2 December 2013
Clean Sky 2
F.F. Verduijn
2
3
4
5
Clean Sky 2 Joint Technical Proposal
7
Clean Sky 2 Programme Overview
CS2 Website (June 2013)
Large SystemsITDs
Vehicle IADPs
Tech
nolo
gy E
valu
ato
r (T
E)
Germ
an
Aero
sp
ace C
en
ter
(DLR
)
Tech
nolo
gy E
valu
ato
r (T
E)
Germ
an
Aero
sp
ace C
en
ter
(DLR
)
Building on Clean Sky, going further into integration at full aircraft levelAnd developing new technology streams for the next the next generations of aircraft
Eco-
Des
ign
Frau
nhof
er G
esel
lsch
aft
Regional Aircraft
Alenia Aermacchi
Regional Aircraft
Alenia Aermacchi
FastRotorcraftAgusta Westland Eurocopter
FastRotorcraftAgusta Westland Eurocopter
Engines ITDSafran – Rolls-Royce – MTU
Engines ITDSafran – Rolls-Royce – MTU
Systems ITDThales – Liebherr
Systems ITDThales – Liebherr
Airframe ITDDassault – EADS-CASA – Saab
Airframe ITDDassault – EADS-CASA – Saab
Sm
all A
ir T
ran
sp
ort
Evekto
r –
Pia
gg
ioS
mall A
ir T
ran
sp
ort
Evekto
r –
Pia
gg
io
1.8b€ Total Funding Assumption
1.8b€ Total Funding Assumption
Large Passenger AircraftAirbus
Large Passenger AircraftAirbus
9
10
IADPs and ITDs detailed• Large Passenger
1- Large Passenger Aircraft (LPA) IADP - Michel Goulain (Airbus) F.pdf
• Regional2- Regional Aircraft (R) IADP - Vito Perrupato, Alenia Aermacchi F.pdf
• Fast Rotorcraft3a- Fast Rotorcraft IADP - Philippe Cabrit, Eurocopter F.pdf3b- Fast Rotorcraft IADP - Colin Turner (AW) F.pdf
• Airframe4- Airframe ITD - Alain Bouillon, Dassaut Aviation F.pdf
• Systems6- Systems ITD - Marc Fabreguetter, Thales F.pdf
• Engines5- Engines ITD - Keith Nurney, Rolls-Royce F.pdf
• SAT
11
SAT topics
12
13
14
15
Status Clean Sky 2• 20 juni: Clean Sky-2 Joint Technical Proposal
overhandigd aan de Europese Commissie op de Paris Airshow
• 27 juni: De Europese Commissie, het Europees Parlement en de EU-lidstaten zijn het eens over de meerjarenbegroting voor de komende 7 jaar van H2020
• 10 juli: Commission Proposal Innovation Package Barosso anounces: “The EU plans to invest maximum 1.8 bn€ in the Clean Sky 2
• July: Proposed Technical Program (1.0) beschikbaar• 12 november: Evaluation by Experts afgerond• 21 november: General Kick-off Information session on
Clean Sky 2 hierna infodagen door Europa
16
De weg naar de call for core partner• 2-3 december “General Approach” van de Council
verwacht tijdens de Competitiveness Council• 9 januari: EP rapportage goedkeuring door ITRE
commissie• Februari: EP planair goedkeuring• Maart: Council adoptie verwacht• Maart/April Governing Board CS-2 -> adoption workplan,
rules for indiening voorstellen en selectie en evaluatie criteria van de core partners
• Juni: launch call for core partners
17
Clean Sky info days
18
Budget Aviation in H2020
• Transport share is 8.23% of overall H2020 budget. (H2020 transport budget is 70,2 B€).
• Share of Aviation in Transport is 45%.• In case of 70B€ -> 5.76B€ transport -> aviation 2,6B€
(1B€ lager dan gevraagd, 0,5B€ hoger dan FP7)• Gevraagd: Collaborative research is 1,2 B€, CS-2 1,8B€
and SESAR 0.6B€ (is above budget)• Indien CS-2 en SESAR2 niet worden aangepast:
Collaborative wordt 200M€ -> 1B€ lager dan begroot!
19
Core Partner selectie
20
Evaluatie van voorstellen
21
Conditions for participating as Core Partner
22
23
NL-clusterleidersITD/IADP Industrial lead Ondersteuning NLRLarge Passenger Aircraft en Airframe Fokker: Peter Kortbeek Johan KosRegionals Airborne: Marcus KremersHelicopters (Fast Rotorcraft) Airborne: Marcus Kremers Joost VreekenSystems Aeronamic: Sido Kermans Michiel SelierEngines Dutch Aero: Ad Verbeek Henk Jan ten HoeveSAT Microflown: Alex Koers Toni Kanakis
Nederlandse clusters, deelnemers en omvang Scope, deelnemers•LPA/Airframe
AirborneFokker AerstructuresFokker ELMONLRTUDKE WorksCoDet
•EnginesDutch AeroTUDNLRAtkinsAirborneDAEC
Nederlandse clusters, deelnemers•Systems
NDFTUDNLRAeronamicFokker Landing Gear
•Fast RotorcraftFokker AerostructuresNLRTUDAirborneAeronamicMicroflown
29
Nederlandse clusters, deelnemers•SAT
ACQADSEAirborneAkzoNobelMicroflownSelflyTechnobis Fibre TechnologiesTUDTUEKVETen Cate Advanced CompositesALEAdCuenta
30
Cluster overlegClusters intern•Ter voorbereiding van info/consultation days•Coördinerend om bijdrages en budgeten af te stemmen
Clusteroverleg tussen de NL clusters:•25 januari•28 maart•26 juni•4 juli•29 augustus•26 september•30 oktober
31
Questions?
32