Pyrometry Bob Faticanti Sr. Manager Supplier Development Eng. / Textron Defense Systems Chemical Processing October 21, 2012
Transcript
Page 1: CP Training on Pyrometrics

Pyrometry

Bob Faticanti

Sr. Manager Supplier Development Eng. /

Textron Defense Systems

Chemical Processing

October 21, 2012

Page 2: CP Training on Pyrometrics

Objectives of Training

1. Improve Understanding of Pyrometry

Basics

2. Improve Understanding of AC7108

sections 5.4 and 5.5

3. Communicate AMS 2750 Rev. E

4. Answer any questions

Page 3: CP Training on Pyrometrics

IMPROVE UNDERSTANDING OF PYROMETRY BASICS

Objective #1

Page 4: CP Training on Pyrometrics

AC7108 section 5.4 • Only required to verify the questions in this

section.

• However, AMS 2750 is considered the

baseline requirement

• Customers may have higher requirements

Page 5: CP Training on Pyrometrics

High Level

• Does it look like they know what they are doing?

• Check the procedure, SAT and TUS reports

• Considerations – Does the Supplier also do Heat Treating?

• Are they Nadcap accredited for Heat Treating?

• Are their HT pyrometry systems also over the CP Thermal Processes?

– Does the Supplier do the pyrometry themselves?

– Does the Supplier outsource pyrometry?

Page 6: CP Training on Pyrometrics

Procedures

– Even if Outsourced • Replacement of control sensors (typically annually per 3.4.3.4)

• SAT procedure

– Frequency

– Correction factors

• TUS procedure

– Define Work Zone → Size affects # of sensors and locations → Corners of TUS

sensors = Boundary of where product can be placed → Needs communicated to

shop

– Survey temperatures and qualified operating range

• Quality needs to review

– Any maintenance that could affect SAT

– Any furnace modifications (defined 3.5.3) that could affect TUS

– Address any out of tolerance needs evaluated per material review procedures

• Quality needs to review and approve Instrument Calibration, SAT Report, and

TUS Reports

Page 7: CP Training on Pyrometrics

AMS 2750 Rev D

Page 8: CP Training on Pyrometrics

AMS 2750 Rev D

Page 9: CP Training on Pyrometrics

Let’s Start with

Thermocouples,

Controllers and Recording

Instrumentation

Page 10: CP Training on Pyrometrics

Thermocouples (T/C)

• Sensors have errors. This needs accounted for or the SAT/TUS data is wrong

• Does the Certificate of Compliance for the T/C State the Correction Factor or Deviation? – NOTE: They need to reverse the sign if it lists a “Deviation”

• Average Front to Back of the wire at a given temperature

• Always add the Correction Factor algebraically – e.g. on the following example. If the Temperature measured shows 1510F

then the true value is 1510 + (-1.5) = 1508.5F.

Page 11: CP Training on Pyrometrics

T/C Correction Factor Cont.

• Was the T/C Correction Factor Determined

correctly?

– Do Not Extrapolate Beyond Calibration Range

– One can use various methods but be consistent

• Use the closest value

• Use correction factor that is the highest

• Use the correction factor that is the lowest

• Linearly Interpolate between Temperatures

Page 12: CP Training on Pyrometrics
Page 13: CP Training on Pyrometrics

Other items on Site

• Check if the Supplier has the items

required to be on site per 3.5.21.2

Page 14: CP Training on Pyrometrics

Tested within oper. range

Page 15: CP Training on Pyrometrics
Page 16: CP Training on Pyrometrics

System Accuracy Testing

Page 17: CP Training on Pyrometrics

System Accuracy Test – tests the accuracy of the control T/C

Page 18: CP Training on Pyrometrics

What does the SAT need?

Page 19: CP Training on Pyrometrics

Weekly System Accuracy Test (S.A.T.) Results

Week: 3/11-3/17 Year: 2012

Test Instrument Test Sensor

Identification/Information Controller Test

Sensor Disposition

Furnace Initials Date Time Handheld ID# S/N

Due Date for

Handheld Calibration

E Handheld Correction

Factor

Type (Probe or T/C) S/N or ID

Calibration Cert./Spool

#

D Correction

Factor

Due Date for Probe

Calibration Temp.

Setpoint Offset

A Temp Actual

B Temp As

Read

C (B+D+E) Temp.

Corrected

F SAT

Difference (C-A)

Accept / Reject

Quality Initials

A Z1 VD 3/14/12 4:17 AM 09-170 5/9/12 -1 P 15222 15222 0.65 5/13/2012 980 0 980 976.6 976.25 -3.75

A Z2 VD 3/14/12 4:17 AM 09-170 5/9/12 -1 P 15219 15219 0.35 5/13/2012 980 0 980 977.1 976.45 -3.55

B Sol VD 3/13/12 2:34 PM 09-170 5/9/12 -1 P 15226 15226 1.08 5/6/2012 1000 0 1000 998.1 998.18 -1.82

C Sol VD 3/15/12 12:36 PM 09-170 5/9/12 -1 P 15176 15176 2.5 4/30/2012 1000 0 1000 1000.1 1001.6 1.6

D Sol 09-170 P 0 0

E Sol VD 3/14/12 11:04 AM 09-170 5/9/12 -1 P 15233 15233 1.25 4/28/2012 980 0 980 975.6 975.85 -4.15

0 0

A age VD 3/14/12 8:19 AM 09-170 5/9/12 -0.8 P 15227 15227 0.2 4/30/2012 370 5 365 365.6 365 0

B age VD 3/15/12 11:00 AM 09-170 5/9/12 -0.9 P 15218 15218 -0.1 4/30/2012 475 -5 480 474.4 473.4 -6.6

C age DOWN 09-170 P 0 0

D age VD 3/15/12 4:30 AM 09-170 5/9/12 -0.8 P 15210 15210 2.01 4/17/2012 370 -5 375 373 374.21 -0.79

Page 20: CP Training on Pyrometrics

Temperature Uniformity Survey

Page 21: CP Training on Pyrometrics

Temperature Uniformity Survey tests the variation in temperature within a defined space.

Example TUS rack:

WORK ZONE

Page 22: CP Training on Pyrometrics

AMS 2750 Rev D

Page 23: CP Training on Pyrometrics

390 Cubic Ft. Furnace

Page 24: CP Training on Pyrometrics

What Does TUS Report need?

Page 25: CP Training on Pyrometrics

Accepted and signed by QC.

Page 26: CP Training on Pyrometrics

TUS Checklist

• Does the TUS show high & low T/C results

• Did the TUS run for 30 minutes after all T/C’s are stabilized? Does it show data before they are stabilized?

• Was the correct number of T/C’s used? (see table 11 for required #)

• Is there a diagram of the locations? (see 3.5.13.2 for required locations)

• Did they use a rack? If so is the load condition maintained per 3.5.10

• What is the operating range of the oven/furnace? Are the high and low surveyed at least once per year?

• Each Oven/Furnace must be identified with the operating Temperature Range: ex. 350 – 1000 F

Page 27: CP Training on Pyrometrics

Passing SAT/TUS • Checklist requires Class 5 unless more stringent

is specified by the customer.

• Specified by customer by detailing a temperature range, e.g. 550 +/- 15 makes it class 3. See 3.3.1 Figure A.

• SAT – To pass = +/-5 F unless more stringent class is

specified by the customer

• TUS – To pass = +/-25F from set point unless more stringent

is specified by customer.

Page 28: CP Training on Pyrometrics

AMS 2750 D Para 3.3.1

Figure A • Furnace Class - Temperature Uniformity Range (Degrees F) - Temperature Uniformity Range (Degrees C)

1 +/- 5 F +/-3 C

2 +/- 10 F +/-6 C

3 +/- 15 F +/-8 C

4 +/- 20 F +/- 10 C

5 +/- 25 F +/- 14 C

6 +/- 50 F +/- 28 C

Page 29: CP Training on Pyrometrics

Failing a TUS/SAT

• Did the TUS/SAT report state fail?

• Did any fail but not state fail?

• Did the Supplier take action? e.g. MRB for

all product since last good test

• If the external report stated failed was the

supplier notified by the pyrometry vendor?

Page 30: CP Training on Pyrometrics

IMPROVE UNDERSTANDING OF AC7108 SECTIONS 5.4 AND 5.5

Objective #2

Page 31: CP Training on Pyrometrics

5.5 Misc. equipment below 250F or

otherwise not controlled by 5.4 • The key point is to avoid overheating parts which could be damaging or to

ensure any customer requirements are met.

• 5.5.1 – Are there controllers? Are they calibrated? Check records, check

calibration recall system, check sticker on the controllers

• 5.5.2 – This is basically asking for a TUS light. They may not be following all of

pyrometry rules but need to define the space for the product and testing sensors. Are there procedures? Is a frequency defined? Are max temperatures checked? Are min temps checked if applicable? Is the work zone defined? Is it defined how test is done?

Page 32: CP Training on Pyrometrics

TBD

• Once AC7108 Rev F is finalized, it needs

to be reviewed to determine what, if any

changes need to be emphasized to CP

auditors.

Page 33: CP Training on Pyrometrics

AMS 2750 Rev E • AMS 2750D went into effect in 2005

– Substantial overhaul of Rev. C

• Rev E went into effect – July, 2012 ~50 editorial changes or changes to clarify rather than alter the technical requirements.

~25 changes noted as changes to technical requirements

• Provide a handout summarizing changes. – Highlight those applicable to CP.

Page 34: CP Training on Pyrometrics

TBD • Now that AMS 2750 Rev E is finalized, it

needs to be reviewed to determine what, if

any changes need to be communicated to

CP auditors to look for.

• Examples: Are Suppliers aware revision

has changed? Do they have a copy of it?

Are TUS/SAT reports from a vendor to the

latest revision?

Page 35: CP Training on Pyrometrics

Questions


Recommended