Core Material:Acousticalinsulationat interiorapplications,thermalinsulationat exteriorapplications.

    2. Fire Rated Doors: Seamlesshollowsteeldoorsa. Grade: SDIGrade II,HeavyDuty; Model2b. Gauge: 18 gaugec. Core Material:Acousticalinsulationd. Label: Asindicated onDrawings.

    D. HollowMetalFrames1. Non-Rated Frames:

    a. Gauge: 16 gaugeb. Framesover4'-0" (1200 mm)wide:14 gauge

    2. Fire Rated Frames:a. Rated hollowmetalframesshallfollow same generalcriteriaasindicated fornon-rated units.b. Provide rated unitsin compliance withASTME152.c. Rated unitsshallbearUL labelcertificate indicated onDrawings.

    E. Finishes1. ShopPriming:

    a. Doorsand framesshallbe chemicallytreated to ensure maximumpaint adhesionand coated,onexposed surfaces,witha rust-inhibitive primersuitable asa base forfinishpaints.

    b. Applyprimerof evenconsistencyto provide auniformfinished surface.Allowto fullycure before shipment.F. Frame Tolerances:

    1. Squareness:+/-1/16" (1.5 mm)a. Measured onaline 90 degreesfromone jamb,at uppercorner offrame at otherjamb.

    2. Alignment:+/-1/16" (1.5 mm)a. Measured onjambsona horizontalline parallelto plane ofwall.

    3. Twist:+/-1/16" (1.5 mm)a. Measured at face cornersofjambson parallellinesperpendicularto plane ofwall.

    4. Plumbness:+/-1/16" (1.5 mm)a.) Measured onjambsat floor.

    G. DoorClearancesSubject to +/-1/32" (.08 mm)tolerance:1. Head and Jambs:1/8" (3 mm)2. Undercut doorssufficientlyto allowclearance above finishfloorsand where indicated onDrawingsto allowfor adequate airtransfer.

    a. Where scheduled floorfinishmaterialis lessthan 1/2" (12 mm)thick,allow not more than5/8" (16 mm)above topof substrate towhichit isapplied.

    b. Where scheduled floorfinish materialismore than1/2" (21 mm)thick, allownot more than1/4" (6mm)above finishmaterial.c. Where athreshold isused,allow not more than1/4" (6mm)above threshold.

    H. Adjustments1. Prime Coat Touch-up:

    a. Sand smoothallrusted or damaged areasofprime coat and touch-upwith compatible air-drying primerb. Touch-upareasshallnot be obvious.

    2. FinalAdjustments:a. Check and re-adjust operating finishhardware just priorto final inspectionand afterpainting hingesif hingesare indicated to be

    painted.b. Remove and replace defective work.

    08120 ALUMINUMDOOR FRAMESA. Submittals

    1. ShopDrawings:a. Submit shopdrawingsthat showelevationsofframes, constructiondetails,and methodsofassembling sections,hardware

    locations,and installationmethods,dimensions,and shapesof materials,anchorage and fastening methods,wallopeningconstructiondetails,and finish requirements.

    b. Indicate locationof eachunit inProject.c. Shopdrawingssubmittalshall be coordinated withshop drawingssubmissionofrelated portionsof Work,suchas:

    i.) Wood Doorsii.) Hardware

    B. Extruded AluminumFrames1.

    Finish:Clearanodized2. Products:

    a. Ragland Manufacturing Company,Inc.- RACOClassicFreestanding Seriesb. AvalonDualLock PartitionSystem,Inc.- Eagle

    C. Tolerances:1. Squareness:+/-1/16" (1.5 mm)

    a. Measured onaline 90 degreesfromone jamb,at uppercorner offrame at otherjamb.2. Alignment:+/-1/16" (1.5 mm)

    a. Measured onjambsona horizontalline parallelto plane ofwall.3. Twist:+/-1/16" (1.5 mm)

    a. Measured at face cornersofjambson parallellinesperpendicularto plane ofwall.4. Plumbness:+/-1/16" (1.5 mm)

    a.) Measured onjambsat floor.D. Adjustments

    1. Check and re-adjust operating finishhardware just priorto final inspection.

  • 8/14/2019 Attach J.2 Anacostia

    3/21

    CB

    DT

    ISSUED

    FOR

    PN

    DB

    1010w

    iscons

    inavenue,

    nw

    suite

    405

    was

    hing

    ton,

    dc

    20007

    T

    202

    .466

    .6116

    F

    202

    .466

    .6235

    E

    [email protected]

    om

    coregroup,pc2006

    PERMITSET

    ICERTIFY THATTHESE DOCUMENTS

    WERE PREPARED OR APPROVED BYME,

    AND THATIAMADULYLICENSED

    ARCHITECTUNDER THE LAWS OF

    THE DISTRICTOFCOLUMBIA

    06015

    .00

    6/15/06

    A0.1Specifications

    FileName:"PROJECTS:06004DCLib-4200Wisconsin:06004DCPLdwgs:3sheetlayouts(.lbks):06004ModularCD.lbk:06004ModularCD.lbk"

    Layout:A0.1Specifications

    PrintedDate:6/15/06at12:54PM

    1801GoodHopeRoadSE

    Washington,DC,20020

    DCP

    ublicLibrary-Anacostia

    SPECIFICATION NOTES

    DIVISION 1 GENERAL REQUIREMENTS

    01010SUMMARYOF WORK

    A. Unless otherwise noted,"The Owner" refersto the persons, organizationand/or business entering into anagreement withtheContractorto execute the Work indicated inthe Contract Documents. "The Landlord" refersto the person,organization and/orbusinessthat ownsorisresponsible formanaging the propertyonwhichthe Work isto be executed. The Contractor'sresponsibilitiesto eachparty are described inthe specificationsand documentsbelow.

    B. The "Work" includes Ownerimprovements to ane xisting tenant space and includesnewp artitions,finishes and modificationstoHVAC,plumbing, electrical,and fire protectionsys tems.

    C. Owner-supplied itemsinclud e:

    1. Furniture2. Appliances3. Equipment4. Dataand telephone cabling and equipment5. Securitysystem and equipment6. Computercabling and equipment

    D. Permitsand Inspections

    1. The Contractorisresponsible forobtaining allnec essarypermits required to performthe Work.

    2. The Contractorisresponsible forinspectionsrequired forthe jurisdictionin whichthe Work isperformed. Verifywithlocalregulatoryagency exact number,type and schedule ofinspections required forthe Work priorto commencing withthe Work.

    3. The Contractorshall provide the Ownerwith documentationan d scheduling necessary forOccupan cyPermit.

    4. The Building Permit willbe obtained byan agent ofthe Owner.

    E. Contract Documents

    1. The AIAGeneral Conditionsof the Contract forConstruction AIADocument A201,1997 edition,published bythe American

    Institute ofArchitects, hereinafterreferred to asGeneral Conditions,is herebymade part ofthe Contract Documents,the sameasifbound herein.

    2. The Contract Documentsconsist ofthe following:

    a. Owner-ContractorAgreement ("The Contract")b. GeneralConditionsc. Drawingsas dated inagreement ("The Drawings")d. Addendae. Modifications

    3. The Contract Documents are instrumentsofservice and shallremain the propertyof the Architect whetherthe project forwhichtheyare prepared isexecuted ornot. The Contract Documentsa re not to be used bythe Owner,Landlord orTenant forotherprojectsorextensionsto the project nor are theyto be modified inany mannerwhatsoeverexcept byagreement inwrit ing andwithappropriate compensation to the Architect.

    01025 MEASUREMENTAND PAYMENT

    A. Priorto commencing with the Work,the Contractorsh allsubmit to the Architect the following information:

    1. ASchedule of Valuesindicating the componentsof Work listed insufficient detailto the satisfactionof the Architect and theOwnerto serve as abasisforcomputing valuesforApplicationsforPaymentsduring construction.

    2. Aconstructionschedule forthe Work inbar chart form.Thisschedule willbe used as the basisforevaluating progressoftheWork and Applicationsfor Payments.

    B. The above schedule willbe used asthe basis forevaluating progress ofthe Work and Applicationsfor Payments.

    C. Applicationsfor Payment shalluse AIADocument G702.Applications are to be notarized and bearthe signature ofan authorizedofficer.

    D. Onlyap proved Change Ordersare to be indicated onApplications forPayment.

    01030 ALTERNATES AND UNITPRICES

    A. The Contractorshallprov ide pricing forall alternatesindicated inthe bid form.

    B. The Ownerreserves the right to reduce orincrease the totalScope ofWork by accepting anyof the Alternatesoradded /deleted UnitPrice items.

    01035 SUBSTITUTIONS

    A. The Contractor'sbid shallbe based onproviding allspecified items.Subs titutionsshall be considered onlyunde rthe followingcircumstances:

    1. The specified itemisaccompanied bythe words"equalto".Referencesto makes,brands,models,etc., isto establishtype andqualitydesired.

    2. The itemisshownto have a prohibit ivelylong lead time.

    3. Anitemofequalappearance and equalor greaterqualityto the specified itemcanbe provided at substantialsavingsto theOwner.

    B. Substitutionssha llbe considered bythe Architect foracceptance underthe following procedure.

    1. The Contractorshallmake allrequestsforsubstitutionswithinseven(7)daysof contract award.

    2. The Architect requiresseven(7)days forreviewofthe Contractor'srequest forsubstitution.

    3. The Contractor'srequ est forsubstitution shallinclude product informationand samplesas deemed necessaryby the Architect ofboththe specified itemand proposed substitution. Characteristicsof bothproducts shallbe clearlyidentified forthe Architect'sevaluation.

    01040 COORDINATION

    A. Coordinationwith Base Building and otherBuilding Tenants:

    1. Exercise extreme care and precaution during construction of the Work. Schedule Work to minimize disturbances toadjacent spaces and/or structures and their occupants, property, public thoroughfares, etc.

    The Contractorshalltake precautionsand be responsible forthe safetyofbuilding occupantsfromconstructionprocedures. TheContractorshall be responsible forany overtime costs incurred thereby.

    2. The Contractorshall be required to meet allLandlord requirements forconstruction.

    3. The Contractorshall coordinate withLandlord allWork required bythe Tenant that occursoutside the Tenant space and isonorwithinthe base building. The contractorisresponsible forthe installationand integrityofall penetrationsrequired to the existingroofand formeeting allLandlord requirements.

    4. The Contractorshallreview the base building Contract Documents and shallcomply withbase building requirementsand designcriteria.

    5. Priorto drilling slabpenetrations,the Contractors halldo the following:a. Clearlyidentifylocationof slabpenetrationsforArchitect'sreview.b. Coordinate withexisting conditionsbelow slabto insure no conflicts withexisting ductwork,sprinkler piping,ceiling

    conditions,etc.b. X-rayproposed slabpenetrationlocationsto identifystructuralconflictsasrequired byLandlord.

    B. Coordinationwith Owner-Supplied items:

    1. Make necessaryprovisionsforitemsto be furnished orinstalled by Ownerasindicated onthe drawings. Suchprovisions

    include,but are not limited to,plumbing & electricalrequirements.

    2. Provide protectionfor Owner-supplied itemsuntil completionof the project.

    3. The Contractoristo include the installationcost ofOwner-supplied itemsunless otherwise noted.

    4. Anyambiguity orneed for clarificationregarding scope ofWork related to Owner-supplied itemsis to be reviewed withtheArchitect priorto commencing withthe Work.

    5. Telephone and datawork shallbe coordinated bythe Contractorwith Owner'srepresen tative.

    6. Securitysystem work shallbe coordinated bythe ContractorwithOwner's representative.

    C. Cut and fit componentsforalterationofexisting work and installationof newwork. Patchdisturbed areasto matchadjacentmaterialsand finishes.

    D. Priorto construction,the Contractorshallverifythat no conflictsexist inlocationsofanymechanical,telephone,electr ical,plumbingand sprinklerequipment (to include piping,duct work, structuralmembers and conduit)and that required clearances forinstallationand maintenance ofabove equipment are provided.Elemen tsin conflict shallbe determined and reviewed withArchitect forresolutionprior to construction.

    E. Contractorshallorderand schedule deliveryofmaterialsinample time to avoid delaysin construction. Ifanitemis found to beunavailable orhave along lead time,the ContractorshallnotifyArchitect withinseven(7)days ofcontract award.

    01060 REGULATORYREQUIREMENTS

    A. The Work shallcomplywithapplicable codes,amendments,rules,regulations,ordinances,laws,orders,approvals,etc.,that arerequired bypublicauthorit ies.In the event ofconflict,the most str ingent requirementsshallgovern.Requirementsinclude,but arenot necessarilylimited to,the currentlyapplicable editionsor publicationsof the following:

    1. InternationalBuilding Code 20002. DC ConstructionCode Supplement of20033. InternationalMechanical Code 20004. InternationalPlumbing Code 20005. InternationalFire Code 20006. NFPANational ElectricalCode 1996

    B. Installbuilding standard fire extinguishersand cabinets where required byapplicable codesas directed bythe Architect (Provide andinstallany additionalco de-required fire extinguishers and cabinetswhere directed bycod e officialsa nd/orthe Architect).

    01300 SUBMITTALS

    A. Withinseven (7)days ofthe contract award,the Contractorshall submit to the Architect asc hedule ofall submittalsidentifyingestimated date ofsubmission. Submittalsshall include but are not limited to:

    1. Finishes2. Carpet seaming diagram3. Doors,frames, and hardware4. Glass5. Metals6. Millwork7. Equipment8. Appliances9. Mechanical equipment,diffusers, grilles,devices, etc.10. Electricalequipment, light fixtures,controls, devices,e tc.11. Plumbing equipment,fixtures, devices, etc.12. Sprinklerplan

    B. Preparationofsubmittalsshallbe asfollows:

    1. Submit one (1)reproducible copyand two (2)printsofeachshop drawing.

    2. Forcatalog cuts,brochures, and otherstandard printed orpublished product data,submit numberof copiesne eded byContractor,plus two (2)copies to be retained byArchitect.

    3. The Contractorshallsubmit a minimumofthree (3) samplesoffinishes.The Architect shallretaintwo (2)samplesoffinishesforrecord and returna minimumof one sample to Contractor.

    C. The Contractorshall provide manufacturer'sspec ifications,installation instructions,shop drawingsand samples forreview andapprovalp riorto ordering orproceeding withthe Work.No constructionshall proceed untilsubmittalsare approved.

    D. Contractorshall allowfive (10)working daysfor the Architect and Consultantsto the Architect to reviewsubmittals. Allsubmittals notreviewed directlyby the Architect,but ratherConsultants to the Architect,shall be submitted simultaneouslyto both the Architect andthe Consultant and shallbe noted assuch. The Contractorshall not proceed withwork untilbo thArchitect and Consultant haveapproved the submittal.No extension ofthe contract time willbe granted because offailure to provide submittalsfor the Architect'srevieworcoordinationina timelyfashion.

    E. The Architect reserves the right to reject anyand allitems installed without priorreview and approvalby the Architect.

    F. Referto specified itemsfor specific submittalrequirements.

    01400 QUALITYCONTROL

    A. Dimensionsa nd Tolerances:

    1. Do not scale drawings;dimensionsgovern.Verifydimensionswithfield conditions. Ifdiscrepanciesare discovered betweenfield conditionsand drawingsorb etweendrawings, contact the Architect forresolution before proceeding.

    2. Horizontaldimensions indicated are to/fromfinished face ofconstruction, except asnoted.

    3. Verticaldimensionsare fromtop offloorslab,except where noted to be fromabove finished floor (AFF),as measured fromthehighpoint ofthe slab.Contractorto notifythe Architect whendeviationisgreaterthanallowed innote 4 below.

    4. FloorTolerance:The Contractoristo immediatelyverifyslope and report anydeviationovera 1/4 inchslope in10 feet to theArchitect priorto commencing Work. The Contractorshallbe responsible forleveling allareas to achieve aslope deviation oflessthan1/4 inchslope in 10 feet. The Contractorshallensure anabsolute levelfloorunderallswinging and sliding doors.

    5. Dimensions are not adjustable without approvalof the Architect unlessno ted ().

    6. Dimensionsindicated to be "clear' or"clr" shallbe maintained.Anydiscrepanciesor variationsinthese dimensionsshallbereviewed withthe Architect before beginning construction.

    7. Any dimensionnoted "Verify" or"VIF" must be reviewed withthe Architect before beginning construction.

    8. The Contractorshall continuously check Architecturaland structuralclearances foraccessibility ofequipment and mechanicaland electricalsystems. No allowance ofany kind willbe made forthe Contractor'sfailure to foresee meansof installingequipment into positioninside structures.

    B. ObservationofWork:

    1. The Architect,acting asthe Owner'sdesignated agent fordesign ofthis project,will exercise sole authorityfor determiningconformance of materials,equipment and systemswiththe intent ofthe design.Reviewand acceptance of itemsproposed byContractorforincorporationinto the Work willbe bythe Architect.Thisfunctionofthe Architect willapplybothto Contract asinitiallysigned, and to the changes to Contract bymod ificationduring progressof Work.

    2. Ifat anytime before commencement ofWork, orduring progressthereof, the Contractor'smethods, equipment orappliances areinefficient orinappropriate forsecuring qualityofWork, orrate ofprogress intended byContract Documents,the Ownermayorderthe Contractorto improve theirqualityorincrease theirefficiency. Thiswillnot relieve the Contractorofhissuretiesfromtheirobligations to secure qualityof Work and rate ofprogress specified incontract.

    C. Reference to Standards:

    1. Materialsand workmanshipspecified byreference to numbersymbol,to t it le ofa specificationsuchascommercialstandards,federalspecification,trade associationstandard,orothersimilarstandard,shallcomplywithrequirementsinlatest edit ionorrevisionthereofand withanyamendment orsupplement thereto ineffect ondate oforiginofthisproject'sContract Documents.Suchstandard,except as modified herein,shallhave fullforce and effectsas thoughprinted in Contract Documents.

    2. The Contractorshall waive "CommonPractice" and "CommonUsage" asconstruction criteriawherever detailsand ContractDocumentsorgoverning codes,ordinances,etc.,require greaterquantityorbetterqualitythancommonpractice orcommonusage would require.

    D. Existing Conditions:

    1. The Contractorshallbe responsible forchec king Contract Documents,field conditions,and dimensionsforaccu racyandconfirming that Work isbuildable asshown before proceeding withconstruction. Clarificationregarding anyconflicts shallbereceived priorto related Work being started.A complete site survey isrequired by G.C.location allexisting utilitiesand servicesaswellas topographicinformatiionpriorto starting work.

    2. The Contractorshallnotifythe Ownerinwrit ing ofanydeficienciesinbase building constructionpriorto the commencement ofthisWork.Anyunreported deficiencieswillbecome the responsibil ityofthe Contractorto correct.

    E. Inthe event ofconflict betweenthe Drawingsand the Specifications,the Specificationsshallgovern. Detaildrawingstakeprecedence overdrawingsoflargerscope. Should the Contractorat anytime discoveranerrorina drawing or specification,oradiscrepancyorvariationbetweendrawings,oradiscrepancyorvariationbetweendimensionsand measurementsat site,orlackofdimensions orother information,the Contractorshallnot proceed withthe Work affected untilclarification hasbee nmade.

    F. The Contractorshall coordinate and reviewthe layout and exact locationof the itemslisted belowin the field priorto construction.Anyc onflictsthat arise shallbe brought to the Architectsattention inwriting forresolution priorto proceeding withconstruction:1. Partitions2. Doors3. Core drilllocations4. Electrical/telephone outlets5. Thermostats6. Light switches7. Light fixtures

    8.Changes inceiling plane,and otherceiling features9. VAVboxes, supplementalAC unitsand othermechanica l,electrical, orplumbing itemsrequiring ceiling access oraffectingceiling height

    G. The Contractorshall followmanufacturer's recommended specification & installationprocedures. Ifthese are contraryto theContract Documents,the Contractorshall notifythe Architect,inwriting, immediately,to resolve discrepancies priorto proceeding.

    H. Onlynewitemsofrecent manufacture,of the highest quality,free fromdefects,willbe permitted on the Work. Rejected itemsshallbe removed immediatelyfromthe Work and replaced withitems ofthe quality specified. Failure to remove rejected materialsandequipment shallnot relieve the Contractorfromthe responsibilityforqualityand characterofitemsused norfromanyotherobligationimposed bythe Contract.

    I. The finished Work shallbe firm,wellanchored,intrue alignment,plumb,level,withsmooth,clean,uniformappearance withoutwaves,distortions,holes,marks,cracks,stains,ordiscoloration.Jointingsshallbe close fitt ing,neat and wellscribed. The finishwork shallhave no exposed unsightlyanchors orfasteners and shallnot present hazardous,unsafe corners. Work shallhave theprovisionfor expansion, contraction,and shrinkage asnecess aryto prevent cracks,buckling and warping due to temperature andhumidityconditions.

    J. Attachments,conne ctions,or fasteningsof any nature are to be properlyand permanentlysec ured incon formance withbest practiceand the Contractorisresponsible forimproving themaccordingly.The drawingsshowonly specialconditionsto assist theContractor. They do not illustrate everysuc hdetail.

    K. No Work defective inconstructionor qualityor deficient inanyrequirementsof drawingsand specificationswillbe acceptable inconsequence ofthe Owner'sor Architect'sfailure to discover orto point out defectsor deficiencies during construction;nor willpresenceofinspectors onWork relieve the Contractorfrom responsibilityfor securing qualityand progressof Work asrequ ired bythe Contract.Defective Work revealed withinrequired time guarantees,as specified inthe Contract,shall be replaced byWork conforming withthe

    intent ofthe Contract. No payment whetherpartialor final,shallbe construed asan acceptance ofdefective Work orimpropermaterials

    01500CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

    A. The Contractorisresponsible forand shallprovide protectionfor anyexisting finishesincluding elevators,lobbies,stairs,and corridorsofthebase building.

    B. The Contractorshallprotect existing base building windowcoverings.

    C. The Contractorshallpatchand repairfireproofing damaged orremoved during performance ofthe Work. Fireproofnewpenetrationsrequired bythe Work.

    D. Debrisshallbe removed fromthe site ona dailybasis. Uponcompletionof the Work,remove debrisfromthe site created bythe Workprovided underthe Contract and leave areasclean.

    E. The Contractorshallbe required to maintaina jobsite telephone and faxmachine.

    01700CONTRACTCLOSEOUT

    A. Whenthe Contractorconsidersthat the Work issubstantiallycomplete,the Contractorshall prepare and submit to the Architect alist of itemsto be completed orcorrected. The Architect shallvisit the site to determine the statusof completionand amend the Contractor'slist asrequired.Upon the Contractorsstated completionof the itemslisted to be completed orcorrected,and priorto final payment,the Architectshallperforma finalinspectionof allitemslisted. Failure to complete listed items,as determined bythe Architect,shallrequire additionalsitevisitsas needed bythe Architect to determine finalcompletion. The cost ofanyadditionalsite visitsshall be billed hourlybased ontheArchitectspublished hourlyratesand shallbe deducted fromthe Contractor'sfinalpayment.

    B. The following itemsshallbe submitted to the Ownerby the Contractorbefore requesting finalpayment:

    1. Complete release orwaiverof liens documentationshallbe notarized and signed.

    2. Certificatesofinspectionapprovalsfor required occupancypermit and similarapprovalsor certificationsbygoverning authorities,assuring the Owner'sfullaccessand use ofcompleted Work.

    3. Anotebook containing warranties,bonds, guarantees,affidavitsand certificatesrequired bythe Contract Documents. Include anyoperating and cleaning instructionsforappliances,materials,finishes, systemsand equipment installed aspart ofthe Work.

    C.FinalCleaning: Remove protective coatings,coverings,any tags,labelsor othermarkingsfrommaterialsfixtures and equipment.Cleanwall,floorand ceiling surfacesincluding trim,outlet and switchplates,windows,windowsills, and windowtreatments.Cleanplumbingfixturesto asanitarycondition.

    DIVISION 2 SITEWORK

    02070SELECTIVE DEMOLITION

    A. Extent ofdemolitionisindicated inthe Drawings.

    B. Protect finishesindicated to remain during demolition.

    C. Following demolition,base building partitionsshould be cleaned and prepared forproposed tenant constructionperreview ofArchitect andthe Contractor. Surfacesindicated asexisting to remainshallbe restored to like-newcondition.Surfacesindicated as existing to remainandto receive newfinishesshall be properlyprepared to receive indicated finishes.

    D. Priorto demolition,the Contractorshallschedule ameeting withthe Ownerand the Architect to reviewallitemsto be salvaged. Salvageditemsmaynot necessarilybe indicated forreuse.Salvaged itemsmayinclude:

    Millwork Doors,frames,and hardware. Lay-inceiling panelsand ceiling grid. Allglassentrance systemcomponents. HVAC diffusers,grilles,equipment and controls Electricalequipment,lighting fixturesand controls

    E. Extent ofitemsto be reused isindicated inthe Contract Documents.Dispose of remaining itemsdetermined not to be salvaged inasafe,clean,mannerand in accordance withlocal,state and federalregulations.

    F. Make safe abandoned electricalconduits.

    G. Terminate abandoned plumbing at entryto tenant space.

    H. G.C.to prepare site grading and improvementsrequired forbuilding foundation,utilities,stairsand ramps to meet finishgrade.

    DIVISION 3 CONCRETE

    FOUNDATIONS AND FOOTINGS

    A.G.C. to provide structural design drawings of foundation and footings with soils report documents soil type bearing capacity and watertable elevation.

    DIVISION 5 METALS

    05500METALFABRI CATIONS

    A. Submittals:Minimumofthree (3)3 1/2" x 12" samplesof metalsindicated inthe finishschedule.

    B. Allcold rolled steelshallmatch Architectssample and be prepared inthe following manner(thismetalis highlyreactive andmust be carefullycleaned and sealed.Allwork isto be performed while wearing rubberglovesor white cottonglovesto keepoilsfromhands awayfrommetal):

    1. Prepare surface withalight brushing to remove loose surface scale (leave most ofscale on metal).

    2. Cleancarefullywithan automotive metalconditioner(a degreasing agent). Acleanrag must be used and changedfrequentlyto avoid accumulationofoil and grease onrag.

    3. Sealthe metalwithone mmthickof anmatte finishautomotive clearcoat acryliclacquerenamel.

    4. Allmaterialsused must be approved byArchitect priorto construction.

    DIVISION 6 - WOODSAND PLASTICS

    06200FINISH CARPENTRY

    A. Submittals:

    1. Submit shopdrawingsand hardware catalog cutsof allmillwork hardware forreviewbythe Architect inaccordance withtherequirementsof the Contract Documents.Shop drawingsshallshow the designand dimensions,and clearlyindicate inlarge scale theconstructionofthe variouscomponents,reinforcements,and allotherpertinent dataand informationasrequired forconstruction.Anyvariationfromthe drawingsmust be clearlynoted as avariationfrom the requirements. Fabricationofmillworkshallnot proceed untilshopdrawingshave been reviewed bythe Architect.

    2. The contractorshall submit aminimumofthree (3)12" x 12" samplesofall millwork finishes(including stone and metal)forapproval.The Architect shallretaintwo (2)samplesoffinishes forrecord and returna minimumofone sample to Contractor.In circumstancesasappropriate,size ofsamplesmay be reduced ifrequested inwriting byContractorand approved byArchitect priorto submission.Finishing ofmillworkshallnot proceed untilsampleshave been reviewed.

    3. The Contractorshallprovide the Architect withanticipated deliverydate for allmillwork. The Contractorshallcontinue to monitorinwriting the anticipated deliverydatesuntilall finishmaterialshave been received.

    B. VerificationofExisting Conditions:

    1. Before proceeding withthe millwork,the Contractoris to obtainfield measurements,verifydimensions,and provide shopdrawings anddetailsto ensure anaccurate fit. Anyvariance found inthe field must be brought to the attentionofthe Architect priorto fabrication.It isthe responsibilityof the Contractorto coordinate withthe millworksubcontractoranyrevisions orclarificationsissued bythe Architect.

    2. The Contractorshallprovide field layout ofall workand report anydiscrepanciesto the Architect.

    C. Executionofthe Work:

    1. The method ofmanufacturing,fabricating and installing millworkand equipment and itsstructuralcomponentsdefined in the Contract

    Documentsisrepresentative and indicatesdesignintent only. Ifthe materials,detailsordimensionalpropertiesare at variance withtheContractor'sormanufacturer'srecommendations,alternate detailswillbe considered forreviewwhen shopdrawingsare submitted inaccordance withthe Contract Documents. It shallbe the responsibilityof the Contractorto guarantee that the millworkand equipmentwillhave propersupport, stability,and fault-free performance.All workshallconform to ArchitecturalWoodwork Institute (AWI)standardsforpremiumconstruction.

    2. It isthe intent ofthe Architect that the hardware represent the highest qualityand lasting durabilityforits specificfunction. If,in theopinionofthe Contractor,the hardware indicated onthe drawingsdoes not represent the above-stated intent,the Contractorshallnotifythe Architect inwriting withstated reasonsand proposed substitutions.

    3. Millwork indicated to have transparent finishesshall be constructed according to AWIstandardsforpremiumgrade construction.

  • 8/14/2019 Attach J.2 Anacostia

    4/21

    CB

    DT

    ISSUED

    FOR

    PN

    DB

    1010w

    iscons

    inavenue,

    nw

    suite

    405

    was

    hing

    ton,

    dc

    20007

    T

    202

    .466

    .6116

    F

    202

    .466

    .6235

    E

    [email protected]

    om

    coregroup,pc2006

    PERMITSET

    ICERTIFY THATTHESE DOCUMENTS

    WERE PREPARED OR APPROVED BYME,

    AND THATIAMADULYLICENSED

    ARCHITECTUNDER THE LAWS OF

    THE DISTRICTOFCOLUMBIA

    06015

    .00

    6/15/06

    A0.3Specifications

    FileName:"PROJECTS:06004DCLib-4200Wisconsin:06004DCPLdwgs:3sheetlayouts(.lbks):06004ModularCD.lbk:06004ModularCD.lbk"

    Layout:A0.3Specifications

    PrintedDate:6/15/06at12:54PM

    1801GoodHopeRoadSE

    Washington,DC,20020

    DCP

    ublicLibrary-Anacostia

    4. Metalrunnersshallcorrespond insize and gauge to metalstuds. Metalrunnersshallbe continuousand attachment shallbe at 24" oncenterunlessnoted otherwise.

    5. Metalfurring shallbe spaced at 24" oncenterunless noted otherwise.C. Fire Rated GypsumBoard Partitions

    1. Fire rated partitionsshallconformto ULdesign numberindicated. Referto ULFire Resistance Directory- Volume I(latest edition)foradditionalinformation.

    2. AllMechanical,Electrical,and Plumbing penetrationsinfire rated partitionsshallbe sealed at their perimeterwithapproved fire ratedsealer.

    D. Sound Rated Partitions1. Sound rated partitionsshallconform to ASTME497,Standard Practice for Installing Sound-Isolating Lightweight Partitions.2. AllMechanical,Electrical,and Plumbing penetrationsinsound rated partitionsshallbe sealed at their perimeterwithapproved

    acousticalsealer.

    E. GypsumBoard FinishNotes1. Gypsumboard shallbe installed and finished to within1/4" of floorslab.2. AllGypsumboard paneljoints,joints to existing construction,edge trim,cornerbeads,and pre-formed revealsshall be tapped,bedded

    injoint compound,and sanded smoothwithno visible joints. Provide properbacking forallrevealsas recommended bymanufacturer.

    3. Outside cornersof gypsumboard shallhave metalcornerbeads (screwed type),unless noted otherwise.4. Metaledge trimshallmatch USG #200Bseriesand shallbe insizes corresponding to gypsumboard thickness.5. Alignment ofdoorheadsand other criticalhorizontalelementsshallbe maintained at aconstant levelrelative to the ceiling plane,and

    shallnot followvariationsin floorplane.

    6. Partitiontypesabove doorare to be same asthe adjacent partitionsunlessnoted otherwise.7. Alignface ofpartitionswithface of adjacent columnunless noted otherwise.8. Provide additionalstudsas required to achieve outlet groupings.Coordinate withengineering drawings.

    F. Blocking1. Wood blocking shallbe fire retardant treated (FRT). Installwood blocking asrequired inpartitionsat wall hung shelving,cabinets,

    artwork,toilet partitionsand accessories,etc.Verifyblocking requirementswithmillwork subcontractorand reviewwith the Architect foracceptance priorto installation.

    09300 TILEA. Submittals

    1. Tile samplesindicating allsizes,shapes,and colors.2. Grout color

    B. Installationmethod1. Floorsurfaces: Tile CouncilofAmericainstallation# F113-96,dry-set mortaror latex-Portland cement mortar.2. Verticalsurfaces:Tile CouncilofAmericainstallation# W242-96,thinset organicadhesive.

    C. Prepare the existing base building slabpriorto installationoftile. Allsurfacesshall be sealed,sized orproperlyprepared permanufacturer'sspecificationsand recommendations. The Contractorshallflashpatch alluneven floorslabsurfaces inorderto provide aflat, smoothandcontinuousfloorsurface.

    D. Installwhite marble threshold at doorsthat define transitionsbetween ceramictile and otherfloorfinishes. Threshold shallbe shaped tomeet ADArequirements.

    09510 ACOUSTICALCEILINGSA. Submittals

    1. Submit aminimumofthree samplesof the following:a. Acousticalceiling panels:6" x 6" minimumb. Suspensionsystemcomponents: 12" inlength

    B. QualityAssurance1. To the greatest extent possible,materials,including exposed wallmoldings,suspensionssystems,and accessories, shallbe productsof

    asingle manufactureroritemsstandard withmanufacturerofacousticalceiling panelunits.

    C. Materials1. Suspensionsystem: ASTMC635

    a. Grid Components:i.) Exposed Tee:Die cut and interlockingii.) WallMoldings: Hemmed angleiii.) Face dimension: 15/16"iv.) Finish: Baked polyesterpaintv.) Color:

    1.) White at locationswithacousticalceiling panels2.) Blackat locationswithopen grid

    b. Acceptable Products:i.) Armstrong -Prelude XLExposed Tee Systemii.) USG Interiors-DX Grid System

    2. AcousticalCeiling Panels: ASTME1264a. Size: 24" x24"b. Thickness: 3/4c. Edge: Beveled tegularlay-ind. Color:Whitee. Acceptable Products:

    i.) Armstrong -Angled TegularCirrusii.) USG Interiors- Eclipse Tapered

    D. Installation1. Grid System:

    a. Installgrid systemincompliance withASTMC636,manufacturer'sinstructions,and assupplemented inthis section.b. Installgrid systemina true,evenplane and instraight coursesasindicated onDrawingsand accepted shopdrawings.c. Coordinate and fit ceiling componentsto grilles,lighting fixtures,and other related items.In determining locationand spacing of

    hangersand primaryrunners,take into considerationweight ofgrilles,light fixtures, etc.,that are to be installed inconjunctionwithacousticalceilings.

    d. Provide stabilizerbars, clips,splices,and edge moldingsneeded fora complete installation.e. Hang grid systemindependent ofwalls,columns,ducts,pipes and conduit.Where carrying membersare spliced,avoid visible

    displacement offace plane of adjacent members.f. Where ductsor otherequipment prevent regularspacing ofhangers, reinforce nearest affected hangersand related carrying

    channelsto spanextradistance.g. Do not support componentsonmain runnersorcross runnersifweight causestotal dead load to exceed maximumdeflection

    limitations.Support fixture loadsby supplementaryhangers located within6" (150 mm)of eachcorner;or support componentsindependently.

    h. Do not eccentricallyload system,or produce rotationof runners.2. Moldingsand Trim

    a. Installwallmoldingsat intersectionof suspended ceiling and verticalsurfaces,using longest practicallengths. Provide moldingsatjunctionswithotherinterruptionsand asneeded to coveredgesof acousticalceiling panels.

    b. Attachmoldingsand trimswithscrews spaced not more than16" (400 mm)oncenter and within3" (75 mm)ofends ofeach piecebeing installed.

    c. Moldingsand trimshallbe levelwithsuspensionsystem and withintolerancesspecified forsuspensionsystem.d. Mitercornersand alignbutt jointswhere wallmoldings intersect to formtight,hairline joints.e. Face riveting ofmoldingsand trimshall not be acceptable.

    3. Tolerancesa. Deflectionofgrid componentsshallnot exceed 1/360 ofspan.b. VariationfromFlat and LevelSurface:1/8" (3 mm) in10 feet (3000 mm)maximum.c. VariationfromPlumbof Grid Members:2 degreesmaximum;caused byeccentricloads.

    E. Adjusting and Cleaning1.

    Followgrid systemmanufacturer'srecommendationsformethodsand materialsto clean and touch-upexposed components.

    2. Replace componentswhichare discolored ordamaged inanyway,in amanner whichresultsin grid systemshowing no evidence ofreplacement work.

    09650 RESILIENTFLOORINGA. Submittals:

    1. Vinylcompositiontile sample.2. Black resilient transition/reducerstrip(provided at changesin flooring).3. Vinylcove and straight base.

    B. Prepare the existing,base building slabprior to installationof the scheduled flooring.All surfacesshallbe sealed,sized or properlypreparedpermanufacturer'sspecificationsand recommendations. The Contractorshallflash patchalluneven floorslab surfacesinorder to provide aflat,smoothand continuousfloorsurface.

    C. VCTshallbe laid instraight grid (not basket weave)direction.Refer to drawingsforcolorpatternsand direction.D. 2 1/2" cove base shallbe used at allVCTlocations. 2 1/2" straight base shallbe used at carpet locationsunlessnoted otherwise. The

    Contractorshalluse inside and outside cornersand end stopsfor allareasspecified. Use rollgoodsonly. No seamshalloccurwithin 6" ofanoutside corner.

    E. Installblack resilient transition/reducerstripbetweenVCTand other floorfinishes.09680 CARPETA. Submittals

    1. ShopDrawings:a. Clearlyindicate locationsof seams,methodsof joining seams,directionof carpet,type ofadhesive to be used,method of

    integrating resilient trimwithcarpet,and installationprocedures.

    2. Samples:a Submit aminimumofthree samplesof eachcarpet to be used,sufficientlysized to clearlyindicate construction,but not lessthan

    12" x 12".b. Submit samples,12" long,ofmoldingsand trims.

    B. Project Conditions1. Field measurements:

    a. Verifydimensionsinfield that mayaffect installation. Installershallbe responsible foraccuracyof measurementsof totalyardage,individualflooryardage requirements,dye lot yardage placement,extrayardage forpatternmatching,and roll lengthrequirements.

    2. Surface Preparation:a. Cleanfloorsof dust,dirt,solvents,oil, grease,paint,plaster,and othersubstanceswhichcould be detrimentalto proper

    performance ofadhesive and carpet. Allowfloorsto thoroughlydry.b. Remove sub-floorridgesand bumps. Filllowspots, cracks,joints,holes,and otherdefects,using subfloorfillercompatible with

    carpet and adhesives.c. Use anapproved cementitiousfillerto patchcracks, smallholes,and for leveling.Do not use gypsum-based leveling and patching

    materials.

    C. Installation1. GeneralRequirements:

    a. Check matching ofcarpet before installing and ensure there is no visible variationbetweendye lots.b. Do not place heavyobjects suchas furniture oncarpeted surfacesfora minimumof24 hoursor untiladhesive hasset.c. Entire carpet installationis to be laid tight and flat to subfloor,wellfastened at edges,and present auniformpleasing appearance.

    Ensure amonolithiccolor,patternand texture matchwithinarea.

    2. Layout:a. Laycarpet onfloors withpile insame directionofanticipated traffic. Do not change runofpile inone room.b. Fit carpet neatlyand snuglyaround projectionsthroughfloorand to wallsand othervertical surfaceswithno gaps.

    3. TransitionalMoldingsand Trim:a. Installresilient trimwhere carpet terminatesat otherfloorcoverings,or at carpet terminationthat doesnot abut a verticalsurface.

    Use fulllengthpieces only. Butt tight to verticalsurfaces. Where splicing cannot be avoided,butt endstight and flush.

    D. Protection1. Ifneeded to protect finished installationfromdirt or paint,orif additionalwork isto be done afterinstallation,cover carpet withanon-

    staining building materialpaper. Plasticsheeting shallnot be used over carpet installation.

    2. Protect installationfromrolling trafficby using sheetsofhardboard orplywood in affected areas.3. Trafficoveradhesive applicationsshallbe restricted foraminimumof 24 to 48 hoursto allowproper adhesive cure.4. Temperature ofcarpeted areasshallnot fallbelow 50 degreesF,regardlessof age ofinstallation.

    09900 PAINTINGA. Submittals

    1. Provide aminimumof three 12x 12samplesfor eachcolor and eachfinish indicated inthe finishschedule.B. Products

    1. See finishschedule formanufacturers,colorsand finishes.C. Execution

    1. General:a. Priorto paint application,the Contractorshallschedule areview offinal paint colorlocationswiththe Architect inthe field.b. See finishplanand interiorelevationsforspecificlocations ofpaint colorsand finishes.c. Where paintsof two different typesorcolorsabut, the seamshallbe onan inside corneronly.d. Finalcoat ofpaint shallbe rollapplied at allGWBsurfaces.

    2. Preparation:a. Remove blistered,peeling and scaling paint orchalk depositsto sound substrates.b. Completelyremove sealantsorcaulking.c. Dullglossysurfaces.d. At metalsurfaces,remove rust,oil,grease and othercontaminantsharmfulto painting. Sand cleanand spot prime.e. At GWBsurfaces;repairsurface defectswithjoint compound,fill flushand sand smooth.Clean surfacesofdust, grease and dirt.f. At wood surfaces;sand smoothand remove dust. Countersink nailsand fillnailholes, cracksand openjointswith puttyorwood

    filler.

    3. Application(unlessnoted otherwise):a. At GWBsurfaces:One (1)primercoat: Vinylacrylicprimersealer.Two (2)finishcoats: Vinylacryliclatex; eggshellfinish@ walls,flat @ceilings.b. At interiorwood surfacesto be painted:One (1)primercoat: Alkyd enamelunderbody.Two (2)finishcoats: Vinylacryliclatex semi-glossenamel.c. At interiormetalsurfacesto be painted:One (1)primercoat: Rust-inhibiting alkyd primer.Two (2)finishcoats: Alkyd glossenamel.

    4. Clean-up:a. The Contractorshallprovide one finaltouch-upof paint surfacesafterthe Ownerhas moved into the space.

    DIVISION 12 - FURNISHINGS

    12490 -WINDOWSHADES

    SUBMITTALS

    A. Product Data:1. Submit manufacturer'sliterature describing productsto be provided.

    B. Samples:1. Submit minimumof3 samplesof eachshade fabric. Sample Size: 6" x 6"

    MANUALCHAIN SHADESA. Acceptable Manufacturers:

    1. Direct PathCorp.-Nysan Shading Systems2. MechoShade SystemsInc.

    B. ManualChainOperator: Unitized premoulded construction1. Mounting Brackets: Lshaped steel

    a. Size: 2 7/8" x 3"2. Drive Chain:#10 stainlesssteel

    a. Strength:90 lbs.testC. Shade Tube Assembly:Extruded aluminumtube

    1. Size: 1 3/8" diameter2. Finish:Anodized; clear

    D. AluminumFascia: Extruded aluminum;6063-T5 alloy1. Size: 3" x 2" nominal2. Thickness:1/16"3. Finish: Matchadjacent windowframing

    F. Shade Fabric:PVC coated fiberglassfabric1. Selections:Refer to Schedule ofFinishes2. Fire Performance Characteristics:NFPA701; pass

    D. ManualChainOperator:1. Unitized premoulded construction,shipped completelyassembled fromfactoryrequiring only afew on-site adjustmentsto install.2. Chainoperatorassemblyshall be set fortravellength ofshade, on-site without disassemblyofhardware.3. Drive chainshallbe #10 stainlesssteel,strengthfor 41 kg (90 lb.)test; Manufactured withprecise automaticbraking system,to

    eliminate breakage ofchainunder normalusage.

    4. Shade shallnot be operable bypulling hembardownward.

    FABRICATION

    A. GeneralRequirements:1. Shading systemcomponentsshallbe manufactured and assembled to allowforcustom installationtechniquesto suit Project conditions.2. Finished assembliesshall be,square,true to size and free fromdistortion,twist,orother defectsthat could effect theirstrength,

    operationorappearance.

    3. Fabricshallbe colorfast ,and retainits shape,and shallnot be affected bymoisture orheat.Cut fabricto eliminate glare andreverberationfromshining surfacesmaintaining exteriorview.Top offabricshall be retained inrecessed spline ofshade roller;bottomoffabricshall be retained inextruded hembar.

    4. Fastenersshallbe non-corrosive type,suitable forintended application.B. AluminumFascia:

    1. Fasciasshallbe customdesigned closuresto fit onto premoulded end mounting bracketswithout exposed fasteners.D. Shade Fabric:

    1. Topoffabric shallbe retained inrecessed spline ofshade roller;bottomof fabricshallbe retained inextruded hembar,without exposedfasteners.

    E. HemBar:1. Barshall be shaped steelprofile,engineered to weight requirements,insert inwelded hembarpocket and closed ends,to maintain

    bottomofshade fabric straight and flat.

    INSTALLATION

    A. Generalrequirements:1. Make accurate measurementsofsite conditions before fabrication. Check layout ofglazing framing sections,spans,and loading

    capabilities.

    2. Shadesshallbe installbymanufacturers' skilled installersinstrict compliance withmanufacturers' recommendations.3. Shadesshallbe installed plumb,square,and rigidlycoupled,adequatelyanchored. Maintainuniform clearances,accurate alignment

    levelsand parallelinstallationwith windowplane.

    4. Installtube withshade fabricalready attached.Shade fabric shallbe pre-measured and manufactured off-site.5. Adjust shadesand operating componentsas needed to ensure smoothand trouble free operationwithout binding. Fabricshallhang flat

    without buckling ordistortion. Replace unitsorcomponentswhich cannot be adjusted to hang properlyoroperate smoothly.

    DIVISION 15 - MECHANICAL

    A. G.C.to provide mechanicalplanshowing alldiffusersand duct layouts.Where ceiling isopenand return airduct isrequired undercut doorsinroomswith finished ceilings.Exhaust allbathroomsto exterior.

    DIVISION 16 ELECTRICAL

    (Note:Refer to engineering drawingsfor complete electricalspecifications.)

    16050 BASIC MATERIALSA. Electricalreceptaclesshallbe DecorabyLeviton (800-323-8920). Colorshallbe black except forreceptacleson dedicated circuitswhich

    shallbe grayand isolated ground receptacleswhichshall be orange.Receptacle faceplatesshall be stainlesssteel witha satinor brushedfinish.

    B. Switchesshallbe Decoraby Leviton(800-323-8920).Color shallbe black.Switchfaceplatesshall be stainlesssteelwitha satinorbrushedfinish.

    C. Dimmersshallbe DecorabyLeviton(800-323-8920)or visuallymatchDecora style. Dimmersshallbe compatible withlight fixturesandballasts.Colorshallbe black.Faceplates shallbe stainlesssteel witha satinorbrushed finishwhere possible -faceplatesshall matchdimmerat otherlocations.

  • 8/14/2019 Attach J.2 Anacostia

    5/21

    CB

    DT

    ISSUED

    FOR

    PN

    DB

    1010w

    iscons

    inavenue,

    nw

    suite

    405

    was

    hing

    ton,

    dc

    20007

    T

    202

    .466

    .6116

    F

    202

    .466

    .6235

    E

    [email protected]

    om

    coregroup,pc2006

    PERMITSET

    ICERTIFY THATTHESE DOCUMENTS

    WERE PREPARED OR APPROVED BYME,

    AND THATIAMADULYLICENSED

    ARCHITECTUNDER THE LAWS OF

    THE DISTRICTOFCOLUMBIA

    06015

    .00

    6/15/06

    A0.4ProjectInfo,

    DrawingIndex

    FileName:"PROJECTS:06004DCLib-4200Wisconsin:06004DCPLdwg

    s:3sheetlayouts(.lbks):06004ModularCD.lbk:06004ModularCD.lbk"

    Layout:A0.4ProjectInfo,DrawingIndex

    PrintedDate:6/15/06at12:54PM

    1801GoodHopeRoadSE

    Washington,DC,20020

    DCP

    ublicLibrary-Anacostia

    SYMBOL LEGEND

    DRAWING INDEX

    VICINITY MAPABBREVIATIONSJA N J ani tor

    JST Joist

    JT Joint

    KIT Kitchen

    LAV L ava to ry

    LEV Level

    LH Left Hand

    LT Light

    LTG L igh ti ng

    MAS M as on ry

    M AT L M at er ia l

    MAX M ax imu m

    MDO MediumDens ityOver lay

    M EC H M ec ha ni ca l

    M EM B M em br an e

    M EZ Z M ez za ni ne

    MFR Manu fac ture r( 's)

    MI N M ini mu m

    M IS C M is ce ll an eo us

    M LD G M ol di ng

    M O M as on ry O pe ni ng

    MTL Metal

    MTD M ou nt ed

    MTG M ou nt in g

    M W M ic ro wa ve O ve n

    N North

    N IC N ot i n C on tr ac t

    NO Number

    # Number

    N TS N ot t o S ca le

    OA Overall

    O D O ut si de D ia me te r

    OC On Center

    OFF Office

    O PN G O pe ni ng

    OPP O pp os it e

    P Pole

    P AR T P ar ti ti on

    C S C as t S ton e

    C SK C ou nt er si nk

    C T C er am ic Til e

    CTR Center

    C TR D C en te re d

    C W C ol d Wat er

    1X One- inchnominal th ickness

    2X Two- inchnomina l th ickness

    @ At

    ABV Above

    A C A ir C o nd it io ni ng

    ACOUS Acoustical

    ACT AcousticalCe i ling T i le

    ADJ Ad jacent ,Ad jus tab le

    A FF A bo ve F in is h F lo or

    A LT A lt er na te

    A LU M A lu mi nu m

    A NC H A nc ho r

    A NO D A no di ze d

    APPROX Approximate

    A SS Y A ss em bl y

    AV G Av er age

    BD Board (o rBead, i fapp l icable )

    B TW N B et we en

    B LD G B ui ld in g

    B LK G B lo ck in g

    BLT Bolt

    BM Beam

    BOT Bottom

    B RG B ea ri ng

    BRK Brick

    B SM T B as em en t

    BYD Beyond

    C AB C ab ine t

    CEM Cement

    C ER C er am ic

    C J C on tr ol J oi nt

    CLO Closet

    CLAD 'G C ladd ing

    C LG C ei li ng

    CLR Clear

    CMU Concrete MasonryUn i t

    COL Column

    C ON C C on cr et e

    CONST Const ruc tion

    C ON T C on ti nu ou s

    CONT'R Cont rac tor

    CPR Copper

    CPT Carpet

    C OR R C or ri do r

    DBL Double

    DEMO Demol ish ,Demoli t ion

    DET Detail

    D F D ri nk in g F ou nt ai n

    D G D ou bl e G la ze d

    D IA D ia me ter

    D IM D im en si on

    DN Down

    D S D ow ns po ut

    D W D is hwa he r

    D WG D ra wi ng

    E East

    EA Each

    E J E xp an si on J oi nt

    E LE C E le ct ri c( al )

    E LE V E le va ti on

    E ME R E me rg en cy

    E P E ne rg yP an el

    EQ Equal

    E QU IP E qu ip me nt

    ETR Ex is t ing to Remain

    EWC E lec t ricWaterCoo ler

    E XI ST E xi st in g

    E XH E xh au st

    E XP E xp an si on , Ex po se d

    E XT E xt eri or

    FA F ir e Al ar m

    F BO F ur ni sh ed b y O wn er

    F D F lo or Dra in

    F DT N F ou nd at io n

    FE F i re Ex tingu isherCab ine t

    F F F in ish Fl oor

    P ER IM P er im et er

    PG

    FGLAS F iberglass

    FIN Finish

    FIX Fixture

    F LA SH F la sh in g

    FLR Floor

    FLUOR F luorescent

    F OM F ac e o f M as on ry

    FOS Face o fS t ruc tu re(o rFace o fS tud ,

    where applicable)

    FRT

    F RM G F ra mi ng

    FT Feet

    F TG F oo tin g

    F UR N F ur ni tu re

    F UR R F ur ri ng

    GA Gauge

    G AL V G al va ni ze d

    GB Grab Bar

    G C G en er al C on tr ac to r

    GFI G round Faul t In te r rup te r

    GL Glass

    G WB G yp su m Wa ll B o ar d

    GYP Gypsum

    HB Hose Bib

    H C H ol low Co re

    HD Head

    H DB D H ar db oa rd

    HDR Header

    H DW R H ar dw ar e

    H DW D H ar dw oo d

    H OR IZ H or iz on ta l

    HT Height

    HTR Heater

    HVAC Heating/Ventilation/Air-Conditioning

    H W H ot Wa ter

    I G I so la te d G ro un d

    IN Inch

    I NC L I nc lu de (d )

    I NS UL I ns ul at io n

    I NT I nte rio r

    Paint Grade

    PL Plate

    PLAM P las t icLaminate

    P LA S P la st er

    P LE X P le xi gl as s

    P LM B P lu mb in g

    P LY WD P ly wo od

    P MV T P av em en t

    P OL Y P ol ye th yl en e

    T BS T o B e S pe ci fie d

    T EL Te le ph on e

    T EM P T em pe ra tu re

    THK Thick

    TLT Toilet

    T O_ To p of ( -- -- )

    T RT D T re at ed

    TYP Ty pi cal

    UL Underwr i te rsLabora tor ies , Inc.

    UNO Un lessNoted Otherwise

    UON Un lessOtherw ise Noted

    UTI L U til it y

    V Volt

    V B V ap or B ar ri er

    VCT V iny lComposi t ionT ile

    VENT Vent i la te( -or )

    V IF V er if y in F ie ld

    W West

    W C W at er C lo se t

    WD Wood

    WDW Wi ndo w

    WF W id e F lan ge

    W H W at er H ea te r

    W P W at er pr oo fin g

    W S W ea th er S t ri pp in g

    W/ With

    W/ O W it hou t

    WT Weight

    WWM Welded Wire Mesh

    PR Pair

    PSF Pound PerSquare Foot

    P SI P ou nd P er S qu ar e I nc h

    P T P re ss ur e T re at ed

    PTD P ai nt ed

    PVC Po lyv iny lChlo ride

    QT Q ua rry Ti le

    QTY Q ua nt it y

    R R is er (s ); Ra di us

    R O R ou gh O pe ni ng

    R= Radius

    RAD Radius

    RDG Removab le Doub le G laz ing

    RECPT Receptac le

    R EF R efi ge ra to r

    REG R eg ist er

    REINF Re in forc ing

    REPL Replace(ment)

    REQ;REQ'D Required

    R ES IL R es il ie nt

    REV R ev isi on

    RM Room

    S S he lf ;S he lv es

    S 4S S ur fa ce F ou r Si de s

    SC S ol id C or e

    SCHED Schedule (d)

    SDG Siding

    S EC T S ec ti on

    S G S in gl e G la ze d

    SHT Sheet

    S HT G S he at hi ng

    SI M S imi lar

    SM

    S PE C S pe ci fic at io n

    SQ Square

    S .STL S tain lessS tee l

    ST Street

    STD S tan da rd

    STL Steel

    S TO R S to ra ge

    S TR UC S tr uc tu re

    S UB FL S ub flo or

    S UR F S ur fa ce

    S US P S us pe nd

    T Tread(s)

    T&G Tongue and Groove

    Fire Retardant Treated

    SmoothLumberMolding Desig.

    1

    12

    2

    A2.0

    3

    4

    A2.1

    Hardware set

    1

    A

    A2.0

    Doortype

    Equipment Designation

    Sheet Number

    ElevationNumber

    Sheet Number

    Interior Elevation-Plan

    ElevationNumber

    Exterior BuildingElevation

    Metal(See materialdesignation &schedule fortype)

    Earth

    Concrete

    Gravel

    Brick

    Concrete MasonryUnit

    Cut Stone

    Glass

    GWB(Large scale)

    MediumDenistyOverlay (MDO)Board/Oriented Strand Board (OSB)

    1

    2

    Partitiontype

    2

    A2.0

    2

    SectionNumber

    Sheet Number

    BuildingSection

    A0.3

    Office001

    RoomName

    RoomNumber

    DetailNumber

    Detail-Section

    Sheet Number

    Sheet Number

    Detail-Plan

    DetailNumber

    1 W in do w De si gn at io n

    1

    Sheet orWork Note

    CL Centerline

    Alignment withEstablished Element

    +32.16' Elevationabove grade BuildingSectionor Building Elevation

    Elevationabove finished floorPlans

    8'-6"

    RevisionCloud and Marker

    1

    Existing to remain

    Existing relocatedR

    E

    Carpet

    Insulation(Loose orBatt)

    Wood Finished

    Insulation(Rigid)

    Plywood

    Lay-inCeiling Tile (AcouticalPanels)

    Wood Blocking/Shim

    Wood Blocking Continuous

    RL R idg e L ine

    VL Val ley Li ne

    PROJECT INFORMATION

    EGRESS DIAGRAM

    Actual

    Capacity

    xx

    xxEGRESS LEGEND

    ARCHITECTURAL

    MECHANICAL / ELECTRICAL

    A0.1 SPECIFICATIONS

    A0.2 SPECIFICATIONS

    A0.3 SPECIFICATIONS

    A0.4 PROJECT INFO, DRAWING INDEX

    A0.5 DOOR TYPES / HARDWARE SCHEDULE

    A0.6 PARTITION TYPES

    A1.1 CONSTRUCTION PLAN

    A1.2 FIXTURE / MILLWORK PLAN

    A1.3 REFLECTED CEILING PLAN

    A1.4 FINISH PLAN

    A2.1 ELEVATIONS

    A2.2 ELEVATIONS

    A4.1 DETAILS

    A4.2 DETAILS

    A4.3 DETAILS

    P100 PLUMBING DATASHEET

    P200 PLUMBING FLOOR PLAN

    E100 ELECTRICALDATA SHEET

    E200 ELECTRICALPOWER PLAN

    E300 ELECTRICALLIGHTING PLAN

    ProjectName: DC PublicLibrary-1801GoodHopeRoadSE,20020

    ProjectNumber: 6015

    ProjectDescription:

    Governing Code: InternationalBuilding Code2000

    DC Construct ionCodeSupplement0f2003

    InternationalMechanical Code200 0

    InternationalPlumbing Code2000

    Internat ionalFireCode2000NFPANational electricalCode 1996

    InternationalEnergy ConservationCode 2000

    Internat ionalFuelCode2000

    Typeof Construction:

    UseGroup: AssemblyGroup MBusinessGroupB

    Building Stories: 1

    ProjectStories: 1

    Area: projectgrosssquarefeet : occupancy:Ground Floor Library (M): 3,828 64

    Ground Floor Office (B): 200 2

    Total Project Gross Area: 4,028 66

    occybysf

    AreaofWork:

    ExitsRequired: 2 stairway .2"

    e g re ss w id th r e qu ir ed : 1 3 .1 6

    egresswidth iscompliantExitsProvided: 2

    Sprinklered:

    FireAlarm:

    Accessibility: New layoutis accessiblewith handrailsand ADAcompliant fixtures

    Plumbing FixtureRequirement: 1 t o i le t f o r500oc c upan ts requi red requi redWC: requ i redLav :

    1/2 men = 0.07 0.04

    1/2 women = 0.07 0.04total : 0 0.1

    P rov i dedWC: P rov i dedLav:

    Ground Floor 2 2

    Serv iceSinkProv ided@ GroundFlr: 1New

    Drink ingFountain@GroundFlr: 1New

    New retailspace

    IIIB

    No

    No

    bathroomfixturesperf loor:

    33

    170

    33

    340

    1801 Good Hope Road SE

  • 8/14/2019 Attach J.2 Anacostia

    6/21

    CB

    DT

    ISSUED

    FOR

    PN

    DB

    1010w

    iscons

    inavenue,

    nw

    suite

    405

    was

    hing

    ton,

    dc

    20007

    T

    202

    .466

    .6116

    F

    202

    .466

    .6235

    E

    [email protected]

    om

    coregroup,pc2006

    PERMITSET

    ICERTIFY THATTHESE DOCUMENTS

    WERE PREPARED OR APPROVED BYME,

    AND THATIAMADULYLICENSED

    ARCHITECTUNDER THE LAWS OF

    THE DISTRICTOFCOLUMBIA

    06015

    .00

    6/15/06

    A0.5DoorTypes/HardwareSchedule

    FileName:"PROJECTS:06004DCLib-4200Wisconsin:06004DCPLdwg

    s:3sheetlayouts(.lbks):06004ModularCD.lbk:06004ModularCD.lbk"

    Layout:A0.5DoorTypes/HardwareSchedule

    PrintedDate:6/15/06at12:54PM

    1801GoodHopeRoadSE

    Washington,DC,20020

    DCP

    ublicLibrary-Anacostia

    E1Door TypeSCALE: 3/8'' = 1'-0''

    E2Frame TypeSCALE: 3/8'' = 1'-0''

    E3Glass Door TypeSCALE: 3/8'' = 1'-0''

    DOOR

    SIZE

    W D H GT

    MATL

    FRAME

    MATL

    DETAIL

    H EA D J AM B

    F I RE R A TI N G S E T N O N OT E S

    3'

    3'

    3'

    H 1/A0.4 J1/A0.4

    B

    DOOR AND FRAME SCHEDULE

    MARK

    D01

    D02

    TYPE

    TYPE

    E2

    E2

    E2

    metal

    metal

    metal

    metal

    metal

    metal

    metal

    7'

    7'

    7'

    7'

    E1

    E1

    E1

    6'E3

    D03

    H1 /A0.4 J1 /A0.4

    H1 /A0.4 J1 /A0.4

    H1 /A0.4 J1 /A0.4D04 metal/glass

    C

    A

    EE2

    SEE

    SCHEDULE

    SEE SCHEDULE

    2" 2"

    2"

    SEE SCHEDULE

    6"

    10"

    3' SEE SCHEDULE 3'

    SEE

    SCHEDULE

    2"

    2"

    2"

    2"

    2" 6" 6" 2"6" 6"

    6"

    ALLEGRESS DOORS SHALLBE OPERABLE IN THE DIRECTION OF TRAVELWITHOUTTHE USE OF A KEYOR SPECIALKNOWLEDGE.

    A B C HARDWARE ITEM DESCRIPTION

    LATCH/LOCK

    AND LEVER SET

    RESTROOM

    STOREROOM

    OFFICELOCKSET

    X

    HINGES

    DOOR STOP

    SILENCERS

    COATHOOK

    CLOSER

    KICK PLATE

    LEVER LOCKSET X X

    X X X

    X X X

    X X

    HOLD OPEN

    X X

    X

    X

    X

    SCHLAGE ALSERIES,CYLINDRICALLATCH AND LOCKSETS.OR APPROVED EQUALBYSEARGENT,OR BEST

    LOCK,OR YALE.

    IVES PLUNGER TYPE FS1153

    PASS

    AGESET

    X

    X

    X

    DOOR AND HARDWARE NOTES:

    SCHLAGE SATURN LEVER 626

    BOMMER #5000-5 KNUCKLE,FULLYMORTISED BUTTHINGE (QTY.3)

    OR EQUALBYHAGER.

    IVES #WS401CVX /WS402CVX GRAYRUBBER STOPPER

    IVES SR66OR EQUIVALENT

    IVES 405COMMERC IAL/PUBLIC GRADE ALUMCAST COAT/HATHOOK

    IVES 405

    24"HIGH METALFULLWIDTH OF DOOR

    D E

    HARDWARE SCHEDULE

    CRASH BAR

    CONTRACTOR TOCOORDINATE SECURITYREQUIREMENTS WITH OWNER.

    F

    X

    1.G.C.toprovidefullsubmittalpackageofallDoorsandHardwarepriortoproceedingwithwork.

    2.SeeArchitecturalPlansA1.1forsymbollocations.

    3.AllhardwarefinishestobeUS26D UON.

    4.G.C.tocoordinateandprovideallnecessarycut-outsindoorandmillworkframesforsecuritycabling,lockingdevices,and accessories. G.C.to coordinateworkbetween trades. Procuretemplate fromowners'securityvendorand coordinateas required.

    5.Allegressdoorsshallbeoperableinthedirectionoftravelwithouttheuseofakey orspecialknowledge.

    6.AllhardwarerequirementsindicatedinplansandspecificationsshallbecoordinatedwithOwnerforallitemspriorto placementof materialsorder.

    7.Alllockestobe Sergeantmaster-keyed;confirmwithOwner.

    8.Hardwarespecifiedforeachleafunlessotherwisenoted.

    9.Cleanandadjustexistinghardwaretoremain.

    REARENTRYSET

    FRONTENTRYSET

    X

    XX

    XX

    XX

    X

    GLASS FOR D04TO BE G1(1"INSULATED LOW-E GLASS)

  • 8/14/2019 Attach J.2 Anacostia

    7/21

    CB

    DT

    ISSUED

    FOR

    PN

    DB

    1010w

    iscons

    inavenue,

    nw

    suite

    405

    was

    hing

    ton,

    dc

    20007

    T

    202

    .466

    .6116

    F

    202

    .466

    .6235

    E

    [email protected]

    om

    coregroup,pc2006

    PERMITSET

    ICERTIFY THATTHESE DOCUMENTS

    WERE PREPARED OR APPROVED BYME,

    AND THATIAMADULYLICENSED

    ARCHITECTUNDER THE LAWS OF

    THE DISTRICTOFCOLUMBIA

    06015

    .00

    6/15/06

    A0.6PartitionTypes/Schedule

    FileName:"PROJECTS:06004DCLib-4200Wisconsin:06004DCPLdwgs:3sheetlayouts(.lbks):06004ModularCD.lbk:06004ModularCD.lbk"

    Layout:A0.6PartitionTypes

    /Schedule

    PrintedDate:6/15/06at12:54PM

    1801GoodHopeRoadSE

    Washington,DC,20020

    DCP

    ublicLibrary-Anacostia

    H1HM Door HeadSCALE: 3'' = 1'-0''

    J1HM Door JambSCALE: 3'' = 1'-0''

    001Partion TypeSCALE: 3'' = 1'-0''

    002Partion TypeSCALE: 3'' = 1'-0''

    3/4"

    1/4"

    1/2" 7/16"

    2"

    6"

    SCHED PARTITION

    HOLLOWMETALFRAME-GROUT SOLID ATRATED DOORS

    ADJACENTPARTITION(WHERE OCCURS)

    SCHED DOOR

    UNDERSIDE OFSTRUCTURE

    ACOUSTICALSEALANT

    TOPTRACK

    TOPOFFILLSLAB

    CONTMTLRUNNER ANCHOREDTOSLAB

    WALLBASE AS SCHEDULED

    FINISHED FLR'G

    ACCOUSTICALSEALANT

    SOUND ATTENUATION BLANKET(STC-50)

    1/2" GWB.,BOTH SIDES,TYP.

    PLAN

    BASE

    HEAD

    3 5/8" METALSTUD@16" O.C.

    CONTMTLRUNNER ANCHOREDTOSLAB

    FINISHED FLR'G

    WALLBASE AS SCHEDULED

    ACCOUSTICALSEALANT

    UNDERSIDE OFSTRUCTURE

    PLAN

    HEAD

    BASE

    1/2" GWB.

    NO.STUDSIZE G AU GE SPACING

    LIMITINGHEIGHTS

    PARTITIONWIDTH

    FIRERATING

    STCRATING REMARKS

    25 16"

    SOUNDBATTS

    STC-503" non rated

    NO.STUDSIZE G AU GE SPACING

    LIMITINGHEIGHTS

    PARTITIONWIDTH

    FIRERATING

    STCRATING REMARKS

    3 5/8" 25 16" 14'-4"

    SOUNDBATTS

    STC-503" non rated

    FACE OFEXISTING PARTITIONOR STRUCTURE

    1/2" SHIMSPACE

    4. REFER TOFINISH SCHEDULE FOR WALL, FLOOR,BASE AND CEILING FINISHES.

    7. ATPARTITIONS SCHEDULED TORECEIVE CERAMIC TILE FINISH,CONTRACTORSHALLPROVIDE ASSEMBLIES MEETING L/360 DEFLECTION CRITERIA.

    8. PARTITION TYPES ARE CONTINUOUS AROUND CORNERS AND ACROSS DOOR ANDWINDOWOPENINGS,UNLESS NOTED OTHERWISE.

    2. GYPSUMWALLBOARD SHALL BE TYPE "X" FIRE RATED ATFIRE RATED PARTITIONS

    5. FIRE RATED PARTITIONS SHALLCONFORMTO THE REQUIREMENTS OFTHEREFERENCED TESTING AGENCYDESIGN NUMBER.ASSEMBLIES CONFORMING TOEQUIVALENTREQUIREMENTS BY OTHER TESTING AGENCIES ARE ACCEPTABLE IFAPPROVED BYTHE LOCALCODE COMPLIANCE DEPARTMENT.

    6. LIMITING HEIGHTS FOR GYPSUMWALLBOARD PARTITIONS ARE BASED ON ALATERALLOAD OF 5 PSFAND ADEFLECTION CRITERIAOFL/240 FOR PRODUCTS OFTHENATIONALGYPSUMCOMPANY.CONTRACTOR SHALL VERIFYTHATAPPROVED PRODUCTSFROMOTHER MANUFACTURERS MEETL/240 DEFLECTION CRITERIA. IFREQUIRED TOMEETCRITERIA,STUD GAGE AND/OR SPACING SHALLBE DECREASED,OR BRACINGSHALLBE ADDED ABOVE THE CEILING.

    3. MOISTURE RESISTANTGYPSUMWALL BOARD SHALLBE USED ATALL PARTITIONSSCHEDULED TORECEIVE CERAMIC TILE.

    GENERAL NOTES

    1. ALLSTUDS SHALLBE 25 GAGE, 16" O.C.UNLESS NOTED OTHERWISE

    2 1/2"

    METALSTUD

    19'-9"25 16" STC-503" non rated6"001B

    001A

    25 16" 14'-4" STC-503" non rated

    002A

    002B 3 5/8"

    11' -3" 3 5 /8"

    4 7/8"

    4 7/8"

    7 1/8"

  • 8/14/2019 Attach J.2 Anacostia

    8/21

    CB

    DT

    ISSUED

    FOR

    PN

    DB

    1010w

    iscons

    inavenue,

    nw

    suite

    405

    was

    hing

    ton,

    dc

    20007

    T

    202

    .466

    .6116

    F

    202

    .466

    .6235

    E

    [email protected]

    om

    coregroup,pc2006

    PERMITSET

    ICERTIFY THATTHESE DOCUMENTS

    WERE PREPARED OR APPROVED BYME,

    AND THATIAMADULYLICENSED

    ARCHITECTUNDER THE LAWS OF

    THE DISTRICTOFCOLUMBIA

    06015

    .00

    6/15/06

    A1.1ConstructionPlan

    FileName:"PROJECTS:06004DCLib-4200Wisconsin:06004DCPLdwgs:3sheetlayouts(.lbks):06004ModularCD.lbk:06004ModularCD.lbk"

    Layout:A1.1ConstructionPlan

    PrintedDate:6/15/06at12:54PM

    1801GoodHopeRoadSE

    Washington,DC,20020

    DCP

    ublicLibrary-Anacostia

    01A

    01A

    02A

    01A

    D03

    1

    1

    2

    1

    D02 01B

    01A

    7

    01A

    0 1 A 0 1 A

    D05D02

    D01

    D01

    7

    3

    4

    5

    D04

    1

    02A

    6

    02A

    6

    1

    02B

    2

    2

    02B01A

    02A

    4

    02A

    01A

    02B

    01B

    5

    02A

    3

    2'-8"CLR

    12'-4"CLR

    EQ EQ

    5'CLR

    2'-9" 18'-4"CLR 2'-9"

    18'-6"CLR 2'-11"

    67'-4"CLR

    48'-4"CLR

    8'CLR

    7'-6"CLR

    3'CLR

    8'-6"CLR

    5'CLR

    1' 12'-4"CLR 3'

    15'-4"CLR

    1 '1 'PartitionType-RefertoSheetA0.4

    RAMPDN

    CONSTRUCTION LEGEND

    ExistingPerimeterWall

    New InteriorFull-HeightWall

    CONSTRUCTION GENERALNOTES

    New InteriorLow -HeightWall

    CONSTRUCTION WORK NOTES

    New Door

    DoorType-RefertoSheetA0.4

    PartitionType-RefertoSheetA0.4

    C

    ALIGN

    CL

    L

    A. RefertoA0.4forpartitiontypesanddetails.

    B. Alldimensionsshownarefromfinishedfacesofpartitions.

    C. Basebuildingpartitionsshouldbecleanandpreparedforproposedtenantconstructionperreview ofArchitectandG.C.Areasthatarescheduledoriginallyorcurrentlywithgyp.bd.shouldbepaintready.

    D. Alignmentofdoorheadsandothercriticalhorizontalelementsshallbemaintainedataconstantlevelrelativetotheceilingplane,andshallnotfollow variationsinthefloorplane.

    E. Allarchitectural,electrical,andnon-structuralsystems,componentsattachedtoexistingstructureshallcomplywithallapplicablecode.

    F. Dimensionsindicatedtobe"clear"or"hold"shallbemaintained. Anydiscrepanciesorvariationsinthesedimensionsshall bereviewed withthe Architectbefore beginningconstruction.

    G. Anydimensionnoted"VIF"mustbereviewedwiththeArchitectbeforebeginningconstruction.

    H. Provideandinstallfireretardantwoodblockinginpartitionsatwallhungshelving,cabinets,etc.Verifyshopstandard withmillworksubconstractor andreview withthe Architectfor acceptanceprior toinstallation. Coordinateblockingrequirements formillwork withplans anddetails.

    I. Providebracingtodeckaboveatdoorjambs,windows,andmillworkthatgoestoceiling.

    J. Provideadditionalstudsasrequiredtoachieveoutletgroupings. Coordinatewithengineeringdrawings.

    K. ContractortoexamineextentofexistingpartitionsandreportanydiscrepanciestoArchitectpriortothestartof construction.

    L Dashedlinesindicatelinesofceilingoverhead.

    M. Locatetypicaldooropening4"awayfromadjacentwallcorner. Keepminimum18"clearancefromlatchto

    wallonpullsideofalldoorsperADAguidelines.

    N. G.C.toreplaceanyremovedordamagedexistingfireproofingmaterialatdeck,beams,orexistingpartitions.

    O. Partitiontypesabovedooraretobe sameastheadjacentpartitionsunlessnotedotherwise.

    P. Coordinateallelevationsanddetailinformationwithplans.

    Q. Provideglavanizedmetalcornerbeadsand/ortrimforallexposedgypsumboardedgesandcorners,spackleandsandsmooth.

    MODULAR WINDOW CENTERED ON STANDARD MODULAR BAY.

    PAINTED PRESSURE TREATED WOOD LANDINGS,STAIRS,AND RAMPS. EXTENTBASED ON SITED CONDITIONS.DESIGN BY ARCHITECT.

    CHAINLINK FENCE WITH VINYL GRAPHIC BANNER.GRAPHIC TBD.

    PAINTED PRESSURE TREATED WOOD CANOPYDESIGN BYARCHIT ECTCOORDINATES WITH STAIR LANDINGAND RAMP.

    MODULAR HVAC UNIT

    DN

    DN

    SEE FIXTURE PLAN

    STRUCTURE ABOVE,TYP

    ALIGN

    SECURITYNIC -BYOWNER

  • 8/14/2019 Attach J.2 Anacostia

    9/21

  • 8/14/2019 Attach J.2 Anacostia

    10/21

    CB

    DT

    ISSUED

    FOR

    PN

    DB

    1010w

    iscons

    inavenue,

    nw

    suite

    405

    was

    hing

    ton,

    dc

    20007

    T

    202

    .466

    .6116

    F

    202

    .466

    .6235

    E

    [email protected]

    om

    coregroup,pc2006

    PERMITSET

    ICERTIFY THATTHESE DOCUMENTS

    WERE PREPARED OR APPROVED BYME,

    AND THATIAMADULYLICENSED

    ARCHITECTUNDER THE LAWS OF

    THE DISTRICTOFCOLUMBIA

    06015

    .00

    6/15/06

    A1.3ReflectedCeilingPlan

    FileName:"PROJECTS:06004DCLib-4200Wisconsin:06004DCPLdw

    gs:3sheetlayouts(.lbks):06004ModularCD.lbk:06004ModularCD.lbk"

    Layout:A1.3ReflectedCeilingPlan

    PrintedDate:6/15/06at12:54PM

    1801GoodHopeRoadSE

    Washington,DC,20020

    DCP

    ublicLibrary-Anacostia

    1

    +10'-0"AFF

    2

    +10'-0"AFF

    2

    +9'-3"AFF

    +9'-6"AFF

    +9'-9"AFF

    +9'-6"

    AFF

    +9'-3"AFF

    +9'-3"AFF

    +9'-3"AFF

    1

    +10'-0"AFF

    +10'-0"

    AFF

    +10'-0"

    AFF

    +10'-0"AFF

    +10'-0"AFF

    EXPOSED CEILING,TYP.NO EXPOSED INSULATION - TOBE COVER ED WITHPAINTED PLYWOOD.

    RCP GENERALNOTES

    Alllightingdimensionsarefromthecenterofthefixturestofinishfaceofpartitionsandfromcenterofthefixturestocenterofthefixtures.

    Ceilingdetailsareprovidedtoillustratedesignintent.Generalcontractortoadviseanyalternativeconstructiondetails whichmay expediteconstruction schedule,pending Architect'sapproval.

    TheGC shallberesponsibleforelectricalworktobe doneinstrictaccordancewithapplicablecodes,regulationsand requirementsfor thegoverning bodyhaving jurisdiction.

    Referto electricaldwgs forthe followinginformation: specification,powerrequirements, circuitry,switching,emergencylighting, location& typeof exitsign, strobe& pulls.

    Referto mechanicaldrawings forair diffusers,returns,and tranferducts.

    Anydiscrepancies withlight fixtures,switches, thermostats,diffusers asto locationbetweenArchitecturalandEngineeringdrawingsorbetweenthedrawingsandexistingfieldconditionsshallbeclarifiedwiththeArchitectbefore proceedingwithinstallation.

    Allmultipleswitchlocationsaretobegangedandinstalledwithasinglefaceplate. Coverplatesshallnotbecutandbuttedtogether.

    ThermostatsandstrobestobecenteredabovelightswitchUNO

    Allexposedceilingareatobecleanandpreparetobepainted.Removeprotrusionsandunidentifieddebrisasrequired.Existingdevicesthatcaneasilyberelocatedaretobe relocated.Abandoneddevicestoberemovedin exposedarea.

    Fixturesshown suspendedfrom structureare tobe supportedindependentlyfrom mechanicalor electricaldevices.

    A.

    B.

    C.

    D.

    E.

    F.

    G.

    H.

    I.

    J.

    K.

    New GWB Ceiling

    Existingceiling toremain.

    LIGHT FIXTURE LEGEND

    CeilingtiletobeACT-1perfinishschedule

    Patchexisting GWB Ceiling

    RCP LEGEND

    Itemsonfinishfloorbelow

    Suspendedandstained MDF

    L.

    LSISINGLE CIRCUITPENDANTMOUNTEDDIMMABLE TRACK (120V)FIELD CUTTOFIT SPECIFIED LENGTH

    LSISINGLE CIRCUITPENDANTMOUNTEDDIMMABLE TRACK (120V)12'LENGTH

    LSISINGLE CIRCUITPENDANTMOUNTEDDIMMABLE TRACK (120V)8'LENGTH

    A.4

    A.1

    A.2

    A.3

    LSISINGLE CIRCUITPENDANTMOUNTEDDIMMABLE TRACK (120V)4'LENGTH

    B

    E

    F

    G

    C

    D

    H ZUMTOBEL8'LINEAR PENDENT(4)54WT5HO3500KETHOS EE45458T305

    I ADACOMPLIENTWALLSCONCE (TBD)100WINCANDESCENT

    RCP WORK NOTES

    M.

    Paintall existingexposed ductworkand mechanicalP4

    A.3

    J

    H

    J J J

    H

    H

    G

    G

    A.3

    A.4

    A.3

    A.3

    A.3

    A.1

    A.3

    A.1

    A.2

    A.3 A.1

    A.3

    A.4

    A.4 A.4

    A.4

    A.1

    J

    A.3

    A.4

    A.4

    J J J

    B B BF

    F

    F

    K

    K

    K

    CeilingopentoexposedstructureUNO,paintP4

    LIGHTOLIER 2X4RECESSED FLUORESCENT(2)54WT5HO3500KQHE 2GPF OP254 120PI

    LSIWALLWASHERPAR38HALOGEN (250WMAX)120V DIMMABLE239-00S WLW/C995LSIACCENTLIGHTPAR38HALOGEN (250WMAX)120V DIMMABLE238-00S WLW/C998EPIDOWNLIGHT100W120VA19INCANDESCENTA19/4COLEPIWALLWASHER100W120VA19INCANDESCENT

    A19/4WW COLLIGHTOLIER VANITYLIGHT- WALLMOUNTED(2)T8 120V 3500KBCW6X48SW4S232HPFUNVHI

    LIGHTOLIER PENDANTCFLMULTITRIPLE TUBE4X 26/32/42W120VDIMMABLE

    4'UTILITYSTRIP FLUORESCENTSURFACE MOUNTW/LENS32WT8 120V 3500K

    A.2 A.2

    J J J

    A.2

    A.2

    J J

    A.1

    J J J

    A.1A.1

    A.4

    A.2

    A.2

    A.2

    TYPECB

    TYPECB

    TYPECB

    TYPECB

    TYPE

    CC

    H.1H.2H.3

    ARTEMIDE CASTORE (SUSPENDED FIXTURE)(VARIOUS DIAM)H.1=6", H.2=10",H.3= 14"DIMMABLE 100W INCANDESCENT

    SeeA4.1andA4.2forceilingtypedetailsandlightingfixtureassignmentsforceilingtypeCC.

    DEDUCT ALTERNATE 1:IF BOTTOMOF STRUCTURE 7'-10"AFF BOTTOM

    OF LIGHTINGFOR TYPES H.1-H.3TO BE 7'-0"AFF AND CEILINGPLANES

    FOR TYPE CC TOBE CONVERTED AS FOLLOWS:

    9'9"AFF TO7'9"AFF

    9'6"AFF TO7'8"AFF

    9'3"AFF TO7'7"AFF

    E 0a

  • 8/14/2019 Attach J.2 Anacostia

    11/21

    CB

    DT

    ISSUED

    FOR

    PN

    DB

    1010w

    iscons

    inavenue,

    nw

    suite

    405

    was

    hing

    ton,

    dc

    20007

    T

    202

    .466

    .6116

    F

    202

    .466

    .6235

    E

    [email protected]

    om

    coregroup,pc2006

    PERMITSET

    ICERTIFY THATTHESE DOCUMENTS

    WERE PREPARED OR APPROVED BYME,

    AND THATIAMADULYLICENSED

    ARCHITECTUNDER THE LAWS OF

    THE DISTRICTOFCOLUMBIA

    06015

    .00

    6/15/06

    A1.4FinishPlan

    FileName:"PROJECTS:06004DCLib-4200Wisconsin:06004DCPLdw

    gs:3sheetlayouts(.lbks):06004ModularCD.lbk:06004ModularCD.lbk"

    Layout:A1.4FinishPlan

    PrintedDate:6/15/06at12:55PM

    1801GoodHopeRoadSE

    Washington,DC,20020

    DCP

    ublicLibrary-Anacostia

    C1

    C2

    VCT1

    WD1

    WD2

    WD3

    PL1

    PL2

    PL3

    PL3

    GC1

    GC2

    T1

    T1

    VCT1

    P2

    P2

    C