27
City of Phoenix Aviation Department Project No. AV41000072-1 Design Services October 26, 2015 Pre-Submittal Meeting Phoenix Goodyear Airport Master Plan Update
Transcript
Page 1: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

City of Phoenix

Aviation Department

Project No. AV41000072-1

Design Services

October 26, 2015

Pre-Submittal Meeting

Phoenix Goodyear Airport Master Plan Update

Page 2: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

• Liz Blakley, Contract Specialist

Street Transportation Department

• Randy Payne, Project Manager

Planning and Environmental Division

• Joanne McLaughlin, Program Assistant

Equal Opportunity Department

• Valerie Churchwell, Small Business Engagement

Manager, Aviation Department

Welcome and Introductions

Page 3: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

Meeting Overview

� Sign-in please…copies of sign in sheet will be

available on website:

http://phoenix.gov/streets/procurement/current-opportunities

� Please hold questions until the Q&A period.

� This is the ONLY opportunity to discuss this

project with City staff.

Page 4: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

�Project Description

�Project Scope of Work

�DBE Participation

�SOQ Criteria

�Submittal Requirements

�Selection Schedule

�Questions?

Agenda

Page 5: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

A Mater Plan was prepared for Phoenix Goodyear Airport in

2007. Since that time, the City of Phoenix Aviation

Department has completed a number of projects at the

airport including a runway shift and other facility

improvements.

The Master Plan Study needs to be updated to reflect new

facilities, current projections of airport activity, new

environmental and other regulatory constraints, and to plan

for an appropriate mix of land uses to support projected

aviation and non-aviation needs and the long-term financial

health of the airport.

Project Description

Page 6: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

The Master Plan update will be prepared in accordance with

Federal Aviation Administration (FAA) Advisory Circular

150/5070-6B, Airport Master Plans, and other relevant FAA

Advisory Circulars and Orders, Federal Aviation

Regulations, Transportation Security Administration, and

other aviation industry publications. All tasks will meet the

current Advisory Circular at the time of scoping.

Project Scope of Work

Page 7: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

Project Scope of Work

Scope of services may include but are not limited to:

• Project Management.

• Develop an active and productive public involvement

program throughout the study process.

• Prepare an inventory of existing facilities, issues and

historical activity at the Airport, including identifying the

recently completed facilities since the last Master Plan.

• Develop forecasts of future aviation demand levels based

upon FAA Terminal Area Forecasts, and any forecast data

reports on file at the Airport.

Page 8: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

Project Scope of Work Continued

• Assess community land use goals and regional aviation

needs.

• Evaluate current land uses adjacent to GYR to prohibit

encroachment that could hinder future growth.

• Determine facility requirements of the airport through the

next 20 years, including the possibility of additional facilities

and/or expansion of existing facilities and land required in

accommodating projected activity.

• Evaluate facility layout for conformance with FAA Advisory

Circular 150/5300-13A, Airport Design

Page 9: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

Project Scope of Work Continued

• Develop ALP drawings that graphically depict existing

conditions at the Airport as well as proposed capital

improvements.

• Update the Capital Improvement Plan (CIP) that prioritizes

and stages proposed development over 5, 10, and 20 year

planning horizons to meet identified specific increases in

volume of activity or level of service and provide the business

case for these improvements.

• Develop an evaluation of possible sustainability initiatives that

if implemented may result in reduced energy consumption

and/or environmental impact from normal airport

development and operation.

Page 10: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

Project Scope of Work Continued

• Develop new safety critical data per section 4.1.3 Safety

Critical Data of FAA Advisory Circular 150/5300-18B, change

1. Obstacle and imagery collection must include GYR’s Part

77 obstruction identification surfaces and future precision

approach) per current master planning effort.

Page 11: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

• Community & Stakeholder Outreach / Involvement

• Approvable Forecast

• Realistic Development Goals

• Approvable Airport Layout Plan

• Approvable AGIS and Obstruction Data

• On Schedule, within Scope and Budget

• Excellent Graphics

Project Expectations

Page 12: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

12

QUESTIONS?

Page 13: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

.

The City of Phoenix strives to advance the economic

growth of local businesses through its Disadvantaged Business Enterprise (DBE) Program.

Through a coordinated effort among several city

departments, the DBE Program provides DBE

certification, procurement opportunities, construction

subcontracting utilization, small business management

and technical assistance and educational services and

networking opportunities.

The City encourages the participation of DBE firms

whenever possible, including the utilization of DBE sub

consultants in the design phase of this contract.

DBE Requirements

Page 14: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

� Project is in part funded by FAA and is subject to 49 CFR Part 26 and USDOT DBE Program.

� Attachment A - Statement of Outreach Commitment All Submitters must provide at the time of submittal.

� Attachment B - Documentation of Outreach Efforts Successful Submitter must providde within 30 days following the award of contract, along with the related supporting documentation.

� Attachment C – Small Business Utilization Commitment Successful Submitter must provide within 30 days following the award of contract.

DBE Requirements

Page 15: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

DBE Requirements

� Current focus is Small Business Outreach

� The FAA approved a triennial DBE goal of 7.42 percent for fiscal years 2013-16, to be achieved through fostering Small Business participation and outreach requirements.

� The City has not established a race- and gender-conscious DBE participation goal.

Page 16: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

DBE Requirements• To participate in this opportunity as a DBE,

only firms certified by the City or another AZUCP member in the specified scopes of work shall be considered in calculating DBE participation.

• All eligible DBEs can be found at:

www.phoenix.diversitycompliance.comor

www.adot.dbesystem.com

Page 17: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

QUESTIONS?

Page 18: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

For more information please contact:

Joanne McLaughlin,Equal Opportunity Programs Assistant

[email protected]

or

Diane Nydick,Equal Opportunity Compliance Specialist

[email protected]

Equal Opportunity Department

Page 19: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

The selection of the Design Professional will be based on

the following qualifications:

� General Information – 15 points

� Experience of the Prime Firm – 20 points

� Experience of Key Personnel and Subconsultants – 25

points

� Project Understanding and Approach – 30 points

� Overall Evaluation – 10 points

Statement of Qualifications

Page 20: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

� Each page side with criteria information will be counted.

� Pages that have photos, charts, and graphs will be

counted toward maximum number of pages.

� Front and back cover, Table of Contents and tab dividers

will NOT be counted toward the maximum page limit,

UNLESS they include information that may be

considered by the selection panel.

Statement of Qualifications, Cont.

Page 21: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

� Submit 8 copies of the SOQ

� SOQ due:

� 12:00 p.m. Noon – Arizona Local Time

� Friday, November 6, 2015

City Engineer

CITY OF PHOENIX

200 W. Washington Street, 6th Floor

Phoenix, AZ 85003

c/o Liz Blakley

Statement of Qualifications, Cont.

Page 22: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

� Grounds for Disqualification:

� Receipt of submittal after specified cut-off date and

time

� Too few copies of the submittal

� Deposit of submittal in the wrong location

Statement of Qualifications, Cont.

Page 23: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

� Cover Letter (company name, address and contact

information)

� Evaluation Criteria (including project organizational chart)

� Additional Content (resumes or other information)

� MAXIMUM pages permitted is 12 pages:

Cover Letter (Not included in 12 pages)

+ Evaluation Criteria (including organizational chart)

+ Additional Content (resumes or other information)

= 12 MAXIMUM pages permitted

Submittal Requirements

Page 24: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

• SOQs due at 12:00 p.m. November 6, 2015

• Interview Notification November 23, 2015

• Interviews December 8, 2015

• Scope Meeting December 2015

Selection Schedule

Page 25: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

�Request for Qualifications

�Notifications

�Power Point Presentation

�Plan Holder List

�Firms to be Interviewed

http://phoenix.gov/streets/procurement/project-

interviews

�Award

http://phoenix.gov/streets/procurement/bid-results

Streets Transportation Webpage

Page 26: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

Liz Blakley, Contracts Specialist

(602) 273-2108

[email protected]

Questions After Today

Page 27: AV41000072 - Goodyear Master Plan Presubmittal Mtg - RP … · 2015-10-27 · A Mater Plan was prepared for Phoenix Goodyear Airport in 2007. Since that time, the City of Phoenix

Questions?


Recommended