    Step 01

    Casing place on skidding.

    TITLE of Drawing:

    PREPARED

    DESIGN

    APPROVED

    CHECKED

    Dwg.No:

    Dwg. No:

    Referensi

    REVISION

    SCALE

    DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

    HaGun

    CATALYST COOLER

    RIGGING STUDY AND LIFTING PLAN

  • 8/12/2019 Cilacap RFCC Catalist Cooler Casing's Lifting Sequence 30March2014.pdf

    2/7

    Step 02

    Move Object to North position by skidding.

    TITLE of Drawing:

    PREPARED

    DESIGN

    APPROVED

    CHECKED

    Dwg.No:

    Dwg. No:

    Referensi

    REVISION

    SCALE

    DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

    HaGun

    CATALYST COOLER

    RIGGING STUDY AND LIFTING PLAN

  • 8/12/2019 Cilacap RFCC Catalist Cooler Casing's Lifting Sequence 30March2014.pdf

    3/7

    Step 03

    Lifting prepare.

    Safety checklist and

    QC checklist

    TITLE of Drawing:

    PREPARED

    DESIGN

    APPROVED

    CHECKED

    Dwg.No:

    Dwg. No:

    Referensi

    REVISION

    SCALE

    DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

    HaGun

    CATALYST COOLER

    RIGGING STUDY AND LIFTING PLAN

  • 8/12/2019 Cilacap RFCC Catalist Cooler Casing's Lifting Sequence 30March2014.pdf

    4/7

    Step 04

    Tailing process by using Strand Jack

    and Skidding

    TITLE of Drawing:

    PREPARED

    DESIGN

    APPROVED

    CHECKED

    Dwg.No:

    Dwg. No:

    Referensi

    REVISION

    SCALE

    DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

    HaGun

    CATALYST COOLER

    RIGGING STUDY AND LIFTING PLAN

  • 8/12/2019 Cilacap RFCC Catalist Cooler Casing's Lifting Sequence 30March2014.pdf

    5/7

    Step 05

    Vertical position.

    Lifting prepare.

    Safety checklist and

    QC checklist

    TITLE of Drawing:

    PREPARED

    DESIGN

    APPROVED

    CHECKED

    Dwg.No:

    Dwg. No:

    Referensi

    REVISION

    SCALE

    DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

    HaGun

    CATALYST COOLER

    RIGGING STUDY AND LIFTING PLAN

  • 8/12/2019 Cilacap RFCC Catalist Cooler Casing's Lifting Sequence 30March2014.pdf

    6/7

    Step 06

    Lifting.

    TITLE of Drawing:

    PREPARED

    DESIGN

    APPROVED

    CHECKED

    Dwg.No:

    Dwg. No:

    Referensi

    REVISION

    SCALE

    DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

    HaGun

    CATALYST COOLER

    RIGGING STUDY AND LIFTING PLAN

  • 8/12/2019 Cilacap RFCC Catalist Cooler Casing's Lifting Sequence 30March2014.pdf

    7/7

    Step 07

    Finish

    TITLE of Drawing:

    PREPARED

    DESIGN

    APPROVED

    CHECKED

    Dwg.No:

    Dwg. No:

    Referensi

    REVISION

    SCALE

    DIVISION RIGGING DEPARTMENTDIMENSIONS IN MILLIMETERS

    HaGun

    CATALYST COOLER

    RIGGING STUDY AND LIFTING PLAN


Recommended