CASA 1000 HVDC Primary Transmission LineTajikistan-Afghanistan-Pakistan
Full storage 10.5 Bil. cubic metersActive storage 4.5 Bil. cubic meters
NUREK HPP AND RESERVOIR
Full storage 13 Bil. cubic metersActive storage 8.6 Bil. cubic meters
ROGUN HPP
Full storage 3.1 Bil. cubic metersActive storage 2.5 Bil. cubic meters
KAIRAKKUM RESERVOIR
Max. Volume 5 Bil. cubic metersKOKSARAI RESERVOIR (FUTURE PROJECT)
Max. Volume 5.2 Bil. cubic metersSHARDARA RESERVOIR
Max. Volume 66 Bil. cubic metersARNASAI DEPRESSION
Full storage 19.5 Bil. cubic metersActive storage 14.0 Bil. cubic meters
Future Rehabilitation
Future Rehabilitation
AC/DC Converter
Rehabilitation
Energy Loss ReductionProject (ELRP) in Tajikistan
Energy Emergency AssistanceProject in Kyrgyz Rep.
Assessment Studies for Rogun HPP
Energy Efficiency Facilityfor Industrial Enterprises
Project in Uzbekistan
TOKTOGUL RESERVOIR
Max. Volume 4.6 Bil. cubic metersKAMBARATA-1 RESERVOIR (FUTURE PROJECT)
Power Modernization Project(ADB) in Kyrgyz Rep.
Energy Emergency RecoveryAssistance Project in Tajikistan
Transmission Rehabilitation and Expansion (ADB) Project in Tajikistan
Pamir Private Power Projectin Tajikistan
DUSHANBEDUSHANBE
TASHKENTTASHKENT
BISHKEKBISHKEK
Kzyl-Orda TPPKzyl-Orda TPP
Karakul’Karakul’
Navoi TPPNavoi TPP1250 MW1250 MW
Mubarek CHPMubarek CHP
Talimarjan TPP 800 MWTalimarjan TPP 800 MW(expansion)(expansion)
GuzarGuzar
SogdianaSogdiana
SurkhanSurkhan
RegarRegar
JavanJavanCHPCHP
Golovnaia HPPGolovnaia HPP
BaipazaBaipazaHPPHPP
Nurek HPP 3000 MWNurek HPP 3000 MW
Rogun HPPRogun HPP3600 MW3600 MW
Tajik Fang-Yagnob Coal TPP 1500 MWTajik Fang-Yagnob Coal TPP 1500 MW
Syrdaria TPPSyrdaria TPP 3000 MW 3000 MW
Kairakkum HPPKairakkum HPP126MW126MWFarhad HPPFarhad HPP
126MW126MW
UzbekistonUzbekiston
Tashkent TPPTashkent TPP 1860 MW 1860 MW
Shardara HPPShardara HPP100 MW100 MW
ChimkentChimkentCharvak HPP 620MWCharvak HPP 620MW
Hojikent HPP 165MWHojikent HPP 165MWGazalkent HPP 120MWGazalkent HPP 120MW Angren TPPAngren TPP
LochinLochin
Shamaldysai HPP 240MWShamaldysai HPP 240MWUchkurgan HPPUchkurgan HPP180MW180MW
Andijgan HPP 140 MWAndijgan HPP 140 MW
Tashkumyr HPP 450MWTashkumyr HPP 450MWKurpsai HPP 800 MWKurpsai HPP 800 MW
Toktogul HPP 1200MWToktogul HPP 1200MW
Ala-Bel’Ala-Bel’
Bishkek CHPBishkek CHPFrunzenskaia
ZhambylZhambylZhambyl TPPZhambyl TPP1230 MW1230 MW
AlmatyAlmaty
YuK GRESYuK GRES
Kapchagai HPPKapchagai HPP
Atbashi HPP 40MWAtbashi HPP 40MW
APK CHP-3APK CHP-3
Hojent 500/220 kVHojent 500/220 kV
Datka 500/220 kVDatka 500/220 kV
Lake Sarez HPP 250 MWLake Sarez HPP 250 MW
Kambarata 1 HPPKambarata 1 HPP1900 MW1900 MW
Kambarata 2 HPPKambarata 2 HPP240/360 MW240/360 MW
Moinak HPPMoinak HPP300 MW300 MW
Sangtuda 1 HPP 670 MWSangtuda 1 HPP 670 MW
Sangtuda 2 HPP 220 MWSangtuda 2 HPP 220 MW
K A Z A K H S T A NK A Z A K H S T A N
U Z B E K I S T A NU Z B E K I S T A N
TURKMENISTANTURKMENISTAN
TAJIKISTANTAJIKISTAN
A F G H A N I S T A NA F G H A N I S T A N
C H I N AC H I N A
KYRGYZ REP.KYRGYZ REP.
Novo-Angren TPP 2100 MWNovo-Angren TPP 2100 MW
ShuShu AlmaAlma
KeminKemin
Coal TPP 1200 MWCoal TPP 1200 MW
Coal TPPCoal TPP200 MW200 MW
C H I N AC H I N A
Balkhash TPP 1320 MW (ADB, EBRD, IFC, Korea Exim Bank)Balkhash TPP 1320 MW (ADB, EBRD, IFC, Korea Exim Bank)
DUSHANBE
TASHKENT
BISHKEK
Kzyl-Orda TPP
Karakul’
Navoi TPP1250 MW
Mubarek CHP
Talimarjan TPP 800 MW(expansion)
Guzar
Sogdiana
Surkhan
Regar
JavanCHP
Coal TPP200 MW
Golovnaia HPP
BaipazaHPP
Nurek HPP 3000 MW
Rogun HPP3600 MW
Tajik Fang-Yagnob Coal TPP 1500 MW
Syrdaria TPP3000 MW
Kairakkum HPP126MWFarhad HPP
126MW
Uzbekiston
Tashkent TPP 1860 MW
Shardara HPP100 MW
ChimkentCharvak HPP 620MW
Hojikent HPP 165MWGazalkent HPP 120MW Angren TPP
Lochin
Shamaldysai HPP 240MW
Novo-Angren TPP 2100 MW
Uchkurgan HPP180MW
Andijgan HPP 140 MW
Tashkumyr HPP 450MWKurpsai HPP 800 MW
Toktogul HPP 1200MW
Ala-Bel’
Bishkek CHPFrunzenskaia
ZhambylZhambyl TPP1230 MW
ShuAlmaty
Alma
Kemin
YuK GRES
Balkhash TPP 1320 MW (ADB, EBRD, IFC, Korea Exim Bank)
Kapchagai HPP
Sary-Jaz Cascade of HPPs700–1500 MW
Atbashi HPP 40MW
Coal TPP 1200 MW
APK CHP-3
Hojent 500/220 kV
Datka 500/220 kV
Lake Sarez HPP 250 MW
Kambarata 1 HPP1900 MW
Kambarata 2 HPP240/360 MW
Moinak HPP300 MW
Sangtuda 1 HPP 670 MW
Sangtuda 2 HPP 220 MWC
K A Z A K H S T A N
U Z B E K I S T A N
TURKMENISTAN
TAJIKISTAN
A F G H A N I S T A N
C H I N A
C H I N A
KYRGYZ REP.
Syr Darya
Amu Darya
Zeravshan Darya
Naryn
Naryn
Vak
hshKarakum Canal
Pyanj
AydarkulAydarkulLakeLake
LakeLakeIssyk-Kul Issyk-Kul
AydarkulLake
LakeIssyk-Kul
Syr Darya
Amu Darya
Zeravshan Darya
Naryn
Sary-Jaz
Naryn
Vak
hshKarakum Canal
Pyanj
64° 72°
38°
72°64°
38°Area of Main Map
Aral Sea
TAJIKISTANTAJIKISTAN
UZBEKISTANUZBEKISTANTURKMENISTANTURKMENISTAN
AFGHANISTANAFGHANISTAN
KYRGYZKYRGYZREPUBLICREPUBLIC
CHINACHINA
ISLAMIC REP.ISLAMIC REP.OF IRANOF IRAN
TAJIKISTAN
UZBEKISTANTURKMENISTAN
AFGHANISTAN
KYRGYZREPUBLIC
CHINA
ISLAMIC REP.OF IRAN
KAZAKHSTAN
CENTRAL ASIA REGIONAL ENERGY–WATER PROGRAM IBRD 39284
MAY 2012
0 100 200
KILOMETERS
HYDRO POWER PLANTS:
<500 MW
500–1000 MW
>1,000 MW
THERMAL POWER PLANTS:
<500 MW
500–1000 MW
>1,000 MW
500 kV SUBSTATIONS
500 kV OVERHEAD LINES
OPERATIONALUNDER CONSTR.
Th is map was produced by the Map Des ign Uni t o f The Wor ld Bank. The boundar ies , co lo rs , denominat ions and any other in format ionshown on th is map do not imply, on the par t o f The Wor ld BankGroup, any judgment on the lega l s tatus of any te r r i to ry , o r anyendorsement or acceptance of such boundar ies .
PROSPECTIVE
IRRIGATED LAND
KARAKUM CANAL
MAIN RIVERS
MAIN TRIBUTARIES
NATIONAL CAPITALS
INTERNATIONAL BOUNDARIES
Population (millions)
GNI per capita ($)
Land area (000 km2)
KAZ
15.67
6126
2725
KYG
5.28
758
192
TAJ
6.84
585
140
TURK
5.03
2783
470
UZB
27.31
915
425