Step 01 Casing place on skidding. Move object to North until Lifting position TITLE of Drawing: PREPARED DESIGN APPROVED CHECKED Dwg.No: Dwg. No: Referensi REVISION SCALE DIVISION RIGGING DEPARTMENT DIMENSIONS IN MILLIMETERS HaGun CATALYST COOLER RIGGING STUDY AND LIFTING PLAN
Transcript

Step 01

Casing place on skidding.

Move object to North

until Lifting position

TITLE of Drawing:

PREPARED

DESIGN

APPROVED

CHECKED

Dwg.No:

Dwg. No:

Referensi

REVISION

SCALE

DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

HaGun

CATALYST COOLER

RIGGING STUDY AND LIFTING PLAN

Step 02

Connected Strand Jack's hook to sling

and lifting guide.

Safety checklist and

QC checklist

TITLE of Drawing:

PREPARED

DESIGN

APPROVED

CHECKED

Dwg.No:

Dwg. No:

Referensi

REVISION

SCALE

DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

HaGun

CATALYST COOLER

RIGGING STUDY AND LIFTING PLAN

Step 03

Tailing by using Strand Jack

and Skidding

TITLE of Drawing:

PREPARED

DESIGN

APPROVED

CHECKED

Dwg.No:

Dwg. No:

Referensi

REVISION

SCALE

DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

HaGun

CATALYST COOLER

RIGGING STUDY AND LIFTING PLAN

Step 04

Continue tailing until vertical

TITLE of Drawing:

PREPARED

DESIGN

APPROVED

CHECKED

Dwg.No:

Dwg. No:

Referensi

REVISION

SCALE

DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

HaGun

CATALYST COOLER

RIGGING STUDY AND LIFTING PLAN

Step 05

Connect hook of Strand Jack to Bundle's Lifting Lug

TITLE of Drawing:

PREPARED

DESIGN

APPROVED

CHECKED

Dwg.No:

Dwg. No:

Referensi

REVISION

SCALE

DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

HaGun

CATALYST COOLER

RIGGING STUDY AND LIFTING PLAN

Step 06

Connect hook of Strand Jack to Bundle's Lifting Lug

All Position.

Lifting prepare.

Safety checklist and

QC checklist

TITLE of Drawing:

PREPARED

DESIGN

APPROVED

CHECKED

Dwg.No:

Dwg. No:

Referensi

REVISION

SCALE

DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

HaGun

CATALYST COOLER

RIGGING STUDY AND LIFTING PLAN

Step 07

Lifting by Slowly.

TITLE of Drawing:

PREPARED

DESIGN

APPROVED

CHECKED

Dwg.No:

Dwg. No:

Referensi

REVISION

SCALE

DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

HaGun

CATALYST COOLER

RIGGING STUDY AND LIFTING PLAN

Step 08

Disconnect Guide Bar on top position

Lifting by Slowly.

TITLE of Drawing:

PREPARED

DESIGN

APPROVED

CHECKED

Dwg.No:

Dwg. No:

Referensi

REVISION

SCALE

DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

HaGun

CATALYST COOLER

RIGGING STUDY AND LIFTING PLAN

Step 09

Lifting by Slowly.

TITLE of Drawing:

PREPARED

DESIGN

APPROVED

CHECKED

Dwg.No:

Dwg. No:

Referensi

REVISION

SCALE

DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

HaGun

CATALYST COOLER

RIGGING STUDY AND LIFTING PLAN

Step 10

Disconnect Guide Bar on lower position

Lifting by Slowly.

TITLE of Drawing:

PREPARED

DESIGN

APPROVED

CHECKED

Dwg.No:

Dwg. No:

Referensi

REVISION

SCALE

DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

HaGun

CATALYST COOLER

RIGGING STUDY AND LIFTING PLAN

Step 10

Disconnect Guide Bar on lower position

Lifting by Slowly.

TITLE of Drawing:

PREPARED

DESIGN

APPROVED

CHECKED

Dwg.No:

Dwg. No:

Referensi

REVISION

SCALE

DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

HaGun

CATALYST COOLER

RIGGING STUDY AND LIFTING PLAN


Recommended