+ All Categories
Home > Business > BIFM North Sustainability in FM Key Learning Event 15 May 2014

BIFM North Sustainability in FM Key Learning Event 15 May 2014

Date post: 20-Jun-2015
Category:
Upload: whitbags
View: 667 times
Download: 0 times
Share this document with a friend
Description:
Presentation slides at the BIFM North Region Sustainability Key Learning Event at AstraZenaeca on 15 May 2014
Popular Tags:
117
“Driving the Sustainability Agenda in FM” Mark Whittaker BIFM North rEGION
Transcript
Page 1: BIFM North Sustainability in FM Key Learning Event 15 May 2014

“Driving the Sustainability

Agenda in FM”

Mark Whittaker

BIFM North rEGION

Page 2: BIFM North Sustainability in FM Key Learning Event 15 May 2014

2 | KLE – Driving the Sustainability Agenda in FM

Welcome & Thanks

Page 3: BIFM North Sustainability in FM Key Learning Event 15 May 2014

3 | KLE – Driving the Sustainability Agenda in FM

Welcome & Thanks

Page 4: BIFM North Sustainability in FM Key Learning Event 15 May 2014

4 | KLE – Driving the Sustainability Agenda in FM

TwitterToday’s event: #bifmkle

@BIFM_North

@BIFM_Sust

@Whitbags

@Everton

@WARPit_

@popupfarm

@AstraZeneca

Page 5: BIFM North Sustainability in FM Key Learning Event 15 May 2014

5 | KLE – Driving the Sustainability Agenda in FM

2014 BIFM North Key Learning Events

Page 6: BIFM North Sustainability in FM Key Learning Event 15 May 2014

6 | KLE – Driving the Sustainability Agenda in FM

The BIFM North Summer Ball

> Weds 9th July:

> BIFM North Ball

> Hilton Deansgate

Page 7: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Today’s Event

Page 8: BIFM North Sustainability in FM Key Learning Event 15 May 2014

8 | KLE – Driving the Sustainability Agenda in FM

Introduction to today’s speakers

Page 9: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Simon GrinterSustainability Special Interest Group

Page 10: BIFM North Sustainability in FM Key Learning Event 15 May 2014

2 | Presentation title here

Aims & Objectives

> Act as a centre of excellence for knowledge and opinion within the FM sector

> Promote best practice, awareness, participation and learning

> Inform the facilities community and other stakeholders about the importance of effective sustainable development practice to create a framework that allows an active business contribution

Page 11: BIFM North Sustainability in FM Key Learning Event 15 May 2014

3 | Presentation title here

> Collaborate with others Regions/Other SIGs

Sustainability Exchange with HE

WRAP Strategy Group

> Consultations

> Annual Sustainability Survey

> Good Practice Guides

> Events

> Articles & Newsletters

> Follow us on twitter ‏@BIFM_Sust

What do we do?

Page 12: BIFM North Sustainability in FM Key Learning Event 15 May 2014

4 | Presentation title here

With thanks to our sponsors

Page 15: BIFM North Sustainability in FM Key Learning Event 15 May 2014

BIFM Key Learning Event: Driving the FM Sustainability Agenda

FM ( All suppliers )

•Unique position and opportunity• Energy and utilities management

• Building Services and equipment maintenance and repair

• Waste management

• Catering and hospitality

• Logistics

• Building stewardship and Security

•ChoiceFit for purpose

Or

Contributing to sustainability and Corporate Responsibility

Page 17: BIFM North Sustainability in FM Key Learning Event 15 May 2014

The Alderley Park Environment £99Kpa

Biodiversity and Estate Sustainability

•Biodiversity action plan BAP

•150 acres of ancient woodland, 100acres of pasture grassland.

•2 sites of Biological Importance

•Thinning and clear felling of coniferous plantation

•30,000 native broadleaf trees planted over the past 15 years

•Self sustaining programme funded by sale of timber and forestry commission grants

•Nature Trails and cross site pathways

•Artificial sandbank for sand martins and Kingfishers

•15 areas of water (25 acres) stocked with fish

•2 designated conservation areas

BIFM Key Learning Event: Driving the FM Sustainability Agenda

Farming

•Sheep and rare breed cattle – graze on 100 acres – low density

•Control of fertilizers < 50 fertilised land – progressive elimination of nitrogen

•Winter fodder produced on site

•Farm open day during lambing season

Page 18: BIFM North Sustainability in FM Key Learning Event 15 May 2014

ReuseEquipment

17000 equipment items in Cheshire. Lifecycle management process employing share, reuse/redeploy, lease, auction

600 items sold in April and donate programmes. Waste is last option.

Managed warehouse facility.

1300 items currently in Global surplus.Migration to Cambridge is based on 80-90% reuse of laboratory equipment

FurnitureLong established reuse process. Managed stock

held in Macclesfield. Redeployed where needed. Reuse -Always the first option.

BIFM Key Learning Event: Driving the FM Sustainability Agenda

Page 19: BIFM North Sustainability in FM Key Learning Event 15 May 2014

ReuseSpace/Offices & Laboratories

Flexible and adaptable design helps to maximise footprint occupancy and reuse opportunity

Reduction in AZ footprint - external tenants moving into

vacated space.

Lab consolidation. Release of space for others to use.

38 businesses, employing ~200.

Site consolidation, Concentration of AZ occupied space towards the Mere.

BIFM Key Learning Event: Driving the FM Sustainability Agenda

Page 21: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Building Change in State Programme

Sodexo Change Team

Background

- Sodexo Change Team

- Building ‘Tickover’ Procedure

- Project Trial

Building Change in State

- Tickover

- Mothball

- Shutdown

Operational Asset

Tickover

Mothball

Shutdown

En

erg

y C

on

su

mp

tio

n

0

100

Sim

ple

an

d q

uic

k

to r

ein

sta

te

Hig

he

r co

st

an

d t

ime t

o r

ein

sta

te.

Ris

k o

f ir

revers

ible

da

mag

e.

Page 22: BIFM North Sustainability in FM Key Learning Event 15 May 2014

£0

£10,000

£20,000

£30,000

£40,000

£50,000£/m

on

th

Block 022.Block 022 Total Electrical (kWh)

Block 022.Block 022 Total HPHW-sprint (kWh)

Key Objective

- Client Engagement

- Programme Delivery

- Handover Documentation

Progress and Benefits

Block 22 Research Building

Operational > Tickover > Mothball

Page 23: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Energy

Reduction

2014 Target 6% Achievement YTD 25%Improvement projects delivering improvements in Optimisation,

Insulation, Building Controls, Heat Recovery, Variable air Volume.

Meeting Corporate target of 30% over 5 years.

CarbonMove to procurement of green electricity.

From 22,000 tonnes to 0 tonnes.

BIFM Key Learning Event: Driving the FM Sustainability Agenda

Page 24: BIFM North Sustainability in FM Key Learning Event 15 May 2014

BIFM Key Learning Event: Driving the FM Sustainability Agenda

FM

•Unique position and opportunity

•Choice Fit for purpose

or

Contributing to Corporate responsibility and sustainability

Page 26: BIFM North Sustainability in FM Key Learning Event 15 May 2014

BACK UP Slides

Author | 00 Month Year14 Set area descriptor | Sub level 1

Page 27: BIFM North Sustainability in FM Key Learning Event 15 May 2014

LAB EQUIPMENT LIFECYCLE

Beneficial

Operation

Maintenance

& Repair

Modification

and

Enhancement

Lab

Computing

support

Relocation

Optimisation

CommissionInstall Decommission Re-useMove to

Location

Delivery to

SiteProcurementCAS

Prepare

Location and

Services

Change Control

Test and

Register

Update

Equipment

Record

Capital

Demand

Sell/Donate

Disposal

Revenue

Demand

Demand and Acquisition Deliver/Install/Commission Beneficial

Operation

Spend wisely on the right

equipment to meet

business objectives

Progress quickly and safely

to beneficial operationMaximise

/Optimise

Develop

Maintenance

and Support

Plan

Equipment Records and Information

Re-use

Surplus Management

Maximise Return on

Investment

Page 28: BIFM North Sustainability in FM Key Learning Event 15 May 2014

16Author

| 00

Month

Year

Set area descriptor | Sub level 1

Page 29: BIFM North Sustainability in FM Key Learning Event 15 May 2014

EnvironmentEstate ManagementWoodlandsAlderley Park has around 150 acres of woodland, much of it classed by English Nature/DEFRA as ‘ancient woodland’ in that it has been in existence for many hundreds of years. There are also 2 areas with S.B.I designation (sites of biological importance) at grade A and B levels. These are Radnor Mere and surrounds and The Boys Walk wood.

Within the woodlands are an abundance of flora and fauna, included several rare and protected species (great crested newts, badgers setts, kingfishers, heronry, several bat species), all of which means that the area needs sensitive environmental management.

The woodland areas are currently managed in line with a woodland management program. This is a long term plan, the aim of which is to gradually reduce the existing plantations of coniferous trees, planted as cash crop in the 1960’s (low amenity, low conservation and habitat value), and to replace these with a mix of native broadleaved tree species to ensure improved biodiversity and habitat value, and ensure the sustainability of the woodlands for future generations.

The woodland management program is currently in its 3rd five year cycle. Three major thinning operations of the coniferous plantations have taken place, and several areas have been clear-felled and replanted with a mix of native broadleaved tree species. Over the past 15 years, approximately 30,000 trees have been planted at Alderley Park. The result has been a much improved woodland structure, offering much greater habitat diversity and sustainability.

The woodland management program is agreed with and grant aided by the Forestry Commission, and as such is self financing. Sale of timber from thinning/clear-felling operations pays for all replanting and ongoing maintenance costs associated with ensuring the health and survival of the newly planted trees. All ongoing maintenance of the woodland areas is carried out by estates staff, including safety inspection and remedial action to trees, clearance of invasive rhododendron growth, and maintenance and clearance of all tracks and pathways throughout the woodland areas. Annual management grants are received from the Forestry Commission to support this.

Nature trailsThroughout the woodland areas, and extending around the parkland and historic building areas of site, a series of nature trails have been developed, and associated natural history and wildlife guides produced, giving informative and educational material about the site history and resident wildlife.

These nature trails and guides have been created and are maintained to offer and encourage staff to access the wider areas of the site, and, like the parkland pathways mentioned previously, are very popular with staff for relaxation and recreation purposes.

Environmental initiativesAs part of the ongoing management strategy, environmental initiatives are undertaken by the estates team to promote and enhance biodiversity across the site. Recent examples include –Reed bed restoration – clearance of invasive rhododendron growth along Radnor Mere shore, and replanting with reed bed plants

Sand Martin/Kingfisher nesting bank – an artificial nesting bank at Radnor Mere created to encourage nesting of these species. Has proved to be a successful nesting site for Kingfishers (a Schedule 1 protected bird species)

Bird box scheme – around 150 nesting boxes, plus barn owl, kestrel and bat boxes have been located right across the estate.

Designated conservation areas (ice house wood, wildflower slope), where rare and/or unusual plants are found. These areas are also used to relocate rare plants affected by building works in other areas of the site

Alderley Park has 15 areas of water within its boundary totaling around 25 acres. Many of these are stocked with fish and used by the Club AZ angling society. These are monitored and maintained by estates staff, including clearance of in/out flows, and clearance of bank sides to ensure healthy waters. Four ponds within the woodland areas that had become stagnant and overgrown have been renovated by dredging and vegetation clearance to return them to healthy waterways and important wildlife habitats.

Development of Alderley Park Biodiversity Action Plan (BAP)

- this document details an update of the original Biodiversity Action Plan drafted in 2007 which followed the Phase 1 habitat survey of the Alderley Park site undertaken in 2006 and 2007.

- the Phase 1 habitat classification and associated field surveys recorded the semi-natural vegetation and other wildlife habitats. Each habitat type/feature was defined following JNCC (Joint Nature Conservation Council)guidelines and was assessed for its potential to support protected or notable species as defined in the Cheshire Regional Biodiversity action plan.

-this update continues to follow Cheshire’s regional BAP and the UK BAP, and in accordance with revised legislation such as the 2010 habitat regulations. Accordingly it comprises a Habitat Action Plan (HAP) and a Species Action Plan (SAP) which focuses on habitats and species of regional (and national) importance, as well as more common indicator species.

-the HAP is a strategy for maintaining and improving habitats on site, with the overall objective of maintaining or enhancing their use by wildlife (plant and animal) species. The SAP provides a focus on key species, which are representative of the site’s wildlife in the context of the region’s important wildlife. )

-both involve managing biodiversity actively or passively and encouraging or discouraging species on site, along with monitoring the abundance and distribution of these species as indicators of performance against specific targets. These and other key performance indicators are to gauge the success of habitat and wildlife management in conjunction with the management of site facilities and operations

Biodiversity Data Base – bespoke database developed for recording of all biodiversity data. Site divided into habitat areas (JNCC classification) and surveys undertaken to record flora/fauna observed in each area. Added to and updated as new records are submitted. Accesible to all staff to promote/ increase awareness of biodiversity across the site.

.

Gary Riddell | 15 May 201417

BIFM Key Learning Event: Driving the FM Sustainability Agenda

Page 30: BIFM North Sustainability in FM Key Learning Event 15 May 2014

EnvironmentBiodiversity and Estate Sustainability

BackgroundThe Alderley Park estate is recognised as a unique asset for the site. Extending to 400 acres, it comprises –80 acres of developed land – buildings/car parks etc. (20% total area).100 acres of parkland/ grassland (26% total area).150 acres of woodland (40% total area).25 acres of lakes/ponds (6.25% total area).15 acres of sports facilities (1.5% total area).25 acres of amenity grassland/ trees (6.25% total area).

The FarmThe farmland makes up the majority of the land area in the central area of the site. There are approximately 100 acres of permanent pasture grassland. This is managed by selective sheep and cattle grazing, to give a cost effective and environmentally sound way of managing the area. The extensive grazing strategy means -animal stocking rates are kept deliberately low (approx 2.5 sheep/acre) to ensure the grassland is not overgrazed.

Artificial fertilizer usage rates have been reduced - now approx. 50% of grazing area receives less than 50kg/nitrogen p/hectare, remaining 50% receives NO fertilizer., helping to maintain healthy sward of native grass species.

Small herd of rare breed cattle (British Whites) introduced in 2002 to offer different grazed habitats for invertibrates/insects, small mammals etc.

Blanket weed spraying replaced by selective (spot) spraying to further protect native grass/wildflower sward.

All winter fodder (hay/silage) made on farm

Member of DEFRA/Natural England Environmental Stewardship scheme

The farm has Farm Assured Welfare status (FABBL), and is run to high standards of animal husbandry and welfare.

The farm is also managed to maximize use of the land area by staff and visitors for recreation and staff welfare. Over recent years a network of signed pathways through the farmland had been developed linking together the Mereside, Parklands and Alderley House areas of site.

Estates staff also provide a farm open weekend at lambing time for staff and their families, giving them the opportunity to experience farming practices at close hand and an insight into how and why the farm and estate is managed. Local environmental and wildlife groups also attend, manning display stands/interactive demonstrations etc.

Gary Riddell | 15 May 201418

BIFM Key Learning Event: Driving the FM Sustainability Agenda

Page 31: BIFM North Sustainability in FM Key Learning Event 15 May 2014

19 Author | 00 Month Year Set area descriptor | Sub level 1

Confidentiality Notice

This file is private and may contain confidential and proprietary information. If you have received this file in error, please notify us and

remove it from your system and note that you must not copy, distribute or take any action in reliance on it. Any unauthorized use or

disclosure of the contents of this file is not permitted and may be unlawful. AstraZeneca PLC, 2 Kingdom Street, London, W2 6BD, UK,

T: +44(0)20 7604 8000, F: +44 (0)20 7604 8151, www.astrazeneca.com

Page 32: BIFM North Sustainability in FM Key Learning Event 15 May 2014

WELCOMEto

TODAYS

DELEGATES

Page 33: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Everton FC (Goodison Park)

‘Small Fixes Which Make a

Big Difference’

SUSTAINABILITY

Page 34: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Everton Football Club

Liverpool, England

Page 35: BIFM North Sustainability in FM Key Learning Event 15 May 2014

• Sustainable architecture is architecture

that seeks to minimize the negative

environmental impact of buildings by

efficiency and moderation in the use of

materials, energy, and development space.

• Sustainable architecture uses a

conscious approach to energy and

ecological conservation in the design of the

built environment.

Page 36: BIFM North Sustainability in FM Key Learning Event 15 May 2014

THE REALITY

• When Goodison Park was constructed,

SUSTAINABILITY was definitely not a priority and

probably not even in the minds of the architects

and engineers that constructed the stadium.

• Goodison Park was not designed with

sustainability in mind, so we have to engineer

sustainability into the architecture when ever the

opportunity arises.

Page 37: BIFM North Sustainability in FM Key Learning Event 15 May 2014

• Everton FC (Goodison Park) won the ‘Sustainability Award’

for their ‘Small Fixes Which Make a Big Difference’ entry at

The Stadium Business Awards 2013.

• Everton saw off competition from Wolfsburg, the Millennium Stadium in

Cardiff, Manchester United’s Old Trafford, the Aviva Stadium in Dublin

and Marlins Park in Miami to win the award. Wembley Stadium were

the 2012 winners.

• The judging panel’s published comments revealed: “Everton's

submission impressed on so many levels – technical detail, costing's,

lifetime carbon reduction, budget ROIs, but also in the context that its

sustainability goals were achieved in one of the oldest operating

stadiums in the world.”

2013 Winners In Focus – Sustainability

Award

Page 38: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 39: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Project Overview

Finding sustainable cost effective projects to reduce

energy within Goodison Park is challenging.

We looked at boiler renewal and solar panels, but

these had large capital expenditure costs with

payback periods of up to 20 years.

Our goal is to secure a new stadium for Everton,

so payback periods are critical to any project.

Page 40: BIFM North Sustainability in FM Key Learning Event 15 May 2014

THE CRITERIA

• Realistic capital expenditure costs.

• Short payback periods (3-5 years or

less)

• Minimal disruption to the operation.

• Measurable energy and cost savings

• Sustainability

It was felt that lighting as well as being highly

visible, was contributing to a large portion

of our energy consumption.

Page 41: BIFM North Sustainability in FM Key Learning Event 15 May 2014

• Some lamp samples were put on test in

our offices, a 10 watt Phillips self-

contained cool white LED was eventually

chosen.

• To maximize the benefits of this project

we negotiated a 5 year replacement

guarantee with Phillips, with the proviso

that we would retain our existing fittings

and transformers.

Page 42: BIFM North Sustainability in FM Key Learning Event 15 May 2014

We decided to install motion sensors in

some rooms to maximize energy savings.

These were to be purchased from our

maintenance budget on an on-going basis

to reduce capital costs.

This would reduce energy even further, but

we did not calculate this into our figures as

it was an unknown.

Page 43: BIFM North Sustainability in FM Key Learning Event 15 May 2014

New LED lights in our Dixie Dean Lounge

Page 44: BIFM North Sustainability in FM Key Learning Event 15 May 2014

The project in numbers

Initially we decide to replace 880 x 50W dichroic lamps and 20 x 100W

AR111 down lighters with the 10W LED equivalents.

Energy costs and carbon emissions before

the project.

(880 x 50w = 44 000W) = 44 Kw + (20 x 100W = 2000W) = 2Kw: Total = 46

Kw.

10 hours per day, 325 days per year: 3250 hrs.

46 x 3250: 149 500 KWh.

Average rate = 8.6p per KWh

Annual running cost £12 857

Annual carbon emissions 61 490 kgCO2

Page 45: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Energy costs and carbon emissions after the

project.

(880 x 10W = 8 800W) = 8.8 Kw + (20 x 40W) = 800W = 0.8Kw: Total =

9.6Kw

10 hours per day, 325 days per year: 3250 hrs.

9.6 x 3250: 31 200 KWh

Average rate = 8.6p per KWh

Annual running cost £2 683

Annual carbon emissions 12 298 kgCO2

Page 46: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Annual savings

Annual electricity cost before project:

£12 857Annual electricity cost after project:

£ 2 683

Cost saving: £10 174

Annual carbon emissions before project:

61 490 kgCO2

Annual carbon emissions after project:

12 298 kgCO2

Carbon Reduction: 49 192 kgCO2

Page 47: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Capital costs and Pay back period

Page 48: BIFM North Sustainability in FM Key Learning Event 15 May 2014

• The new lamp cost was £18.74 x 900 = £16 866

• With an annual energy cost saving of £10 174 and a 5 year

manufacturers guarantee we will see a saving of £50 870 over the 5

year life of the project.

• The carbon emissions reduction over the same period is a

significant 245 960kgCO2 (nearly a quarter of a million tons) over

the life of the project.

The lamps were fitted by our own electricians, so there was no

additional labour cost or any disruption to the operation with this

project.

From the figures above we can see that the payback period was

around 18 months, which fitted perfectly with what we wanted to

achieve.

Page 49: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Conclusion & Future Initiatives

• This project is on-going and we will be fitting more

LED lamps over the coming closed seasons.

• We have also replaced or are in the process of

replacing all our air-conditioning units with the

latest low energy units available on the market.

• We try where possible to engineer sustainability

into all our new projects by using the latest energy

saving technology, sustainably produced products

and the latest building and construction methods.

Page 50: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 51: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Although this was not a multi-million pound hi

tech endeavour, this has been and continues to

be an extremely viable cost effective initiative

that delivers on all the criteria that we had hoped

to achieve.

Page 52: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Other Environmental InitiativesWe currently recycle glass, cardboard, plastics, office paper, all our

WEEE.

With the purchase of a bailing machine this summer , we will

be able to bail all our cardboard and plastic, this enables us

to sell this on to the highest bidder.

We also sell on all our WEEE which includes computers and

mobile phones (All data is erased and they are sold on with

any profit going to our charity EITC)

Waterless urinals are used throughout the stadium.

Page 53: BIFM North Sustainability in FM Key Learning Event 15 May 2014

THANK YOU FOR YOUR

TIME

Richard Cairns

Facilities Manager

Everton Football Club

Goodison Park

Liverpool

L4 4EL

Page 54: BIFM North Sustainability in FM Key Learning Event 15 May 2014

BIFM North & Midlands

Regions

"Driving the Sustainability

Agenda in FM“

Daniel O’Connor

warp-it.co.uk

Page 55: BIFM North Sustainability in FM Key Learning Event 15 May 2014

How organisations

can cut costs, waste

and injury by

reusing assets

better.

Page 56: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 57: BIFM North Sustainability in FM Key Learning Event 15 May 2014

BackgroundWhy reuse mattersDemo

Page 58: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 59: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 60: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 61: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 62: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Why is this important?

Page 63: BIFM North Sustainability in FM Key Learning Event 15 May 2014

WasteBerg-supply chain

Page 64: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Consumer goods

generate a further 90%

of waste during

primary & secondary

manufacture.

Page 65: BIFM North Sustainability in FM Key Learning Event 15 May 2014

IT products…

close to 4000

times weight!

Page 66: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Over half of your carbon emissions are supply chain related..

Page 67: BIFM North Sustainability in FM Key Learning Event 15 May 2014

WasteBerg-internal

Page 68: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Page 69: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Page 70: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Purchase Orders cost £50 av in staff timeNo purchase orders on reused items!

Page 71: BIFM North Sustainability in FM Key Learning Event 15 May 2014

So it is important

to reuse where

possible…

Page 72: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Resource

redistribution

network for

organisations

Page 73: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 74: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 75: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Page 76: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 77: BIFM North Sustainability in FM Key Learning Event 15 May 2014

...creating a organisational, city, region or country wide sharing network.

Page 78: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Savings:UCL £22K 4 mthsSt Andrew’s £1K in 1st dayUni of London: £4K 1 mthDundee CC; £75K 6 monthsSunderland CC: 250K 30 months

Page 79: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Council

University

Private sector

School

Third sector

Business

Page 80: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Audit &Liability

Page 81: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 82: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 83: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 84: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Building clearance

Page 85: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 86: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Insert remind me button

Page 87: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Reduced injury, damage & hassle

Page 88: BIFM North Sustainability in FM Key Learning Event 15 May 2014

FM Benefits:

Reduces waste disposal costs Reduces injury risksClears buildings even before the assets have stopped being used

Page 89: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Sustainability: Reduce supply chain impacts (CO2)Better use of existing resourcesSupport 3rd sector

Page 90: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Twitter

@danwasteman

@WARPit_

LinkedIn;

Daniel Bede O’Connor

Page 91: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Info

@warp-it.co.uk

Page 92: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 93: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 94: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 95: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 96: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 97: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 98: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 99: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 100: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 101: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 102: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 103: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 104: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 105: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 106: BIFM North Sustainability in FM Key Learning Event 15 May 2014
Page 107: BIFM North Sustainability in FM Key Learning Event 15 May 2014

www.pop-up-foundation.org

www.happycoffeebean.com

[email protected]

@popupfarm

Page 108: BIFM North Sustainability in FM Key Learning Event 15 May 2014

Event Close

Mark Whittaker

BIFM North Region

Page 109: BIFM North Sustainability in FM Key Learning Event 15 May 2014

BIFM – Getting the most from your membership

Page 110: BIFM North Sustainability in FM Key Learning Event 15 May 2014

3 | KLE – Driving the Sustainability Agenda in FM

BIFM Groups & Regions

Regions

> Events

> Networking

Special Interest Groups (SIG’s)

– Catering & Hospitality

– Charities

– Education

– Health & Safety

– International

– People Management

– Procurement

– Retail

– Rising FMs

– Security & Business Continuity

– Sustainability

– Women in FM

– Workplace

Page 111: BIFM North Sustainability in FM Key Learning Event 15 May 2014

4 | KLE – Driving the Sustainability Agenda in FM

How do we support our members?

•Providing members with learning, support and advice services to improve, extend and maximise their career opportunities within the FM industry.

Professional Development

•Members can share best practice and gain experience from different disciplines across the facilities management profession.

Networking

•We keep members up-to-date with the latest thinking in facilities management. This enables members to achieve their full potential and deliver the best of their ability.

Information and Knowledge

•Our clear membership grading structure provides pathways for anyone involved in FM at any stage of their career, which are recognised throughout the industry.

Recognition and Industry

Awareness

Page 112: BIFM North Sustainability in FM Key Learning Event 15 May 2014

5 | KLE – Driving the Sustainability Agenda in FM

BIFM in the North

NW Groups:•Merseyside•Lancashire & Manchester

NE Groups:•Tyne-Wear-Tees•West & North Yorkshire•South Yorkshire•Hull

Page 113: BIFM North Sustainability in FM Key Learning Event 15 May 2014

6 | KLE – Driving the Sustainability Agenda in FM

BIFM & Social Media

@BIFM_UK@BIFM_North

Page 114: BIFM North Sustainability in FM Key Learning Event 15 May 2014

7 | KLE – Driving the Sustainability Agenda in FM

2014 North Region events

Page 115: BIFM North Sustainability in FM Key Learning Event 15 May 2014

8 | KLE – Driving the Sustainability Agenda in FM

Upcoming events in the region

> 3 June – Merseyside Group – Edge Hill University

> 14 July– HSE L8 Update – Leeds Metropolitan University

> 11 September – Social Media Strategies – BBC Media City, Salford

> 16 September – FM Careers Event, Sheffield Hallam University

> 13 November – Collaborative Partnerships – BAE Systems, Salmesbury

Page 116: BIFM North Sustainability in FM Key Learning Event 15 May 2014

9 | KLE – Driving the Sustainability Agenda in FM

Contact Details – BIFM North

Mark WhittakerDeputy Chair, North Region & NW Branch ChairE: [email protected]: 07764840694T: @Whitbags

Sue GottChair, North RegionE: [email protected]: 07764 809783T: @Mrsgotty

Mick AndersonDeputy Chair, North Region & NE Branch ChairE: [email protected]: 07713122164T: @MandersFM

Page 117: BIFM North Sustainability in FM Key Learning Event 15 May 2014

10 | KLE – Driving the Sustainability Agenda in FM

See you on 11th September at our BBC KLE


Recommended