Page 1 of 16 STANDARD OPERATING PROCEDURE CUSTOM EYELET MACHINE 3/6/8MM Created by : Julian Kalac Revision Level 1 Department PACKAGING Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac GENERAL SAFETY 1. PERSONAL PROTECTIVE EQUIPMENT 2. EMERGENCY In case of an emergency, stop the equipment by pressing the red emergency stop button (see picture). All employees should be familiar with the location of the emergency stop buttons on the equipment they operate. Scope: The purpose of the procedure is to illustrate how to SET-UP AND RUN the Eyelet Machine Safely and Efficiently, while minimizing machine downtime during changeovers. Emergency Stop “E-Stop” Button 3.6mm 9.6mm “SMALL” “LARGE” eyelets Die sets and Drums are labelled “LARGE” &“SMALL” SAFETY SENSOR AND GUARDING
Transcript
Page 1: Custom Lean Eyelet machine SOP with 5 min changeover

Page 1 of 16

STANDARD OPERATING PROCEDURE

CUSTOM EYELET MACHINE 3/6/8MM

Created by : Julian Kalac Revision Level 1 Department PACKAGING

Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac

GENERAL SAFETY 1. PERSONAL PROTECTIVE EQUIPMENT

2. EMERGENCY

In case of an emergency, stop the equipment by pressing the red emergency stop button (see picture).

All employees should be familiar with the location of the emergency stop buttons on the equipment they operate.

Scope: The purpose of the procedure is to illustrate how to SET-UP AND RUN the Eyelet Machine Safely

and Efficiently, while minimizing machine downtime during changeovers.

Emergency Stop “E-Stop” Button

3.6mm 9.6mm “SMALL” “LARGE” eyelets

Die sets and Drums are labelled “LARGE” &“SMALL”

SAFETY SENSOR AND GUARDING

Page 2: Custom Lean Eyelet machine SOP with 5 min changeover

Page 2 of 16

STANDARD OPERATING PROCEDURE

CUSTOM EYELET MACHINE 3/6/8MM

Created by : Julian Kalac Revision Level 1 Department PACKAGING

Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac

3 STEP SETUP OF MACHINE

1-Release spring, depress the track

switch and remove the eyelets from the

track

2-Remove the spring loaded clamp and drum

Track switch & spring

3-Quick release spring loaded clamp 5 MIN SETUP

CHANGEOVER

Quick Connect Drum

Page 3: Custom Lean Eyelet machine SOP with 5 min changeover

Page 3 of 16

STANDARD OPERATING PROCEDURE

CUSTOM EYELET MACHINE 3/6/8MM

Created by : Julian Kalac Revision Level 1 Department PACKAGING

Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac

Place the material flat onto the table

& align with the ruler and back stop

Adjust the back stop

position for depth

Easy Die changeover

2-OPERATION

SPRING LOADED WASHER ARM

Page 4: Custom Lean Eyelet machine SOP with 5 min changeover

Page 4 of 16

STANDARD OPERATING PROCEDURE

CUSTOM EYELET MACHINE 3/6/8MM

Created by : Julian Kalac Revision Level 1 Department PACKAGING

Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac

GOOD ROLLOVER QUALITY

Page 5: Custom Lean Eyelet machine SOP with 5 min changeover

Page 5 of 16

STANDARD OPERATING PROCEDURE

CUSTOM EYELET MACHINE 3/6/8MM

Created by : Julian Kalac Revision Level 1 Department PACKAGING

Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac

MATERIAL –EYELET IDENTIFICATION

COLOR CODED MATERIAL BINS FOR DIFFERENT SIZES

Page 6: Custom Lean Eyelet machine SOP with 5 min changeover

Page 6 of 16

STANDARD OPERATING PROCEDURE

CUSTOM EYELET MACHINE 3/6/8MM

Created by : Julian Kalac Revision Level 1 Department PACKAGING

Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac

3-TROUBLESHOOTING:

Page 7: Custom Lean Eyelet machine SOP with 5 min changeover

Page 7 of 16

STANDARD OPERATING PROCEDURE

CUSTOM EYELET MACHINE 3/6/8MM

Created by : Julian Kalac Revision Level 1 Department PACKAGING

Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac

Page 8: Custom Lean Eyelet machine SOP with 5 min changeover

Page 8 of 16

STANDARD OPERATING PROCEDURE

CUSTOM EYELET MACHINE 3/6/8MM

Created by : Julian Kalac Revision Level 1 Department PACKAGING

Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac

Page 9: Custom Lean Eyelet machine SOP with 5 min changeover

Page 9 of 16

STANDARD OPERATING PROCEDURE

CUSTOM EYELET MACHINE 3/6/8MM

Created by : Julian Kalac Revision Level 1 Department PACKAGING

Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac

FLYWHEEL BRAKE HOOPPER DRUM

MECHANICAL TRACK

Page 10: Custom Lean Eyelet machine SOP with 5 min changeover

Page 10 of 16

STANDARD OPERATING PROCEDURE

CUSTOM EYELET MACHINE 3/6/8MM

Created by : Julian Kalac Revision Level 1 Department PACKAGING

Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac

Page 11: Custom Lean Eyelet machine SOP with 5 min changeover

Page 11 of 16

STANDARD OPERATING PROCEDURE

CUSTOM EYELET MACHINE 3/6/8MM

Created by : Julian Kalac Revision Level 1 Department PACKAGING

Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac

B-01 Pedal Support

B -02 Lower Treadle Rod

B -03 Connector

B -04 Upper Treadle Rod

B 05 Pedal

B -06 Frame

B -07 Pedal Bolt

B -08 Spacing Washer

B -09 Working Plate

B -10 Hollow Inner Screw

B -11 T-Sleeve

B -12 Die Set

B -13 Ring Nut

A-10 Motor Plate

A-14 Motor

A-15 Flywheel Cover

FINAL ASSEMBLY PARTS

Page 12: Custom Lean Eyelet machine SOP with 5 min changeover

Page 12 of 16

STANDARD OPERATING PROCEDURE

CUSTOM EYELET MACHINE 3/6/8MM

Created by : Julian Kalac Revision Level 1 Department PACKAGING

Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac

HOPPER COMPLETE SET EXPLODED VIEW

Page 13: Custom Lean Eyelet machine SOP with 5 min changeover

Page 13 of 16

STANDARD OPERATING PROCEDURE

CUSTOM EYELET MACHINE 3/6/8MM

Created by : Julian Kalac Revision Level 1 Department PACKAGING

Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac

Page 14: Custom Lean Eyelet machine SOP with 5 min changeover

Page 14 of 16

STANDARD OPERATING PROCEDURE

CUSTOM EYELET MACHINE 3/6/8MM

Created by : Julian Kalac Revision Level 1 Department PACKAGING

Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac

Page 15: Custom Lean Eyelet machine SOP with 5 min changeover

Page 15 of 16

STANDARD OPERATING PROCEDURE

CUSTOM EYELET MACHINE 3/6/8MM

Created by : Julian Kalac Revision Level 1 Department PACKAGING

Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac

SUGGESTED PREVENTATIVE MAINTENANCE FREQUENCY

Page 16: Custom Lean Eyelet machine SOP with 5 min changeover

Page 16 of 16

STANDARD OPERATING PROCEDURE

CUSTOM EYELET MACHINE 3/6/8MM

Created by : Julian Kalac Revision Level 1 Department PACKAGING

Date Created July 13, 2015 Revision Date: N/A P.Eng Julian Kalac

SUGGESTED REGULAR MACHINE MAINTENANCE (MONTHLY)


Recommended