CCOOMMPPAANNYY PPRREESSEENNTTAATTIIOONN wwwwww..ppaabb--rroommaanniiaa..ccoomm
Welcome word from PAB Romania
For PAB Romania "to build" represents in fact a partnership. Being a good partner means more than just to put concrete, steel and glass together. It means cooperating with the architects and beneficiaries in order to improve every aspect of their projects. It means to add value to this process of creation - to create buildings that last longer, that are more efficiently used and maintained, buildings that serve better those who live and work within.
In what follows you will find various aspects of the way we understand to add value to your projects, as well as projects that had the benefits of the partnership with us.
PAB philosophy has remained unchanged from the beginnings of its activity: delivering quality products, on time and within the budget (regardless of the nature of goods or delivery method).
The basic principles of our society’s activity are: - guiding the whole activity towards satisfying the clearly stated or inherent requirements of our customers by offering a diversified range of products and services at competitive prices
- treating seriously each cooperation with interested parties in order to gain and maintain markets
- to obtaining and maintain an excellent image that reflects professionalism, integrity, honesty and fairness as well as optimal communication relationships with suppliers and subcontractors, professional associations and customers.
(From the statement of the President Ion Sandu regarding quality policy)
ABOUT US P.A.B. ROMANIA Ltd. ARAD Trading Company, located in Arad, no. 8 Iustin Marsieu Street, registered at the Chamber of Commerce under no. J02/35/93, fiscal code RO 3513698 is a Romanian company with a joint stock of 1.500.000.RON.
The main field of activity of the society is manufacturing commercial, industrial, agricultural buildings, civil buildings of general interest, entertainment and sports places.
Our delivery services cover the entire spectrum of activities from simple manufacturing (as a specialist entrepreneur) to the complete delivery of the project, along with the full range of services such as design, preconstruction and manufacturing to the expiration of the warranty of projects.
During the 20 years working in construction, our experience can be summarized:
3,000,000 sqrm of built area, over 1,200 hectares of land surfaces arranged approximately 10,800,000 cubic meters of soil excavated and transported and about same amount of filling material over 1.5 million cubic meters of concrete and 14.400.000 kg of steel reinforcements more than 120.000 tones of metallic structure
The society is concerned with designing, manufacturing and assembling metallic and concrete constructions, manufacturing closing perimeters and roofs with or without thermal and hydro insulation as well as floors and industrial platforms, preparing the land, draining, damming, land stabilization and pouring concrete, asphalt and any other processing of land.
The constructive solutions adopted confer a vast range of advantages. They are modern solutions confirmed and implemented by our prior experience gained in time.
Some of the advantages are: quick manufacture, long lasting, low maintenance expenses, thermal and acoustic insulation as well as a nice design of the building.
The company disposes of 720 employees divided into different departments which form a very well organized unit.
The company has collaboration agreements with the authorized testing laboratories in the surroundings of works in progress.
The technical equipment park that our company has in endowment is various starting with mini-excavators, telescopic trucks, frontal cranes, excavators on wheels and caterpillar excavators, compacting cylinders, bulldozers, motor cranes, diesel motor and electric self-lifting platforms, equipments of low and high mechanization, means of travel for the stuff, motor trucks for transporting materials, the newest motor layouts which confer high productivity.
The experience acquired in time in adopting modern qualitative solutions, as well as the performance of each department and high productivity of the motor park triggered about the steady increase of the social investment of the company. It reached 1.500.000. RON in 2007, having the following turnovers in the last 3 years:
year 2006 = 34,68 mil Euro year 2007 = 51,37 mil Euro year 2008 = 51,33 mil Euro
The materials used by our society in achieving the targets are from producers worldwide known for the quality they assure. The seriousness proven in dealing with foreign companies has led to a good collaboration and priority for the deliveries requested by our company.
PAB experience stretches over a wide range of projects. We have never specialized in a certain market, simply because our work has been determined by the needs of our beneficiaries. This flexibility meant opportunities to build in any field, from very large commercial centers, or very small ones, exhibition centers or objectives of general interest, to sport centers and entertainment grounds, hospitals and complex industrial factories. When new projects make us work away from home, we take with us the values which consecrated our company.
Succeeding in life and business it’s happen the most efficiently when your partners share your values. These values don’t develop by themselves – they have to be constantly cultivated. At PAB, we do this every day – sustaining values that guide our steps. We believe in our values, and endeavor to translate these values into our behavior and daily actions
MANAGEMENT
president: Mr. Ion Sandu
general manager: eng. Vasile Moianu - over 18 years experience in industrial and civil engineering - managing construction for more than 500.000 square meters of commercial and industrial buildings
Execution Department Organizing/controlling construction activities: civil eng. Lucian Dima - 25 years of experience in management of construction activities - over 1.2 million square meters of built area in big and important civil, industrial and commercial buildings.
Featured: Underground Electrical Plant in Caransebes, Romania Nuclear Power Plant in Cernavoda, Romania ALCOA Factory – 14.000 square meters COFICAB Production facility – 15.000 square meters for Coficab, Portugal LOTUS MARKET Mall – 35.000 square meters built surface, 20.000 square meters exterior parking places, platforms and roads
Site manager: mech. eng. Dorin Borzan - 30 years experience in industrial and commercial buildings, industrial structures and installations - over 700.000 square meters built surface for PAB in national and international sites
Featured: ARMONIA CENTER – Mall - 50.400 square meters built surface with 62.100 square meters exterior parking places, roads and platforms LOTUS MARKET – Mall – 35.000 square meters built surface, 20.000 square meters exterior parking places, platforms and roads Over 54.000 square meters supermarkets built surfaces in international sites: METRO I – Beograd, Serbia, METRO II – Beograd, Serbia, METRO – Novisad, Serbia, METRO – Nis, Serbia, METRO – Kracuevac, Serbia
Site manager: mech. eng. Sida Marius - 14 years experience in industrial and commercial buildings, industrial structures and installations - over 700.000 square meters built surface for PAB in national and international sites
Featured: ARMONIA CENTER – Mall - 50.400 square meters built surface with 62.100 square meters exterior parking places, roads and platforms LOTUS MARKET – Mall – 35.000 square meters built surface, 20.000 square meters exterior parking places, platforms and roads Over 36.000 square meters supermarkets built surfaces in international sites: METRO I – Chisinau Moldova, METRO II – Chisinau, Moldova, METRO – Balti, Moldova
Site manager: mech. telecomm. eng. Dejan Trajkovic - nationality: Serbian - works for PAB AT all sites in Serbia (more than 54.000 square meters); also in Romania for more than 120.000 square meters on commercial buildings - specialized in monitoring and coordinating installation works.
Site manager: civil eng. Radu Munteanu - Specialized in monitoring and coordinating of finishing works
Site manager: mech. eng. Ciprian Tanase
Site survey: eng. Pavel Teczesi - coordinating of all surveying activities - over 30 years in site experience
Technical department Constructive and technological designing
Technical manager: civil eng. Florian Vintila - Civil designer, structural analyst - More than 26 important projects
Budget development and analysis compartment manager: eng. Delia Szepesi
Production settling up & organizing production eng. Lorena Stana eng. Luminita Munteanu
Economic department
Department manager: Economist Gloria Cismas
Economic management of sites: Economist Marinike Capacin
Economist Marioara Popan
Economist Alina Marcut
Economist Eva Redai
IT Department
Eng. Dan Tamas
Quality in Construction Department Quality Approval: eng. Danciu Stanoiu
Quality Approval: mech. eng. Constantin Manea
Health & Safety Department HR Manager: Livia Bradean Health & safety environment: mech. eng. Ana Maria Gyorgyi
Legal Department Legal adviser: Bogdan Puiu Legal adviser: Adrian Zahoi
The company has contracts with the authorized testing laboratories situated in the area of the site. The park for equipment is varied, beginning with miniexcavator, frontal loader, caterpillar shovel, wheel shovel, compactor, bulldozer, truck cranes, diesel and electric lifting platforms, minibuses to transport the workers, auto – trucks to transport the materials, last generation auto equipment that have a major productivity.
2009 AUTO EQUIPMENT
Nr. Crt.
STOCK LIST
NUMBER
EQUIPMENT NAME MANUFACTURER MODEL YEAR obs./technical
1 212056 TRUCK CRANE 12to 1985
2 212110 TOUR CRANE POTAIN MDT98 2006 H-50m,L-55m/1.2to
3 212111 TOUR CRANE CARLO RAIMONDI MR 99 E 2003 H-46.9m,L-60m/1.3to
4 212087 AUTOBASCULE BARFORD 4.3to SX6000 2008 1 mc
5 212086 AUTOBASCULE BARFORD 4.3to SX6000 2007 1 mc
6 212109 AUTOBASCULE KOMATSU HD 325-3 1992 16.7 mc
7 212088 BULLDOZER KOMATSU D-61EX 15EO 19.7to 2008 3.6mc/1.2to/1.6to+laser
8 212089 BULLDOZER KOMATSU D-61EX 15EO 19.7to 2008 3.6mc/1.2to/1.6to+laser
9 212085 BULLDOZER KOMATSU D-61EX 15EO 19.7to 2007 3.6mc/1.2to/1.6to+laser
10 212064 BULLDOZER CATERPILAR D6NXL 20.3to 2003 3.6mc/1.2to/1.5to
11 212070 BULLDOEXCAVATOR JCB 3CX-4T 2006
12 212073 BULLDOEXCAVATOR CATERPILAR 428 D 2005
13 212071 BULLDOEXCAVATOR JCB 2CX-A 2003
14 212072 BULLDOEXCAVATOR JCB 3CX-97T 1999
15 212069 BULLDOEXCAVATOR CATERPILAR 428 C 1998
16 212108 BULLDOEXCAVATOR CASE 580.SLE 1997
17 212068 BULLDOEXCAVATOR FIAT HITACHI FT-800.2 1994
18 212066 BULLDOEXCAVATOR JCB 3 D 1992
19 212164 COMPACTOR BOMAG 21,5to BW219 PDH-3 1999 crampons
20 212079 COMPACTOR PROTEC 20,5to AC 160 HD 1998 smooth
21 212090 COMPACTOR HAMM 19,5to D-95643 1997 smooth
22 212067 COMPACTOR PUMA 8,7to 1987 smooth
23 212107 EXCAVATOR ON WHEELS KOMATSU PW 140-7K 2008
24 212081 EXCAVATOR ON WHEELS KOMATSU PW 140-7 2007
25 212054 EXCAVATOR ON WHEELS AKERMAN EW 200 1999
26 212052 EXCAVATOR ON WHEELS O&K 1977
27 212106 EXCAVATOR WITH CRAWLER
KOMATSU PC 240 LC- 8 /25to 2008 arm length 18 m
28 212082 EXCAVATOR WITH CRAWLER
KOMATSU PC 240 NLC 3 2007
29 PRACTICE PIT BALLAST PRODUCTS INHERENT
2008 MURES-BARZAVA
30 212083 FRONT END LOADER KOMATSU WA380-6 2007 3.6mc
31 212084 FRONT END LOADER KOMATSU WA380-6 2007 3.6mc
32 212105 FRONT END LOADER KOMATSU WA430-6 21.2to 2007 3.6mc
33 212078 LOADER WITH LEVER MERLO P26.6LPT 2005
34 212077 LOADER WITH LEVER MERLO P26.6SP 2005
35 212076 LOADER WITH LEVER MERLO ROTO 30.16K 2003
36 212075 LOADER WITH LEVER MANITOU MVT1330S 2002
37 212074 LOADER WITH LEVER MANITOU MVT1330SLC 1999
38 212059 LOADER WITH LEVER TACHEUKI DM 15 2001
39 212060 LOADER WITH LEVER CATERPILAR 301.5 2001
40 212061 MINIEXCAVATOR VOLVO EC 15 2001
41 212104 MINI FRONT ND LOADER KOMATSU SK 815-5 2008 with sweep system
42 212080 MINI FRONT ND LOADER KOMATSU SK 714-5 2007
43 212091 MINI COMPACTOR RAMMAX 0.8to RW-1504 2007 crampons
44 212092 MOTOSTACKER WITH LEVER
KOMATSU 30-3,0to 2008
45 212094 MOTOCOMPRESSOR ATLAS 2000
46 212093 MOTOCOMPRESSOR MANNESMANN DEMAG 1998
47 212095 UNDERSTRUCTURE 8 m HAULOTTE COMPACT 10 2007
48 212096 UNDERSTRUCTURE 8 m HAULOTTE COMPACT 10 2007
49 212097 UNDERSTRUCTURE 10 m HAULOTTE COMPACT 12 2007
50 212098 UNDERSTURCTURE 10 m HAULOTTE COMPACT 12 2007
51 212099 UNDERSTRUCTURE 10 m HAULOTTE COMPACT 12DX 2007
52 212100 UNDERSTRUCTURE 10 m HAULOTTE COMPACT 12DX 2007
53 212101 UNDERSTRUCTURE 10 m HAULOTTE COMPACT 12DX 2007
54 212102 UNDERSTRUCTURE 10 m HAULOTTE COMPACT 12DX 2007
55 212103 UNDERSTRUCTURE 8 m HAULOTTE STAR 10 2007
PRODUCTS & SERVICES One of the most valuable things we can do for our clients is to reduce uncertainty and the inherent risk implied by a major construction project. PAB has developed extensive resources dedicated to provide precise estimation, ideas for saving money, dates concerning the completion of trustworthy works and, in the end, a reliable building that functions as the beneficiary expected when inaugurated. These resources help control the project from start to delivery and also offer viable solutions and the safety of fulfilled task for our customers.
BUILDING SYSTEMS
Besides the very diversified services concerning constructions of all kinds, services that cover the entire possible spectrum, from designing to covering the warranties, PAB may be one of your suppliers of components or complete systems of buildings, executed on the basis of your projects or based on projects executed by our specialists.
From light metal structures, which are economical, to structures able to cope with the most difficult situations of exploitation, from the prefabricated concrete structures to structures of composite materials (metal/concrete or other), executed by us together with our partners, we can design and deliver any type of structure for a modern building that complies with all current safety and quality standards.
From simple metal closures suitable for industrial halls, composite panels to the most sophisticated systems of ventilated walls with thermal insulation and acoustic performance, we approach the delivery of complete packages of closings for constructions in all areas: commercial, industrial, civil buildings of general interest, sports and recreation, etc... Using materials that satisfy the highest demands of quality or proper for sophisticated and demanding aesthetic creations we offer our and our partners’ services that satisfy your most exquisite demands.
Elements of the facade or interior joinery are all part of the packet of closings that you want. Whether simple doors and windows, curtain walls or complete systems for modern facades in combination with our plating systems, you can request the entire range of joinery items for your building.
Together with our partners we provide our knowledge concerning design and delivery of complete electrical installation systems, ventilation and air handling, plumbing, sewage disposals for waste water and pluvial water, water treatment stations, fire protection and fire-fighting, and, in case, other systems that would complete the functionality of the building that you desire.
PROJECT SERVICES
DESIGNING
Working with our own designers or cooperating with independent designers or employed by our beneficiaries, we have the experience of managing large projects and of high complexity. The works executed on the entire spectrum of the construction market have created in time an informational basis meant to provide real data for both an economically efficient design, but also in terms of energy consumption and comfort level of buildings, optimal depending on their destination.
PRECONSTRUCTION SERVICES
PAB offers a wide range of services in the preconstruction phase - as an important building company should do. The desire for continuous improvement has guided us in developing some processes and progressive and precise tools for evaluating the results of our future work. Although our services vary depending on the method we deliver the project, on the market demands as well as on each client’s demands, there are stable aspects, and these are the results detailed, accurate and complete data that allow to make decisions with full knowledge of the facts and to have total control over costs and schedule of works from beginning to end.
Budget estimation and development Value analysis Green consultancy (green materials, energy consumption, impact) Projects feasibility
CONSTRUCTION
During the construction phase of a project, even if this is a new commercial space or a new factory PAB brings to the site experienced builders with solid knowledge, acting on the full interest of the recipient and interacting with the team of designers during the entire period of construction. The services offered by PAB during the construction phase can be grouped into several categories:
Planning the phases of the project (being connected permanently with our partners) Purchasing the materials and equipments Accomplishing the plan independently Managing the subcontractors’ activity Planning and assuring quality, safety and health Putting into operation
COMPLETING THE WORKS
PAB can be proud of the swiftness in achieving their projects. The closing process begins the very first day when our teams of specialists identify the elements required by the final accomplishment of the works, continuing so that nothing remains incomplete. At the beginning we draw up a checklist of construction elements to be monitored - using a computerized data basis drew up on the PAB experience of millions of built and arranged square meters in order to accomplish the project completely. We end the construction by closing the site and following the bearing of the project by the end of the warranty.
DELIVERY METHODS
Irrespective of the delivery method, the approach to each project is the same – that of an undisputed leader in safety procedures, quality and project management, with the stated aim to surpass your expectations. Each beneficiary can choose a different method of delivery, which is best, suited for the planning, designing and the building he wants. We have the experience of a full scale of methods, ranging from simple auctions for construction contracts (in which case PAB has no involvement in the design phase) to the delivery of complete projects (when PAB plays a decisive role beginning with the early design process until the carrying out of the last guarantees).
THE LUMP SUM CONTRACT
PAB signs a lump sum contract for a global amount (flat-rate) in exchange for the construction services it offers, as a result of auctions based on the contract documents supplied by the customer.
PROJECT MANAGEMENT
PAB is committed to achieve the preconstruction and construction phase, without actually constructing with their own staff. Subcontracts are owned by the beneficiary. While carrying out the project, PAB is involved with the beneficiary, architects and consultants beginning with the design and construction until the investment is operational and taken hold off by the beneficiary. In time PAB services have diversified offering our customers a complete control over: costs, execution schedule, feasibility of projects, quality of executed works and guarantees.
GENERAL ENTREPRENEUR
PAB completes the works and services in the preconstruction and construction phase of the project, which are granted as a result of auctions and contract negotiations and executes on its own strength a big part of these works. PAB can make with its staff a great variety of civil works and structural ones, steel and concrete structures, all types of works of closing, as well as finishing and equipment assembly. By performing the most critical phases of the construction by its own, PAB exercises a maximum control over costs, program and execution quality issues. All subcontracts are held by PAB, so the execution schedule as well as the costs is guaranteed.
PROJECT MANAGEMENT & GENERAL ENTREPRENEUR
PAB performs a combination of the two methods described above - both the project management and the general contracting of the works performed. From the management of works in the preconstruction phase to the accomplishment with the own staff of the most important works during the construction phase PAB controls the project from the very beginning to its end. The guarantee concerning quality execution within the deadline and the budget is maximum.
ASSISTING DESIGN
PAB provides an extensive team of specialists within different areas to help design teams in their efforts. Our focus is on connecting all subcontractors with designers to find the best solutions that satisfy all the needs of the beneficiary
DESIGN & CONSTRUCTION
PAB concludes a single contract, which includes all services for planning, design, construction and implementation of a project. From the draught to the actual functioning of the objective the responsibility and the guarantee are total.
INTEGRATED PROJECTS
PAB closes a settlement with the customer, design team and teams of builders, to have a cooperation that allows a share of benefits when the project objectives are achieved. Execution of such projects allows us to fully integrate our approach to works, our safety and quality programs to successfully attain the object for all team members.
PARTNERSHIPS
For PAB Romania "to build" represents in fact a partnership. Being a good partner means more than just to put concrete, steel and glass together. It means cooperating with the architects and beneficiaries in order to improve every aspect of their projects. It means to add value to this process of creation - to create buildings that last longer, that are more efficiently used and maintained, buildings that serve better those who live and work within.
In order to achieve a solid development of the business and also for giving confidence and security to your clients, your partners must share this strength and basic values that guide their present actions and vision about how future should look like.
In this context, the association between PAB Romania and Corus - British Steel Nederland International BV Netherlands comes as a natural pursuit of the constant growth that our company has experienced. This increase in both quantity and quality concerning all fields of our activity has resulted in a new company - Corus Building Systems Romania - a joint venture within whose framework we feel both honored and obliged.
Having adhered to the core values of CORUS (one of the largest global manufacturers of metal and metal products) requires a total opening towards what is new and lasting in the field of constructions. Using materials produced by CORUS can be a guarantee of the quality and the sustainability of the executed works. These materials along with our system of quality assurance, safety and health, but also with the respect for the environment, are the guarantees of works that have a particular quality level but are also very "current" in terms of compliance with all the requirements of a modern, economic and efficient building.
Collaboration with CORUS unquestionably means "development", a quantitative development - considering the strength of CORUS as supplier of materials - making possible to tackle more projects at a larger scale, providing certainty and quality concerning their execution within the term. Development concerns also quality - the huge system of production performed by CORUS can provide a diverse range of materials, created due to the latest scientific research in the field, able to satisfy the most demanding aesthetic and sustainability claims.
Our leadership, coordination and monitoring of activity in all its aspects is a developed and upgraded one, with the stated aim to be leaders in this field of activity. We are characterized by the wish to evolve and the constant desire for self-improvement, therefore we can say we have a performance oriented management system able to cope with the projects it undertakes and to keep their excellent performance over time.
In this regard we are in the process of developing cooperation with Corus KALZIP specialized in manufacturing and supplying worldwide metal solutions of aluminum closures suitable for buildings (facades and roofs). Kalzip – the world's leading aluminum standing seam roofing and wall cladding system is a precision engineered, multi component system with proven durability, high performance and low maintenance. A range of materials, finishes and shapes, virtually limitless design potential and advanced roll forming techniques have enabled Kalzip to combine functionality with stunning aesthetics on both small uncomplicated designs and world-famous, award winning projects. Truly sustainable features, such as solar solutions and Nature Roof provide the perfect finishing touches to the unique Kalzip range.
The new and innovative Kalzip-FC facade system offers architects and designers a flexible and economical solution for coating walls both for new buildings and renovation projects. The innovative fixing and flexible bidirectional assembly system are the new features added by this system to the already known metal ventilated facades.
RESPONSIBILITY We take our responsibilities seriously. Our objective is to be world class. For PAB Romania, responsibility involves the integration of our financial and strategic goals with: - a commitment to the health, safety and well-being of its employees and communities. - a focus on improving environmental performance and providing sustainable products. - conducting all aspects of its business with honesty and integrity.
ENERGY&ENVIRONEMENT
Regulation Framework for environmental protection - from the statement of the President
“Protecting the environment in which we operate and where our employees and our community live is a fundamental deed for the ongoing success of our business. This set of environmental rules has been developed to maintain and improve our company's behavior by encouraging these ecological practices. The framework confirms the values that PAB has had and has always applied, and which must from now on become strategic targets in the development of the company. I am personally committed to ensuring that we have functional procedures and that the staff from our company’s management provides the exceptionality of our projects in this regard. I expect all our actions to be directed to improve the environment by following these rules.”
ION SANDU President PAB Romania
Our mission is to maintain and develop a large number of contracts and business development projects that will generate profit for investors and real values for customers. In this approach, the environmental protection is one of the essential values in the core virtues of our company.
PAB encourages and supports its staff to develop a strong and environmentally responsible culture. It also acts for developing ecological execution procedures to be followed by all those involved in the company’s projects. The integration of environmental issues can only be achieved when all those responsible involved in the company's operations will contribute directly and side by side to achieve these objectives.
PAB Romania will always coordinate its affairs in compliance with environmental protection as basic value for the company and its staff. Our approach is based on clear objectives. All participants to the company's activities are obliged to have regard for these procedures supporting their own environmental protection systems. PAB will strive to carry on its operations in a responsible and environmentally sustainable manner.
SAFETY IS OUR NUMBER ONE PRIORITY
Simply put, nothing we do is more important than ensuring that our employees and our team members return safely to their loved ones every night.
And that's because we are a company where family is a key word and a society whose employees are regarded as our greatest and most valuable asset. But above all, we stress the safety issue in our work, simply because it is important. Everything we do within PAB to achieve a labor environment that has zero accident potential is not only a priority but a basic principle of our company.
The company's total commitment to safety work rewards everyone involved. Our performance within labor safety has improved steadily. Our approach through preventing events led PAB to achieve a safety record – the registering of an insignificant number of events. The results only motivate us to work even better.
PAB safety philosophy is built around the idea that everyone must be equally involved in safety programs at work. This approach proves to be an effective tool to eliminate deceases, injuries, and professional diseases at work.
Our formal and proactive security program is actively managed by trained and dedicated security professional staff and is best summarized in four words: communication, training, motivation and monitoring.
COMMUNITY INVOLVEMENT
PAB employees are as passionate about building better communities as we are about construction. Ours is a personal approach. We give of our time and talent for one simple reason. It's the right thing to do. More than donating money, it's about creating personal relationships, improving lives, helping those who need help most, making a real difference, together. PAB employees build more than buildings. We build relationships. At PAB we are proud of the difference we make in the communities where we live and work.
THE MAIN WORKS CARRIED OUT BY OUR COMPANY
CONSTRUCTION DIVISION
1. “ARBEMA” - ARAD – DEPOSIT
• Built surface – 8.200 sqrm. • Type of working – sub-contractor • Execution time – 3 months • Year of execution – 1997
Enclosures: - Walls: sandwich pannels with polyuretanic core - Roof: trapezoidal sheet, anti-dew foil, mineral wool,
heat –sealable membrane 2. “MONDIAL” - LUGOJ – production facility
• Built surface – 8.700 sqrm. • Type of working – sub-contractor • Execution time – 2 months • Year of execution – 1997
Enclosures: - Walls: sandwich pannels with polyuretanic core - Roof: sandwich pannels with polyuretanic core
3. “METTERA” - GIURGIU – production facility for special steels in FREE ZONE OF GIURGIU
• Built surface – 32.000 sqrm. • Type of working – sub-contractor • Execution time – 4 months • Year of execution – 1998 – 1999
Enclosures: - Walls: sandwich pannels with polyuretanic core - Roof: trapezoidal sheet, anti-dew foil, mineral wool,
heat –sealable membrane
4. “SOLECTRON” I - TIMISOARA • Built surface – 12.000 sqrm. • Type of working – sub-contractor • Execution time – 3 months • Year of execution – 1999
Enclosures: - Walls: cassetes, mineral wool, anti-dew foil,
metal sheet for façade, - Roof: trapezoidal sheet, anti-dew foil,
mineral wool, heat –sealable membrane
5. “CONPET S.A.” - PLOIESTI – pumping plants and distributors – 10 Pieces
• Built surface – 8.200 sqrm. • Type of working – sub-contractor • Execution time – 8 months • Year of execution – 1999- 2000
Enclosures: - Walls: sandwich pannels with polyuretanic core - Roof: : sandwich pannels with polyuretanic core
6. “EASTERN TECHNOLOGY” - ARAD – production facility • Built surface – 5.500 sqrm. • Way of execution: walls - cassettes, mineral wool, anti-dew foil, metal sheet for façade, roof – Alkorplan, metallic structure made out of euro profiles • Type of working – general contractor • Execution time – 6 months • Year of execution – 1999- 2000
7. “STEROM” - CAMPINA • Built surface – 12.700 sqrm. • Way of execution – thermo insulating panels • Type of working – sub-contractor • Execution time – 2 months • Year of execution – 1999
8. “ALKATEL E.K.R.” - SANTANA • Built surface – 6.900 sqrm. • Type of working – sub-contractor • Execution time – 3 months • Year of execution – 2000
Enclosures: - Walls: thermo insulating panels - Roof: thermo insulating panels
9. “SOLECTRON” II - TIMISOARA • Built surface – 12.000 sqrm. • Type of working – sub-contractor • Execution time – 3 months • Year of execution – 2000
Enclosures: - Walls: cassetes, mineral wool, anti-dew foil,
metal sheet for façade - Roof: trapezoidal sheet, anti-dew foil, mineral
wool, heat – sealable membrane
10. “METRO” - CLUJ • Built surface – 10.000 sqrm. • Type of working – sub-contractor • Execution time – 3 month • Year of execution – 2000
Enclosures: - Walls: cassetes, mineral wool, anti-dew foil, metal sheet for façade - Roof: trapezoidal sheet, anti-dew foil, mineral wool, heat – sealable
membrane
11. “SARA LEE- ROSKO TEXTIL” - CURTICI • Built surface – 4.740 sqrm. • Type of working – general contractor • Execution time – 3 months • Year of execution – 2000 – 2001
Enclosures: - Walls: cassetes, mineral wool, anti-dew foil,
metal sheet for façade - Roof: trapezoidal sheet, anti-dew foil,
mineral wool, heat – sealable membrane
12. “KROMBERG & SCHUBERT” - TIMISOARA • Built surface – 8.400 sqrm. • Type of working – sub - contractor • Execution time – 2 months • Year of execution – 2000
Enclosures: - walls: cassettes, mineral wool, anti-dew foil, metal
sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral wool,
heat – sealable membrane
13. “MOMO” - RIBITA, BRAD • Built surface – 2.400 sqrm. • Type of working – sub-contractor • Execution time – 2 months • Year of execution – 2000
Enclosures: - walls: sandwich panels with polyuretanic core - roof: trapezoidal sheet, anti-dew foil, mineral wool,
heat – sealable membrane 14 CASH&CARY “XXL” – REWE – BUCURESTI - PANTELIMON
• Built surface – 4.584 sqrm • Type of working – sub-contractor • Execution time – 1 month • Year of execution – 2001
Enclosures: - walls: cassettes, mineral wool, anti-dew foil, metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat – sealable membrane
15. “METRO” – VOLUNTARI, BUCURESTI • Built surface – 12.700 sqrm • Type of working – sub-contractor • Execution time – 1,5 month • Year of execution – 2000
Enclosures: - walls: cassettes, mineral wool, anti-dew foil, metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat – sealable membrane 16. “METRO” - BAIA MARE
• Built surface – 10.000 sqrm • Type of working – sub-contractor • Execution time – 1,5 month • Year of execution – 2001
Enclosures: - walls: cassettes, mineral wool, anti-dew foil, metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat – sealable membrane
17. “SELGROS” – BUCURESTI – PANTELIMON • Built surface – 14.000 sqrm • Type of working – sub-contractor • Execution time – 1,5 month • Year of execution – 2001
Enclosures: - walls: cassettes, mineral wool, anti-dew foil,
metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral
wool, heat – sealable membrane
18. “METRO” GALATI
• Built surface – 10.000 sqrm • Type of working – sub-contractor • Execution time – 1,5 month • Year of execution – 2001
Enclosures: - walls: cassettes, mineral wool, anti-dew foil,
metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral
wool, heat – sealable membrane
19. EXHIBITION PAVILION – CCIA – ARAD • Built surface – 4.800 sqrm • Type of working – direct contract • Execution time – 1 month • Year of execution – 2001
Enclosures: - walls: cassettes, mineral wool, anti-dew foil,
metal sheet for façade - roof: trapezoidal sheet, anti-dew foil,
mineral wool, heat – sealable membrane
20. “METRO” - PLOIESTI • Built surface – 10.000 sqrm • Type of working – sub-contractor • Execution time – 1,5 month • Year of execution – 2002
Enclosures: - walls: cassettes, mineral wool, anti-dew foil,
metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral
wool, heat – sealable membrane
21. “METRO” - ORADEA • Built surface – 10.000 sqrm • Type of working – sub-contractor • Execution time – 1,5 month • Year of execution – 2002
Enclosures: - walls: cassettes, mineral wool, anti-dew foil,
metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral
wool, heat – sealable membrane
22. “SELGROS” – BUCURESTI – BANEASA
• Built surface – 14.000 sqrm • Type of working – sub-contractor • Execution time – 1,5 month • Year of execution – 2002
Enclosures: - walls: cassettes, mineral wool, anti-dew foil, metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat – sealable membrane
23. “METRO” SIBIU • Built surface – 10.000 sqrm • Type of working – sub-contractor • Execution time – 1,5 month • Year of execution – 2002
Enclosures: - walls: cassettes, mineral wool, anti-dew foil,
metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral
wool, heat – sealable membrane
24. “SELGROS” TARGU. MURES • Built surface – 14.000 sqrm • Type of working – sub-contractor • Execution time – 1,5 month • Year of execution – 2002
Enclosures: - walls: cassettes, mineral wool, anti-dew foil, metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat – sealable membrane
25. “MAXSTILE” FACTORY – ARAD • Built surface – 4.000 sqrm • Type of working – general-contractor • Execution time – 2 months • Year of execution – 2002
Enclosures: - walls: cassettes, mineral wool, anti-dew foil, metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat – sealable membrane
26. SHOWROOM & SERVICE – “QUARK MOTORS” - ARAD • Built surface – 2.500 sqrm • Type of working – sub-contractor • Year of execution – 2003 – in work
Enclosures: - walls: cassettes, mineral wool, anti-dew foil,
metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral
wool, heat – sealable membrane
27. CASH&CARY “XXL” – Sibiu • Built surface – 5.450 sqrm • Type of working – sub-contractor • Execution time – 3 weeks • Year of execution – 2002
Enclosures: - walls: cassettes, mineral wool, anti-dew foil,
metal sheet for façade - roof: trapezoidal sheet, anti-dew foil,
mineral wool, heat – sealable membrane
28. CASH&CARY “XXL” – TARGOVISTE • Built surface – 5.450 sqrm • Type of working – sub-contractor • Execution time – 1 month • Year of execution – 2003
Encasings - walls: sandwich panels with polyuretanic core - roof: trapezoidal sheet, anti-dew foil, mineral wool,
heat – sealable membrane
29. CASH&CARY “XXL” – BUZAU
• Built surface – 5.450 sqrm • Type of working – sub-contractor • Execution time – 1 month • Year of execution – 2003
Encasings - walls: sandwich panels with polyurethane core - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat – sealable membrane
30. “SELGROS” - BUCURESTI BERCENI • Built surface – 14.000 sqrm • Type of working – sub-contractor • Execution time – 1,5 month • Year of execution – 2003
Encasings - walls: cassettes, mineral wool, anti-dew
foil, metal sheet for façade - roof: trapezoidal sheet, anti-dew foil,
mineral wool, heat – sealable membrane
31. FUEL SUPPLY BASE – “ROMOIL” - BUCURESTI • Built surface – 1.800 sqrm • Type of working – direct contract • Execution time – 1 month • Year of execution – 2003
Encasings - walls: sandwich panels with polyuretanic core - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat – sealable membrane
32. “METRO” - SUCEAVA • Built surface – 10.000 sqrm • Type of working – sub-contractor • Execution time – 1,5 month • Year of execution – 2003
33. SPACES FOR STORING FOOD PRODUCTS – “S.C. ASTRAL IMPEX S.R.L.” - ARAD • Built surface – 2.900 sqrm • Type of working – general contractor • Execution time – 4 months • Year of execution – 2003
Structure: - insulated foundations, foundation beams - Structure: columns made out of built-up concrete Encasings - walls: cassettes, mineral wool, anti-dew foil, metal sheet
for façade - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat –
sealable membrane Exterior furnishing - exterior roads and platforms - connection to the national road
34. “METRO” - TG MURES
• Built surface – 10.000 sqrm • Type of working – sub-contractor • Execution time – 1,5 month • Year of execution – 2003
Encasings - walls: cassettes, mineral wool, anti-dew foil, metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat – sealable membrane
35. “METRO” – BUCURESTI IV, BERCENI • Built surface – 10.000 sqrm • Type of working – sub-contractor • Execution time – 1,5 month • Year of execution – 2003
Encasings - walls: cassettes, mineral wool, anti-dew foil, metal sheet for
façade - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat –
sealable membrane
36. “METRO” - PITESTI • Built surface – 10.000 sqrm • Type of working – sub-contractor • Execution time – 1,5 month • Year of execution – 2003
Encasings - walls: cassettes, mineral wool, anti-dew foil, metal sheet for
façade - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat –
sealable membrane
37. “DRAEXLMAIER” - HUNEDOARA
• Built surface – 15.000 sqrm • Type of working – general contractor • Execution time – 3,5 months • Year of execution – 2003
Structure - insulated foundations, foundation beams - structure made out of euro profiles Encasings - walls: cassettes, mineral wool, anti-dew foil,
metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral
wool, heat – sealable membrane Exterior furnishing - exterior roads and platforms - connection to the national road
38. “SELGROS” - CONSTANTA • Built surface – 14.000 sqrm • Type of working – sub-contractor • Execution time – 1,5 month • Year of execution – 2003
Encasings - walls: cassettes, mineral wool, anti-dew foil, metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat – sealable membrane
39. GAS STATION “ROMPETROL” • CONSTANTA – 2 Stations • TARGOVISTE • ARAD • Year of execution: 2003
Structure: - insulated foundations under the columns, - foundation beams - metallic structure made out of euro profiles Encasings - walls: sandwich panels with polyuretanic core - roof: trapezoidal sheet, anti-dew foil, mineral wool,
heat – sealable membrane
40. SHOW ROOM “BMW” • CONSTANTA • BUCURESTI
Encasings - walls: cassettes, mineral wool, anti-dew foil,
metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral
wool, heat – sealable membrane
41. “CONTITECH” - TIMISOARA • Built surface – 7.000 sqrm • Type of working – general-contractor • Execution time – 3 months • Year of execution – 2003
Structure - insulated foundations under the columns,
foundation beams - structure made out of euro profiles Encasings - walls: sandwich panels with mineral wool core - roof: sandwich panels with mineral wool core Exterior furnishings - exterior roads and platforms - connection to the national road
42. FUEL
SUPPLY BASE – “ROMOIL” - CRAIOVA • Built surface – 1.800 sqrm • Type of working – direct contract • Execution time – 1 month • Year of execution – 2004
Encasings - walls: sandwich panels with polyuretanic core - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat – sealable membrane
43. GAS STATION “ROMPETROL” • TIMISOARA • ORADEA • CLUJ • SUCEAVA • SLOBOZIA • SIBIU • ARAD • DROBETA TURNU SEVERIN • CRAIOVA
Structure: - insulated foundations under the columns, foundation beams - metallic structure made out of euro profiles Encasings - walls: sandwich panels with polyuretanic core - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat –
sealable membrane
44. „SELGROS” - TIMISOARA • Built surface – 14.000 sqrm • Type of working – sub-contractor • Execution time – 3,5 months • Year of execution – 2004\
Encasings - walls: cassettes, mineral wool, anti-dew foil, metal
sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral wool,
heat – sealable membrane
45. „BLUE ARCTIC GYM” – ARAD • Built surface – 1.200 sqrm • Type of working – direct contract • Execution time – 2 weeks • Year of execution – 2004
Encasings - walls: cassettes, mineral wool, anti-dew foil, metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat – sealable membrane
46. INDUSTRIAL COMPLEX „ALCOA” - CHISINEU CRIS
• Built surface – 12.000 sqrm • Type of working – general-contractor • Execution time – 5 months • Year of execution – 2004
S Structure - insulated foundations under the columns, ground
beams - technical channels - metallic structure made out of europrofiles Encasings - walls: cassettes, mineral wool, anti-dew foil,
metal sheet for façade - roof: trapezoidal sheet, anti-dew foil,
mineral wool, heat – sealable membrane Exterior furnishings - exterior roads and platforms
(36 000 sqrm) - connection to the national road
(12 000 sqrm)
47. „METRO” – BRASOV
• Built surface – 10.000 sqrm • Type of working – sub-contractor • Execution time – 1,5 month • Year of execution – 2004
Encasings - walls: cassettes, mineral wool, anti-dew foil, metal sheet for façade - roof: trapezoidal sheet, anti-dew foil, mineral wool, heat – sealable membrane
48. „SELGROS” ORADEA • Built surface – 14.000 sqrm • Construction solution – lateral encasing: cassettes, terrace: ALKORPLAN • Type of working – sub-contractor • Execution time – 2 months • Year of execution – 2004
49. „METRO” CONSTANTA
• Built surface – 10.000 sqrm • Construction solution – lateral encasing: cassettes, terrace: ALKORPLAN • Type of working – sub-contractor • Execution time – 2 months • Year of execution – 2004
50. SHOW ROOM „BANAT CAR” – TIMISOARA – „BMW” • Built surface – 3.000 sqrm • Type of working – sub-contractor • Execution time – 4 months • Year of execution – 2004
51. “METRO” – CHISINAU –
REPUBLIC OF MOLDAVIA • Built surface – 10.000 sqrm • Construction solution – lateral encasing:
cassettes, terrace: ALKORPLAN • Type of working – sub-contractor • Execution time – 2 months • Year of execution – 2004
52. „METRO” - BELGRAD” –
REPUBLIC OF SERBIA • Built surface – 10.000 sqrm • Construction solution – lateral encasing:
cassettes, terrace: ALKORPLAN • Type of working – sub-contractor • Execution time – 2 months • Year of execution – 2004
53. GAS STATION “ROMPETROL”
• TIMISOARA • ARAD - SAVARSIN • TURDA • SIBIU
54. 54. INDUSTRIAL COMPLEX – CARANSEBES
• Built surface – 1.200 sqrm • Construction solution – lateral encasing:
cassettes, terrace: ALKORPLAN • Type of working – general-contractor • Execution time – 4 months • Year of execution – 2004
55. „SELGROS” - ARAD • Built surface– 14.000 sqrm • Type of the contract – general contractor • Execution time – 4 months • Year of execution – 2005
Structure: - insulated foundations under the columns, - ground beam - structure made out of built -up concrete Encasings: - walls: :cassetes, mineral wool, anti – dew foil,
metal sheet for facade - roof: trapezoidal sheet, anti – dew foil, mineral
wool, heat – sealable membrane Exterior furnishings: - exterior roads and platforms (42 000 sqrm) - docks - connection to the national road (15 000 sqrm)
56. ”METRO” - ARAD HALL
• built surface – 9.000 sqrm • type of contract – General Contractor • time of execution – 2 months • year of execution – 2005
Structure: - insulated foundations under the columns, - ground beams - structure made out of built – up concrete Encasings: - walls: cassettes, mineral wool, anti – dew foil,
metal sheet for facade - roof: trapezoidal sheet, anti – dew foil,
mineral wool, heat – sealable membrane Exterior furnishings: - exterior roads and platforms (25 000 sqrm) - docks - connection to the national road (16 000 sqrm)
57. ”METRO” - TIMISOARA 2 HALL • built surface – 9.000 sqrm • type of contract – General Contractor • execution time – 2 months • Year of execution – 2005
Encasings: - walls: :cassettes, mineral wool, anti – dew foil,
metal sheet for facade - roof: trapezoidal sheet, anti – dew foil, mineral
wool, heat – sealable membrane
58. ”METRO” - BELGRAD 2 SERBIA HALL • built surface – 12.000 sqrm • type of contract – subcontractor • time of execution – 2 luni • year of execution – 2005
Encasings: - walls: cassettes, mineral wool, anti – dew foil, metal sheet for facade - roof: trapezoidal sheet, anti – dew foil, mineral wool, heat – sealable membrane
59. „SELGROS” - CRAIOVA HALL • built surface – 14.000 sqrm • type of contract – subcontractor • time of execution – 2 months • year of execution – 2005
Encasings: - walls: cassettes, mineral wool, anti – dew foil, metal sheet for facade - roof: trapezoidal sheet, anti – dew foil, mineral wool, heat – sealable membrane
60. „SELGROS” - PLOIESTI HALL
• built surface – 14.000 sqrm • type of contract – subcontractor • time of execution – 2 months • year of execution – 2005
Encasings: - walls: cassettes, mineral wool, anti – dew foil, metal sheet for facade - roof: trapezoidal sheet, anti – dew foil, mineral wool, heat – sealable membrane
61. ”SIEMENS” - SIBIU HALL
• built surface – 4.000 sqrm • type of contract – subcontractor • time of execution – 2 months • year of execution – 2005
Encasings - walls: cassettes, mineral wool, anti – dew foil, metal sheet for facade - roof: trapezoidal sheet, anti – dew foil, mineral wool, heat – sealable membrane
62. „METRO” - KRACUJEVAC SERBIA HALL
• BUILT SURFACE – 9.000 sqrm • type of contract – subcontractor • time of execution – 2 months • year of execution – 2005
Encasings: - walls: cassettes, mineral wool, anti – dew foil, metal sheet for facade - roof: trapezoidal sheet, anti – dew foil, mineral wool, heat – sealable membrane
63. „COINDU” – CURTICI, ARAD
• built surface – 12.000 sqrm • time of execution – 3 months • year of execution - 2005
Encasings: - walls: cassettes, mineral wool, anti – dew foil,
metal sheet for facade - roof: trapezoidal sheet, anti – dew foil, mineral
wool, heat – sealable membrane
64. „COFICAB EASTERN EUROPE” - ARAD
• built surface – 15.000 sqrm • type of contract – General Contractor • time of execution – 6 months • year of execution - 2005
Structure: - insulated foundations under the columns, - ground beams - technical channels - euro profiles metallic structure Encasings - walls: cassettes, mineral wool, anti – dew foil,
metal sheet for facade - roof: trapezoidal sheet, anti – dew foil,
mineral wool, heat – sealable membrane Exterior furnishings: - exterior roads and platforms (35 000 sqrm) - docks
65. „REAL” - CONSTANTA
• built surface - 14.500 sqrm • type of contract – subcontractor • time of execution – 2,5 months • year of execution - 2006
66. „REAL” - CRAIOVA
• built surface – 15.000 sqrm • type of contract – subcontractor • time of execution – 2,5 months • year of execution – 2006
67. „SELGROS” - BACAU
• built surface – 14.500 sqrm • type of contract – subcontractor • time of execution – 3 months • year of execution – 2006
68. „SELGROS” - SUCEAVA
• built surface – 14.500 sqrm • type of contract – subcontractor • time of execution – 3,5 months • year of execution – 2006 -2007
69. „SPAR” - ARAD
• built surface – 1.100 sqrm • type of contract – General Contractor • time of execution – 1,5 months • year of execution – 2006
70. „SPAR” - RESITA • built surface – 1.100 sqrm • type of contract – General Contractor • time of execution – 1,5 monhs • year of execution – 2006
71. „KANDIA” - BUCHAREST
• built surface: - 4.572 sqrm • type of contract – General Contractor • time of execution: 5 months • year of execution - 2006
72. „SELGROS” - IASI • built surface – 16.000 sqrm • type of contract – subcontractor • time of execution – 4,5 months • year of execution – 2007 – 2007
73. „REAL” - TARGU – MURES • built surface – 15.500 sqrm • type of contract – subcontractor • time of execution – 1,5 months • year of execution – 2006
74. „REAL” - BRASOV
• built surface – 12.500 sqrm • type of contract – subcontractor • time of execution - 1,5 months • year of execution – 2006
75. „HORNBACH” - BUCHAREST • type of contract – General Contractor • built surface – 16.773 sqrm • time of execution: - 8 months • year of execution – 2006 – 2007
76. „SELGROS” - BRAILA • built surface – 14.500 sqrm • type of contract – Subcontractor • time of execution – 3 months • year of execution – 2008
77. „PRAKTIKER” - IASI • built surface – 10.000 sqrm • type of contract – General Contractor • time of execution – 3,5 months • year of execution – 2008
78. WAREHOUSE „PENNY MARKET” - TURDA • built surface – 30.000 sqrm • type of contract – General Contractor • time of execution - 6 months • year of execution 2008
79. COMERCIAL COMPLEX „ARMONIA” - ARAD • built surface – 51.090,8 sqrm • roads and platforms surface – 64.200 sqrm • road connection • type of Contract – General Contractor • year of execution – 2008
80. Comercial Complex „LOTUS MARKET” ORADEA • built surface – 35.000 sqrm • roads and platforms surface – 20.000 sqrm • type of contract – Subcontractor • time of execution – 4 months • year of execution – 2008
81. Comercial Complex „ARMONIA” – SATU-MARE • Built surface – 51.100 sqrm • parking, roads, platforms– 112.000 sqrm • type of contract – General Contractor • time of execution – in work
82. Comercial Complex „ROUA” – BRASOV • built surface – 40.500 sqrm • parking, roads, platforms– 86.000 sqrm • type of contract – General Contractor • time of execution – in work
83. WAREHOUSE „TRADE TRANS TERMINAL” – CURTICI, ARAD
• built surface – 5.400 sqrm • roads and platforms surface – 10.500 sqrm • type of contract – General Contractor • time of execution - 3 months • year of execution 2008
84. „INTERMODAL” RAILPORT TERMINAL - CURTICI, ARAD
• built surface – 36.600 sqrm • railway – 2.500 m • type of contract – General Contractor • time of execution - 4 months • year of execution 2008
85. Office building „TRADE TRANS LOG” CURTICI, ARAD • built surface – 2.000 sqrm • roads and platforms surface – 2.400 sqrm • type of contract – General Contractor • time of execution – 2.5 months • year of execution 2009
86. „KAUFLAND” RESITA
• built surface – 5.500 sqrm • roads and platforms surface – 15.000 sqrm • type of contract – Subcontractor • time of execution – 3 months • year of execution – 2009
87. „DEDEMAN” II STORE - BUCURESTI • built surface – 13.400 sqrm • roads and platforms surface – 6.200 sqrm • type of Contract – General Contractor • time of execution – 3.5 months • year of execution – 2009
88. „SELGROS” – MILITARI, BUCURESTI • built surface – 11.700 sqrm • roads and platforms surface – 13.000 sqrm • type of contract – Subcontractor • time of execution – 4 months • year of execution – 2009
89. „DEDEMAN” STORE - BRASOV • - built surface – 14.500 sqrm • - roads and platforms surface – 18.200 sqrm • - type of Contract – General Contractor • - time of execution – 4 months • - year of execution – 2010
90. „DEDEMAN” STORE - CRAIOVA • - built surface – 13.100 sqrm • - roads and platforms surface – 18.000 sqrm • - type of Contract – General Contractor • - time of execution – 4 months • - year of execution – 2010
91. „DEDEMAN” STORE - ARAD
• - built surface – 13.100 sqrm • - roads and platforms surface – 18.400 sqrm • - type of Contract – General Contractor • - time of execution – in work • - start of execution – december 2009
92. „DEDEMAN” STORE - TIMISOARA
• - built surface – 15.400 sqrm • - roads and platforms surface – 18.400 sqrm • - type of Contract – General Contractor • - time of execution – in work • - start of execution – march 2010
ROAD DIVISION
HUMAN RESOURCES
The road division has 483 employees, 50 with high degree in road construction specialists and other personnel construction and restoring roads.
EXPERTISE
Construction, maintenance and mending of highways, roads, airdromes, sports grounds Construction demount, embankments and building site management Lease of construction and demount equipment with service personnel
SERVICES
On site stabilizing and recycling of road layers with an addition of frothy bitumen, cement or other binders Summer and winter road maintenance Mending of road systems Maintenance and mending of art works Paving, reinforcing and modernizing roads Support walls and parapetes Asphalt carpets Preparation and delivering of asphalt mixture
COMPLETED PROJECTS
o Primary mending works on the DN 68-57 km national road (16.7 mil euro); o Asphalt mending works on Highway A1; o Modernization of county and communal roads; o Mending and compensation works for the wear of the road coating caused by Road reinforcement
works, maintenance works for roads, embankments, art works, execution of support walls, rigid parapets, asphalt drillings on DN57B and DN57;
o Stabilizing works; o On site recycling works of the road coating; o On site consolidation by recycling with frothy bitumen and cement and two layers of DC39 mixture
– Sânandrei cityhall o Mending works with mixture on large and isolated surfaces 28,669,117 lei
EQUIPMENTS
o Equipment for production of asphalt mixture, total capacity of 500 tones/h: o OKIPP asphalt mixing plant - 240t/h = 1 piece• o BENINGHOVEN asphalt mixing plant -160 t/h = 1 piece• o KDM asphalt mixing plant -100 t/h = 1 piece• Laying aspahlt mixture tools o ABG road paver finisher = 3 pieces• o MARINI road paver finisher = 1 piece• o VÖGELE road paver finisher = 3 pieces• o HAMM mixt cilindric vibrocompactor = 6 pieces• o HAMM wheels cilindric vibrocompactor = 6 pieces• o Bituminos emulsion plant o Aspahlt distributing truck• o Emulsion distributing equipment• o TEREX Crushing and Screening equipment = 1 piece o On site milling machines o WIRTGEN 2500 cold milling machine = 1 piece• o WIRTGEN 2100 cold milling machine = 1 piece• o Road construction and maintenance machines o CAT dreger – 3 pieces• o CAT 428 Bulldreger = 15 pieces• o CAT bulldozer = 2 pieces• o Motor graders = 7 pieces• o UMBARBER green road widener= 1 piece• o HAMM cilindric vibrocompactor = 9 pieces• o BOMAG cilindric vibrocompactor = 14 pieces • o 500 W asphalt driller = 5 pieces• o CAT frontal loader 3.5 mc = 4 pieces• o Vibratory plate compactors = 6 pieces• o Themocontainer = 10 pieces• o Means of transportation o MERCEDES BENZ ACTROS dump truck= 15 pieces• o ROMAN dump track – 20 pieces• o Carcrane = 2 pieces• o MERCEDES Transporter = 17 pieces• o LEA Transporter = 30 pieces• o Transport trailer equipment = 15 pieces• o Semitrailer = 2 pieces• o Equipment for snow removal and spreading of non-skidding materials = 52 pieces
Since November 2000 S.C. P.A.B. ROMANIA S.R.L. is certified by the ROMANIAN SOCIETY FOR QUALITY ASSURANCE as being the owner of a quality assurance system, according to the ISO 9001 standard. The quality of execution and complying with the contracted terms are two major objectives of our company and are certified by the owners.
PRESIDENT ION SANDU