Date post: | 02-Aug-2015 |
Category: |
Documents |
Upload: | nitesh-desai |
View: | 185 times |
Download: | 1 times |
Atlas Copco Drilling Solutions LLC Predator 1 – Drilling EquipmentPredator 1 Drilling Equipment
Total CBM- 463MV-
Summary of Project -:Summary of Project :
1) Transportation from HOUSTON PORT to BOMBAY PORT
2) H dli & Cl BOMBAY PORT2) Handling & Clearance at BOMBAY PORT.
3) Port & Warf .
4) BB Ocean Full liner terms .
Total Project Handling was done with out resources of Capricorn logistics.
VOLUME WEIGHT(LB) DIMENSIONS(IN) WEIGHT(KG) DIMENSIONS(CM)
CM CF Gross Net Tare L x W x H Gross Net Tare L x W x H
158.27 5589.34 114500 112500 2000 557.00 102.00 170.00 51937 51030 907.20 1414.78 259.08 431.80
VOLUME WEIGHT(LB) DIMENSIONS(IN) WEIGHT(KG) DIMENSIONS(CM)
CM CF Gross Net Tare L x W x H Gross Net Tare L x W x H
37.06 1308.88 10800.00 10300.00 500.00 218.00 125.00 83.00 4898.88 4672.08 226.80 553.72 317.50 210.82
VOLUME WEIGHT(LB) DIMENSIONS(IN) WEIGHT(KG) DIMENSIONS(CM)( ) ( ) ( ) ( )
CM CF Gross Net Tare L x W x H Gross Net Tare L x W x H
169.16 5973.92 85300.00 84300.00 1000.00 588.00 132.00 133.00 38692.08 38238.48 453.60 1493.52 335.28 337.82
VOLUME WEIGHT(LB) DIMENSIONS(IN) WEIGHT(KG) DIMENSIONS(CM)
CM CF Gross Net Tare L x W x H Gross Net Tare L x W x H
60.76 2145.94 41100.00 39600.00 1500.00 654.00 105.00 54.00 18642.96 17962.56 680.40 1661.16 266.70 137.16