+ All Categories
Home > Documents > Chandrashekhar Mangalgirimangalgiri.in/img/member/Chandrashekhar cv.pdf · Chandrashekhar...

Chandrashekhar Mangalgirimangalgiri.in/img/member/Chandrashekhar cv.pdf · Chandrashekhar...

Date post: 23-Aug-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
10
Chandrashekhar Mangalgiri Details of Credentials Education IIT, Delhi, 1995. M Tech in Construction Management & Building Sciences Ravishanker University, Raipur, 1982. BE (Civil), Govt College of Engineering Raipur (Now NIT Raipur) Board of Secondary Education Bhopal, 1975. Hr Secondary Govt. Multipurpose Hr Sec School, Jagdalpur Professional WITH NATIONAL HIGHWAYS AUTHORITY OF INDIA JUNE 2000 – TILL DATE (19 YEARS) 17 th Jan 2015–Till Date Regional Officer, Nagpur 31 st Oct 2012–17 th Jan 2015 Project Director, Nagpur 2 nd Apr 2012–31 st Oct 2012 General Manager at Regional Office, Nagpur 4 th Oct 2010–31 st Mar 2012 General Manager Co-ordination and Land Acquisition at HQ 1 st Feb 2009–31 st Jan 2011 General Manager Technology Induction Cell, HQ 7th Oct 2007–31st Jan 2009 Project Director, Vijayawada & Rajahmundry. 22 nd Mar 2004–7 th Oct 2007 Project Director, Varanasi. May 2003–Mar 2004 Project Director, Jammu. June 2000–May 2003 Project Director, Ahmedabad DG-1 Amar Vihar Kamptee Road Nagpur-440026 9096067685 [email protected] Mangalgiri.in
Transcript
Page 1: Chandrashekhar Mangalgirimangalgiri.in/img/member/Chandrashekhar cv.pdf · Chandrashekhar Mangalgiri Details of Credentials Education IIT, Delhi, 1995. M Tech in Construction Management

Chandrashekhar Mangalgiri

Details of Credentials

Education

IIT, Delhi, 1995. M Tech in Construction Management & Building Sciences Ravishanker University, Raipur, 1982. • BE (Civil), Govt College of Engineering Raipur (Now NIT Raipur) Board of Secondary Education Bhopal, 1975. • Hr Secondary Govt. Multipurpose Hr Sec School, Jagdalpur

Professional

WITH NATIONAL HIGHWAYS AUTHORITY OF INDIA JUNE 2000 – TILL DATE (19 YEARS)

17th Jan 2015–Till Date Regional Officer, Nagpur

31st Oct 2012–17th Jan 2015 Project Director, Nagpur

2nd Apr 2012–31st Oct 2012 General Manager at Regional Office, Nagpur

4th Oct 2010–31st Mar 2012 General Manager Co-ordination and Land Acquisition at HQ

1st Feb 2009–31st Jan 2011 General Manager Technology Induction Cell, HQ

7th Oct 2007–31st Jan 2009 Project Director, Vijayawada & Rajahmundry. 22nd Mar 2004–7th Oct 2007 Project Director, Varanasi.

May 2003–Mar 2004 Project Director, Jammu. June 2000–May 2003 Project Director, Ahmedabad

DG-1 Amar Vihar Kamptee Road

Nagpur-440026

9096067685

[email protected]

Mangalgiri.in

Page 2: Chandrashekhar Mangalgirimangalgiri.in/img/member/Chandrashekhar cv.pdf · Chandrashekhar Mangalgiri Details of Credentials Education IIT, Delhi, 1995. M Tech in Construction Management

WITH BORDER ROADS ORGANISATION

APR 1984 TO MAY 200 (16 YEARS)

May 1998–May 2000

Officer Commanding 71 Road Construction Company

Jan 1995 - May 1998: Deputy Director Works & Planning at HQ

Apr1 991 - Oct 1992: Second in Command, 68 Road Construction Company,

Aug 1989 to Apr 1991: Cost Control Officer 50 Border roads Task Force.

Apr 1987–Aug 1989

Dy. Garrison Engineer, 1353 GE •

Apr 1985–Apr 1987 Second in Command, 83 Road Construction Company

Apr 1984–Apr 1985

Platoon Commander 415 Road. Maintenance. Platoon,

WITH CENTRAL WAREHOUSING CORPORATION

& MITTAL BUILDERS APR 1983 TO APR 1984 (2 YEARS)

Oct 1983–Apr 1984

Assistant Engineer, Chirgaon, Jhansi & Banda in Uttar Pradesh•

Apr 1982 – Oct 1983

Project Manager, Delhi.

Page 3: Chandrashekhar Mangalgirimangalgiri.in/img/member/Chandrashekhar cv.pdf · Chandrashekhar Mangalgiri Details of Credentials Education IIT, Delhi, 1995. M Tech in Construction Management

EXPERIENCE POSSESSED BY THE EXPERT

FROM 17.01.2015 TO TILL DATE: WORKING AS REGIONAL OFFICER AT NATIONAL

HIGHWAYS AUTHORITY OF INDIA, REGIONAL OFFICE-NAGPUR IN MAHARASHTRA.

Brief Description:

• Responsible for construction and Maintenance of more than 4000 Km of various NHDP projects in the State of Maharashtra & Chhattisgarh.

• Responsible for handling pre-construction & post-construction activities i.e. finalization of accounts, preparation of road property records, Arbitrations and Court Cases.

• Have engaged Road Safety Consultancy, Independent Engineers during O&M period, Supervision Consultancy Services and DPR consultants for prestigious projects under RO-Nagpur

• Clearing the approvals for long pending forest clearances through coordination at highest level officers of Forest Department & concerned Ministries

• Responsible for Safety of Roads under RO-Nagpur

Experience:

• Construction & Maintenance Roads & Bridges

• Arbitrations and Court Cases pertaining to land acquisition and construction contracts.

• Contract Managements for roads built under BOT Annuity, BOT Toll, Hybrid Annuity Mode and EPC

• Engagement of Road Safety Consultancy, Independent Engineers during O&M period, Supervision Consultancy Services and DPR consultants for prestigious projects under RO-Nagpur

FROM 31.10.2012 TO 17.01.2015: WORKED AS PROJECT DIRECTOR AT NATIONAL

HIGHWAYS AUTHORITY OF INDIA, PIU-NAGPUR IN MAHARASHTRA.

Brief Description:

• Responsible for construction of more than 250 Km of NHDP Phase-IV projects.

• Responsible for handling post construction activities i.e. finalization of accounts, preparation of road property records, Arbitrations and Court Cases

• Responsible for safety of roads under PIU-Nagpur

Experience:

• Construction & Maintenance Roads & ROB

• Arbitrations and Court Cases pertaining to land acquisition and construction contracts.

Page 4: Chandrashekhar Mangalgirimangalgiri.in/img/member/Chandrashekhar cv.pdf · Chandrashekhar Mangalgiri Details of Credentials Education IIT, Delhi, 1995. M Tech in Construction Management

• Contract Managements for roads built under BOT Annuity & BOT Toll.

• Safety Audit of Roads

FROM 02.04.2012 TO 31.10.2012: WORKED AS GENERAL MANAGER AT REGIONAL

OFFICE MAHARASHTRA.

Brief Description:

• Assisted RO for following activities in Implementation of Consultancy work, approval of estimates for railway charges for clearances from railways, Issue of commencement orders for the contacts entered under RO Maharashtra, Monitoring the works under execution, examining the proposals for release of equity support, processing of proposals for change of scope, dealing with Dispute resolution and arbitrations, and asset management.

Experience:

• Exposed to the activities of Regional Office

• Held the responsibility of employer’s representative for the concessions/contracts under operation at RO-Maharashtra.

FROM 04.11.2010 TO 31.03.2012: WORKED AS GENERAL MANAGER CO-ORDINATION

AND LAND ACQUISITION HQ NATIONAL HIGHWAYS AUTHORITY OF INDIA (NHAI), NEW

DELHI, INDIA.

Brief Description:

• Responsible for all Land Acquisition activities.

• Matters related to Parliament

• Monitoring of Board Meetings; Executive Committee Meetings, Variation Committee Meetings etc.

• Keeping track of Information related to Projects and other activities of NHAI.

Experience:

• Exposed to Formulating and Drafting of Policies

• Exposed to process of decision making at highest level of NHAI and Government of India

FROM 01.02.2009 TO 31.03.2011: WORKED AS GENERAL MANAGER TECHNOLOGY

INDUCTION CELL, HQ NATIONAL HIGHWAYS AUTHORITY OF INDIA (NHAI), NEW DELHI,

INDIA.

Brief Description:

• Responsible for R&D activities; formulate technical manuals, standards and specifications for guiding design and safety.

Page 5: Chandrashekhar Mangalgirimangalgiri.in/img/member/Chandrashekhar cv.pdf · Chandrashekhar Mangalgiri Details of Credentials Education IIT, Delhi, 1995. M Tech in Construction Management

• New technological developments, track international best practices.

• Facilitate design consistency and standardization, advice the technical divisions on the matters relating to standards and specifications for all stages of contract management.

• Interact with organizations involved in R&D activities / standardization in highways sector.

• Proactively study best practices in the world and encourage concessionaires to use upcoming techniques and materials with a view to reducing cost and time period of road construction.

• Improve road safety and perform functions such as standardization and quality, research, testing procedures and technological up gradation in the area.

Experience:

• Exposed to International Practises in the area of Roads, Bridge & Tunnel construction.

• Associated with formulation of standards and Codes for Roads, Bridge & Tunnel construction.

• Formulating and Drafting Policies.

FROM 07.10.2007 TO 31.01.2009: WORKED AS PROJECT DIRECTOR, NATIONAL HIGHWAYS AUTHORITY OF INDIA (NHAI), VIJAYAWADA & RAJAMUNDRY, INDIA.

Brief Description:

• Responsible for maintenance of more than 400 Km of Golden Quadrilateral

• Associated with preparation of proposals for converting the four-lane section of GQ to six lanes.

• Responsible for handling post construction activities i.e. finalization of accounts, preparation of road property records, Arbitrations and Court Cases.

• Responsible for Safety of Roads

Experience:

• Maintenance of Roads & Bridges

• Arbitrations and Court Cases pertaining to land acquisition and construction contracts.

• Contract Managements for roads built under BOT Annuity.

• Safety Audit of Roads

FROM 22.03.2004 TO 07.10.2007: WORKED AS PROJECT DIRECTOR, NATIONAL HIGHWAYS AUTHORITY OF INDIA (NHAI), VARANASI, INDIA.

Brief Description:

• Responsible as employer’s representative at site for operation of World Bank funded Projects of four-lane and strengthening of construction package IV A & IV C under Grand Trunk Road Improvement Project (GTRIP) and Package IV B & IV D under Third National Highways Project (TNHP), costing about Rs. 1400 crores.

• Responsible for Preconstruction activities i.e. land Acquisition, Utility Shifting, Statutory clearance from government, Resettlement & Rehabilitation in association with local administrative and NGOs.

• Safety of Roads

Page 6: Chandrashekhar Mangalgirimangalgiri.in/img/member/Chandrashekhar cv.pdf · Chandrashekhar Mangalgiri Details of Credentials Education IIT, Delhi, 1995. M Tech in Construction Management

Experience:

• Construction of fly overs.

• Major bridges

• Reinforced earth walls

• Rigid pavement and flexible pavement.

• Co-ordination with World Bank Construction site.

• Safety Audit of Roads

FROM MAY 2003 TO MARCH 2004: WORKED AS PROJECT DIRECTOR, NHAI, JAMMU.

Brief Description:

• Responsible for conversion of two lance to four lane programme of NH 1A in the state of Jammu & Kashmir. Total length about 425 Kms.

• Coordination with DPR Consultant for preparation of DPR of Hill Roads

• Employer’s representative for execution works to the tune of 160 crores.

• Pre-construction activities i.e., Land Acquisition & Utility Shifting.

• Safety of Roads Experience:

• Examining roads proposal with regard to safety of roads planned.

• Examining DPRs for hill road construction.

• Coordinating with local bodies for land acquisition and utility shifting.

FROM JUNE 2000 TO MAY 2003: WORKED AS PROJECT DIRECTOR, NHAI, AHEMDABAD.

Brief Description:

• Responsible in the capacity of employer’s representative at site for execution of civil works of National Expressway No.1 between Ahmedabad-Vadodara Section (94 Km.).

• Maintenance of existing NH-8 between Ahmedabad-Surat Section (263 Km.)

• Safety of Expressways

Experience:

• Construction of Expressways

• Maintenance of National Highways

• Coordination with local authorities for utility shifting.

• Operating of toll collection.

• Providing Safety features for Expressways

Page 7: Chandrashekhar Mangalgirimangalgiri.in/img/member/Chandrashekhar cv.pdf · Chandrashekhar Mangalgiri Details of Credentials Education IIT, Delhi, 1995. M Tech in Construction Management

FROM MAY 1998 TO MAY 2000: WORKED AS OFFICER COMMANDING 71 ROAD

CONSTRUCTION COMPANY IN BORDER ROAD ORGANISATION.

Brief Description:

• Responsible for construction and maintenance of NH 54 and 54 B in the state of Mizoram.

• Construction of other roads under North-East Council and Ministry of Defence to the specification of National Highway single lane. Total length of road handled 600 Kms.

• Safety of Roads Experience:

• Construction and planning of execution of Hill roads and bridges in remote areas.

• Inventory management for road construction.

• Human resources management for road construction.

• Budgetary control.

• Equipment management.

• Safety requirements for hill roads

FROM JANUARY 1995 TO MAY 1998: WORKED AS DEPUTY DIRECTOR WORKS &

PLANNING IN BORDER ROAD ORGANISATION.

Brief Description:

• Responsible for scrutiny of project proposals and processing with government for getting administration approval.

Experience:

• Planning of road construction activities to tune of 700 crores per year.

• Budgetary control.

FROM APRIL 1991 TO OCTOBER 1992: WORKED AS SECOND IN COMMAND, 68

CONSTRUCTION COMPANY, BORDER ROAD ORGANISATION.

Brief Description:

• Responsible for logistic support for maintenance of snow bond road i.e. 22 in the state of Himachal Pradesh.

Experience:

• Progress monitoring.

• Inventory management for road construction.

• Human resources management for road construction.

• Budgetary control.

• Planning road construction activities.

• Contract management.

• Equipment management.

• Safety Audit

Page 8: Chandrashekhar Mangalgirimangalgiri.in/img/member/Chandrashekhar cv.pdf · Chandrashekhar Mangalgiri Details of Credentials Education IIT, Delhi, 1995. M Tech in Construction Management

FROM AUGUST 1989 TO APRIL 1991: WORKED AS COST CONTROL OFFICER 50

BORDER ROADS TASK FORCE, BORDER ROAD ORGANISATION.

Brief Description:

• Responsible for monitoring procurement of stores.

• Work of road construction and progress monitoring of construction activities in the Union territory of Andaman & Nicobar.

Experience: • Working in coastal areas. • Construction of Jetties. • Rehabilitation of primitive tribes. • Procurement of construction stores. • Contract management. • Equipment management.

FROM APRIL 1987 TO AUGUST 1989: WORKED AS DY. GARRISON ENGINEER, 1353 GE, BORDER ROAD ORGANISATION

Brief Description: • Responsible for construction of roads. • Construction of accommodation for Infantry Battalion. • Air Field Construction in Great Nicobar Island.

Experience: • Construction of North-South and East-West road in Great Nicobar island • Construction for Defence accommodation. • Equipment management • Construction Air Field.

FROM OCTOBER 1985 TO APRIL 1987: WORKED AS SECOND IN COMMAND, 83 CONSTRUCTION COMPANY, BORDER ROAD ORGANISATION.

Brief Description: • Responsible for logistic support for the project • Conversion of NH-53 form single lance to intermediate lance in the state of Assam and Manipur.

Experience: • Widening of NH having the traffic moving on it. • Human resources management for road construction. • Budgetary control • Contract management. • Equipment management.

Page 9: Chandrashekhar Mangalgirimangalgiri.in/img/member/Chandrashekhar cv.pdf · Chandrashekhar Mangalgiri Details of Credentials Education IIT, Delhi, 1995. M Tech in Construction Management

FROM APRIL 1984 TO OCTOBER 1985: WORKED AS PLATOON COMMANDER 415 R.M. PLATOON, BORDER ROAD ORGANISATION.

Brief Description: • Responsible for construction of Udarband-Mahur, Section of NH-54 which is presently a part of

East – West Corridor on NHDP. Experience: • Construction of new road • Human resources management for road construction. • Contract management. • Equipment management.

FROM OCT. 1983 TO APRIL 1984: WORKED AS ASST. ENGINEER IN CENTRAL

WAREHOUSING CORPORATION.

Brief Description:

• Responsible for Construction and Maintenance of Warehouses.

Experience:

• Contract management.

• Maintenance of Silos.

FROM APRIL 1982 TO APRIL 1983: WORKED AS PROJECT MANAGER IN MITTAL

BUILDERS DELHI.

Brief Description:

• Planning and execution of major projects.

• Contract Management.

• Arbitration.

• Litigation.

SIGNIFICANT CONTRIBUTION BY THE EXPERT TO THE INDUSTRY

• Contributed for construction of Roads for 35 years in almost all parts of the country.

• Constructed Expressway between Ahmedabad – Vadodara

• Constructed longest (then) bridge on Golden Quadrilateral at Dehri on Sone, Bihar.

• Connected southern most part of Country Indira Point by road from Campbell bay Jetty

• Constructed southernmost airstrip of the country at Great Nicobar Island

• Designed and constructed mitigation measures for Tiger corridor crossing at Pench Tiger reserve on NH-7

• Constructed Srinagar By-pass during insurgency and GQ in Distt Sasaram & Aurangabad, Bihar Under Maoist threat.

Page 10: Chandrashekhar Mangalgirimangalgiri.in/img/member/Chandrashekhar cv.pdf · Chandrashekhar Mangalgiri Details of Credentials Education IIT, Delhi, 1995. M Tech in Construction Management

WILLINGNESS OF THE EXPERT

I, M. Chandrashekhar, G.M.(Tech.), Regional Officer, NHAI is willing to be a part of Pool of Experts for Comptroller & Auditor General of India.

28th May, 2019 M Chandrashekhar Nagpur Regional Officer

National Highways Authority of India


Recommended