An Electric Utility Perspective on Applications of Electricity Storage for Distributed Generation Workshop on Advances in Electricity Storage in Support of Distributed Renewable Energy Based Systems Monday, May 10, 2004 Hyatt Regency Waikiki. Bradley R. Williams, PE - PowerPoint PPT Presentation
30
P A C I F I C O R P P O W E R D E L I V E R Y Page 1 May 10, 2004 An Electric Utility Perspective on Applications of Electricity Storage for Distributed Generation Workshop on Advances in Electricity Storage in Support of Distributed Renewable Energy Based Systems Monday, May 10, 2004 Hyatt Regency Waikiki Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR [email protected]
Transcript
Page 1: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 1

May 10, 2004

An Electric Utility Perspective on Applications of Electricity Storage for

Distributed Generation

Workshop on Advances in Electricity Storage in Support of Distributed Renewable Energy Based

Systems Monday, May 10, 2004 Hyatt Regency Waikiki

Bradley R. Williams, PEDirector, Power Delivery Business TechnologyPacifiCorp, Portland, [email protected]

Page 2: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 2

May 10, 2004

PacifiCorp Quick Facts

• 1.5 million electric customers in six Western states

• Doing business as Pacific Power and Utah Power

• Low-cost, reliable energy producer

• 8300 megawatts of generation capacity from coal, hydro, gas-fired combustion turbines, geothermal, co-generation and renewable wind power

• 6,400 employees in the United States, headquartered in Portland, Oregon

• President and CEO: Judi Johansen

• Part of the ScottishPower Group, which additionally provides energy and other utility services to 5.5 million customers in the United Kingdom.

Page 3: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 3

May 10, 2004

Utility Distribution Applications best Suited to Distributed Electricity

Storage• High loading - existing infrastructure at full capacity• High Costs to increase capacity and/or build

transmission• Slow to moderate load growth to leverage best asset

deferral benefit • Feeder voltage/reactive power (var) support needed• Difficult access to stable fuel source• Difficult permitting process for DG combustion

engines emissions

DG

SubstationCB

Feeder capacitylimit

Load Concentration

Page 4: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 4

May 10, 2004

Rattlesnake#2225kV Feeder

•Environmentally Pristine Southeast Utah– East of Moab– East of Arches National Park– Along Colorado River valley

•209-mile long 25kV feeder, with 3-line regulators & 7-reclosers

•Possible denial of new connects because feeder cannot supply any significant amount of new load without causing low voltage to existing customers.

•Because feeder is so long, reliability and power quality is low leading to Public Service Commission Complaints. PacifiCorp agreed to fix.

•Traditional alternatives to add capacity and improve service are very costly and environmentally difficult.

•Demonstrated distribution benefits of VRB energy storage as part of PacifiCorp's DG Strategy – 2 MWh, 250kW VRB-ESS (expandable to 1MW) in Castle Valley, Utah

CASTLE VALLEY

MOAB

Castle Valley

Page 5: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 5

May 10, 2004

Castle Valley, Utah - VRB Site

Page 6: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 6

May 10, 2004

Utility Electricity Storage Applications

0

Pow

er

rati

ng

0 10s 1 h 2 h 8 h

10 kW

100 kW

1 MW

10 MW

100 MW

Storage inventory

1s 1 min 4 h30 min

Power quality

Un-interruptiblepower supplies

Frequencycontrol

Voltagesupport

VAR support

Peak shaving

Transmission stability

Spinning and standby reserve

Black startLoad levelling/following

Tariff trading

Load factor increase Capacity deferral Integration of renewables

Power quality and reliability

applications

Energy management applications

Page 7: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 7

May 10, 2004

Electricity Storage Technology Alternatives

100-MW and above

Pumped storage

Compressed AirEnergy Storage(CAES)

10-MW1-MW

Large-scale batteriesLead-acidNASVRBZBB

FlywheelsBatteries

• Li Ion

• NiMHCapacitors

UPSMarket

Page 8: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 8

May 10, 2004

PacifiCorp’s View of Electricity Storage

•Excellent progress in electricity storage technology & power electronics

– Redox Flow Cell stores charged electrolytes separate from cell for greater kWh storage capability. Best distributed resource applications.

•Efficiency: 60-85%

•Best Applications:– Deferred Power Delivery assets: Peak Shaving, load following,

dynamic frequency control, volt-var support– Large renewable wind and solar projects. Leveling applications.– Premium Power: Industrial/Commercial High 9’s Availability

(99.999% available)

•Opportunity for early adopters– Looked at a number of storage technologies: Regenesys, ZBB,

VRB, others– Selected VRB Power Systems due to efficiency, availability, and

scalability (smaller size initially to prove the technology).

Page 9: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 9

May 10, 2004

What is a Vanadium Redox Battery?

The VRB-ESS is a “green” technology. It has no emissions, and does not contain heavy metals. Most other

energy storage systems rely on toxic substances such as lead, zinc or

cadmium. The electrolyte used in the VRB-ESS has an indefinite life and is

completely reusable.

Vanadium Redox Batteries are a type of energy storage system (“VRB-ESS”) - flow batteries capable of storing electrical energy and deploying it back to the grid when required.

The VRB-ESS is charged like any other battery, but the energy is stored by chemical changes to the electrolyte. The electrolyte is a solution of ionic forms of vanadium in a dilute sulfuric acid that are electrochemically oxidized or reduced to store the energy. The acidity level of the electrolyte is no greater than a conventional car battery.

The electrolyte is pumped from separate plastic storage tanks across proton exchange membranes in the cell stacks, creating a current. The reaction is reversible, allowing the battery to be charged, discharged, and recharged with high efficiency.

Castle Valley VRB System

Page 10: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 10

May 10, 2004

VRB Energy Storage System Components

• Electrolyte storage tanks

• Cell stacks (with proton exchange membranes & carbon felt electrodes)

• Pumps to move the electrolyte fluid through the cell stack

• ac/dc Inverter and power conditioning

• VRB ESS Control system

The battery provides DC power. Therefore, an inverter is used to convert it to alternating current when it is returned to the electric delivery system.

Also involved: control, monitoring, and temperature regulation systems

DC Power

AC Power

V2+ and V3+ V4+ and V5+

Page 11: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 11

May 10, 2004

VRB Chemistry

Vanadium sulfates in H2SO4

V2+ V3+ + e- [1]

V5+ + e- V4+ [2]

• Based on reduction and oxidation of different ionic forms of Vanadium. • Chemical energy can be stored indefinitely (very low discharge rate).• Very fast conversion response: less than 1 millisecond to change from charging to

discharging.

V2+ /V3+V4+ /V5+

- dc Power +

Page 12: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 12

May 10, 2004

Potential VRB-ESS Utility Applications• Load Leveling (Peak Shaving)

– The VRB Energy Storage System can reduce the peak of a customer’s energy load as seen by the distribution system. This enhances utilization of assets on the electrical grid and manages customer energy demand.

• Ancillary Services to Utilities– Reserves - Spinning, Standby, Replacement - In the event of the loss of output from a supply source or an

unexpected change in system demand, the VRB-ESS can immediately provide the required power to make up the shortfall.

• Constraint Relief & Capital Deferment– The VRB Energy Storage System is a means of buffering both the flow and supply of power and thereby

increase the associated delivered capacity in MW on a network path that is otherwise constrained.

• Power Quality & Reliability– demand side management– Uninterruptible Power Supply (UPS) – emergency power backup for loss of AC, voltage sags, dips, etc.– Voltage support & flicker compensation– Power factor management

• Quality of Supply (QOS) – supply side management– Reactive power provision– Capacity extension – improves voltage regulation– Power factor management

• Renewable Energy Capacity Support– The VRB-ESS can serve as a buffer between a variable supply sources and the firm competitive

requirements of a power contract – which could add value to non-firm resources such as wind and photo-voltaic (PV). It could also provide stabilization of wind turbine output and is a source of reactive energy.

Page 13: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 13

May 10, 2004

High Cost

Low Cost

Example Peak Shaving

Page 14: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 14

May 10, 2004

Renewable Energy Applications• The VRB can be used to store

solar and wind energy

• Using a VRB can smooth the power supplied, making it more constant

• The VRB can provide reactive energy through the AC/DC converter

• The VRB is an environmentally friendly alternative to diesel generators and larger lead acid batteries

V R B AC/DC

Converter

renewable energy source

Wind output is variable so capacity is discounted by > 75%

VRB can firm supply and increase capacity and efficiency

King Island – Hydro Tasmania800kWh VRB Integration with Remote Wind & Diesel Systems

• Reduced emissions – 47%

• Saved fuel costs – Load factor is 28% or 10,000litres/day average. Reduced by 1.5million/litres/year

• Reduced Operating and Maintenance costs

• Improved power system stability and enhance power quality

Page 15: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 15

May 10, 2004

Castle Valley VRB Enclosure Footprint (m2) per capacity

2.0MWh – 250kW

• Castle Valley enclosure 7300 sq. ft. designed for expansion, room to work, and visitors (being 1st VRB in North America).

• Minimum VRB foot print design for 1MW-4hrs = 3200 sq ft.

Hours 4 6 8 10kW

50 11 16 21 26100 21 32 42 53200 46 46 46 57500 60 90 120 149

1,000 120 179 239 2722,500 272 408 414 518

10,000 622 933 995 1291

Page 16: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 16

May 10, 2004

Modular Design

• Sumitomo (Japan) – 50kW VRB Cell Stacks have 5X short duration overload rating for PQ support and major disturbance mitigation.

• Each stack size = 4.2-ft X 3.2-ft X 3.6-ft (1.3m X 1.0m X 1.1m)

Page 17: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 17

May 10, 2004

VRB Cell Stacks

Page 18: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 18

May 10, 2004

Electrolyte Storage Tanks

• 58-ft long, 9.5-ft diameter. 70,000 liters capacity• Fiberglass (double wall) construction with leak detection sensors.

Page 19: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 19

May 10, 2004

Inverter

• TSI/Eskom QuPS 250kW, 300kVAR inverter • 1200A, Vdc=200-300 volts with constant power output• Internal ac bus = 600volts (IEEE 514 harmonic filter capability)• Overload capability = 200% for 10-seconds, 150% for 5-minutes

Page 20: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 20

May 10, 2004

System Layout Design

Page 21: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 21

May 10, 2004

Cell Operating Range State of Charge

Cell potential vs. state of chargeT = 298 K

0.9

1

1.1

1.2

1.3

1.4

1.5

1.6

0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1

State of Charge

Op

en C

ircu

it V

olta

ge /

V

Page 22: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 22

May 10, 2004

Charge Discharge curves for VRB-ESS

400

500

600

700

800

900

0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5Discharge/Charge time (hr)

Ba

tte

ry

po

ten

tia

l (V

dc)

-400

-300

-200

-100

0

100

200

300

400

Bat

tery

cu

rren

t (A

)

Battery potential

Battery currentElelctrolyte Temp: 38-41 C

Page 23: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 23

May 10, 2004

Operating Parameters

• Temperature range - 5ºC to 40ºC

• Electrolyte concentration – 1.6 to 2.4 Mole/liter

• Sulphuric acid concentration 2 to 4 Mole/l

• Electrolyte Hazardous classification: EEC 8, 6.1

• Speed of response - <1ms

• SG – 1.36 to 1.47 kg/liter

Page 24: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 24

May 10, 2004

Castle Valley VRB Project Status

•Initial operations in startup and testing in November 2003

•Continuous full power daily cycling operations since March 2004

•On-going monitoring and performance testing

•Minor Capacity enhancements Underway

Page 25: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 25

May 10, 2004

PacifiCorp VRB Future Plans

•Advanced application development:– Advanced power quality applications– Advanced islanded operations– Adaptive charge/discharge energy arbitrage control algorithms– Advanced dynamic voltage control algorithms– Dynamic stability control algorithms– Wind farm application studies

•DOE Wyoming Wind Farm / Energy Storage Study.

•Increases to capacity through:– Additional cell stacks– Higher capacity inverter– Increased molarity of the electrolyte

•Can relocate to new site once transmission line and sub is built

•Investigating future telecom site and substation battery replacements

Page 26: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 26

May 10, 2004

Storage Business CaseSoutheastern USA 2004

Generator (1,000kW 6 hours/day 320days/y) –1,920,000kWh/year

• Fuel ($9/MMbtu) and O&M costs ($0.0168/kWh) per year = $214,000

• CAPEX cost per year (20 years @ 7%) = $99,523

• Equivalent cost of energy = $0.1634/kWh

VRB-ESS 1,000 kW 1,000kVAR for 6 hours storage

• Fuel cost (off peak purchases $0.013/kWh @80% efficiency) and O&M per year = $45,000

• CAPEX cost per year (20 years @ 7%) = $267,000

• Equivalent cost of energy = $0.1625/kWh

• Ancillary services are additional value streams that could be derived by a storage system, and a hedge against gas price volatility

Page 27: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 27

May 10, 2004

Cost Benefit Analysis Arbitrage – East Coast

• Out of City generation = 300MW

• Unable to deliver during peak daytime loads due to line constraints

• Option – Install several distributed Energy Storage systems locally to the loads.

• Cost of Storage installation $320/kWh – 10MW, 10MVAR, 10 hours

Size of connection - kW 10,000energy charge plus O&M - $/kWh 0.024

Demand charge - $/kW.month 0.55Repayment period -years 15Energy price in $/kWh 0.12Capacity price in $/kW.month 2.00Period available in year (hours) 3650Discount rate (WACC) 7.00%Assumed depreciation period - years 12

NPV = $5.6million

ROI AT = 23%

Page 28: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 28

May 10, 2004

Cost Benefit Analysis Industrial facility - NY

Monthly Max Demand Industrial - NY

0

500

1000

1500

2000

2500

3000

3500

4000

4500

1 2 3 4 5 6 7 8 9 10 11 12Month

kW

Industrial customer Daily load profile in NY with Storage

(1,000)

(500)

-

500

1,000

1,500

2,000

2,500

3,000

hour

kW

Average Demand VRB Charge (+ve) discharge (-ve) Resultant Demand curve

•Maximum Demand – 3,862kW

•Minimum Demand – 680kW

•Load factor 60%

•Storage – 800kW x 6 hours 75% round trip efficiency

•Storage shifts 6,230kWh usage per day from peak pricing to off peak pricing and MD reduced 800kW.

•Annual saving based on current tariffs - $292,000

•Simple payback < 6 years

Page 29: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 29

May 10, 2004

Industrial Consumer Solution

Grid, Regenesys, Mill energy interaction

0.0

10.0

20.0

30.0

40.0

50.0

60.0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Time period

Po

we

r in

pe

rio

d

From Reg to Mill

From Grid to Reg

From Grid to Mill

0

10

20

30

40

50

60

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

0

10

20

30

40

50

60

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Regenesys Eff iciency Loss

Average

Profile Without Storage

Profile With Storage

Courtesy Regenesys – Mr. Mark Kuntz

Page 30: Bradley R. Williams, PE Director, Power Delivery Business Technology PacifiCorp, Portland, OR

P A C I F I C O R P

P O W E R D E L I V E R Y

Page 30

May 10, 2004

1. Focus on best applications – this can make or break the project.

2. Cost – CAPEX and O&M (life cycle) – Maximize efficiency, minimize maintenance requirement

3. Reliability and Availability – Must be there when we need it!

4. Must be large enough to have an impact (MWh).

5. Speed of response to an event - Can it be controlled and dispatched – risk to system

6. Grid stability impacts – voltage and protection dynamic interactions

7. Permitting – ease and time to obtain permits

8. Footprint – How Big? Can it be sited at customer’s premise or substation

9. Must breakthrough utility Technology bias – just build more lines and substations – new technology is too risky and subject to disallowance.

Conclusion - Lessons Learned from Utility Energy Storage

Application


Recommended