BLUE PRINT READING FOR FMS CLASS OPEN DISCUSSION OF USING BLUEPRINTS, ARCHITECTURAL DRAWINGS, SCHEMATICS, SITE PLANS
Transcript
Page 1: Blueprint Reading for Facility Managers

BLUE PRINT READING FOR FMSCLASS OPEN DISCUSSION OF USING BLUEPRINTS, ARCHITECTURAL DRAWINGS, SCHEMATICS, SITE PLANS

Page 2: Blueprint Reading for Facility Managers

CURRENT STATUS

Who has access, where they located, have you used them? Does the Architect or General Contractor still have originals? Have you made modifications, renovations or changes…Are plans updated or changes

obtained? Are the plans you have initial drawings or “As Builts”? Have you changed the numbering / labeling of items such as “Room Numbers”, HVAC

numbers, etc…

Page 3: Blueprint Reading for Facility Managers

TOPO

Page 4: Blueprint Reading for Facility Managers

TOPO

Local Surveyor Co. can hold copies and refresh at reduced cost Neighbors Borders Lay of Land / slope Wetlands Right of Way Some Utilities Used to develop Landscaping plan

Page 5: Blueprint Reading for Facility Managers

INDEX

C - CivilA - ArchitecturalS - StructuralP - PlumbingM – MechanicalE - ElectricalD - Demo

Page 6: Blueprint Reading for Facility Managers

A1

Page 7: Blueprint Reading for Facility Managers

A

If used for Bids then this page give contractor a lot of information Shows the assumptions made by Architect Provides Standard for the rest of attached drawings If changes made during Drawing work up – Architect has to come back to update front

page.

Page 8: Blueprint Reading for Facility Managers

A1

• SymbolsDrawing / Section /

Sheet

• Thermal EnvelopeDegree Days

Page 9: Blueprint Reading for Facility Managers

A1

• May be different than another set of plans

• Applicable only to this set of plans• Don’t assume when reading plans –

come back to this page• TEMP for instance• MTD• SD

Page 10: Blueprint Reading for Facility Managers

A1

• Frame Construction (ISO Class I, IBC Type V)

• Joisted Masonry (ISO Class 2, IBC Type III, IBC Type IV)

• Light Noncombustible (ISO Class 3, IBC Type IIB)

• Masonry Noncombustible (ISO Class 4, IBC Type IIA)

• Modified Fire Resistive (ISO Class 5, IBC Type IB)

• Fire Resistive (ISO Class 6, IBC Type IA)

Page 11: Blueprint Reading for Facility Managers

S1

Page 12: Blueprint Reading for Facility Managers

S

Location of Footers affects future installation such as sprinkler system Load bearing and amount of load notice difference Tying on addition or adjoining building

Page 13: Blueprint Reading for Facility Managers

P

Page 14: Blueprint Reading for Facility Managers

P

Locating Isolation Valve Vent stack clogged Relocation of existing equipment Replacement of existing equipment Toilets not flushing well Location of Cleanouts Capacity of Water line or Booster pump Calculations for custodial cost

Page 15: Blueprint Reading for Facility Managers

E

Page 16: Blueprint Reading for Facility Managers

E

Switching to new fixtures Replacement fixtures, battery locations, load per switch Breaker Location for tag out or maintenance Style of Fixture Count for PM of Emergency Lights Location for PM Acoustical Plan shown as well

Page 17: Blueprint Reading for Facility Managers

M

Page 18: Blueprint Reading for Facility Managers

M

Load capacity for occupants – may be a room limit instead of sqft, or fire limit Fresh air requirement Replacement schedule Energy Use / Type of Utility Notes – location of condensate for instance 3 phase vs 1 phase

Page 19: Blueprint Reading for Facility Managers

DISCUSSION

Take Homes Look at Local Building Plans Give examples of local use and experience