MAHAN POWER PROJECT 2X600 MW BOILER STEAM DRUM LIFTING #2 10 th /11 th JANUARY 2011 1
Transcript
Page 1: Boiler#2 Drum Lifting

MAHAN POWER PROJECT 2X600 MW

BOILER STEAM DRUM LIFTING #2

10th /11th JANUARY 2011

1

Page 2: Boiler#2 Drum Lifting

2

ARRIVAL OF STEAM DRUM AT MAHAN SITE (30.11.2010)

Page 3: Boiler#2 Drum Lifting

3

BOILER DRUM #2: UNLOADING AT LIFTING LOCATION(30.11.2010)

Page 4: Boiler#2 Drum Lifting

4

PREPARATION WORK FOR STEAM DRUM LIFTING(10.01.2011)

DRUM ‘U’ RODS

STEAM DRUM

Page 5: Boiler#2 Drum Lifting

5

STRAND JACK ARRANGEMENT FOR DRUM LIFTING(10.01.2011)

STRAND JACK

COMPRESSOR UNIT

MAIN OPERATOR DESK

Page 6: Boiler#2 Drum Lifting

6

RIGHT HAND SIDE ‘U’ ROD INSERTION WORK(10.01.2011)

‘U’ ROD

Page 7: Boiler#2 Drum Lifting

7

LOAD TEST BEFORE DRUM LIFTING(10.01.2011)

Page 8: Boiler#2 Drum Lifting

8

DRUM LIFTING PUJA CEREMONY (10.01.2011)

Page 9: Boiler#2 Drum Lifting

9

BOILER DRUM IN TILTED FOR LIFTING

Page 10: Boiler#2 Drum Lifting

10

BOILER DRUM TILTING COMPLETED

Page 11: Boiler#2 Drum Lifting

11

DRUM LIFTING STARTED IN EARLY MORNING -7:29 AM (11.01.2011)

Page 12: Boiler#2 Drum Lifting

12

BOILER DRUM LIFTING UPTO EL 77.104 M

Page 13: Boiler#2 Drum Lifting

13

DRUM STARIGHTINING TO HORIZONTAL POSITION

Page 14: Boiler#2 Drum Lifting

14

HORIZONTAL POSITIONING

Page 15: Boiler#2 Drum Lifting

15

HORIZONTAL POSITIONED AND FINAL LEVEL REACHED

Page 16: Boiler#2 Drum Lifting

16

U BOLTS INSERTED AND CLAMPED ON TOP – LOAD ON U BOLTS

Page 17: Boiler#2 Drum Lifting

17

STEAM DRUM AT ITS FINAL POSITION – 11.01.2011 - 7:30PM

Page 18: Boiler#2 Drum Lifting

18

Thank you

Team Mahan