Appendix N: Regional Capacity Projects Transportation 2040 as amended in 2015 Note: Project costs are expressed in 2015 dollars and are sorted by sponsor. Sponsor: AUBURN Title: A St Trail Description: Shared use bike path Location / Facility: A St Trail From: 31st St SE To: Transit station at 1st & B St. Project ID: 2858 Completion Year: 2030 MTP Status: Candidate Estimated Cost: $2,062,420 Type: New Facility-Road County: King County Sponsor: AUBURN Title: Auburn Pacific Phase 2 (trail) Description: New east-west trail connection serving the residents of Auburn and Pacific and connecting through other existing trails to the Auburn urban center. Location / Facility: 0 From: Ellingson Road SW To: Pacific Park Project ID: 4516 Completion Year: 2011 MTP Status: Completed Estimated Cost: $180,425 Type: New Facility-Road County: King County
Transcript
Page 1: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Appendix N: Regional Capacity ProjectsTransportation 2040 as amended in 2015Note: Project costs are expressed in 2015 dollars and are sorted by sponsor.

Sponsor: AUBURNTitle: A St Trail

Description:Shared use bike pathLocation / Facility:A St Trail

From:31st St SE

To:Transit station at 1st & B St.

Project ID: 2858

Completion Year:2030

MTP Status: CandidateEstimated Cost: $2,062,420

Type:New Facility-RoadCounty:King County

Sponsor: AUBURNTitle: Auburn Pacific Phase 2 (trail)

Description:New east-west trail connection serving the residents of Auburn and Pacific and connecting through other existing trails to the Auburn urban center.Location / Facility:0

From:Ellingson Road SW

To:Pacific Park

Project ID: 4516

Completion Year:2011

MTP Status: CompletedEstimated Cost: $180,425

Type:New Facility-RoadCounty:King County

Page 2: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: AUBURNTitle: Auburn Way South (SR 164) Corridor Improvements, Fir Street SE to Hemlock Street SEg & Non-Motorized Improvements

Description:The Auburn Way South (SR 164) Corridor Improvement project is approximately 0.14 miles in length, from Fir ST SE to Hemlock ST SE. This project will design and construct a new 5 lane section of roadway with illumination. There will be 2 through lanes in each direction and a center turn-lane with a U-turn/Wedge and transit pullouts at Hemlock ST SE. There will also be 10-foot wide sidewalks and storm drainage improvements. The project includes a new traffic signal at the intersection of Hemlock ST SE and Auburn Way South (SR 164) with ADA compliant ramps, push buttons, and signal heads.Location / Facility:Auburn Way South (SR 164)

From:Fir St SE

To:Hemlock St SE

Project ID: 1744

Completion Year:2015

MTP Status: CandidateEstimated Cost: $3,591,990

Type:New Facility-RoadCounty:King County

Sponsor: AUBURNTitle: BNSF Pedestrian/Bicycle Undercrossing

Description:Non-motorized connection extending from the White River Trail to the Interurban Trail and all urban centers located proximate to the Interurban Trail. Location / Facility:BNSF Underpass

From:A Street SE

To:Skinner Rd

Project ID: 4515

Completion Year:2017

MTP Status: CandidateEstimated Cost: $11,279,810

Type:New Facility-RoadCounty:King County

Page 3: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: AUBURNTitle: BPA Trail

Description:New east-west trail connection from Federal Way urban center to Covington.Location / Facility:BPA Trail

From:west city limits

To:east city limits

Project ID: 4510

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $2,472,030

Type:New Facility-RoadCounty:King County

Sponsor: AUBURNTitle: C St Trail

Description:Shared Use bike pathLocation / Facility:0

From:Interurban Trail @ 15th St SW

To:Pacific City Limits

Project ID: 2871

Completion Year:2011

MTP Status: CompletedEstimated Cost: $349,879

Type:New Facility-RoadCounty:King County

Sponsor: AUBURNTitle: Grade Separated Crossing of BNSF Railyard

Description:Improved east-west connectivity and mitigation for potential future BNSF railyard expansion as a multimodal facility (at 6th Street SW/SE )Location / Facility:6th Street SW/SE

From:C Street SW

To:A Street SE

Project ID: 4504

Completion Year:2030

MTP Status: CandidateEstimated Cost: $34,967,411

Type:New Facility-RoadCounty:King County

Page 4: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: AUBURNTitle: Green River Trail

Description:New north-south non-motorized corridor that links to Auburn's urban center through future on-street bicycle lanes and sidewalks.Location / Facility:Green River Trail

From:S. 277th Street

To:SR 18

Project ID: 4511

Completion Year:2020

MTP Status: CandidateEstimated Cost: $2,472,030

Type:New Facility-RoadCounty:King County

Sponsor: AUBURNTitle: M Street Widening and Underpass

Description:GRADE SEPARATE RAIL XING, WIDEN TO 4 LANES, ADD SIDEWALK, BIKE LANES, AND ROADWAY LIGHTING.Location / Facility:M St SE

From:E MAIN

To:AUBURN WAY S

Project ID: 975

Completion Year:2019

MTP Status: CandidateEstimated Cost: $26,116,619

Type:New Facility-RoadCounty:King County

Sponsor: AUBURNTitle: S 272nd/277th St Corridor Capacity Non Motorized Trail Improvements

Description:Widen roadway between Auburn Way North and L St NE. Includes 2 new EB lanes, 1 new WB lane, separated non-motorized trail, intersection improvements, lighting, ITS improvements, and associated storm improvements.Location / Facility:52nd St NE

From:AUBURN WAY N

To:GREEN RIVER

Project ID: 976

Completion Year:2016

MTP Status: CandidateEstimated Cost: $8,293,101

Type:New Facility-RoadCounty:King County

Page 5: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: AUBURNTitle: SR 164

Description:Widen to 4 lanes - Restrict access where appropriate (Project is from Dogwood to Auburn City limits with the exception of the segment between Fir and Hemlock that has been segmented out into a Candidate project - MTP 1744)Location / Facility:SR 164

From:Dogwood

To:Auburn City Limits

Project ID: 4287

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $18,540,225

Type:New Facility-RoadCounty:King County

Sponsor: AUBURNTitle: White River Trail

Description:A new trail connection that will link south-east Auburn residents to the Auburn urban center via travel on the future BNSF Pedestrian/Bicycle Undercrossing, Auburn-Pacific Trail (Phase 2), and the Interurban Trail. Location / Facility:White River Trail

From:Pacific

To:Southeast Auburn along the White River

Project ID: 4513

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $7,416,090

Type:New Facility-RoadCounty:King County

Page 6: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: AUBURNTitle: Williams Trail

Description:A new trail connection that will link south-east Auburn and Pierce County residents to the Auburn urban center via travel on the White River Trail, future BNSF Pedestrian/Bicycle Undercrossing, Auburn-Pacific Trail (Phase 2), and Interurban Trail. Location / Facility:Williams Trail

From:Kersey Way/White River Trail

To:Lake Tapps Parkway

Project ID: 4514

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $2,472,030

Type:New Facility-RoadCounty:King County

Page 7: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BELLEVUETitle: 120th Avenue NE Corridor Widening: NE 4th Street to Northup Way

Description:Improve and widen the 120th Avenue NE corridor in phases to increase connectivity between the Downtown Bellevue and Overlake regional growth centers and the new Bel-Red TOD node. Widen to five lanes with bike lanes and continuous sidewalk between NE 4th and NE 8th Streets; realign the roadway with sidewalks and bike lanes between NE 8th Street and Old Bel-Red Road; widen to five lanes with sidewalks and bike lanes between Old Bel-Red Road and NE 15th Street; and widen to five lanes with sidewalks and a separated multi-use path between NE 15th Street and Northup Way (this segment may primarily be implemented with four lanes on an interim basis). Project to be designed and constructed in coordination with Sound Transit specifically in the segment where the East Link project will cross under roadway, between NE 14th and NE 16th Streets.Location / Facility:120th Ave NE

From:NE 4th Street (new connection at 120th Ave NE)

To:Northup Way

Project ID: 4264

Completion Year:2023

MTP Status: ApprovedEstimated Cost: $58,187,427

Type:New Facility-RoadCounty:King County

Sponsor: BELLEVUETitle: Bellevue Way Trail

Description:Construct a multi-use pedestrian and bike facility. Project may be designed and constructed in coordination with Sound Transit and the implementation of the East Link project along this corridor. Location / Facility:Bellevue Way Trail

From:Parallel along Bellevue Way from SE 30th

To:SE 8th St

Project ID: 2865

Completion Year:2029

MTP Status: CandidateEstimated Cost: $1,516,547

Type:New Facility-RoadCounty:King County

Page 8: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BELLEVUETitle: Bel-Red Regional Connectivity - 124th Ave NE

Description:Improve and widen the 124th Avenue corridor in phases to increase connectivity between Downtown Bellevue and Overlake regional growth centers and the new Bel-Red TOD node. Widen for bike lanes between NE 8th Street and Bel-Red Road; widen to five lanes with sidewalks and bike facilities between Bel-Red Road and the planned NE 15th Street intersection; and widen to five lanes with sidewalks between NE 15th Street and Northup Way. Project to be designed and constructed in coordination with Sound Transit specifically in the segment where the East Link project will cross under roadway, between NE 14th and NE 18th Streets.Location / Facility:124th Avenue NE

From:NE 8th Street

To:Northup Way

Project ID: 4527

Completion Year:2019

MTP Status: CandidateEstimated Cost: $44,990,889

Type:New Facility-RoadCounty:King County

Sponsor: BELLEVUETitle: Bel-Red Regional Connectivity - NE 4th St Extension

Description:Construct a four/five lane extension of NE 4th Street from 116th Ave to 120th Ave, including sidewalks, and bike lanes to increase connectivity between Downtown Bellevue and Overlake regional growth centers and the new Bel-Red TOD node. The extension will be designed to accommodate future development and uses of the BNSF corridor.Location / Facility:NE 4th Street

From:116th Avenue NE

To:120th Avenue NE

Project ID: 4523

Completion Year:2015

MTP Status: ApprovedEstimated Cost: $46,813,017

Type:New Facility-RoadCounty:King County

Page 9: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BELLEVUETitle: Bel-Red Regional Connectivity - NE 6th St Extension

Description:Construct east half of NE 6th/I-405 HOV/HOT interchange to provide transit/HOV access east of I-405. Location / Facility:NE 6th Street

From:112th Avenue NE

To:120th Avenue NE

Project ID: 4524

Completion Year:2020

MTP Status: CandidateEstimated Cost: $86,666,660

Type:New Facility-RoadCounty:King County

Sponsor: BELLEVUETitle: Coal Creek Parkway

Description:Widen Coal Creek Pkwy to six lanes at the intersection between the I-405 ramps.Location / Facility:COAL CREEK PKWY

From:I-405 northbound on ramp

To:I-405 southbound off ramp

Project ID: 1100

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $3,714,693

Type:New Facility-RoadCounty:King County

Sponsor: BELLEVUETitle: Downtown-Overlake Connection Trail

Description:Add a 10 to 14 foot wide off-street path on the north side of NE 12th Street from 100th Avenue NE to 116th Avenue NE. Component of priority bike corridor; Add 10-14 foot-wide off street path along the north side of NE 16th Street from 116th Avenue NE to 140th Avenue NE. Component of priority bike corridor;Location / Facility: north side of NE 12th Street

From:100th Ave NE

To:140th Ave NE

Project ID: 5497

Completion Year:2029

MTP Status: CandidateEstimated Cost: $1,219,089

Type:New Facility-RoadCounty:King County

Page 10: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BELLEVUETitle: I-90 Trail/124th Ave SE Connector

Description:Add a 10-14 foot-wide off street path from the I-90 trail to SE 38th StreetLocation / Facility:I-90 Trail/124th Ave SE Connector

From:124th Ave SE & SE 38th Pl

To:I-90 Trail at Factoria Blvd.

Project ID: 2868

Completion Year:2011

MTP Status: CompletedEstimated Cost: $1,706,725

Type:New Facility-RoadCounty:King County

Sponsor: BELLEVUETitle: Lake Washington Blvd Trail

Description:Shared use bike pathLocation / Facility:Lake Washington Blvd Trail

From:Southern terminus of existing Lk WA Blvd Trail near Bagley Ln

To:Along BNSF Corridor to Bellevue/Newcastle limits

Project ID: 2888

Completion Year:2029

MTP Status: CandidateEstimated Cost: $1,238,231

Type:New Facility-RoadCounty:King County

Sponsor: BELLEVUETitle: Lake-to-Lake Trail

Description:Add a 10 to 14 foot wide off street path on the south side of Main Street from Bellevue Way NE to 116th Avenue NE. Component of priority bike corridor.Location / Facility:Main St

From:Bellevue Way

To:116th Ave NE

Project ID: 5498

Completion Year:2029

MTP Status: CandidateEstimated Cost: $1,857,346

Type:New Facility-RoadCounty:King County

Page 11: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BELLEVUETitle: Lake-to-Lake Trail

Description:Add a 10-14 foot-wide off street path on the north side of Lake Hills Connector from Main Street to 140th Avenue SE. Component of priority bike corridor.Location / Facility:north side of Lake Hills Connector

From:Main St

To:140th Ave SE

Project ID: 5499

Completion Year:2029

MTP Status: CandidateEstimated Cost: $1,238,231

Type:New Facility-RoadCounty:King County

Sponsor: BELLEVUETitle: Lake-to-Lake Trail

Description:Add a 10-14 foot-wide off street path on the south side of SE 8th Street from 114th Avenue SE to Lake Hills Connector. Component of priority bike corridor.Location / Facility:on the south side of SE 8th Street

From:114th Ave SE

To:Lake Hills Connector

Project ID: 5500

Completion Year:2029

MTP Status: CandidateEstimated Cost: $619,115

Type:New Facility-RoadCounty:King County

Page 12: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BELLEVUETitle: Mountain to Sound Greenway

Description: A paved multiuse trail of 12 feet wide (where feasible) is proposed beginning at the current end of the trail at Factoria Blvd and running eastward along the south side of I-90 and the north side of SE 36th St to the curve near the 150th Ave SE interchange with I-90, then following a new independent alignment to the south of the interchange and north of the 150th Avenue SE/SE 37th St intersection. Eastward from 150th Ave SE, the trail will continue on the south side of I-90 and the north side of SE 37th St. Eastward from the termination of SE 37th St, the trail will continue on the south side of I-90 and the north side of private properties and/or Newport Way to the intersection of Lakemont Blvd SE and Newport Way. Location / Facility:Parallel to I-90

From:Factoria Blvd

To:Lakemont Blvd

Project ID: 5501

Completion Year:2030

MTP Status: CandidateEstimated Cost: $30,676,746

Type:New Facility-RoadCounty:King County

Sponsor: BELLEVUETitle: NE Spring Boulevard Multi-Modal Corridor – Zone 1A

Description:The project includes one segment of a new multi-modal arterial street connection between 116th Ave NE to the West Abutment of West Bridge. All zones will include two travel lanes in each direction, turn pockets and center turn lanes where appropriate storm drainage and water quality treatment. Zone 1A will include a separated wide multi-use path on the north side and sidewalk on the south side; it will also include, new traffic signals connected to the city’s traffic adaptive control system, landscaping and irrigation, and illumination for both Zone 1A and Zone 1B.Location / Facility:NE Spring Boulevard

From:116th Ave NE

To:West Abutment of West Bridge

Project ID: 4473

Completion Year:2020

MTP Status: CandidateEstimated Cost: $12,046,583

Type:New Facility-RoadCounty:King County

Page 13: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BELLEVUETitle: NE Spring Boulevard Multi-Modal Corridor -- Zone 1B

Description:The project includes one segment of a new multi-modal arterial street connection, including two travel lanes ineach direction, turn pockets and center turn lanes where appropriate, storm drainage, and water quality treatment.Zone 1B will include a separated wide multi-use path on the north side and sidewalk on the south side, and twobridges spanning the north-south Eastside Rail Corridor and Sound Transit rail tracks.Location / Facility:NE 15th Street

From:West Abutment of West Bridge

To:120th Avenue NE

Project ID: 4526

Completion Year:2020

MTP Status: ApprovedEstimated Cost: $22,607,475

Type:New Facility-RoadCounty:King County

Sponsor: BELLEVUETitle: NE Spring Boulevard Multi-Modal Corridor – Zone 2

Description:The project includes one segment of a new multi-modal arterial street connection from 120th Ave NE to 124th Ave NE. All zones will include two travel lanes in each direction, turn pockets and center turn lanes where appropriate, new traffic signals connected to the city’s traffic adaptive control system, landscaping and irrigation, illumination, storm drainage and water quality treatment. Zone 2 will include widened outside lanes for shared bicycle use and sidewalks on both sides.Location / Facility:NE Spring Boulevard

From:120th Ave NE

To:124th Ave NE

Project ID: 4474

Completion Year:2020

MTP Status: CandidateEstimated Cost: $27,050,306

Type:New Facility-RoadCounty:King County

Page 14: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BELLEVUETitle: SR 520 Trail

Description: Add a 10-14 foot-wide off street path along the south side of NE Points Drive from the western part of the interchange area to the south side of Northup Way just east of the interchange. Component of priority bike corridor. Add a 10-14 foot-wide off street path along SR-520 connecting NE Points Drive to Northup Way over the Bellevue Way Interchange area (just north of SR-520). Component of priority bike corridor.Location / Facility:SR 520 Trail

From:Bellevue Way I/C

To:Bellevue Way

Project ID: 5495

Completion Year:2015

MTP Status: CandidateEstimated Cost: $3,657,267

Type:New Facility-RoadCounty:King County

Sponsor: BELLEVUETitle: SR 520 Trail

Description:Construct 10-14 foot-wide path from Bellevue Way / Evergreen Point Bridge to the west terminus of existing SR-520 trail at 124th Avenue NE. This facility extends east of Bellevue Way along the south side of Northup Way to 108th Avenue NE; along the east side of 108th Avenue NE; continuing east along the north side of SR-520 and eventually leading back to the proposed BNSF regional trail. East of the BNSF regional trail, completing the connection along the north side of SR-520 and south side of NE 24th Street to the existing trail system. Component of priority bike corridor; EW-1: SR-520 Trail. Location / Facility:SR 520 Trail

From:Evergreen Point Bridge

To:124th Ave NE

Project ID: 5496

Completion Year:2015

MTP Status: CandidateEstimated Cost: $14,326,046

Type:New Facility-RoadCounty:King County

Page 15: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BELLEVUETitle: West Lake Sammamish Pkwy Path

Description:Construct a ten foot multi-use path on the west side of the parkway and a four foot bike shoulder on the east side. Portions of the west side path will be separated from the vehicle travel lanes by two to five foot landscape planting. The project will include five mid-block pedestrian crossings, three intersection crossings, and rehabilitation of existing pavement throughout the corridor.Location / Facility:on the west side of West Lake Sammamish Pkwy

From:North City Limit

To:I-90

Project ID: 5502

Completion Year:2020

MTP Status: CandidateEstimated Cost: $36,572,670

Type:New Facility-RoadCounty:King County

Page 16: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BOTHELLTitle: Bothell Way NE / Bothell-Everett Hwy Improvements

Description:Widen to 4/5 lanes between NE 188th St and 240th St SE.Location / Facility:SR 527

From:NE 188th St

To:240th St SE

Project ID: 4262

Completion Year:2030

MTP Status: CandidateEstimated Cost: $36,184,339

Type:New Facility-RoadCounty:King County

Sponsor: BOTHELLTitle: Bothell Way NE: Multiway Boulevard Project

Description:Reconstruct and expand the existing 4-lane roadway between SR 522 and NE 188th St to a tree-lined boulevard with 5 travel lanes and business access lanes. Location / Facility:SR 527

From:SR 522

To:NE 188th St

Project ID: 5446

Completion Year:2017

MTP Status: CandidateEstimated Cost: $32,308,938

Type:New Facility-RoadCounty:King County

Page 17: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BOTHELLTitle: Bothell-Everett Hwy Widening: 240th St SE to 228th St SE

Description:This project will widen Bothell-Everett Hwy from two lanes to four lanes with a center dual left turn lane, bike lanes, transit stops and sidewalks, curb/gutter/plantings, minor side street improvements, interconnect and coordinate signals, provide access management, retaining walls, storm drainage facilities, landscaping and illumination.Location / Facility:SR 527

From:240th St SE

To:228th St SE

Project ID: 4271

Completion Year:2015

MTP Status: CompletedEstimated Cost: $10,537,340

Type:New Facility-RoadCounty:Snohomish County

Sponsor: BOTHELLTitle: North Creek Trail - 220th St SE to SR 524 (Woodlands Technology Campus)

Description:The North Creek Trail north of 220th St SE to SR 524 will be constructed by project developers and the City of Bothell over the next several years. The project "Woodlands Technology Campus" has completed construction of a 12-foot wide mixed-use path on their property which runs from 220th St SE north to 214th St SE at SR 527. The next piece of mixed-use path from 214th St SE north to SR 524 will be built by a City contract in 2014/2015 using grant funding.Location / Facility:North Creek

From:220th St SE

To:SR 524

Project ID: 4172

Completion Year:2016

MTP Status: ApprovedEstimated Cost: $1,589,240

Type:New Facility-RoadCounty:Snohomish County

Page 18: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BOTHELLTitle: North Creek Trail, Section 1 Stage 1

Description:The North Creek Trail - Section 1, Stage 1 project will construct a Class I non-motorized trail (missing trail segment) on NE 195th Street between North Creek and I-405/NE 195th Street interchange in Bothell. Location / Facility:parallel to NE 195th

From: I-405 ramp/ NE 195th Street

To:North Creek (waterway)

Project ID: 4169

Completion Year:2011

MTP Status: CompletedEstimated Cost: $1,047,307

Type:New Facility-RoadCounty:King County

Sponsor: BOTHELLTitle: North Creek Trail, Section 1, Stage 2 (Schnitzer)

Description:The North Creek Trail, Section 1, Stage 2 (Schnitzer) project will construct Class I non-motorized trail segments along the North Creek levy top north of NE 195th Street to North Creek Parkway North in Bothell. Location / Facility:along the North Creek levy (still on East side of waterway)

From:NE 195th (just north of)

To:North Creek Parkway North

Project ID: 4170

Completion Year:2011

MTP Status: CompletedEstimated Cost: $1,220,896

Type:New Facility-RoadCounty:King County

Page 19: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BOTHELLTitle: North Creek Trail, Section 2, Stage 2 (Canyon Park Business Park)

Description:The North Creek Trail - Section 2, Stage 2 (Canyon Park Business Park) project will construct a Class I non-motorized trail from 228th Street SE north approximately 0.8 miles to 220th Street SE. Location / Facility:North Creek Trail ROW

From:228th Street SE

To:220th Street SE

Project ID: 4171

Completion Year:2011

MTP Status: CompletedEstimated Cost: $1,098,311

Type:New Facility-RoadCounty:Snohomish County

Sponsor: BOTHELLTitle: SR 522 - West City Limits to NE 180th Street Stage 2A Improvements

Description:The west segment of the project (M.P. 8.62 to M.P. 8.85) includes construction of an exclusive BAT lane from 91st Ave NE to 1300 feet west of 96th Ave NE, retaining walls, landscaping, curbs/gutter/sidewalk, signal interconnect and access management.Location / Facility:SR 522

From:91st Ave NE

To:1300 feet west of 96th Ave NE

Project ID: 4272

Completion Year:2015

MTP Status: CompletedEstimated Cost: $9,590,163

Type:New Facility-RoadCounty:King County

Page 20: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BOTHELLTitle: SR 522 - West City Limits to NE 180th Street Stage 2b Improvements

Description:The east segment of the project (M.P. 9.20 to M.P. 9.61) includes installation of curbs/gutter/sidewalk, signal interconnect and access management.Location / Facility:SR 522

From:750 feet east of 96th Avenue NE

To:Hall Road

Project ID: 5537

Completion Year:2019

MTP Status: ROW Conditionally ApEstimated Cost: $11,870,491

Type:New Facility-RoadCounty:King County

Sponsor: BOTHELLTitle: SR 522 West City Limits to NE 180th St. Stage 1 Improvements (at 96th Ave NE) - Wayne Curve.

Description:This project includes curb, gutters and sidewalks installation on both sides of the roadway; upgrade storm water facilities; street lighting improvements; widen through lanes; realign 96th Avenue NE approach, increase intersection capacity by adding left turn lanes; enhance transit operation by adding Business Access Transit (BAT) lanes and queue jump lane at the 96th Avenue NE intersection, and enhance traffic safety through access management and median installation.Location / Facility:SR 522 @ 96th Ave NE

From:SR 522 @ 96th Ave NE

To:1300' west of 96th Ave NE

Project ID: 4002

Completion Year:2012

MTP Status: CompletedEstimated Cost: $28,415,298

Type:New Facility-RoadCounty:King County

Page 21: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BOTHELLTitle: SR 522, Stage 3

Description:The proposed project will provide corridor continuity, improve traffic flow (capacity), provide continuous westbound and eastbound BAT (Business Access and Transit) lanes and provide a continuous ADA pedestrian facility. Location / Facility:SR 522

From:83rd Ave NE

To:91st Ave NE

Project ID: 4254

Completion Year:2020

MTP Status: CandidateEstimated Cost: $46,934,926

Type:New Facility-RoadCounty:King County

Sponsor: BOTHELLTitle: SR 527

Description:Widen to 4/5 lanes between 228th St. SE and I-405.Location / Facility:SR 527

From:228th St. SE

To:I-405

Project ID: 5536

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $6,212,069

Type:New Facility-RoadCounty:Snohomish County

Page 22: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BOTHELLTitle: Transit Center and Parking Garage (Bothell)

Description:Construct a transit center/park-and-ride with up to 400 stalls in the vicinity of SR 527/Bothell Way NE and NE 185th Street in downtown Bothell.Location / Facility:Vicinity of SR 527/Bothell Way NE and NE 185th Street

From:Bothell Way NE at NE 185th Street

To:#N/A

Project ID: 4056

Completion Year:2040

MTP Status: CandidateEstimated Cost: $47,679,266

Type:New Facility-RoadCounty:Snohomish County

Page 23: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BUCKLEYTitle: Foothills Trail - White River Crossing

Description:Shared use pathLocation / Facility:Foothills Trail

From:South side of the White River

To:North side of the White River

Project ID: 2809

Completion Year:2016

MTP Status: CandidateEstimated Cost: $7,331,877

Type:New Facility-RoadCounty:Pierce County

Sponsor: BUCKLEYTitle: SR-165 Realignment, P2

Description:Phase 2 includes: realignment of SR-165 to form a T intersection with SR-410, signals at the SR-410/SR-165 intersection and at the SR-165/Ryan/112th Street intersection, the addition of a right turn lane on the west leg of the SR-410/SR165 intersection, realignment of River Avenue north of Pearl Street, realignment of the Foothills Trail north of the intersection of SR-165/Ryan/112th Street. The road improvements include curb, gutter and sidewalk north of Ryan Rd and paved shoulders south of Ryan Road. The project includes street illumination and wetland mitigation. Location / Facility:Intersection of SR-410, SR-165, Ryan Road, 112th Street

From:Intersection of SR-165,Ryan Rd,112th St

To:Intersection SR-165, SR410

Project ID: 4286

Completion Year:2015

MTP Status: CandidateEstimated Cost: $2,618,044

Type:New Facility-RoadCounty:Pierce County

Page 24: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BUCKLEYTitle: SR-410/SR-165/Ryan Rd/ 112th St E Realignment, Phase 1

Description:Phase 1 includes: realignment of Ryan and 112th to intersect with SR165, realignment of River Avenue and the Foothills Trail. Roads include curbs, gutters and sidewalks. Phase 1 includes a storm trunk line along Ryan, 112th, easements and Hinkleman. Location / Facility:Intersection of SR-410, SR-165, Ryan Road, 112th Street

From:Intersection of SR-410, SR-165, Ryan Road, 112th Street

To:Intersection of SR-410, SR-165, Ryan Road, 112th Street

Project ID: 1239

Completion Year:2012

MTP Status: CompletedEstimated Cost: $3,978,142

Type:New Facility-RoadCounty:Pierce County

Page 25: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BURIENTitle: 1st Avenue South, Phase 2 (SW 140th Street to SW 146th Street)

Description:Reconstruct 1st Avenue South from SW 140th Street to SW 146th Street. Maintain two travel lanes in each direction and a center turn lane. Provide curb, gutter, sidewalks, planter strips, illumination, storm water facilities, traffic signals and interconnections, and driveway consolidation where feasible. Utility undergrounding will be completed by the respective utility companies.Location / Facility:1st Ave S

From:SW 140th Street

To:SW 146th Street

Project ID: 5449

Completion Year:2013

MTP Status: CompletedEstimated Cost: $10,089,781

Type:New Facility-RoadCounty:King County

Sponsor: BURIENTitle: 1st Avenue South, Phase 3 (SW 128th Street to SW 140th Street)

Description:Reconstruct 1st Avenue South from SW 128th Street to SW 140th Street. Maintain two travel lanes in each direction and a center turn lane. Provide curb, gutter, sidewalks, planter strips, illumination, storm water facilities, traffic signals and interconnections, and driveway consolidation where feasible. Utility undergrounding will be completed by the respective utility companies.Location / Facility:1st Ave S

From: SW 128th Street

To:SW 140th Street

Project ID: 5450

Completion Year:2018

MTP Status: UnprogrammedEstimated Cost: $20,296,217

Type:New Facility-RoadCounty:King County

Page 26: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: BURIENTitle: Ambaum Boulevard SW Corridor Study (SW 116th Street to SW 153rd Street)

Description:Conduct study to determine current and projected requirements for Transit HOV/BAT capabilities, non-motorized upgrades for bicycle and pedestrian uses, center turn lane/left turn pocket additions and coordinated signalization enhancement for safety and volume improvement requirements. The study will identify locations of anticipated significant purchases of ROW and easements.Location / Facility:Ambaum Boulevard

From:SW 116th Street

To: SW 153rd Street

Project ID: 5451

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $922,555

Type:New Facility-RoadCounty:King County

Page 27: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: COMMUNITY TRANSITTitle: Core or Swift BRT - SR 527 Downtown Bothell to SR 526/I-5

Description: Swift II Bus Rapid Transit will be Community Transit`s 2nd line of BRT, traveling between the Canyon Park Park Ride and Paine Field/Boeing. This 12 mile corridor will have 15 stations in each direction served by 60 ft articulated buses. Swift II BRT will meet a critical need for east-west transportation options in Snohomish County, connecting a Regional Growth Center (Canyon Park) with a Regional Manufacturing and Industrial Growth Center (Paine Field). This service will be all day bi-directional service operating at a 10 min frequency during peak hours. Location / Facility:Swift Corridor

From:Canyon Park Park Ride

To:Seaway and 75th Street

Project ID: 5466

Completion Year:2019

MTP Status: ApprovedEstimated Cost: $51,286,830

Type:Transit Service ExpansionCounty:Snohomish County

Sponsor: COMMUNITY TRANSITTitle: Core or BRT - 20th St US 2 to SR 9

Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on 20th St from US 2 to SR 9. Requires speed & reliability improvements and accessible transit stops.Location / Facility:20th St

From:US 2

To:SR 9

Project ID: 5478

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $0

Type:New Facility-RoadCounty:Snohomish County

Page 28: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: COMMUNITY TRANSITTitle: Core or BRT - 228th St Edmonds Ferry, SR 104, 228th, 236th, 228th to SR 9

Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on 228th St from Edmonds Ferry to SR 9. Requires speed & reliability improvements and accessible transit stops.Location / Facility:228th St

From:Edmonds Ferry

To:SR 9

Project ID: 5476

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $0

Type:New Facility-RoadCounty:Snohomish County

Sponsor: COMMUNITY TRANSITTitle: Core or BRT - 35th Ave SE Bothell to Everett

Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on 35th Ave SE from downtown Bothell to Everett. Requires speed & reliability improvements and accessible transit stops.Location / Facility:35 Ave SE

From:Downtown Bothell

To:Everett

Project ID: 5480

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $0

Type:New Facility-RoadCounty:Snohomish County

Page 29: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: COMMUNITY TRANSITTitle: Core or BRT - I-5 Smokey Point to King County

Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on I-5 from Smokey Point to King County. Requires speed & reliability improvements and accessible transit stops.Location / Facility:I-5

From:Smokey Point

To:King County

Project ID: 5482

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $0

Type:New Facility-RoadCounty:Snohomish County

Sponsor: COMMUNITY TRANSITTitle: Core or BRT - Mukilteo Speedway

Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on Mukilteo Speedway (SR 525) from Mukilteo Ferry to I-405 (ramp just short of I-405). Requires speed & reliability improvements and accessible transit stops.Location / Facility:Mukilteo Speedway (SR 525)

From:Mukilteo Ferry

To:I-405

Project ID: 5333

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $7,688,635

Type:New Facility-RoadCounty:Snohomish County

Page 30: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: COMMUNITY TRANSITTitle: Core or BRT - SR 522 Monroe to Bothell

Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on SR 522 Monroe to Bothell. Requires speed & reliability improvements and accessible transit stops.Location / Facility:SR 522

From:Monroe

To:Bothell

Project ID: 5484

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $0

Type:New Facility-RoadCounty:Snohomish County

Sponsor: COMMUNITY TRANSITTitle: Core or BRT - SR 526 from SR 525 to I-5

Description:Service hours and buses. Core service or Swift Bus Rapid Transit on SR 526 from SR 525 to I-5. Requires speed & reliability improvements and accessible transit stops.Location / Facility:SR 526

From:SR 525

To:I-5

Project ID: 5312

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $4,379,234

Type:New Facility-RoadCounty:Snohomish County

Page 31: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: COMMUNITY TRANSITTitle: Core or BRT - SR 528 I-5 to SR-9

Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on SR 528 from I-5 to SR 9. Requires speed & reliability improvements and accessible transit stops.Location / Facility:SR 528

From:I-5

To:SR 9

Project ID: 5470

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $0

Type:New Facility-RoadCounty:Snohomish County

Sponsor: COMMUNITY TRANSITTitle: Core or BRT - SR 531 I-5 to downtown Arlington

Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on SR 531 from I-5 to downtown Arlington. Requires speed & reliability improvements and accessible transit stops.Location / Facility:SR 531

From:I-5

To:Downtown Arlington

Project ID: 5468

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $0

Type:New Facility-RoadCounty:Snohomish County

Page 32: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: COMMUNITY TRANSITTitle: Core or BRT - SR 9 Bothell to Arlington

Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on SR 9 from Bothell to Arlington. Requires speed & reliability improvements and accessible transit stops.Location / Facility:SR 9

From:Downtown Bothell

To:Arlington

Project ID: 5474

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $0

Type:New Facility-RoadCounty:Snohomish County

Sponsor: COMMUNITY TRANSITTitle: Core or BRT - US 2 Everett to Monroe (via Ave D and 2nd St in Snohomish)

Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on US 2 from Everett to Monroe (via Ave D and 2nd St in Snohomish). Requires speed & reliability improvements and accessible transit stops.Location / Facility:US 2

From:Everett

To:Monroe

Project ID: 5472

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $0

Type:New Facility-RoadCounty:Snohomish County

Page 33: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: COMMUNITY TRANSITTitle: Core or Swift BRT - 164th St

Description:Service hours and buses. Core Service or Swift Bus Rapid Transit (BRT) on 164th from SR 99 to SR 527. Requires speed & reliability improvements and accessible transit stops.Location / Facility:164th

From:SR 99

To:SR 527

Project ID: 5335

Completion Year:2030

MTP Status: CandidateEstimated Cost: $3,548,503

Type:New Facility-RoadCounty:Snohomish County

Sponsor: COMMUNITY TRANSITTitle: Core or Swift BRT - Airport Rd to Cathcart Way (Everett)

Description:Service hours and buses. Core Service or Swift Bus Rapid Transit (BRT) on Airport Rd, 128th, 132nd, Cathcart Way from SR 526 to SR 9. Requires speed & reliability improvements and accessible transit stops.Location / Facility:Airport Rd, 128th, 132nd, Cathcart way

From:SR 526

To:SR 9

Project ID: 5334

Completion Year:2030

MTP Status: CandidateEstimated Cost: $9,452,531

Type:New Facility-RoadCounty:Snohomish County

Page 34: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: COMMUNITY TRANSITTitle: Core or Swift BRT - Smokey Point Corridor

Description:Service hours and buses. Core Service or Swift Bus Rapid Transit (BRT) on N Broadway (Smokey Point corridor) from Everett Station up N Broadway, SR 529, State Ave, Smokey Pt to Arlington (SR 531). Requires speed & reliability improvements and accessible transit stops.Location / Facility:Smokey Point corridor up N Broadway, SR 529, State Ave, Smokey Pt

From:Everett Station

To:SR 531

Project ID: 5332

Completion Year:2030

MTP Status: CandidateEstimated Cost: $11,718,285

Type:New Facility-RoadCounty:Snohomish County

Sponsor: COMMUNITY TRANSITTitle: Core or Swift BRT - SR 524 (196th)

Description:Service hours and buses. Core service or Swift Bus Rapid Transit on SR 524 (196th, Filbert) from ferry to SR 527. Requires speed & reliability improvements and accessible transit stops.Location / Facility:SR 524 (196th St and Filbert)

From:Edmonds Ferry

To:SR 527

Project ID: 5331

Completion Year:2030

MTP Status: CandidateEstimated Cost: $5,832,454

Type:New Facility-RoadCounty:Snohomish County

Page 35: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: COMMUNITY TRANSITTitle: North Snohomish Co. Park & Ride

Description:Create a new Park and Ride facility with approximately 350 stalls, bus bays and layover space, DART transfer space, platform with customer shelters, lighting, bike lockers & racks, information kiosks, driversÆ restroom/utility building, pedestrian walkways, landscaping, safety & security features, and on-site surface water detention & treatment facilities. The exact location is to be determined.Location / Facility:Arlington/Smokey Point Area, Vicinity I-5

From:172nd in Smokey Pt

To:

Project ID: 3654

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $7,753,460

Type:New Facility-RoadCounty:Snohomish County

Sponsor: COVINGTONTitle: SR 516 – Jenkins Creek to 185th Place SE

Description:This project is to widen and reconstruct a portion of SR 516 (SE 272nd St) between Jenkins Creek and 185th Place SE. This project will include the crossing of Jenkins Creek with a new structure for the stream, widening the street from 2-lanes to 5-lanes including curb and gutter, 8’ sidewalks, access control features, landscaping and provisions for u-turns.Location / Facility:SR 516

From:Jenkins Creek

To:185th Place SE

Project ID: 4288

Completion Year:2015

MTP Status: CandidateEstimated Cost: $17,896,151

Type:New Facility-RoadCounty:King County

Page 36: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: DES MOINESTitle: Barnes Creek Trail

Description:Conduct prelimary design to provide a multipurpose non montorized trail connection to the regional Des Moines Creek Trail. Design will be developed in phases, from south to north, and will be used to assist in environmental assessement and identification of Right of Way requirements for the future trail as provided in the City of Des Moines Comprehensive Plan.Location / Facility:Unused SR 509 Right of Way

From:Des Moines Creek Trail

To:Kent Des Moines Road

Project ID: 4299

Completion Year:2017

MTP Status: CandidateEstimated Cost: $1,731,106

Type:New Facility-RoadCounty:King County

Sponsor: DES MOINESTitle: Connecting 28th/24th Avenue South (S 208th Street to S 216th Street)

Description:The project will complete a five lane principal arterial corridor on 24th Avenue South between S. 216th Street and S. 208th Street. The improvements include bicycle lanes, curb, gutter, sidewalks, storm drainage collection and treatment facilities, street lighting, coordination of signal improvements at S. 216th Street, channelization, landscaping, utilities, and undergrounding of aerial utilities.Location / Facility:24th Avenue South

From:S 208th Street

To:S 216th Street

Project ID: 4459

Completion Year:2014

MTP Status: ApprovedEstimated Cost: $11,330,587

Type:New Facility-RoadCounty:

Page 37: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: DES MOINESTitle: S. 216th Street Segment 1A

Description:Utility coordination, finalize PS&E, acquire right of way and construct improvements as a Complete Street including widening of two additional lanes, a turn lane, transit stop improvements, bicycle lanes, curbs, gutters, sidewalks, stormwater retention and treatment, planter strips, sustainable street and pedestrian lights, utility undergrounding and signal modifications.Location / Facility:South 216th Street

From:29th Avenue South

To:24th Avenue South

Project ID: 4297

Completion Year:2016

MTP Status: CandidateEstimated Cost: $10,408,022

Type:New Facility-RoadCounty:King County

Sponsor: DUPONTTitle: DuPont-Steilacoom Rd

Description:Scope of the project has not been fully defined. Widening Improvements to DuPont-Steilacoom Rd are anticipated to be necessary to accommodate expected growth in the City of DuPont and increased traffic flows from nearby areas, such as JBLM. The existing road is two lanes with left turn pockets onto the I-5 Exit 119 Interchange (which has been identified in various corridor studies for recommended improvements.)Location / Facility:DuPont-Steilacoom Rd

From:[Not submitted]

To:

Project ID: 296

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $31,013,839

Type:New Facility-RoadCounty:Pierce County

Page 38: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: EDGEWOODTitle: Interurban Trail & Trailhead Construction Project (114th St, E to 900ft S of Military Rd)

Description:Edgewood's segment of the Interurban Trail is a "missing link" in the Interurban/Green River Trail system and will eventually provide connection between Milton and Pacific, providing the only non-motorized route on and off "the hill". Location / Facility:Interurban Trail

From:114th St. E

To:900ft south of military road

Project ID: 2890

Completion Year:2012

MTP Status: CompletedEstimated Cost: $1,758,809

Type:New Facility-RoadCounty:Pierce County

Sponsor: EDGEWOODTitle: Interurban Trail Construction Project (114th Ave E to Edgewood/Pacific CL)

Description:Edgewood's final segment of the Interurban Trail is a "missing link" in the Interurban/Green River Trail system and will eventually provide connection between Milton and Pacific, providing the only non-motorized route on and off "the hill". The project limits for the trail will extend from 114th St. E to Edgewood/ Pacific City Limits which will provide access to pedestrians and bicyclists, the trail improvements is approximately 1mile of a multi-use non-motorized path with shoulders, with viewing areas, interpretive display and seating.Location / Facility:Interurban Trail

From:Edgewood/ Pacific City Limits

To:114th St. E

Project ID: 4285

Completion Year:2018

MTP Status: CandidateEstimated Cost: $16,097,002

Type:New Facility-RoadCounty:Pierce County

Page 39: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: EDMONDSTitle: Edmonds Terminal Relocation/Expansion Phase I

Description:Bus/Rail connection, vehicle holding lanes, toll-booth, parking, ferry pier, slip and terminal relocationLocation / Facility:Edmonds Terminal Relocation/Expansion Phase I

From:[Not submitted]

To:

Project ID: 2483

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $124,055,356

Type:New Facility-RoadCounty:Snohomish County

Sponsor: EDMONDSTitle: Edmonds Terminal Relocation/Expansion Phase II

Description:Phase II or relocation; people mover. See 4072 for the parking structure and Sounder Station.Location / Facility:Edmonds Terminal Relocation/Expansion Phase II

From:[Not submitted]

To:

Project ID: 3415

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $103,896,361

Type:New Facility-RoadCounty:Snohomish County

Page 40: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: EDMONDSTitle: Interurban Trail

Description:The project will complete the missing link of the Interurban Trail between King and Snohomish counties. The project will include two 5-foot bike lanes along 76th Ave W. between SR 104 and 228th St SW. These bike lanes will then extend east on 228th St SW to the Interurban Trail. In addition, the project will include 1.37 miles of safety improvements along 74th Ave W., of which 2500 feet will be a 12’ paved and grade-separated path. The project will also feature the Lake Ballinger Station located at the intersection of 76th Avenue and McAleer Way.Location / Facility:Interurban Trail

From:228th St

To:SR 104 (Snohomish/King county line)

Project ID: 2812

Completion Year:2012

MTP Status: CompletedEstimated Cost: $1,896,579

Type:New Facility-RoadCounty:Snohomish County

Page 41: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: ENUMCLAWTitle: SR 410 Channelization: Mtn. Villa Dr. to Watson St. N.

Description: This project will provide for channelization, roadway, and pedestrian facility improvements along an existing section of the State Route 410 corridor within the City of Enumclaw. The project will modify and optimize the existing 65-foot wide, variable (2-to-4) lane channelization to a proposed 5-lane configuration; one-through lane and one general purpose (through/right turning) lane for each direction with medians, continuous two-way left turn lanes, or left turn pockets as approved by WSDOT. The project will add or upgrade curb, gutters, sidewalks, driveways, storm drainage, illumination, and curb ramps along the SR 410 corridor between mileposts 24.34 to 24.81. Location / Facility:SR 410 `Roosevelt Avenue`

From:Mtn. Villa Dr. (Monroe Ave)

To:Watson St. N.

Project ID: 361

Completion Year:2017

MTP Status: CandidateEstimated Cost: $1,944,706

Type:New Facility-RoadCounty:King County

Sponsor: ENUMCLAWTitle: SR 410

Description:Widen to 3 lanes, curb, gutter, sidewalk, Widening Project 2Location / Facility:SR 410

From:Farman St

To:E city lim

Project ID: 362

Completion Year:2010

MTP Status: UnprogrammedEstimated Cost: $730,221

Type:New Facility-RoadCounty:King County

Page 42: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: ENUMCLAWTitle: SR 410

Description:Widen to 3 lanes, curb, gutter, sidewalk 244th to Mt Villa/Monroe Ave. Widen to 2/5 lanes Watson to Farman.Location / Facility:SR 410

From:244th Ave SE to Mtn Villa Rd

To:Watson St N to Farman St

Project ID: 4470

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $6,317,845

Type:New Facility-RoadCounty:King County

Page 43: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: EVERETTTitle: 112th St - Beverly Park Rd Corridor

Description:Widen from 2 or 3 lanes to 5 lanes with sidewalks and bike lanes on both sides in 6 phases: 1) SR 99 to 3rd Ave SE 2) SR 99 to Airport Rd 3) Airport Rd to SR 525 4) 3rd Ave SE to I-5 5) I-5 to Silver Lake Road (No HOV ramps or P&R lot as part of this project) and 6) Silver Lake Road to SR 527.Location / Facility:112th St - Beverly Park Rd Corridor

From:SR 527

To:SR 525

Project ID: 792

Completion Year:2013

MTP Status: ApprovedEstimated Cost: $69,597,117

Type:New Facility-RoadCounty:Snohomish County

Sponsor: EVERETTTitle: Broadway Corridor Improvements

Description:Widen to 5 lanes with bike lanes, sidewalks, new bridge. Transit signal priority.Location / Facility:Broadway Ave

From:SR 526

To:37th St.

Project ID: 5517

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $42,024,510

Type:New Facility-RoadCounty:Snohomish County

Page 44: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: EVERETTTitle: Everett Arterial Access Improvements

Description:Arterial access improvements to US 2 and I-5 in Everett Location / Facility:Vicinity of Walnut and Chestnut on various streets

From:Everett Avenue

To:Pacific

Project ID: 4005

Completion Year:2018

MTP Status: UnprogrammedEstimated Cost: $38,813,777

Type:New Facility-RoadCounty:Snohomish County

Sponsor: EVERETTTitle: I-5 @ 41st Street Interchange Access Improvements

Description:41st St Interchange improvement, improvement of arterial approaches and connectionsLocation / Facility:41st Street

From:Colby

To:3rd Ave

Project ID: 547

Completion Year:2009

MTP Status: CompletedEstimated Cost: $70,935,523

Type:New Facility-RoadCounty:Snohomish County

Sponsor: EVERETTTitle: Interurban Trail

Description:Shared use bike pathLocation / Facility:Interurban Trail

From:Northern terminus of existing trail at Beverly Blvd

To:41st St

Project ID: 2834

Completion Year:2010

MTP Status: CompletedEstimated Cost: $2,887,388

Type:New Facility-RoadCounty:Snohomish County

Page 45: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: EVERETTTitle: Riverfront Walkway

Description:Complete Phase I of Riverfront Walkway non-motorized improvements and construct overcrossing of BNRR.Location / Facility:Riverfront Walkway

From:Lenora Street

To:Pacific Avenue

Project ID: 1885

Completion Year:2011

MTP Status: CompletedEstimated Cost: $85,288

Type:New Facility-RoadCounty:Snohomish County

Sponsor: EVERETTTitle: Riverfront/Interurban Connector

Description:Shared use bike path Not in local plansLocation / Facility:Riverfront/Interurban Connector

From:Everett City limits

To:Interurban Trail at 84th St

Project ID: 2680

Completion Year:2018

MTP Status: CandidateEstimated Cost: $1,997,291

Type:New Facility-RoadCounty:Snohomish County

Page 46: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: EVERETTTitle: SR 526 Hardeson Road Half Interchange

Description:This proposed project would improve access to the Paine Field Manufacturing and Industrial Center, a key commercial, aerospace, and industrial area in southwest Everett. Improving access and travel time to this area will benefit the local businesses and regional businesses who are vendors or customers of businesses in SW Everett. Businesses in this area work in local, regional and international markets. The proposed project will construct access ramps on SR 526 at Hardeson Road to improve traffic flow on SR 526 and local streets within the SW Everett industrial area. Access will be provided for SR 526 traffic to/from the east. The westbound off ramp will access 80th Street SW instead of Hardeson Road due to the location of the Federal Post Office Facility.Location / Facility:SR 526

From:Milepost 2.60

To:Milepost 3.00

Project ID: 4467

Completion Year:2020

MTP Status: CandidateEstimated Cost: $53,545,110

Type:New Facility-RoadCounty:Snohomish County

Sponsor: EVERETTTitle: SR 99/ Evergreen Way

Description:Widen Evergreen Way from 5 to 7 lanes, with curb, gutters and sidewalks and drainage improvements.Location / Facility:SR 99/ Evergreen Way

From:115th Street

To:Airport Road

Project ID: 1879

Completion Year:2012

MTP Status: CompletedEstimated Cost: $803,044

Type:New Facility-RoadCounty:Snohomish County

Page 47: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: EVERETTTitle: SR 99/ Evergreen Way Transit HOV Treatments

Description:Construct BAT lanes on Evergreen Way / Highway 99 from 115th Street SW to 46th Street. Location / Facility:Evergreen Way Transit HOV Treatments

From:115th St

To:46th Street

Project ID: 621

Completion Year:2019

MTP Status: UnprogrammedEstimated Cost: $1,606,087

Type:New Facility-RoadCounty:Snohomish County

Sponsor: EVERETT TRANSITTitle: Everett Station Parking Structure

Description:Everett Transit Project that provides structured parking for up to 900 vehicles at Everett Station. Providing additional parking on the East side of Rail tracks and close to the bus platforms. Location / Facility:Smith Street

From:33rd Street

To:35th Street

Project ID: 4007

Completion Year:2020

MTP Status: CandidateEstimated Cost: $29,444,934

Type:New Facility-RoadCounty:Snohomish County

Page 48: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: FEDERAL WAYTitle: 21st Ave SW

Description:Major Widening (5 lanes). Provides sidewalks; Bikes provided for on parallel route per Comp PlanLocation / Facility:21st Ave SW

From:SW 344th St

To:SW 356th St

Project ID: 2103

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $3,094,918

Type:New Facility-RoadCounty:King County

Sponsor: FEDERAL WAYTitle: BPA Trail Phase IV

Description:Class 1 bike trailLocation / Facility:BPA Trail

From:51st Ave S

To:32nd Av S

Project ID: 3351

Completion Year:2020

MTP Status: CandidateEstimated Cost: $2,474,904

Type:New Facility-RoadCounty:King County

Sponsor: FEDERAL WAYTitle: City Center Access Phase 3C--32nd Ave S.

Description:Extend and widen 32nd Ave S to 3 lane collector from Military Rd S to S 320th St and 3 intersection signal improvements at Military Rd S, S 312th St and S 320th S. The new facility to be constructed with bike lanes and sidewalksLocation / Facility:32nd Ave S

From:Military Rd S

To:S 320th St

Project ID: 3659

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $9,159,667

Type:New Facility-RoadCounty:King County

Page 49: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: FEDERAL WAYTitle: City Center Access Phase 4A: S 320th St @ I-5 I/C HOV lanes

Description:Add two HOV lanes and widen existing bridge structure to the south with HOV lanes on S 320th St from 25th Ave S to 32nd Ave S, retrofit to current standards existing HAL loop ramp, modify existing ramps, add CD lane.Location / Facility:S 320th St @ I-5 I/C

From:S 320th St @ I-5 I/C

To:

Project ID: 3660

Completion Year:2025

MTP Status: CandidateEstimated Cost: $120,615,838

Type:New Facility-RoadCounty:King County

Sponsor: FEDERAL WAYTitle: Federal Way Trail to Transit Center

Description:Class 1 bike trailLocation / Facility:Trail to Transit Center

From:28th Ave S

To:S 288th St

Project ID: 3350

Completion Year:2030

MTP Status: CandidateEstimated Cost: $1,953,872

Type:New Facility-RoadCounty:King County

Sponsor: FEDERAL WAYTitle: S 348th St

Description:HOV - Widen to a 6 lane cross section, 2 GP, 1 HOV each direction.Location / Facility: S 348th St

From:1st Ave S

To:9th Ave S

Project ID: 2019

Completion Year:2030

MTP Status: CandidateEstimated Cost: $10,961,167

Type:New Facility-RoadCounty:King County

Page 50: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: FEDERAL WAYTitle: S 356th St

Description:Major Widening to 5 lanes. Provides sidewalks and bike lanes; improves freight movement; fixes bottlenecks at SR 161/S 356 StLocation / Facility:S 356th St

From:SR 99

To:SR 161

Project ID: 2023

Completion Year:2015

MTP Status: CandidateEstimated Cost: $7,710,214

Type:New Facility-RoadCounty:King County

Sponsor: FEDERAL WAYTitle: S Park-and-Ride Trail

Description:Shared use bike pathLocation / Facility:S Park-and-Ride Trail

From:S 348th St

To:S 352nd St

Project ID: 2863

Completion Year:2020

MTP Status: CandidateEstimated Cost: $575,307

Type:New Facility-RoadCounty:King County

Sponsor: FEDERAL WAYTitle: SR 99

Description:Add HOV lanes, sidewalks, street lighting, raised medians, access management, construct new traffic signal at S 344th Street, add southbound left-turn lane at SR 18.Location / Facility:SR 99

From:S 359th St

To:S 340th St

Project ID: 2061

Completion Year:2017

MTP Status: ApprovedEstimated Cost: $19,214,281

Type:New Facility-RoadCounty:King County

Page 51: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: FEDERAL WAYTitle: SR 99 Phase IV

Description:CONSTRUCT HOV LANESLocation / Facility:SR 99

From:S 312TH ST

To:SR 509 (S 297th vicinity)

Project ID: 1200

Completion Year:2012

MTP Status: CompletedEstimated Cost: $25,455,371

Type:New Facility-RoadCounty:King County

Sponsor: FEDERAL WAYTitle: Steel Lake Trail

Description:Class 1 Bike pathLocation / Facility:Steel Lake Trail

From:28th Ave S

To:S 290th Pl

Project ID: 3352

Completion Year:2030

MTP Status: CandidateEstimated Cost: $1,953,872

Type:New Facility-RoadCounty:King County

Page 52: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: FIFETitle: Puyallup Riverfront Trail

Description:Shared use bike pathLocation / Facility:Puyallup Riverfront Trail

From:Fife/Tacoma city limits

To:Fife/Pierce Co limits

Project ID: 2897

Completion Year:2025

MTP Status: CandidateEstimated Cost: $2,550,888

Type:New Facility-RoadCounty:Pierce County

Sponsor: FIFETitle: Valley Ave E

Description:Widen and reconstruct existing two-lane roadway to major arterial standards (to four lanes), including non-motorized plan elements.Location / Facility:Valley Ave E

From:Freeman Rd E

To:70th Ave E

Project ID: 122

Completion Year:2008

MTP Status: CompletedEstimated Cost: $17,265,439

Type:New Facility-RoadCounty:Pierce County

Page 53: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: GIG HARBORTitle: Cushman Trail (phase 3 and 4)

Description:Shared Use pathLocation / Facility:new

From:96th Street NW

To:Borgen Boulevard NW

Project ID: 5520

Completion Year:2015

MTP Status: CandidateEstimated Cost: $3,747,504

Type:New Facility-RoadCounty:Pierce County

Sponsor: GIG HARBORTitle: Cushman Trail (Phase 4)

Description:Shared use pathLocation / Facility:Cushman Trail

From:Borgen Blvd NW

To:Purdy

Project ID: 5504

Completion Year:2040

MTP Status: CandidateEstimated Cost: $3,551,912

Type:New Facility-RoadCounty:Pierce County

Page 54: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: ISSAQUAHTitle: 12th Ave NW/SR900/NW Sammamish Rd Widening

Description:Widen 12th Avenue NW at SR900/NW Sammamish Road to provide for an additional westbound left-turn lane that will provide dual left-turn lane capacity. In addition, add a northbound right turn lane approaching 12th Ave NW. Right of way will be required and the cost and amount necessary is undertermined at this time.Location / Facility:SR-900 and 12th Ave NW

From:SR-900

To:Lake Drive

Project ID: 4113

Completion Year:2015

MTP Status: UnprogrammedEstimated Cost: $7,134,529

Type:New Facility-RoadCounty:King County

Sponsor: ISSAQUAHTitle: E Lake Sammamish Pkwy

Description:Design and roadway widening construction to provide for an additional south bound lane widening, constructing curb, gutter, bike lanes, street lights, sidewalks, landscaping and drainage system.Location / Facility:E. Lake Sammamish Pkwy

From:SE 56th St

To:Issaquah-Fall City Rd

Project ID: 265

Completion Year:2016

MTP Status: ApprovedEstimated Cost: $9,657,716

Type:New Facility-RoadCounty:King County

Page 55: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: ISSAQUAHTitle: I-90 High Point Trail

Description:Shared use bike pathLocation / Facility:I-90 Trail

From:Planned E Lake Sammamish Trial

To:Easterly End of 1st Ave NE

Project ID: 2883

Completion Year:2007

MTP Status: CompletedEstimated Cost: $1,856,951

Type:New Facility-RoadCounty:King County

Sponsor: ISSAQUAHTitle: I-90 HOV Direct Access Ramp

Description:Will improve speed and reliability of transit and other HOV modes and, therefore, increase ridership and decrease SOV travel. Van- and car-pools, jitneys and buses all can use this to complement and support HCT and to provide smaller transit and HOV usage to activity centers that are too small to support HCT but of which there are many in King County. This project was identified in the I-90 Corridor Study.Location / Facility:I-90 @ SR 900

From:I-90 @ SR 900

To:

Project ID: 4543

Completion Year:2019

MTP Status: UnprogrammedEstimated Cost: $74,590,158

Type:New Facility-RoadCounty:King County

Page 56: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: ISSAQUAHTitle: Newport Way

Description:Widen Southbound direction to 2 lanes from Maple Street to south of Holly Street then transition to one lane each direction to Sunset Way. Northbound will continue to be one lane from Sunset Way to Maple St. Includes 3 roundabout intersections, bike lanes, sidewalk on one side, shared use facility with landscaping buffer on other side and stormwater system.Location / Facility:Newport Way

From:NW Maple St

To:W. Sunset Way

Project ID: 2270

Completion Year:2016

MTP Status: CandidateEstimated Cost: $12,080,205

Type:New Facility-RoadCounty:King County

Sponsor: ISSAQUAHTitle: SR 900 Pedestrian/Non-Motorized Improvement

Description:New non-motorized multi-use trail along SR 900Location / Facility:SR 900

From:I-90 Eastbound Ramps

To:12th Avenue NW/NW Sammamish Rd

Project ID: 4112

Completion Year:2012

MTP Status: CompletedEstimated Cost: $7,785,642

Type:New Facility-RoadCounty:King County

Sponsor: KENMORETitle: 68th Ave NE

Description:Widen to add additional GP lanes - estimated additional NB laneLocation / Facility:68th Ave NE

From:NE 175th St

To:NE 170th St.

Project ID: 2292

Completion Year:2018

MTP Status: UnprogrammedEstimated Cost: $3,690,221

Type:New Facility-RoadCounty:King County

Page 57: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KENTTitle: 212th Street

Description:Grade Separated Railroad CrossingLocation / Facility:212th St

From:BNSF railroad crossing

To:BNSF railroad crossing

Project ID: 1563

Completion Year:2019

MTP Status: CandidateEstimated Cost: $37,295,079

Type:New Facility-RoadCounty:King County

Sponsor: KENTTitle: East Valley Highway (84th Ave. S.) Improvement Project

Description:This project will widen East Valley Highway (84th Ave. S.) between SR 167 and S. 212th St by providing: Continuous SB GP lane from S. 216th St. to SR 167; Continuous NB GP lane from SR 167 to S. 212th St.; New deceleration lane SB at 216th St.; Complete sidewalk system on the E side of road with new curb, gutter, sidewalk where not currently existing; new sidewalk on W side of roadway from S. 212th to S. 224th where missing currently; overlay of entire roadway; upgrades to existing traffic signal system at S. 212th, S. 216th, S. 220th, and S. 224th streets as needed to accommodate widening.Location / Facility:East Valley Highway (84th Ave. S.)

From:SR 167

To:S. 212th St.

Project ID: 3612

Completion Year:2012

MTP Status: CompletedEstimated Cost: $9,168,082

Type:New Facility-RoadCounty:King County

Page 58: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KENTTitle: S 228th St Grade Separation

Description:Grade separation of the roadway from the Union Pacific Railroad tracks. A bridge will be constructed at the track locations, and the road will run over the tracks and the adjacent Interurban Trail.Location / Facility:S 228th St

From:500 ft west of the Union Pacific Railroad tracks

To:500 ft west of the Burlington Northern Santa-Fe railroad tracks

Project ID: 3643

Completion Year:2018

MTP Status: ApprovedEstimated Cost: $29,911,563

Type:New Facility-RoadCounty:King County

Sponsor: KENTTitle: S 228th St Grade Separation

Description:Grade separation of the roadway from and BNSF railroad tracks. Bridges will be constructed at the track locations and the road will run under the tracks.Location / Facility:new

From:S 228th / BNSF railroad

To:

Project ID: 5538

Completion Year:2009

MTP Status: CompletedEstimated Cost: $28,428,345

Type:New Facility-RoadCounty:King County

Page 59: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KENTTitle: S 272nd St

Description:Major Widening Phase I (including HOV, sidewalks and bike lanes)Location / Facility:S 272nd St

From:Military Road

To:Pacific Highway South

Project ID: 2007

Completion Year:2019

MTP Status: CandidateEstimated Cost: $9,471,766

Type:New Facility-RoadCounty:King County

Sponsor: KENTTitle: South 212th Street

Description:Grade Separated Railroad Crossing in Kent - Fast Phase IILocation / Facility:212th St

From:UPRR crossing

To:UPRR crossing

Project ID: 1564

Completion Year:2020

MTP Status: CandidateEstimated Cost: $31,967,211

Type:New Facility-RoadCounty:King County

Sponsor: KENTTitle: West Valley Highway

Description:Major Widening including Complete Streets, three lanes each direction and center left-turn laneLocation / Facility:W Valley Hwy

From:West Meeker Street

To:Vicinity of South 218th Street

Project ID: 2026

Completion Year:2023

MTP Status: UnprogrammedEstimated Cost: $23,679,415

Type:New Facility-RoadCounty:King County

Page 60: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KENTTitle: Willis Street Grade Separations

Description:Provides a critical, grade-separated link through the commercial/industrial center of Kent. Links the valley warehouse/industrial center to SR 167 and I-5.Location / Facility:Willis St

From:SR 167

To:Central Avenue South

Project ID: 5289

Completion Year:2021

MTP Status: CandidateEstimated Cost: $55,646,626

Type:New Facility-RoadCounty:King County

Page 61: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY DEPT. OF TRANSPORTATION (MARINE)Title: Passenger Only Ferry: Kenmore-UW

Description:Passenger Only Ferry - new route: Kenmore-UW This future King County Ferry District passenger-only ferry route is a 8.3 nautical mile route serving Tracy Owen Station Park in Kenmore to the University of Washington. Location / Facility:POF route

From:Kenmore

To:UW

Project ID: 5375

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $10,135,323

Type:New Facility-RoadCounty:Multicounty

Sponsor: KING COUNTY DEPT. OF TRANSPORTATION (MARINE)Title: Passenger Only Ferry: Kirkland-UW

Description:Passenger Only Ferry - new route: Kirkland-UW This future King County Ferry District passenger-only ferry route is a 6.0 nautical mile route serving Marina Park in downtown Kirkland to the University of Washington. Location / Facility:POF route

From:Kirkland

To:UW

Project ID: 5368

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $494,406

Type:New Facility-RoadCounty:Multicounty

Page 62: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY DEPT. OF TRANSPORTATION (MARINE)Title: Passenger Only Ferry: Renton-Leschi

Description:Passenger Only Ferry - new route: Renton-Leschi This future King County Ferry District passenger-only ferry route is a 7.1 nautical mile route serving the City of RentonÆs Gene Coulon Memorial Beach Park to Leschi Park on Lakeside Avenue South.Location / Facility:POF route

From:Renton

To:Leschi Park in Seattle

Project ID: 5374

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $10,135,323

Type:New Facility-RoadCounty:Multicounty

Sponsor: KING COUNTY DEPT. OF TRANSPORTATION (ROADS)Title: East Lake Sammamish Trail, South Sammamish Segment A

Description:Develop a 1.3 mile-long paved regional trail segment within the City of Samammish. The trail will be constructed from SE 43rd Way to SE 33rd Street.Location / Facility:County Owned ROW

From:SE 43rd Way

To:SE 33rd Street

Project ID: 4471

Completion Year:

MTP Status: ApprovedEstimated Cost: $5,747,954

Type:New Facility-RoadCounty:King County

Page 63: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: 140th/132nd Avenue SE

Description:Provide continuity in the north/south corridor by capacity, operational, and safety improvements. Will add additional lanes in the south portion of the corridor.Location / Facility:140/132nd Ave SE

From:SE Petrovitsky Road

To:SE 240th St

Project ID: 4551

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $23,774,749

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Atlantic / Central Base Expansion

Description:Pre-design and property acquisition toward expanding the Phase One bus base capacity in the North Duwamish area of Seattle to cost effectively repair, service and dispatch buses for transit service planned by both King County METRO and Sound Transit for King County. This three phase will increase area capacity by approximately 385 buses. Phase One is estimated at approximately $58 million and will add capacity for approximately 100 buses to the existing bases.Location / Facility:Atlantic / Central Base Expansion

From:1270 Sixth Ave S

To:

Project ID: 3418

Completion Year:2011

MTP Status: CompletedEstimated Cost: $73,074,865

Type:New Facility-RoadCounty:King County

Page 64: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Aurora Village Rapid Ride BRT (E line)

Description:Bus Rapid Transit between Aurora Village and Downtown Seattle, providing more frequent service, transit signal priority, enhanced bus zones, queue jumps and rider information kiosks (in coordination with SWIFT).Location / Facility:SR 99 (Aurora Avenue)

From:Aurora Village

To:Downtown Seattle

Project ID: 4026

Completion Year:2013

MTP Status: CompletedEstimated Cost: $64,235,530

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Avondale Rd

Description:Widen to 4 lanes, 2-way L turn, traffic signal, replace bridge, bike lane, curb, gutter, sidewalkLocation / Facility:0

From:Avondale Pl NE

To:NE 132nd St

Project ID: 423

Completion Year:2000

MTP Status: CompletedEstimated Cost: $0

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Avondale Road

Description:Capacity and pedestrian improvements will aid traffic flow in the Avondale Corridor. (Avondale ITS Phases I and II have been funded.)Location / Facility:Avondale Road

From:City of Redmond

To:Woodinville Duvall Road

Project ID: 4554

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $51,992,906

Type:New Facility-RoadCounty:King County

Page 65: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Burien Transit Oriented Development/ Park and Ride Expansion

Description:117 additional stalls. This project will assist in meeting the City's goals by constructing a 550-stall transit-oriented development (TOD) Facility that will occupy 50% less land than the present 385-stall park and ride surface lot. $12.5m contribution Location / Facility:Burien P & R

From:Burien P & R

To:

Project ID: 3601

Completion Year:2011

MTP Status: CompletedEstimated Cost: $25,231,273

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Cedar River to Sammamish Trail

Description:Acquisition, design, and construction of paved off-road multi-purpose facility linking the Cedar River Trail with East Lake Sammamish TrailLocation / Facility:Off-road

From:Cedar River Trail (Renton)

To:East Lake Sammamish Trail (Issaquah)

Project ID: 4029

Completion Year:2018

MTP Status: CandidateEstimated Cost: $23,205,827

Type:New Facility-RoadCounty:King County

Page 66: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Cedar River Trail - Landsburg to Cedar Falls

Description:Design and construct paved regional trail from southern terminus of Cedar River Trail at Landsburg to southern terminus of Snoqualmie Valley Road at Rattlesnake Lake. Change of current land use would be required for development.Location / Facility:Abandoned railway alignment.

From:Existing terminus of Cedar River Trail at Landsburg Road SE.

To:Rattlesnake Lake at junction of Snoqualmie Valley Trail and John Wayne Trail.

Project ID: 4596

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $49,726,772

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Chief Sealth Trail Extension

Description:Shared use bike path. Not in local plans Continuation of Seattle's Chief Sealth Trail from south Seattle CL through Unincorporated King County to Renton CLLocation / Facility:Chief Sealth Trail Extension

From:Southern terminus of planned Chief Sealth Trail

To:Renton City Limits

Project ID: 2672

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $1,780,194

Type:New Facility-RoadCounty:King County

Page 67: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Des Moines Creek Trail

Description:Lake to Sound Trail corridor - complete paving of Des Moines Creek Trail as part of the Lake to Sound corridorLocation / Facility:0

From:Near 13th Ave S at treatment plant

To:Western terminus of Des Moines Creek Trail

Project ID: 4630

Completion Year:2011

MTP Status: CompletedEstimated Cost: $2,670,334

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: East Lake Sammamish Trail - Issaquah Segment

Description:The project will provide a 12-foot-wide paved facility with 2-foot-wide soft surface shoulders. The project will include related drainage improvements, site amenities and sensitive areas mitigation.Location / Facility:County Owned ROW

From:Gilman Blvd

To:Vicinity of SE 43rd Way

Project ID: 4038

Completion Year:2014

MTP Status: CompletedEstimated Cost: $10,549,821

Type:New Facility-RoadCounty:King County

Page 68: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: East Lake Sammamish Trail - North

Description:Design and construct paved regional trail link between northern terminus of the East Lake Sammamish Trail at SR520 and Bear Creek Trail at Bear Creek Parkway in Redmond; incorporates grade separation between trail and SR520. Location / Facility:Abandoned railway alignment, dedicated trail right-of-way.

From:East Lake Sammamish Trail at SR 520.

To:Bear Creek Trail near SR 520.

Project ID: 4598

Completion Year:2015

MTP Status: CandidateEstimated Cost: $4,143,898

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: East Lake Sammamish Trail – Redmond Segment

Description:The project will provide a 12-foot-wide paved facility with 2-foot-wide soft surface shoulders. The project will include related drainage improvements, site amenities and sensitive areas mitigation. The project includes parking at NE 70th St.Location / Facility:0

From:187th Ave NE

To:Vicinity of SR 520

Project ID: 4290

Completion Year:2011

MTP Status: CompletedEstimated Cost: $4,448,685

Type:New Facility-RoadCounty:King County

Page 69: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: East Lake Sammamish Trail - Sammamish Segment

Description:The project will provide a 12-foot-wide paved facility with 2-foot-wide soft surface shoulders. The project will include related drainage improvements, site amenities and sensitive areas mitigation. The project includes parking near Inglewood Hill Rd and SE 33rd St.Location / Facility:County Owned ROW

From:SE 33rd Street

To:187th Ave NE

Project ID: 4289

Completion Year:2019

MTP Status: CandidateEstimated Cost: $24,206,506

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: East Plateau Trail - Klahanie to Soaring Eagle Park

Description:Design and construct paved regional trail from existing East Plateau Trail at Issaquah-Beaver Lake Road at SE Duthie Hill Road to Soaring Eagle Park via Trossachs community in Sammamish.Location / Facility:Dedicated trail right-of-way, Duthie Hill Road, Trossachs Boulevard SE.

From:Existing East Plateau Trail at SE Duthie Hill Road at Issaquah-Beaver Lake Road.

To:Soaring Eagle Park n/o SE 9th Way.

Project ID: 4599

Completion Year:2018

MTP Status: CandidateEstimated Cost: $10,774,134

Type:New Facility-RoadCounty:King County

Page 70: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: East Plateau Trails - Issaquah Highlands to Duthie Hill Park

Description:Develop regional trail between Duthie Hill Park at Duthie Hill Road and Issaquah-Preston Trail near High Point.Location / Facility:Dedicated trail right-of-way.

From:Existing Issaquah-Preston Trail e/o Sunset interchange.

To:SE Issaquah-Fall City Road at Duthie Hill Park.

Project ID: 4600

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $22,377,047

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Eastside ERC Trail, Woodinville Spur (NE 124th Street to Woodinville)

Description:Paved bike path to AASHTO standards Connecting Totem Lake to the Sammamish River Trail in WoodinvilleLocation / Facility:BNSF Corridor

From:Woodinville rail junction@rail spur and SR 202

To:NE 124th Street

Project ID: 4011

Completion Year:2020

MTP Status: CandidateEstimated Cost: $2,083,884

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: ERC Trail, Main Line, North Bellevue

Description:Design, and construction of a paved and soft-surface regional trailLocation / Facility:Eastside Rail Corridor (BNSF)

From:NE 8th Street, Bellevue

To:108th Avenue NE, Bellevue

Project ID: 4444

Completion Year:2020

MTP Status: CandidateEstimated Cost: $11,392,608

Type:New Facility-RoadCounty:King County

Page 71: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: ERC Trail, Mainline, Woodinville

Description:Design, and construction of a paved and soft-surface regional trailLocation / Facility:Eastside Rail Corridor (BNSF)

From:132nd Place NE, Kirkland

To:Woodinville rail junction@rail spur and SR202

Project ID: 4445

Completion Year:2020

MTP Status: CandidateEstimated Cost: $20,021,663

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: ERC, Main Line South

Description:Acquisition, design, and construction of a paved and soft-surface regional trailLocation / Facility:Eastside Rail Corridor (BNSF)

From:Eastside Rail Corridor @ north end of Coulon Park in Renton

To:Eastside Rail Corridor @ Interstate 90 in south Bellevue

Project ID: 4040

Completion Year:2020

MTP Status: CandidateEstimated Cost: $33,125,551

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: ERC, Main Line, Central Bellevue

Description:Design, and construction of a paved and soft-surface regional trail.Location / Facility:Eastside Rail Corridor (BNSF)

From:Eastside Rail Corridor @ Interstate 90 in south Bellevue

To:Eastside Rail Corridor @ NE 8th Street, Bellevue

Project ID: 4443

Completion Year:2020

MTP Status: CandidateEstimated Cost: $15,002,147

Type:New Facility-RoadCounty:King County

Page 72: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Foothills (Enumclaw Plateau) Trail - Central

Description:Design and construct new paved regional trail segment between Enumclaw and Nolte State Park along BNSF rail line near Veazie-Cumberland Road.Location / Facility:Abandoned railway corridor.

From:Chinook Avenue, Enumclaw.

To:304th Avenue SE; Nolte State Park.

Project ID: 4601

Completion Year:2020

MTP Status: CandidateEstimated Cost: $19,535,518

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Foothills (Enumclaw Plateau) Trail - North

Description:Design and construct new paved regional trail segment between Nolte State Park along BNSF rail line near Cumberland-Kanaskat Road to southern terminus of the Landsburg-Kanaskat Trail in Kanaskat .Location / Facility:Abandoned railway alignment, dedicated trail right-of-way.

From:304th Avenue SE; Nolte State Park; Foothills Trail - Central (RTNR ID FH-4).

To:Cumberland-Kanaskat Road at the Green River; southern terminus of Landsburg-Kanaskat Trail (RTNR ID LK-1), Kanaskat.

Project ID: 4602

Completion Year:2022

MTP Status: UnprogrammedEstimated Cost: $17,877,959

Type:New Facility-RoadCounty:King County

Page 73: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Foothills (Enumclaw Plateau) Trail - South

Description:Develops 0.9-mile paved regional trail to continue Foothills Trail south of Enumclaw to White River.Location / Facility:Railway corridor

From:252nd Avenue SE, Enumclaw

To:Mud Mountain Road

Project ID: 4603

Completion Year:2016

MTP Status: CandidateEstimated Cost: $4,617,486

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Foothills (Enumclaw Plateau) Trail - White River Bridge

Description:Design and construct a pedestrian/regional trail bridge over the White River between Enumclaw and Pierce County to link Foothills Trail between King County and Pierce County.Location / Facility:Railway corridor

From:Terminus of Foothills Trail (RTNR ID FH-1) at Mud Mountain Road

To:Terminus of Foothills Trail at City of Buckley

Project ID: 4604

Completion Year:2018

MTP Status: UnprogrammedEstimated Cost: $7,103,825

Type:New Facility-RoadCounty:King County

Page 74: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Green River 2.2 (S. 259th St)

Description:Design and construct new paved regional trail link along S. 259th Street between Interurban Trail and Green River Trail Phase 2.Location / Facility:S. 259th Street

From:Green River Trail at Interurban Trail at S. 259th Street

To:Green River Trail Phase 2 (RTNR ID GR-1) at S. 259th Street

Project ID: 4605

Completion Year:2018

MTP Status: CandidateEstimated Cost: $1,302,368

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Green River Trail - North

Description:Continues Green River Trail north from current terminus at S. 102nd Street to Seattle CL. Acquisition, design, and construction of a paved regional trailLocation / Facility:Off-road

From:North Terminus of Green River Trail at S. 102nd Street

To:Seattle City boundary

Project ID: 4032

Completion Year:2015

MTP Status: CandidateEstimated Cost: $1,183,971

Type:New Facility-RoadCounty:King County

Page 75: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Green River Trail - Phase 2

Description:Construction of paved regional trailLocation / Facility:Off-road and on S. 259th St

From:S. 259th Street (Kent)

To:Near Central Avenue S. (Kent)

Project ID: 4033

Completion Year:2020

MTP Status: CandidateEstimated Cost: $1,070,725

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Green River Trail - Phase 3

Description:Design and construction of paved regional trail link between cities of Kent and Auburn. Location / Facility:Off-road

From:Green River Bridge (86th Avenue S. - Kent)

To:Brannan Park (Auburn)

Project ID: 4034

Completion Year:2018

MTP Status: CandidateEstimated Cost: $11,247,722

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Green River Trail - Phase 4

Description:Acquisition, design, permitting, and construction of paved regional trail Location / Facility:Off-road

From:Brannan Park (Auburn)

To:SR-18

Project ID: 4035

Completion Year:2020

MTP Status: CandidateEstimated Cost: $19,535,518

Type:New Facility-RoadCounty:King County

Page 76: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Green River Trail Bridge

Description:Construction of multi-purpose (non-vehicular) Bridge across Green RiverLocation / Facility:Off-road

From:86th Avenue S. (Kent)

To:86th Avenue S. (Unincorporated King County)

Project ID: 4036

Completion Year:2018

MTP Status: CandidateEstimated Cost: $3,196,721

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Green River Trail Phase 5 (Upper)

Description:Develop paved regional trail along Green River from intersection of Auburn-Black Diamond Road at SE Green Valley Road to Green-to-Cedar Rivers Trail near Flaming Geyser State Park.Location / Facility:Dedicated trail right-of-way along Green River and SE Green Valley Road.

From:SR18.

To:SE Green Valley Road near 227th Avenue SE at Flaming Geyser State Park.

Project ID: 4606

Completion Year:2025

MTP Status: CandidateEstimated Cost: $33,624,770

Type:New Facility-RoadCounty:King County

Page 77: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Green-to-Cedar Rivers Trail

Description:Design and construct paved regional trail between existing terminus at Kent-Kangley Road in Maple Valley to Green River Trail at SE Green Valley Road.Location / Facility:Dedicated trail right-of-way.

From:Green-to Cedar River Trail at Kent-Kangley Road, Maple Valley.

To:SE Green Valley Road near 227th Avenue SE.

Project ID: 4607

Completion Year:2018

MTP Status: CandidateEstimated Cost: $21,548,268

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Highline Community College Intermodal Transit Facility and Parking Garage

Description:Construct a Transit Center with bus layover to facilitate a potential Bus Rapid Transit route on SR 99 in south King County. In addition, the project will construct a parking garage with up to 500 stalls that will provide commuter parking, vanpool and carpool stalls as well as joint use parking for Highline Community College students and staff.Location / Facility:SR 99

From:South 240th Street@SR 99 South

To:

Project ID: 4128

Completion Year:2020

MTP Status: CandidateEstimated Cost: $28,106,528

Type:New Facility-RoadCounty:King County

Page 78: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Interurban Trail (south) Extension

Description:Construction of paved regional trail extension of the Interurban TrailLocation / Facility:Off-road facility

From:Terminus of Interurban Trail in Pacific at 3rd Ave SW (Pacific)

To:Pierce County Boundary (Edgewood)

Project ID: 4031

Completion Year:2018

MTP Status: CandidateEstimated Cost: $9,945,354

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Issaquah Fall City / Duthie Hill Road

Description:Widen 4 lane arterial to 5 lanes with turn pockets, bicycle and pedestrain faciltities and ITS. Location / Facility:Issaquah Fall City/Duthie Hill Road

From:Issaquah Pine Lake Road

To:SR 202

Project ID: 4555

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $43,728

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Issaquah Hobart Road

Description:Operational, ITS and safety improvements to congested corridor used as an Urban Connector between the Maple Valley/SR-18 area and Issaquah Plateau.Location / Facility:Issaquah-Hobart Road

From:I-90

To:SR-18

Project ID: 4556

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $123,623

Type:New Facility-RoadCounty:King County

Page 79: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Issaquah-Preston Trail - High Point to Preston (WSDOT Lead)

Description:Design and construct new regional trail along I-90 and Issaquah Creek between High Point Way interchange and Preston-Snoqualmie Trail near the Preston Park and Ride in Preston.Location / Facility:Dedicated trail right-of-way, High Point Way

From:High Point Way interchange on I-90

To:High Point Way approx. 07 mile from Preston-Snoqualmie Trail

Project ID: 4609

Completion Year:2010

MTP Status: CompletedEstimated Cost: $2,879,915

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Issaquah-Snoqualmie Corridor - Preston-Snoqualmie Trail Extension

Description:Construction of paved trail, including new bridge facilities; easternmost segment provides a link between urban areas and cross-state trail system.Location / Facility:Off-road

From:Preston-Snoqualmie Trail terminus 1 mile east of Lake Alice Road

To:Junction of SR202 at Snoqualmie Parkway

Project ID: 4027

Completion Year:2018

MTP Status: CandidateEstimated Cost: $11,247,722

Type:New Facility-RoadCounty:King County

Page 80: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Kennydale P&R

Description:400 new stallsLocation / Facility:Kennydale P&R

From:I-405

To:

Project ID: 2665

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $22,081,853

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Lake to Sound Trail 1

Description:Acquisition, design, and construction of paved regional trail or in-road track from Cedar River Trail to Black River Forest at Naches Ave S.Location / Facility:On-road and off-road

From:Cedar River Trail (Renton)

To:Naches Ave S (Renton)

Project ID: 4030

Completion Year:2016

MTP Status: CandidateEstimated Cost: $13,197,378

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Lake to Sound Trail 2 (Segment A)

Description:Acquisition, design, and construction of paved regional trail from Naches Ave S. through Black River Forest to Green River Trail.Location / Facility:Off-road

From:Naches Ave S (Renton)

To:Green River Trail (Tukwila)

Project ID: 4441

Completion Year:2017

MTP Status: CandidateEstimated Cost: $4,703,681

Type:New Facility-RoadCounty:King County

Page 81: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Lake to Sound Trail 3

Description:Design and construction of a paved regional trail from Green River Trail in Tukwila to trail on S 154th Street in SeaTacLocation / Facility:Alignment along South Center Blvd and 154th Ave S

From:Green River Trail (Tukwila)

To:S 154th Street (SeaTac)

Project ID: 4628

Completion Year:2018

MTP Status: CandidateEstimated Cost: $2,030,366

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Lake to Sound Trail 4 (Segment B)

Description:Acquisition, design, and construction of paved regional trail along Des Moines Memorial Drive from S 156th Street in SeaTac to 8th Ave S in Burien Location / Facility:SW 7th Street, Green R. Trail, Southcenter Blvd, S. 154th Street, S. 156th Way, Des Moines Memorial Dr., Des Moines Creek Trail.

From:Cedar River Trail at I-405

To:Eastern terminus of Des Moines Creek Trail.

Project ID: 4629

Completion Year:2016

MTP Status: CandidateEstimated Cost: $7,636,431

Type:New Facility-RoadCounty:King County

Page 82: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Lake to Sound Trail 5

Description:Acquisition, design, and construction of paved regional trail along Des Moines Memorial Drive from S Normandy Road to 8th Ave S in Burien Location / Facility:Des Moines Memorial Drive

From:S Normandy Road (Burien)

To:8th Ave S (Burien)

Project ID: 4442

Completion Year:2018

MTP Status: CandidateEstimated Cost: $1,127,981

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Lake to Sound Trail Trail 6

Description:Acquisition, design, and construction of paved regional trail from 8th Ave S in SeaTac to Des Moines Creek Trail (S 200th Stree) in Des Moines.Location / Facility:SW 7th Street, Green R. Trail, Southcenter Blvd, S. 154th Street, S. 156th Way, Des Moines Memorial Dr., Des Moines Creek Trail.

From:8th Ave S (Burien)

To:Des Moines Creek Trail (S 200th Street) (Des Moines)

Project ID: 4627

Completion Year:2020

MTP Status: CandidateEstimated Cost: $2,255,962

Type:New Facility-RoadCounty:King County

Page 83: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Lake Youngs to Cedar River Trail (Soft-Surface)

Description:Develop regional trail between Lake Youngs Trail near intersection of SE Lake Youngs Road at 184th Avenue SE to Cedar River Trail in Maple Valley near junction of Cedar River Trail at SR18. Location / Facility:Pipeline corridor.

From:Lake Youngs Trail near South Lake Youngs Road..

To:Junction of Cedar River Trail at Green-to-Cedar Rivers Trail, Maple Valley.

Project ID: 4611

Completion Year:2020

MTP Status: CandidateEstimated Cost: $13,378,870

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Landsburg-Kanaskat Trail

Description:Develop paved regional trail between terminus of existing Cedar River Trail at Landsburg to intersection of Kanaskat Kangley Road and Retreat Kanaskat Road in Kanaskat.Location / Facility:Dedicated trail right-of-way, abandoned railway alignment.

From:Eastern terminus of Cedar River Trail at Landsburg Road SE

To:Cumberland-Kanaskat Road at the Green River; northern terminus of Foothills Trail (RTNR ID FH-5), Kanaskat.

Project ID: 4612

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $34,453,549

Type:New Facility-RoadCounty:King County

Page 84: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Laughing Jacobs Creek Trail Segment

Description:Design and construct new regional trail segment between East Lake Sammamish Trail on East Lake Sammamish Parkway SE in Issaquah and existing trail terminus w/o 229th Place SE in Sammamish.Location / Facility:Abandoned railway alignment.

From:East Lake Sammamish Trail (RTNR ID ELS-2) at E. Lake Sammamish Parkway at SE 43rd Way.

To:Western terminus of East Plateau Trail near Providence Point Place SE.

Project ID: 4613

Completion Year:2018

MTP Status: UnprogrammedEstimated Cost: $2,131,147

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Madison Street Corridor

Description:Transit Priority and Speed improvements on Madison StreetLocation / Facility:Madison Street

From:Alaskan Way

To:Madison Park

Project ID: 4447

Completion Year:2020

MTP Status: CandidateEstimated Cost: $5,639,905

Type:New Facility-RoadCounty:King County

Page 85: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Military Rd S

Description:Reconstruct the road to urban standards with facilities for bicyclists and pedestrians. In the north where Military Rd intersects with S 272 St, partner with the City of Federal Way to add travel lanes.Location / Facility:Military Rd

From:south King County line

To:S 272 St

Project ID: 4559

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $25,552,849

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Milton-Edgewood Interurban Trail

Description:Shared use bike pathLocation / Facility:Milton-Edgewood Interurban Trail

From:Milton city limits near Hylebos Ave

To:Edgewood city limits

Project ID: 2891

Completion Year:2010

MTP Status: UnprogrammedEstimated Cost: $1,302,581

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Montlake Flyer Bike Station

Description:Construct a bicycle commuter stationLocation / Facility:Montlake Flyer Bike Station

From:SR 520

To:

Project ID: 3364

Completion Year:2010

MTP Status: CompletedEstimated Cost: $593,115

Type:New Facility-RoadCounty:King County

Page 86: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: NE 132nd/NE 128th St

Description:Widen NE 128 St for right-turn lane and shoulder. Widen Avondale Rd and add right-turn lane. Modify signals at NE 132 St and NE 128 St. Widen NE 132 St from 3 to 4 lanes. Insall a new signal at Bear Creek Rd.Location / Facility:NE 132nd/NE 128th St

From:184th Ave NE

To:196th Ave NE

Project ID: 447

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $11,376,452

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Novelty Hill Road

Description:Capacity, ITS and operational improvements will improve flow through this heavily used commuting corridor in the Bear Creek area between Duvall area and Redmond. Project results in additional lanes, operational, and safety improvements between the UPDs and Redmond.Location / Facility:Novelty Hill Road; 196th Ave NE

From:Union Hill Rd

To:West Snoqualmie Road NE

Project ID: 4562

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $122,852,757

Type:New Facility-RoadCounty:King County

Page 87: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Parking Garage at South Kirkland Park-and-Ride

Description:Construct parking garage for a 850 stalls upon completion.Location / Facility:South Kirkland Park-and-Ride

From:NE 38th St @ 108th Ave NE

To:

Project ID: 4059

Completion Year:2027

MTP Status: CandidateEstimated Cost: $64,086,379

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Puget Power (PSE) Trail - East Segment

Description:Design and construct regional trail segment between Ferrel-McWhirter Park and Redmond Watershed Preserve and between Preserve and Novelty Hill Road at Redmond Ridge. Continues existing regional trail east.Location / Facility:Power line corridor.

From:Eastern terminus of existing trail at Ferrel-McWhirter Park near 196th Avenue NE.

To:Novelty Hill Road near Redmond Ridge Drive.

Project ID: 4614

Completion Year:2018

MTP Status: UnprogrammedEstimated Cost: $8,287,795

Type:New Facility-RoadCounty:King County

Page 88: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Rapid Ride (BRT) - A line (K Co Metro) - Pacific Hwy S

Description:Bus Rapid Transit between Federal Way and SeaTac, providing more frequent service, transit signal priorty, enhanced bus zones, queue jumps and rider information kiosks. Rapid Ride - Bus Rapid Transit (A line) along Pacific Highway S. Corridor from existing Link Light Rail station in Tukwila to the Federal Way Transit Center.Location / Facility:SR 99 (Pacific Hwy S)

From:Federal Way Transit Center

To:Tukwila Light Rail Station

Project ID: 4025

Completion Year:2010

MTP Status: CompletedEstimated Cost: $33,261,619

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Rapid Ride BRT: Ballard to Downtown (D line)

Description:Bus Rapid Transit between Ballard and Downtown Seattle via lower Queen Anne, providing more frequent service, transit signal priority, enhanced bus zones, queue jumps and rider information kiosks. Routing alternatives on 15th Ave NW or 24th Ave NW and is Route 15 Rapid Ride or E line).Location / Facility:via lower Queen Anne (exact alignment TBD)

From:Ballard

To:Downtown Seattle

Project ID: 4022

Completion Year:2012

MTP Status: CompletedEstimated Cost: $51,847,242

Type:New Facility-RoadCounty:King County

Page 89: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Rapid Ride BRT: Redmond TC to Bellevue TC (B line)

Description:Bus Rapid Transit between Bellevue and Redmond, providing more frequent service, transit signal priority, enhanced bus zones, queue jumps and rider information kiosks. From the Redmond Transit Center (NE 90th to 148th Ave NE) to Overlake Transit Center then (along 156th Ave NE and NE 8th ST) to the Bellevue Transit Center.Location / Facility:NE 90th, 148th Ave NE, NE 40th, 156th Ave NE, NE 8th

From:Redmond Transit Center

To:Bellevue Transit Center

Project ID: 4024

Completion Year:2012

MTP Status: CompletedEstimated Cost: $36,215,668

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Rapid Ride BRT: West Seattle to Downtown (C line)

Description:Bus Rapid Transit between West Seattle and Downtown Seattle. Station, providing more frequent service, transit signal priority, enhanced bus zones, queue jumps and rider information kiosks. Westwood Village in West Seattle to Seattle CBD bia Fauntleroy and Alaska Junction. This is the Route 54 Rapid Ride or Bus Rapid Transit C line.Location / Facility:Fauntleroy and Alaska junction

From:West Seattle

To:Downtown Seattle

Project ID: 4023

Completion Year:2012

MTP Status: CompletedEstimated Cost: $38,294,672

Type:New Facility-RoadCounty:King County

Page 90: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: RapidRide BRT: Burien to Renton (F line)

Description:Provide a direct East/West routing between Burien and Renton via Tukwila International Blvd Link Station, Southcenter Mall, Tukwila Sounder Station and South Renton P&R. 10 minute peak, 15 minute off-peak midday and early evening, 30 minute night. Span 5:30AM-12:00AM. 1/2 mile stop spacing.Location / Facility:S 156 St to 24th Ave S to S 154th St onto Southcenter Blvd to 66 Ave S (serve Link station) to Tukwila Parkway to Andover Parkway to Strander Blvd to SW Grady Way (serve Sounder Station) to S Renton P&R to Renton TC

From:Burien Transit Center

To:Renton Transit Center

Project ID: 5526

Completion Year:2013

MTP Status: CompletedEstimated Cost: $43,624,401

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: SE 212th Way/SE 208th Street

Description:Capacity, ITS, operational and pedestrian improvements will provide access to the business district and link two regional trails.Location / Facility:SE 212th Way/SE 208th Street

From:SR 167

To:148th Ave SE

Project ID: 4569

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $59,733,840

Type:New Facility-RoadCounty:King County

Page 91: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Seattle South End Transit Pathways

Description: Establish transit pathway between 1st and 3rd Avenues, includes reconstruction of two-way Columbia Street between 1st and 3rd Avenues, including turn radius improvements, curb ramps, signal modifications, and potential bus stop improvements. Location / Facility:Columbia Street

From:1st Avenue

To:3rd Avenue

Project ID: 4451

Completion Year:2018

MTP Status: CandidateEstimated Cost: $7,600,000

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Shoreline Park and Ride TOD

Description:Replace existing 385 , and add additional 200, for a total of 585 stalls in parking structure supporting new mixed use housing development. In King County TOD Work plan to issue 2010 RFP seeking development.Location / Facility:Shoreline P&R

From:Shoreline P&R at 18821 Aurora Ave. N.

To:

Project ID: 3597

Completion Year:2020

MTP Status: CandidateEstimated Cost: $28,783,726

Type:New Facility-RoadCounty:King County

Page 92: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Snoqualmie Regional Connector

Description:Design and construct paved regional trail from eastern terminus of Preston-Snoqualmie Trail near intersection of Snoqualmie Parkway at SR202 to Snoqualmie Valley Trail near Tokul Road. Location / Facility:Dedicated trail right-of-way.

From:Snoqualmie River Bridge (RTNR ID PS-2) at SR202.

To:Snoqualmie Valley Trail at Tokul Road.

Project ID: 4616

Completion Year:2018

MTP Status: UnprogrammedEstimated Cost: $3,078,324

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Snoqualmie River Bridge at SR202, Snoqualmie

Description:Design and construct regional trail/pedestrian bridge across Snoqualmie River at or near SR202 in Snoqualmie. (Partner with WSDOT)Location / Facility:SR202.

From:Eastern terminus of Preston-Snoqualmie Trail at Snoqualmie Parkway/SR202/Snoqualmie River.

To:North side of Snoqualmie River at SR202; terminus of Snoqualmie Regional Connector (RTNR ID PS-3).

Project ID: 4617

Completion Year:2018

MTP Status: CandidateEstimated Cost: $1,894,353

Type:New Facility-RoadCounty:King County

Page 93: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Snoqualmie Valley Trail - Snoqualmie Mill Segment

Description:Acquisition, design, and construction of soft-surface regional trail link.Location / Facility:Off-road

From:Tokul Road

To:Reinig Road

Project ID: 4028

Completion Year:2016

MTP Status: CandidateEstimated Cost: $7,222,222

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Snoqualmie Valley Trail (North)

Description:Design and construction of regional trail Location / Facility:Off-road

From:Woodinville-Duvall Road

To:Snohomish County boundary

Project ID: 4042

Completion Year:2012

MTP Status: CandidateEstimated Cost: $13,260,473

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Soos Creek Trail Phase 6 (Petro - CRT)

Description:Continue development of paved Soos Creek regional trail from Petrovitsky Road to Cedar River Trail at SR 169.Location / Facility:Parkland corridor, utility corridor

From:Cedar River Trail near intersection of 140th Way SE at SR169

To:Petrovitsky Road

Project ID: 4619

Completion Year:2018

MTP Status: CandidateEstimated Cost: $4,585,616

Type:New Facility-RoadCounty:King County

Page 94: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Soos Creek Trail Phase 7 (To SR18)

Description:Design and construct continuation of paved Soos Creek Trail from southern terminus of existing trail to SR18.Location / Facility:Dedicated trail right-of-way.

From:Southern terminus of existing Soos Creek Trail near 148th Avenue SE at SE 266th Street.

To:SR18.

Project ID: 4620

Completion Year:2016

MTP Status: UnprogrammedEstimated Cost: $3,315,118

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Soos Creek Trail Phase 8 (SR18-GRT)

Description:Develop paved regional trail from SR18 to Green River Trail near intersection of Auburn-Black Diamond Road at SE Green Valley Road. Bridge/underpass at SR18.Location / Facility:Dedicated trail right-of-way, railway right-of-way, road right of way, power line corridor.

From:SR18.

To:Green River Trail Phase 4 (RTNR ID GR-4) near SR18 at SE Green Valley Road.

Project ID: 4621

Completion Year:2035

MTP Status: UnprogrammedEstimated Cost: $2,723,133

Type:New Facility-RoadCounty:King County

Page 95: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Soos Creek Trail to Lake Youngs Trail

Description:Design and construct on-road and off-road connector trail between Soos Creek and Lake Youngs Trails via SE 216th Street.Location / Facility:SE 116th Street alignment, power corridor.

From:Soos Creek Trail at SE 116th Street.

To:Lake Youngs Trail at SE 116th Street/148th Avenue SE.

Project ID: 4622

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $473,588

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Soos Creek Trail, Phase 5 (192nd to Petro)

Description:Design and construct a regional trail from SE 192nd Street to Petrovitsky RoadLocation / Facility:Parkland corridor, utility corridor

From:Petrovitsky Road

To:SE 192nd Street, Kent

Project ID: 2273

Completion Year:2016

MTP Status: CandidateEstimated Cost: $4,341,937

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: SR 18 Trail (Auburn to Snoqualmie Trail)

Description:Shared use bike pathLocation / Facility:Auburn to Snoqualmie Trail

From:Interurban Trail

To:Auburn eastern city limits

Project ID: 2860

Completion Year:2018

MTP Status: CandidateEstimated Cost: $103,597,442

Type:New Facility-RoadCounty:King County

Page 96: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Tolt Pipeline Trail (East Extension)

Description:Extend regional trailLocation / Facility:Off-road

From:NE Big Rock Road

To:NE North Fork Road

Project ID: 4045

Completion Year:2016

MTP Status: UnprogrammedEstimated Cost: $1,539,162

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Tolt Pipeline Trail (West)

Description:Design and construct an approach to Tolt Pipeline Trail Location / Facility:Off-road

From:Sammamish River Trail (near W. Riverside Drive)

To:104th Avenue NE

Project ID: 4044

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $4,143,898

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Tolt Pipeline Trail Bridge - Snoqualmie River

Description:Design and construct regional trail crossing of Snoqualmie River near alignment of NE 165th Street west of SR203.Location / Facility:Existing pipeline corridor.

From:Tolt Pipeline at Snoqualmie River.

To:Tolt Pipeline at Snoqualmie River.

Project ID: 4624

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $4,617,486

Type:New Facility-RoadCounty:King County

Page 97: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: Tolt River Trail

Description:Develop paved regional trail along Tolt River from Snoqualmie Valley Trail in Carnation to Moss Lake.Location / Facility:Dedicated trail right-of-way along Tolt River.

From:Snoqualmie Valley Trail at Tolt River.

To:Moss Lake, junction with Tolt Pipeline Trail (RTNR ID TP-4).

Project ID: 4625

Completion Year:2032

MTP Status: UnprogrammedEstimated Cost: $26,994,533

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Transit priority infrastructure for RapidRide BRT: Burien to Renton (F line)

Description:Improve RapidRide corridor - 10 stations, real-time info sighs, transit signal priority and fiber communications - realize approx 10-15% running time improvement Location / Facility:S 156 and S 154 st. Andover Parkway to Strander to Grady Way to S. Renton P&R to Renton TC

From:Burien Transit Center

To:Renton Transit Center

Project ID: 5524

Completion Year:2013

MTP Status: CompletedEstimated Cost: $42,806,566

Type:New Facility-RoadCounty:King County

Page 98: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KING COUNTY/METROTitle: W Sammamish River Trail (Soft-Surface)

Description:Develop soft-surface regional trail along west bank of Sammamish River from Redmond to 102nd Avenue NE in Bothell.Location / Facility:River levee, abandoned railway right-of-way.

From:Sammamish River Trail at Leary Way NE.

To:102nd Avenue NE at E. Riverside Drive

Project ID: 4626

Completion Year:2030

MTP Status: CandidateEstimated Cost: $17,641,164

Type:New Facility-RoadCounty:King County

Sponsor: KING COUNTY/METROTitle: Woodinville-Duvall Road

Description:Operational, safety, nonmotorized, ITS and capacity improvements in this congested corridor heavily used by regional traffic.Location / Facility:Woodinville-Duvall Road

From:SR-522

To:SR-203

Project ID: 4571

Completion Year:2030

MTP Status: ApprovedEstimated Cost: $54,906,419

Type:New Facility-RoadCounty:King County

Page 99: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KIRKLANDTitle: 124th Ave NE Roadway Improvements (North)

Description:Widen to 5 lanes n. of NE 116th St with ped/bike facilitiesLocation / Facility:124th Ave NE

From:NE 116th

To:NE 124th Ave

Project ID: 2293

Completion Year:2022

MTP Status: CandidateEstimated Cost: $11,839,707

Type:New Facility-RoadCounty:King County

Sponsor: KIRKLANDTitle: 124th Ave NE Roadway Improvements (South)

Description:Widen to 3 lanes s. of NE 116th St with ped/bike facilitiesLocation / Facility:124th Ave NE

From:NE 85th

To:NE 116th

Project ID: 4469

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $35,932,328

Type:New Facility-RoadCounty:King County

Sponsor: KIRKLANDTitle: Cross Kirkland Corridor

Description:The project will be completed in phases. The first phase of the project, an interim trail is currently underway. Subsequent phases include facilities for pedestrians and bicycles, and in the future, transit.Location / Facility:BNSF Corridor

From:108th Ave

To:Northern Kirkland City Limits

Project ID: 4041

Completion Year:2016

MTP Status: ApprovedEstimated Cost: $58,091,022

Type:New Facility-RoadCounty:King County

Page 100: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KITSAP COUNTYTitle: Bethel Road/Bethel Ave SE

Description:Widen the roadway from 2 lanes to 5 lanes (center lane likely to be median interspersed with turn lanes) with bike lanes, street lighting, and sidewalksLocation / Facility:Bethel Road/Bethel Ave SE

From:Lincoln Ave SE

To:Bay St

Project ID: 3647

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $8,335,536

Type:New Facility-RoadCounty:Kitsap County

Sponsor: KITSAP COUNTYTitle: Bucklin Hill Rd Estuary Enhancement and Road Widening

Description:Widen to 4/5 lanes, new bridgeLocation / Facility:Bucklin Hill Rd

From:Mickelberry Road + 300'

To:Clear Creek Crossing

Project ID: 485

Completion Year:2015

MTP Status: ApprovedEstimated Cost: $18,286,335

Type:New Facility-RoadCounty:Kitsap County

Sponsor: KITSAP COUNTYTitle: Kitsap County Regional Trail

Description:2.8 mile segment of Shared Use PathLocation / Facility:WSDOT Hwy 3 Corridor ROW, Kitsap County

From:Mountain View Rd

To:Sherman Heights Road

Project ID: 4465

Completion Year:2018

MTP Status: CandidateEstimated Cost: $3,000,000

Type:New Facility-RoadCounty:Kitsap County

Page 101: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KITSAP COUNTYTitle: Newberry Hill Rd

Description:Widen to 4 lanesLocation / Facility:Newberry Hill Road

From:Chico Way NW

To:SR 3 SB on Ramp

Project ID: 1264

Completion Year:2020

MTP Status: CandidateEstimated Cost: $2,072,451

Type:New Facility-RoadCounty:Kitsap County

Sponsor: KITSAP COUNTYTitle: Silverdale Way

Description:Widen to 4 lanesLocation / Facility:Silverdale Way

From:Byron

To:Chico Way NW

Project ID: 491

Completion Year:2020

MTP Status: CandidateEstimated Cost: $6,202,768

Type:New Facility-RoadCounty:Kitsap County

Sponsor: KITSAP COUNTYTitle: Sound to Olympics Trail

Description:The basic concept of this plan is to develop a shared use path from the WSF Bainbridge ferry terminal in Winslow to connect with the Discovery Trail in Jefferson County. Components of this concept on Bainbridge would include a shared use path on one side of the highway if safe and efficient crossing can be provided.Location / Facility:Sound to Olympics Trail

From:WSF Bainbridge ferry terminal in Winslow

To:Agate Pass Bridge

Project ID: 4518

Completion Year:2020

MTP Status: CandidateEstimated Cost: $1,236,015

Type:New Facility-RoadCounty:Kitsap County

Page 102: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KITSAP COUNTYTitle: Sound to Olympics Trail

Description:a) Separated grade crossings would be preferable at intersections. Overhead bicycle/pedestrian bridges could be adapted to existing terrain in places. Microtunnels might be feasible in places. Location / Facility:Sound to Olympics Trail

From:-

To:

Project ID: 4519

Completion Year:2020

MTP Status: CandidateEstimated Cost: $12,405,500

Type:New Facility-RoadCounty:Kitsap County

Sponsor: KITSAP COUNTYTitle: Sound to Olympics Trail

Description:b) A separated non-motorized facility should be constructed at the Agate Pass Bridge, either by cantilever off the existing bridge, or separate construction (possibly in conjunction with constructing a new facility for rapid transit).Location / Facility:Sound to Olympics Trail

From:-

To:

Project ID: 4520

Completion Year:2020

MTP Status: CandidateEstimated Cost: $12,405,500

Type:New Facility-RoadCounty:Kitsap County

Page 103: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KITSAP COUNTYTitle: Sound to Olympics Trail

Description:The basic concept of this plan is to develop a shared use path from the WSF Bainbridge ferry terminal in Winslow to connect with the Discovery Trail in Jefferson County. Components of this concept connect Kingston to Port GambleLocation / Facility:Sound to Olympics Trail

From:Kingston

To:Port Gamble

Project ID: 5292

Completion Year:2020

MTP Status: CandidateEstimated Cost: $2,802,788

Type:New Facility-RoadCounty:Kitsap County

Sponsor: KITSAP COUNTYTitle: Sound to Olympics Trail

Description:The basic concept of this plan is to develop a shared use path from the WSF Bainbridge ferry terminal in Winslow to connect with the Discovery Trail in Jefferson County. Components of this concept north of Bainbridge Island would extend the trail from the Agate Pass Bridge to the Hood Canal Bridge (via Poulsbo)Location / Facility:Sound to Olympics Trail

From:Agate Pass Bridge

To:Hood Canal Bridge

Project ID: 5503

Completion Year:2020

MTP Status: CandidateEstimated Cost: $12,405,500

Type:New Facility-RoadCounty:Kitsap County

Page 104: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KITSAP COUNTYTitle: SR 305 Trail (Sound to Olympics)

Description:Shared use bike pathLocation / Facility:SR 305 Trail

From:Winslow ferry terminal

To:High School Rd

Project ID: 2820

Completion Year:2016

MTP Status: CandidateEstimated Cost: $1,085,484

Type:New Facility-RoadCounty:Kitsap County

Page 105: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KITSAP TRANSITTitle: Annapolis Ferry Terminal

Description:Improve existing passenger-only dock owned by the Port of Bremerton. Extend the dock, provide ADA accessibility and build a larger float to accommodate both Bremerton ferries and smaller, fast POFs to Seattle. Connections to Port Orchard Pedestrian Pathway.Location / Facility:Annapolis Ferry Terminal

From:Bay Street/Marine Drive

To:#N/A

Project ID: 3436

Completion Year:2018

MTP Status: CandidateEstimated Cost: $1,495,802

Type:New Facility-RoadCounty:Kitsap County

Sponsor: KITSAP TRANSITTitle: Bainbridge Island Multimodal Center

Description:Replace old ferry terminal with a new multimodal terminal in the same location.Location / Facility:Bainbridge Island Multimodal Center

From:Olympic Dr

To:

Project ID: 3308

Completion Year:2030

MTP Status: CandidateEstimated Cost: $1,550,692

Type:New Facility-RoadCounty:Kitsap County

Sponsor: KITSAP TRANSITTitle: Bremerton POFF Terminal Expansion

Description:Outfit the large multi-berth float to the initial passenger-only ferry (POF) float, to serve multiple POF vessels and provide utility, moorage and fueling services.Location / Facility:Bremerton POFF Terminal Expansion

From:Bremerton Transportation Center

To:#N/A

Project ID: 2480

Completion Year:2015

MTP Status: CandidateEstimated Cost: $2,819,953

Type:New Facility-RoadCounty:Kitsap County

Page 106: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KITSAP TRANSITTitle: BRT on SR 303 Silverdale POF to Bethel

Description:Bus Rapid Transit on SR 303 from Silverdale to Bremerton POF to Bay Street, Port Orchard and Bethel to SR 160. This route was identified in the Transit Competitive Index (PSRC Index)Location / Facility:SR 303 and Viking

From:Central Kitsap

To:South Kitsap

Project ID: 5318

Completion Year:2025

MTP Status: CandidateEstimated Cost: $13,426,191

Type:New Facility-RoadCounty:Kitsap County

Sponsor: KITSAP TRANSITTitle: BRT on SR 305 (matching congested corridor) to Bainbridge Ferry Dock

Description:Bus Rapid Transit on SR 305 from SR 3 to Bainbridge Ferry Dock. This route was identified in the Transit Competitive IndexLocation / Facility:SR 305

From:SR 3 (Poulsbo)

To:Bainbridge Ferry Dock

Project ID: 5319

Completion Year:2030

MTP Status: CandidateEstimated Cost: $12,335,849

Type:New Facility-RoadCounty:Kitsap County

Sponsor: KITSAP TRANSITTitle: East Bremerton Bus Transit Center

Description:Relocated and improved intermodal transit center and park n ride (250 stalls)Location / Facility:East Bremerton Bus Transit Center

From:Wheaton Way

To:#N/A

Project ID: 3310

Completion Year:2018

MTP Status: CandidateEstimated Cost: $6,202,768

Type:New Facility-RoadCounty:Kitsap County

Page 107: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KITSAP TRANSITTitle: Passenger Only Ferry: Bremerton-Downtown Seattle

Description:Passenger Only Ferry - new route: Bremerton-Downtown SeattleLocation / Facility:POF route

From:Bremerton

To:Downtown Seattle

Project ID: 5365

Completion Year:2018

MTP Status: CandidateEstimated Cost: $16,933,406

Type:New Facility-RoadCounty:Multicounty

Sponsor: KITSAP TRANSITTitle: Passenger Only Ferry: Kingston-Downtown Seattle

Description:Passenger Only Ferry - new route: Kingston-Downtown SeattleLocation / Facility:POF route

From:Kingston

To:Downtown Seattle

Project ID: 5366

Completion Year:2020

MTP Status: CandidateEstimated Cost: $10,073,522

Type:New Facility-RoadCounty:Multicounty

Sponsor: KITSAP TRANSITTitle: Passenger Only Ferry: Southworth-Downtown Seattle

Description:Passenger Only Ferry - new route: Southworth-Downtown SeattleLocation / Facility:POF route

From:Southworth

To:Downtown Seattle

Project ID: 5367

Completion Year:2023

MTP Status: CandidateEstimated Cost: $16,686,203

Type:New Facility-RoadCounty:Multicounty

Page 108: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KITSAP TRANSITTitle: Phase I Poulsbo SR 3/ SR 305 Hub (Olhava II) P&R

Description:Development of a 250-300 stall park and ride at the intersection of SR 3 and SR 305. Located in Poulsbo, Kistap Co., the park and ride will consist of 4.7 acres near the Olhava Master Plan development.Location / Facility:Viking Ave

From:SR 3/ SR 305

To:SR 305 / SR 307 / SR 3

Project ID: 2589

Completion Year:2017

MTP Status: ApprovedEstimated Cost: $3,433,515

Type:New Facility-RoadCounty:Kitsap County

Sponsor: KITSAP TRANSITTitle: Phase II and Phase III SR305 Corridor P&Rs

Description:This is a placeholder project for the remaining 500-550 stalls for the SR305 P&R's from the city of Poulsbo to Suquamish to Bainbridge Island. Location / Facility:TBD

From:SR3

To:Bainbridge Island Ferry Terminal

Project ID: 4294

Completion Year:2025

MTP Status: CandidateEstimated Cost: $5,571,793

Type:New Facility-RoadCounty:Kitsap County

Sponsor: KITSAP TRANSITTitle: Silverdale P&R

Description:250 new stalls in the Regional CenterLocation / Facility:Newberry Hill Road

From:Central Kitsap

To:SR 3

Project ID: 2576

Completion Year:2018

MTP Status: CandidateEstimated Cost: $4,652,076

Type:New Facility-RoadCounty:Kitsap County

Page 109: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KITSAP TRANSITTitle: SR 104 Kingston Park and Ride Expansion

Description:100 additional stalls (350 total) AKA George's Corner Park and Ride, behind the George's Corner PUDLocation / Facility:Kingston P & R

From:SR 104@Hansville Rd

To:#N/A

Project ID: 3602

Completion Year:2030

MTP Status: CandidateEstimated Cost: $1,163,019

Type:New Facility-RoadCounty:Kitsap County

Sponsor: KITSAP TRANSITTitle: SR 16 P&R (Mullenix)

Description:250 new stalls Location / Facility:SR 16 P&R (Mullenix)

From:South Kitsap

To:SR 16

Project ID: 2582

Completion Year:2025

MTP Status: CandidateEstimated Cost: $3,489,057

Type:New Facility-RoadCounty:Kitsap County

Sponsor: KITSAP TRANSITTitle: SR 16/SR 160 Port Orchard Park and Ride Expansion

Description:up to 250 Stalls totalLocation / Facility:Port Orchard P & R

From:SR 16/SR 160@Port Orchard

To:

Project ID: 3604

Completion Year:2030

MTP Status: CandidateEstimated Cost: $1,163,019

Type:New Facility-RoadCounty:Kitsap County

Page 110: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: KITSAP TRANSITTitle: SR 303 (North of Bremerton/Riddell) P&R

Description:250 new stallsLocation / Facility:SR 303 (North of Bremerton) P&R

From:Central Kitsap

To:SR 303

Project ID: 2575

Completion Year:2020

MTP Status: CandidateEstimated Cost: $3,489,057

Type:New Facility-RoadCounty:Kitsap County

Sponsor: KITSAP TRANSITTitle: SR 303 P&R (N Silverdale)

Description:250 new stalls (near NE Silverdale)Location / Facility:SR 3 / SR 303 P&R

From:Central Kitsap

To: SR 303

Project ID: 2585

Completion Year:2025

MTP Status: CandidateEstimated Cost: $3,489,057

Type:New Facility-RoadCounty:Kitsap County

Sponsor: KITSAP TRANSITTitle: SR 304 (Bremerton) P&R (Gateway)

Description:250 new stalls at SR310 (6th) and Montgomery in surface lot and parking structureLocation / Facility:SR 304 (Bremerton) P&R

From:Central Kitsap

To:SR 304

Project ID: 2574

Completion Year:2020

MTP Status: CandidateEstimated Cost: $23,260,379

Type:New Facility-RoadCounty:Kitsap County

Page 111: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: LAKEWOODTitle: Bridgeport Way

Description:Widen roadway to accommodate continuous 2-way center turn lane. Add 5 foot bike lanes OR widen outside travel lane to be a shared bike/vehicle facility. Add curb, gutter, sidewalks, streetlights, landscaping, and upgraded storm drainage. Signal upgrades as required to accommodate improvements.Location / Facility:Bridgeport Way

From:Steilacoom Blvd

To:N. City Limits

Project ID: 5523

Completion Year:2014

MTP Status: UnprogrammedEstimated Cost: $8,347,059

Type:New Facility-RoadCounty:Pierce County

Sponsor: LAKEWOODTitle: City Water Ditch Bike Trail

Description:Shared use bike path or dedicated bicycle lanes and sidewalks along South Tacoma Way to tie into Tacoma's Water Ditch Trail.Location / Facility:City Water Ditch Bike Trail

From:Tacoma city limits

To:84th St S

Project ID: 2806

Completion Year:2019

MTP Status: CandidateEstimated Cost: $2,255,962

Type:New Facility-RoadCounty:Pierce County

Page 112: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: LYNNWOODTitle: 44th Ave. W. (SR 524 Spur)

Description:Widen roadway to 7 lanes with 8 lanes just south of 196th St. SW. The City of Lynnwood is proposing BAT lanes on this corridor but this is still subject to public process.Location / Facility:44th Ave.

From:194th St.

To: I-5

Project ID: 4119

Completion Year:2020

MTP Status: CandidateEstimated Cost: $19,406,888

Type:New Facility-RoadCounty:Snohomish County

Sponsor: LYNNWOODTitle: I-5/44th Avenue Interchange Improvements

Description:Completion of existing half diamond interchange by adding access to the north. Project includes two braided ramps.Location / Facility:I-5 @ 44th Ave W

From:196th St SW

To:220th St SW

Project ID: 4631

Completion Year:2020

MTP Status: CandidateEstimated Cost: $157,324,981

Type:New Facility-RoadCounty:Snohomish County

Sponsor: LYNNWOODTitle: Interurban Regional Trail - Missing Link

Description:Completion of a multi-use trail that provides direct access to a designated urban centers and a high capacity transit stationLocation / Facility:PUD Right of Way

From:212th St SW

To:52nd Ave W

Project ID: 4634

Completion Year:2015

MTP Status: ApprovedEstimated Cost: $988,812

Type:New Facility-RoadCounty:Snohomish County

Page 113: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: LYNNWOODTitle: Interurban Trail Missing Link Pedestrian Bridge at I-5/44th Ave W

Description:This project will complete the 'missing link' in Lynnwood's Interurban Trail by constructing a Class I bicycle/ pedestrian trail and bridge over 44th Ave W and the southbound on-ramp to I-5 and a missing section of the Interurban trail. Location / Facility:0

From:Lynnwood P&R

To:Landmark Inn/PUD ROW

Project ID: 3442

Completion Year:2010

MTP Status: CompletedEstimated Cost: $5,294,025

Type:New Facility-RoadCounty:Snohomish County

Sponsor: LYNNWOODTitle: SR 524 (196th St SW) Widening

Description:Increase capacity of existing major east-west 5 lane arterial by increasing roadway section to 7 lanes, curb, gutter and sidewalk (12 feet). The City of Lynnwood is proposing BAT lanes on this corridor but this is still subject to public process.Location / Facility:SR 524 (196th St SW)

From:48th Ave W

To:37th Ave W

Project ID: 4009

Completion Year:2016

MTP Status: CandidateEstimated Cost: $22,835,617

Type:New Facility-RoadCounty:Snohomish County

Page 114: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: MAPLE VALLEYTitle: SR 169

Description:SR 169 Widening to 4 lanes, center turn lanes or left turn pockets and Bike Lanes (SE 270th to SE 290th) Location / Facility:SR 169

From:SE 270th St

To:SE 290th St

Project ID: 5445

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $5,376,249

Type:New Facility-RoadCounty:King County

Sponsor: MAPLE VALLEYTitle: SR 516 (Kent-Kangley Road), 213th Place SE to SR 169

Description:SR 516 Widening from 2 to 4 lanes, center turn lane/ left turn pockets, bike lanes and sidewalks (from 213th SE to SR 169)Location / Facility:SR 516 (Kent-Kangley Road)

From:213th Place SE

To:SR 169

Project ID: 4118

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $5,065,700

Type:New Facility-RoadCounty:King County

Page 115: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: MARYSVILLETitle: 156th St NE Widening to 3/5 lanes: State Ave to 51st St NE Vic.

Description:Widen to 3 to 5 lanes w/ curb gutter and sidewalkLocation / Facility:156th/152nd St NE

From:State Ave

To:51st Ave

Project ID: 5528

Completion Year:2017

MTP Status: UnprogrammedEstimated Cost: $15,867,951

Type:New Facility-RoadCounty:Snohomish County

Sponsor: MARYSVILLETitle: 156th St. NE Interchange

Description:The project would complete the Interchange Justification Report for converting the 156th St. NE Overcrossing (currently under construction) to a full Single Point Urban Interchange.Location / Facility:156th St. NE

From:Twin Lakes Blvd

To:State Ave.

Project ID: 4411

Completion Year:2020

MTP Status: CandidateEstimated Cost: $31,838,817

Type:New Facility-RoadCounty:Snohomish County

Sponsor: MARYSVILLETitle: 1st St Bypass: 3/5 lane new alignment

Description:3/5 lane new alignment Location / Facility:First St or new parallel alignment

From:SR 529

To:Sunnyside Blvd

Project ID: 5527

Completion Year:2017

MTP Status: UnprogrammedEstimated Cost: $13,100,285

Type:New Facility-RoadCounty:Snohomish County

Page 116: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: MARYSVILLETitle: 40th St NE - 3/5 lanes on existing and new alignment: Sunnyside Blvd to SR9

Description:3/5 lane on existing and new alignmentLocation / Facility:40th St NE/87th Ave NE/35th St NE

From:Sunnyside Blvd

To:SR9 at SR 92

Project ID: 5532

Completion Year:2015

MTP Status: UnprogrammedEstimated Cost: $22,141,327

Type:New Facility-RoadCounty:Snohomish County

Sponsor: MARYSVILLETitle: 88th St NE

Description:Upgrade existing 2 lane roadway to 5 lanes, upgrade State Ave. intersection.Location / Facility:88th St NE

From:State Avenue

To:67th Avenue NE

Project ID: 4123

Completion Year:2016

MTP Status: ApprovedEstimated Cost: $34,820,580

Type:New Facility-RoadCounty:Snohomish County

Sponsor: MARYSVILLETitle: 88th St NE new WB lane: Quil Ceda Crk Bridge to I-5

Description:Add new westbound laneLocation / Facility:88th St NE

From:Quil Ceda Crk Bridge

To:I-5 NB on ramp

Project ID: 5533

Completion Year:2017

MTP Status: UnprogrammedEstimated Cost: $2,337,140

Type:New Facility-RoadCounty:Snohomish County

Page 117: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: MARYSVILLETitle: Ingraham Boulevard

Description:New 3/4 lane arterial to finish 88th Street NE Corridor between I-5 and SR 9Location / Facility:Ingraham Boulevard

From:67th Ave. NE

To:83rd Ave. NE

Project ID: 4127

Completion Year:2011

MTP Status: CompletedEstimated Cost: $6,057,653

Type:New Facility-RoadCounty:Snohomish County

Sponsor: MARYSVILLETitle: Lakewood Triangle Access/156th St NE Overcrossing

Description:New I-5 overcrossing 2/4 laneLocation / Facility:156th St. NE

From:Twin Lakes Blvd

To:State Ave

Project ID: 5529

Completion Year:2012

MTP Status: CompletedEstimated Cost: $18,943,532

Type:New Facility-RoadCounty:Snohomish County

Sponsor: MARYSVILLETitle: SR 529 Interchange

Description:Complete the current half interchange by constructing a new Interstate 5 northbound off-ramp onto SR 529 and new southbound on-ramps from SR 529 to Interstate 5Location / Facility:I-5

From:SR 529

To:I-5

Project ID: 4410

Completion Year:2017

MTP Status: CandidateEstimated Cost: $46,782,911

Type:New Facility-RoadCounty:Snohomish County

Page 118: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: MARYSVILLETitle: SR528/I-5 additional lanes under I-5 interchange

Description:Add one new east and west bound lane under I-5 at the interchangeLocation / Facility:SR 528

From:I-5 SR 528 NB ramps

To:I-5 SR 528 SB ramps

Project ID: 5534

Completion Year:2015

MTP Status: UnprogrammedEstimated Cost: $14,760,885

Type:New Facility-RoadCounty:Snohomish County

Sponsor: MARYSVILLETitle: State Ave. 116th St. NE to 136th St. NE

Description: Widening the segment of State Avenue between 116th Street NE and 136th Street NE from three lanes to five. Other elements include installation of sidewalk on the east side of the road, improvements to the "Arlington Spur" railroad crossing, and upgrade of the traffic signal at 128th Street NE.Location / Facility:State Avenue

From:116th St. NE

To:136th St. NE

Project ID: 4124

Completion Year:2015

MTP Status: CandidateEstimated Cost: $4,279,440

Type:New Facility-RoadCounty:Snohomish County

Sponsor: MARYSVILLETitle: State Avenue

Description:Upgrade existing 2 lane roadway to 5 lanesLocation / Facility:0

From:136th St. NE

To:152nd St. NE

Project ID: 4125

Completion Year:2010

MTP Status: CompletedEstimated Cost: $11,144,078

Type:New Facility-RoadCounty:Snohomish County

Page 119: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: MARYSVILLETitle: State Avenue

Description:Upgrade existing 3 lane roadway to 5 lanesLocation / Facility:State Avenue

From:100th St. NE

To:116th St. NE

Project ID: 4126

Completion Year:2016

MTP Status: UnprogrammedEstimated Cost: $26,719,852

Type:New Facility-RoadCounty:Snohomish County

Sponsor: MARYSVILLETitle: Sunnyside Blvds Widening: 47th Ave NE to 52nd St NE

Description:Widen to 5 lane on existing alignment and connect to 1st St BypassLocation / Facility:Sunnyside Blvd

From:47th Ave NE

To:52nd St NE

Project ID: 5531

Completion Year:2017

MTP Status: UnprogrammedEstimated Cost: $16,298,477

Type:New Facility-RoadCounty:Snohomish County

Page 120: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: MILTONTitle: Milton Way

Description:Road widening / sidewalk installLocation / Facility:Milton Way

From:28th Ave

To:20th St E

Project ID: 1958

Completion Year:2010

MTP Status: UnprogrammedEstimated Cost: $1,662,342

Type:New Facility-RoadCounty:Pierce County

Sponsor: MILTONTitle: Milton-Edgewood Interurban Trail

Description:Shared use bike pathLocation / Facility:Milton-Edgewood Interurban Trail

From:Milton city limits at 70th Ave E

To:northeast to city limits at King Co limits

Project ID: 2892

Completion Year:2010

MTP Status: CandidateEstimated Cost: $1,335,146

Type:New Facility-RoadCounty:Pierce County

Page 121: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: MONROETitle: Centennial Trail

Description:Shared use bike pathLocation / Facility:Centennial Trail

From:Terminus of existing trail

To:Monroe city limits (by SR 203)

Project ID: 2829

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $5,313,661

Type:New Facility-RoadCounty:Snohomish County

Sponsor: MONROETitle: SR 522 Trail

Description:Shared use bike pathLocation / Facility:SR 522 Trail

From:City Limits

To:Proposed Centennial Trail

Project ID: 2826

Completion Year:2030

MTP Status: CandidateEstimated Cost: $3,962,040

Type:New Facility-RoadCounty:Snohomish County

Sponsor: MONROETitle: US Hwy 2 Trail Extension

Description:Shared use bike path Location / Facility:US Hwy 2 Trail Extension

From:Planned Hwy 2 trail terminus at Monroe city limits

To:Planned Centennial Trail at SR 203

Project ID: 2687

Completion Year:2025

MTP Status: UnprogrammedEstimated Cost: $3,116,211

Type:New Facility-RoadCounty:Snohomish County

Page 122: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: MUKILTEOTitle: Ferry Holding Lanes

Description:Mitigation measure for traffic congestion associated with Ferry traffic backup on SR 525.Options include off-street storage, traffic warning measures, signals at 5th, Goat Trail Rd, 76th St SW, 84th St SW.Location / Facility:Ferry Holding Lanes

From:Mukilteo Ferry Terminal

To:

Project ID: 807

Completion Year:2010

MTP Status: UnprogrammedEstimated Cost: $7,361,234

Type:New Facility-RoadCounty:Snohomish County

Sponsor: MUKILTEOTitle: Mukilteo Lane Waterfront Access

Description:Construct Parking Lot (80-100 stalls) and Pedestrian Access Bridge connecting Mukilteo with Mukilteo Multi-modal TerminalLocation / Facility:Mukilteo Lane

From:Park Ave

To:Mt. Baker Crossing

Project ID: 4010

Completion Year:2020

MTP Status: CandidateEstimated Cost: $8,298,118

Type:New Facility-RoadCounty:Snohomish County

Sponsor: NEWCASTLETitle: Coal Creek Pkwy (Phase I, II & III)

Description:Widen to 4/5 lanes + CGS, bike lanes, traffic signals; (PSRC ID No. NC-5)Location / Facility:Coal Creek Pkwy

From:Newcastle Way

To:SE 95th Way

Project ID: 2313

Completion Year:2010

MTP Status: CompletedEstimated Cost: $61,123,755

Type:New Facility-RoadCounty:King County

Page 123: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PACIFICTitle: Interurban Trail

Description:Shared use bike pathLocation / Facility:Interurban Trail

From:8th St E

To:southern terminus of existing Interurban Trail at 3rd Ave SW

Project ID: 2884

Completion Year:2018

MTP Status: CandidateEstimated Cost: $1,085,484

Type:New Facility-RoadCounty:King County

Sponsor: PACIFICTitle: Stewart Rd (8th St E.)

Description:Widen existing two-lane roadway to 5 lanes. East 0.69 mile is within City of Pacific jurisdiction and is a joint project with City of Pacific. Includes replacement of Br #1204-A over the White River. May include construction of Br #1204-B over the BNSFRR tracks. Includes non-motorized facilities.Location / Facility:Stewart Rd (8th St E.)

From:E Valley Hwy E

To:W Valley Hwy

Project ID: 127

Completion Year:2020

MTP Status: CandidateEstimated Cost: $28,508,050

Type:New Facility-RoadCounty:Pierce County

Page 124: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PIERCE COUNTYTitle: 112th St E/S

Description:Widen and reconstruct existing (two-lane in sections) roadway to 5 lanes, improve intersections and provide non-motorized features.Location / Facility:112th St E/S

From:86th Avenue E

To:Steele Street

Project ID: 116

Completion Year:2030

MTP Status: ApprovedEstimated Cost: $16,258,206

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE COUNTYTitle: 160th St E

Description:Widen and reconstruct existing arterial roadway including NMFLocation / Facility:160th St E

From:56th Ave Ct E

To:70th Ave E

Project ID: 1937

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $14,183,272

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE COUNTYTitle: 176th St E

Description:Widen and reconstruct existing 2/4-lane road to 5 lanes. Provide non-motorized features.Location / Facility:176th St E

From:SR 161 (Meridian E)

To:SR 7 (Pacific Avenue)

Project ID: 115

Completion Year:2014

MTP Status: CompletedEstimated Cost: $73,019,029

Type:New Facility-RoadCounty:Pierce County

Page 125: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PIERCE COUNTYTitle: 176th St E

Description:Construct the eastern two miles of 176 St E to provide for the future connection of SR-704 to SR-162 and to provide evacuation route from the Orting Valley. Construct urban section with 4-5 lanes and NMF. Construct rural section with 2-3 lanes and NMF (sidewalks, bicycle facilities, and a raised median).Location / Facility:176th St E

From:130th Ave E

To:Calistoga Ave

Project ID: 1938

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $56,356,415

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE COUNTYTitle: 224th St E

Description:Widen and reconstruct existing arterial to 3 lanes including NMFLocation / Facility:224th St E

From:SR 7

To:SR 161

Project ID: 522

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $93,319,133

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE COUNTYTitle: 72nd St E

Description:Reconstruct existing arterial roadway including NMF, add center left turn laneLocation / Facility:72nd St E

From:Tacoma City Limits

To:Fruitland Avenue E

Project ID: 1473

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $43,260,525

Type:New Facility-RoadCounty:Pierce County

Page 126: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PIERCE COUNTYTitle: 96th St E

Description:Reconstruct existing arterial roadway including NMF, add center left turn laneLocation / Facility:96th St E

From:SR 7

To:Fruitland Ave E

Project ID: 1474

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $78,795,957

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE COUNTYTitle: Br #36193-A / 176th St E

Description:Widen to 4 lanes with NMF and replace bridge to eliminate the bottleneck caused by this being the only two-lane section of 176 St E.Location / Facility:Br #36193-A / 176th St E

From:176th St E over Tacoma Eastern Railroad

To:

Project ID: 1489

Completion Year:2012

MTP Status: CompletedEstimated Cost: $8,652,105

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE COUNTYTitle: Canyon Rd E

Description:Widen and reconstruct existing 2/4-lane roadway to provide 7 through lanes, turn lanes, wider curb lanes, curbs, gutters, and sidewalks; signal modifications included. Location / Facility:Canyon Rd E

From:106th St E

To:192nd St E

Project ID: 113

Completion Year:2020

MTP Status: ApprovedEstimated Cost: $89,884,863

Type:New Facility-RoadCounty:Pierce County

Page 127: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PIERCE COUNTYTitle: Canyon Rd E

Description:Southerly Ext. Extend Major arterial roadway from 192nd Street E to SR-7 in two phases. The proposed roadway will be 4 to 5 lanes wide with paved shoulders and sidewalks to accommodate nonmotorized modes in the first phase to 224th Street E. The roadway would narrow to 2-lane with paved shoulders south of 224th Street E.Location / Facility:Canyon Rd E

From:Mountain Hwy (SR 7)

To:192nd Street E

Project ID: 134

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $68,907,837

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE COUNTYTitle: Canyon Rd E

Description:Northerly Ext. Extend major arterial roadway from it's current northerly terminus to connect with the planned completion of SR-167, crossing over 2 railroads and the Puyallup River. The project would be a four-lane roadway with paved shoulders (to accommodate non-motorized modes). This roadway would link the planned employment center in Frederickson with the Port of Tacoma and destinations northward (e.g. Seattle)Location / Facility:Canyon Rd E

From:Pioneer Way E

To:52nd St E / 62nd Ave E

Project ID: 135

Completion Year:2026

MTP Status: ROW Conditionally ApEstimated Cost: $52,009,335

Type:New Facility-RoadCounty:Pierce County

Page 128: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PIERCE COUNTYTitle: Canyon Rd E

Description:Widen to 5 lanes, reconstruct existing arterial including NMF.Location / Facility:Canyon Rd E

From:84th St. E

To:99th St Ct E

Project ID: 528

Completion Year:2020

MTP Status: CandidateEstimated Cost: $17,097,028

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE COUNTYTitle: Canyon Rd E

Description:Widen and reconstruct existing roadway to provide additional lanes, add turn lane(s) at intersections, add auxiliary lane where appropriate, and provide non-motorized features.Location / Facility:Canyon Rd E

From:72nd St E

To:Pioneer Wy E

Project ID: 4439

Completion Year:2030

MTP Status: CandidateEstimated Cost: $22,684,343

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE COUNTYTitle: Canyon Rd East Corridor Improvements

Description:Widen and reconstruct existing roadway to provide additional lanes, add turn lane(s) at intersections, add center turning lane where appropriate, and provide non-motorized features.Location / Facility:Canyon Rd E

From:84th St E

To:72nd St E

Project ID: 4438

Completion Year:2030

MTP Status: ROW Conditionally ApEstimated Cost: $8,778,504

Type:New Facility-RoadCounty:Pierce County

Page 129: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PIERCE COUNTYTitle: Canyon Road East Northerly Extension

Description:Extend major arterial roadway from its current northerly terminus to connect with the planned completion of SR-167, crossing over 2 railroads and the Puyallup River. The project would be a four-lane roadway with paved shoulders (to accommodate non-motorized modes). This roadway would linkthe planned employment center in Frederickson with the Port of Tacoma and destinations northward (e.g. Seattle)Location / Facility:Canyon Road E

From:52nd st E/62nd Ave E Intersection

To:70th Ave E

Project ID: 4475

Completion Year:2025

MTP Status: CandidateEstimated Cost: $63,320,331

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE COUNTYTitle: Cushman Trail (phase 2)

Description:Shared use pathLocation / Facility:Cushman Trail

From:Pierce Transit Park and Ride (Kimball Dr NW)

To:96th Street NW

Project ID: 2851

Completion Year:2011

MTP Status: CompletedEstimated Cost: $6,180,075

Type:New Facility-RoadCounty:Pierce County

Page 130: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PIERCE COUNTYTitle: Fennel Creek Trail – Segment 2

Description:Shared use pathLocation / Facility:Fennel Creek corridor

From:Fennel Creek Park

To:Sumner-Buckley Highway (SR 410)

Project ID: 5522

Completion Year:2018

MTP Status: CandidateEstimated Cost: $3,910,050

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE COUNTYTitle: Foothills Trail – South Prairie, East Segment

Description:The East Segment includes construction of 1.3 miles of 12 foot wide porous asphalt multi-use trail. A shoulder composed of natural materials will vary in width from 0 to 5 feet depending on topographic restrictions. The project will extend from approximately 1,900 ft. south of Borell Road East to 268th Avenue Court East where it will connect to the already complete Middle Segment.Location / Facility:Foothills Trail

From:1,900 ft. south of Borell Road East

To:268th Avenue Court East

Project ID: 4472

Completion Year:2017

MTP Status: ApprovedEstimated Cost: $3,477,533

Type:New Facility-RoadCounty:Pierce County

Page 131: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PIERCE COUNTYTitle: Foothills Trail-Carbonado

Description:Design and construct the Cascade Jct. to Wilkeson/Carbonado section of Foothills Trail. Pierce County owns about half of this 7 mile section. The design portion will include engineering and all environmental requirements.Location / Facility:Foothills Trail

From:Cascade Junction

To:Carbonado

Project ID: 3439

Completion Year:2022

MTP Status: CandidateEstimated Cost: $7,781,407

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE COUNTYTitle: Foothills Trail-S. Prairie

Description:Design and construct the remaining 2.7 mile sections of Foothills Trail that will complete the 19.2 mile trail from east Puyallup to Buckley. The design portion will include engineering and all environmental requirements. Location / Facility:Foothills Trail

From:South Prairie city limits

To:268th Ave Ct East

Project ID: 2835

Completion Year:2015

MTP Status: CandidateEstimated Cost: $2,999,467

Type:New Facility-RoadCounty:Pierce County

Page 132: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PIERCE COUNTYTitle: Military Rd S/152nd St E

Description:Widen and reconstruct 2-3 lane existing road (east of SR-7) to provide 2 additional general purpose lanes and non-motorized features along entire length.Location / Facility:Military Rd S/152nd St E

From:Waller Rd E

To:Spanaway Loop Rd

Project ID: 125

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $63,988,497

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE COUNTYTitle: Milton-Edgewood Interurban Trail

Description:Shared use bike pathLocation / Facility:Milton-Edgewood Interurban Trail

From:70th Ave E

To:Milton City Limits

Project ID: 2894

Completion Year:2008

MTP Status: CompletedEstimated Cost: $651,291

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE COUNTYTitle: Spanaway Loop Rd

Description:Southerly Ext. Widen existing roadway and construct new roadway on new alignment including non-motorized features. Location / Facility:0

From:Pacific Avenue S (SR 7)

To:10th Ave S

Project ID: 131

Completion Year:2006

MTP Status: CompletedEstimated Cost: $9,234,368

Type:New Facility-RoadCounty:Pierce County

Page 133: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PIERCE COUNTYTitle: SR 302 Trail

Description:Shared use pathLocation / Facility:SR 302 and/or Tacoma Utility ROW

From:Mason County

To:SR 16

Project ID: 5505

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $13,950,871

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE COUNTYTitle: WOLLOCHET DR NW

Description:Widen existing road between Fillmore Dr NW and Artondale Dr NW to five lanes and between Artondale Dr NW and 40 St NW to 3 lanes to accommodate existing traffic. Construct NMF that will complete the nonmotorized route between the heart of Fox Island and SR-16 and the nonmotorized trail systems in Gig Harbor and Tacoma.Location / Facility:WOLLOCHET DR NW

From:FILLMORE DR NW

To:40TH ST NW

Project ID: 880

Completion Year:2014

MTP Status: CompletedEstimated Cost: $14,500,196

Type:New Facility-RoadCounty:Pierce County

Page 134: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PIERCE TRANSITTitle: BRT - Meridian / SR 161

Description:Bus Rapid Transit on SR 161 from 176th Street to Downtown PuyallupLocation / Facility:SR 161

From:176th St.

To:Downtown Puyallup

Project ID: 5489

Completion Year:2030

MTP Status: CandidateEstimated Cost: $60,673,315

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE TRANSITTitle: BRT (Route 1) on SR 7 from Roy Y to Downtown Tacoma (PC Congested Corridor)

Description:Bus Rapid Transit from on SR 7 from Roy Y to downtown Tacoma. This route was identified in the Transit Competitive IndexLocation / Facility:SR 7/ Pacific/ Commerce

From:Roy Y

To:Downtown Tacoma

Project ID: 5320

Completion Year:2020

MTP Status: CandidateEstimated Cost: $15,674,713

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE TRANSITTitle: Fife I-5 P&R

Description:1000 new stallsLocation / Facility:I-5 / Fife P&R

From:I-5 Central

To:

Project ID: 2606

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $47,683,777

Type:New Facility-RoadCounty:Pierce County

Page 135: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PIERCE TRANSITTitle: South Hill P & R

Description:433 new stallsLocation / Facility:South Hill P & R

From:Valley

To:SR 512 / SR 161

Project ID: 2596

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $9,428,207

Type:New Facility-RoadCounty:Pierce County

Sponsor: PIERCE TRANSITTitle: SR 512 / SR 7 (Parkland) P&R

Description:550 new stallsLocation / Facility:Parkland P&R

From:Vicinity SR 512@SR 7

To:

Project ID: 2602

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $14,654,039

Type:New Facility-RoadCounty:Pierce County

Page 136: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PORT OF SEATTLETitle: E MARGINAL WAY GRADE SEPARATION

Description:GRADE SEPARATION OF ON/OFF RAMPS AT SR 99 OVER UP LEAD TRACK FROM HARBOR ISLANDLocation / Facility:E MARGINAL WAY

From:Duwamish Ave S & East Marginal Way S

To:SW Spokane St

Project ID: 1224

Completion Year:2009

MTP Status: CompletedEstimated Cost: $47,245,735

Type:New Facility-RoadCounty:King County

Sponsor: PORT OF SEATTLETitle: Grade separation at Atlantic St. - South End Viaduct local access: Holgate to King stage 3

Description:This new grade separation is the local access portion of the Alaskan Way Viaduct Holgate to King street project at Atlantic. It allows a grade separated roadway to get traffic from East Marginal Way to Colorado St and the freeway system east when the at-grade Atlantic roadway is blocked by a train.Location / Facility:U tube road (looping underneath Viaduct between Atlantic and S. Royal Brougham Way

From:East Marginal Way north-west of S Atlantic St

To:S Atlantic St east of SR-99

Project ID: 5347

Completion Year:2013

MTP Status: CandidateEstimated Cost: $497,927

Type:New Facility-RoadCounty:King County

Page 137: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PORT OF SEATTLETitle: Hanford & Main SIG's Entry Gate Improvements

Description:Add a center turn lane and, if warranted, a traffic signal for east-to-north bound truck traffic entering the Main SIG Yard entrance on HanfordLocation / Facility:S. Hanford St.

From:Colorado Ave S

To:East Marginal Way

Project ID: 5348

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $356,807

Type:New Facility-RoadCounty:King County

Sponsor: PORT OF SEATTLETitle: North Argo Truck Roadway

Description:Create a new southbound one-way truck-only street from the south-east end of Duwamish Ave S to the north-west end of Colorado Ave S just east of East Marginal Way/ Alaskan Way viaduct. Project grade-separates truck traffic headed fro the Argo Rail Yard from mainline SR-99 and eliminates a difficult weaving maneuverLocation / Facility:North Argo Truck Roadway

From:south-east end of Duwamish Ave S

To:north-west end of Colorado Ave S

Project ID: 5346

Completion Year:2014

MTP Status: UnprogrammedEstimated Cost: $497,927

Type:New Facility-RoadCounty:King County

Page 138: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PORT OF SEATTLETitle: South Access

Description:New construction of a two-lane, limited access arterial connecting the planned South Airport Link roadway to the planned extension of SR 509 to I-5.Location / Facility:New Alignment

From:SR 509 extension to I-5

To:S 188th St

Project ID: 5512

Completion Year:2025

MTP Status: CandidateEstimated Cost: $247,203,001

Type:New Facility-RoadCounty:King County

Sponsor: PORT OF SEATTLETitle: South Airport Link Project

Description:New Construction of a south airport expressway to connect the existing north airport expressway and airport terminal drives to the planned South Access roadway and extension of SR 509 to I-5. The project would close the existing south airport entrance at S 182nd Street and International Boulevard and create a new at grade connection to the local roadway network at S. 188th Street and 28th Ave S.Location / Facility:South Airport Link Project

From:S 188th St

To:Airport

Project ID: 2074

Completion Year:2025

MTP Status: CandidateEstimated Cost: $465,208

Type:New Facility-RoadCounty:King County

Page 139: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PORT OF SEATTLETitle: West Marginal Way/Chelan Street/Spokane Street intersection

Description:Re-stripe & change the signal timing at West Marginal Way/Chelan Street/Spokane Street intersection to maintain freight flows during commute hours (particularly morning commute) but using existing lanes to designate current left/through lane on northwest-bound West Marginal Way and eastbound Chelan Avenue as left turn only lanes. Also, need to change signal phasing to provide for concurrent through movements on these same two approaches.Location / Facility:West Marginal Way/Chelan Street/Spokane Street intersection

From:West Marginal Way/Chelan Street/Spokane Street intersection

To:

Project ID: 5350

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $694,628

Type:New Facility-RoadCounty:King County

Sponsor: PORT OF TACOMATitle: Port of Tacoma Road/Rail/Infrastructure

Description:The project supports anticipated marine terminal development by eliminating at-grade railroad crossings; provides new Port-owned rail support infrastructure including new arrival/dispatch tracks and intermodal support tracks to facilitate efficient and reliable freight movement.Location / Facility:I-5/54th Avenue East I/C Ramps; 54th Avenue East; 54th Avenue East/SR509/Taylor Way intersection; Taylor Way; East 11th Street

From:Milwaukee Way and SR 509, City of Tacoma

To:Taylor Way and SR 509, City of Tacoma

Project ID: 4639

Completion Year:2020

MTP Status: CandidateEstimated Cost: $446,516,768

Type:New Facility-RoadCounty:Pierce County

Page 140: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PORT ORCHARDTitle: Bay Street Pedestrian Path

Description:Design approximately one mile of curb, sidewalk and bike lane along Bay Street.Location / Facility:Shared use bike path

From:city limits

To:city limits

Project ID: 2832

Completion Year:2013

MTP Status: CandidateEstimated Cost: $2,312,082

Type:New Facility-RoadCounty:Kitsap County

Sponsor: PORT ORCHARDTitle: Bethel Road SE

Description:Widen the roadway from 2 lanes to 3/4/5 lanes with a planted median island, bike lanes, street lighting, and sidewalks separated from the roadway by a planting strip. Bus pullouts will be constructed at major intersections, traffic signals will be installed at the intersections of Blueberry/Bethel Road and Salmonberry/Bethel Road. The existing signals at Sedgwick Road, Wal-Mart, and Lund Ave will be retrofitted to accommodate the additional traffic lanes. The intersection of Bethel Mitchell/Lund Rd will be replaced with a roundabout. Blueberry and Salmonberry Rd will be widened at the intersection to provide right and left turn lanes and U-turn movements. Property purchase will be approximately 60 acquisitions. Of the 60 acquisitions approximately 55 are 10'-20' wide frontage strips and 5 are total takes with relocation assistance.Location / Facility:Bethel Road

From:Lincoln Ave SE

To:Ives Mill Rd SE

Project ID: 3646

Completion Year:2025

MTP Status: ApprovedEstimated Cost: $28,938,202

Type:New Facility-RoadCounty:Kitsap County

Page 141: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PUYALLUPTitle: 31st Ave SW

Description:Widen 31st Ave SW between S Meridian/SR 161 to SR-512 westbound ramp including widening 31st Avenue SW overpass across SR-512, signal modifications, addition of curb, gutter, sidewalks, and shared bike lanes, and add transit signal priority.Location / Facility:31st Ave SW

From:SR 512 off ramp

To:S Meridian/SR 161

Project ID: 141

Completion Year:2005

MTP Status: ApprovedEstimated Cost: $6,667,975

Type:New Facility-RoadCounty:Pierce County

Sponsor: PUYALLUPTitle: East Puyallup Riverfront Trail

Description:Shared use pathLocation / Facility:Foothills Trail

From:Terminus of Existing Foothills Trail at 134th Ave E

To:Puyallup Riverfront Trail at easterly Puyallup city limits

Project ID: 2844

Completion Year:2011

MTP Status: ApprovedEstimated Cost: $1,476,088

Type:New Facility-RoadCounty:Pierce County

Page 142: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PUYALLUPTitle: Puyallup Riverfront Trail

Description:Shared use bike pathLocation / Facility:Puyallup Riverfront Trail

From:western terminus of existing Puyallup Riverfront Trail

To:Puyallup city limits

Project ID: 2899

Completion Year:2010

MTP Status: CompletedEstimated Cost: $1,139,759

Type:New Facility-RoadCounty:Pierce County

Sponsor: PUYALLUPTitle: Puyallup Riverfront Trail

Description:Shared use bike pathLocation / Facility:Puyallup Riverfront Trail

From:Eastern terminus of existing Puyallup Riverfront Trail

To:Sumner city limits at river

Project ID: 2900

Completion Year:2010

MTP Status: CompletedEstimated Cost: $2,496,614

Type:New Facility-RoadCounty:Pierce County

Page 143: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PUYALLUPTitle: S Meridian (SR 161)

Description:This three phase project will reconstruct S Meridian with new infrastructure, curb, gutter and sidewalk. Interconnect signals, improve road base to support truck traffic and provide improved pedestrian friendly environment with street scape items.Location / Facility:0

From:7th Ave

To:Stewart St

Project ID: 138

Completion Year:2000

MTP Status: CompletedEstimated Cost: $4,768,378

Type:New Facility-RoadCounty:Pierce County

Sponsor: PUYALLUPTitle: Shaw Rd

Description:Widen Shaw Road from 2 lanes to 5 lanes to include curb, gutter, sidewalk, shared bike lanes, transit signal priority, and street lighting. This project is critical as the other portion of Shaw Road connecting E Main and E Pioneer is currently under construction and will be completed by 2010. As a parallel route to S Meridian/SR 161, Shaw Road improvements would also help ease the traffic congestion along S Meridian/SR 161.Location / Facility:Shaw Rd

From:E Pioneer

To:39th Ave SE

Project ID: 494

Completion Year:2004

MTP Status: CandidateEstimated Cost: $3,644,126

Type:New Facility-RoadCounty:Pierce County

Page 144: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PUYALLUPTitle: Shaw Rd E

Description:Conduct corridor study and environmental documentation for proposed north-south arterial roadway. Widen, and realign as needed, the existing two-lane roadway and/or construct new roadway (in portions) to include non-motorized features. Location / Facility:Shaw Rd E

From:SR 410

To:Orting-Kapowsin Hwy

Project ID: 129

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $38,767,299

Type:New Facility-RoadCounty:Pierce County

Sponsor: PUYALLUPTitle: Shaw Rd Extension in Puyallup

Description:The extension is a grade-separated crossing of the BNSF railway tracks, connecting Shaw road directly to E Main. This project also includes the addition of pedestrian and bicycle facilities and direct access to from E. Pioneer Ave. and Shaw Rd to E. Main.Location / Facility:

From:E MAIN AVE

To:E. PIONEER AVE

Project ID: 1222

Completion Year:2010

MTP Status: CompletedEstimated Cost: $28,370,079

Type:New Facility-RoadCounty:Pierce County

Page 145: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: PUYALLUP TRIBETitle: Lister Gulch Bicycle-Pedestrian Improvements

Description:Design and construction of 500 LF pedestrian and bicycle path, lighting and 40 LF bridge over Lister Gulch linking the Portland Avenue area neighborhood of Tacoma to the Puyallup Tribal campus thereby decreasing traffic at the I-5 and Hwy 167 interchange.Location / Facility:Lister Gulch Bicycle-Pedestrian Improvements

From:Tribal Administrative Center

To:Portland Ave area

Project ID: 3443

Completion Year:2010

MTP Status: UnprogrammedEstimated Cost: $71,798

Type:New Facility-RoadCounty:Tribal Nations

Page 146: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: REDMONDTitle: 148th Ave NE

Description:Create third northbound through lane on 148th Ave NE from NE 22nd St to SR 520 eastbound on-ramp using primarily existing right turn lanes and modify SR 520 eastbound on-ramp to allow HOV access. At NE 24th St and 148th Ave NE intersection add second left turn lane on the eastbound and westbound approaches, add right turn lane on northbound approach, and extend right turn lane on westbound approach.Location / Facility:148th Ave NE

From:NE 22nd St

To:SR 520 eastbound on-ramp

Project ID: 5516

Completion Year:2022

MTP Status: CandidateEstimated Cost: $12,300,737

Type:New Facility-RoadCounty:King County

Sponsor: REDMONDTitle: Bear and Evans Creek Trail

Description:Shared use bike pathLocation / Facility:Bear and Evans Creek Trail

From:South of Union Hill Rd at Avondale Way

To:Puget Sound Energy Trail and East Lake Sammamish Trail

Project ID: 2862

Completion Year:2035

MTP Status: ApprovedEstimated Cost: $11,391,899

Type:New Facility-RoadCounty:King County

Page 147: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: REDMONDTitle: Bear Creek Trail Connector, Redmond Town Center to Marymoor Park

Description:Construct paved multi-use trail that would cross over Bear Creek on a new bridge and pass under SR 520 on the east side of the Sammamish River.Location / Facility:Bear Creek Trail

From:Bear Creek Trail

To:Sammamish River Trail

Project ID: 5513

Completion Year:2025

MTP Status: CandidateEstimated Cost: $2,164,930

Type:New Facility-RoadCounty:King County

Sponsor: REDMONDTitle: Bel-Red Rd

Description:Widen Bel-Red Rd. Improvements include 4-5 lanes, curb, gutter, sidewalks, street lights, storm drainage, underground power, right-of-way and easement acquisition. (exist- 2NB, 1SB)Location / Facility:Bel-Red Rd

From:NE 30th ST

To:NE 40th ST

Project ID: 836

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $22,073,478

Type:New Facility-RoadCounty:King County

Page 148: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: REDMONDTitle: Cleveland St

Description:Convert Cleveland St to 1 through lane in each direction. Improvements include parking, curb bulbouts, widened sidewalks, pedestrian amenities and realignment of street at eastern connection to Redmond Way to improve traffic flow.Location / Facility:Cleveland St

From:Redmond Way

To:Redmond Way (SR 202)

Project ID: 4116

Completion Year:2015

MTP Status: CandidateEstimated Cost: $9,294,582

Type:New Facility-RoadCounty:King County

Sponsor: REDMONDTitle: East Lake Sammamish Pkwy

Description:Widen East Lake Sammamish Pkwy from Redmond Way to 187th Ave NE. Improvements include 1 through lane in each direction, left turn lanes, bike lanes, curb, gutter, sidewalks, street lights, storm drainage, underground power, and right-of-way. (exist- 1NB, 1SB)Location / Facility:East Lake Sammamish Pkwy

From:Redmond Way

To:187th AVE NE

Project ID: 840

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $22,513,063

Type:New Facility-RoadCounty:King County

Page 149: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: REDMONDTitle: Puget Sound Energy Trail Improvements

Description:Improve existing soft surface trail with newly paved multi-use trail that meets AASHTO standards. The trail corridor will also include a parallel soft surface trail.Location / Facility:Puget Sound Energy Trail

From:Sammamish River Trail

To:Avondale Rd

Project ID: 5518

Completion Year:2035

MTP Status: UnprogrammedEstimated Cost: $6,150,369

Type:New Facility-RoadCounty:King County

Sponsor: REDMONDTitle: Puget Sound Energy Trail, Rose Hill Extension

Description:Extend Puget Sound Energy Trail from its terminus west of Willows Road to 132nd Avenue NE and 142nd Ave NE. Trail project would also design and construct a new crossing of Willows Road in the vicinity of the trail crossing. Provides a connection to Kirkland.Location / Facility:Puget Sound Energy Trail

From:Willows Rd

To:132nd Ave NE/NE 142nd St

Project ID: 4115

Completion Year:2030

MTP Status: CandidateEstimated Cost: $6,692,030

Type:New Facility-RoadCounty:King County

Sponsor: REDMONDTitle: Redmond Central Connector

Description:Shared use bike pathLocation / Facility:Redmond Central Connector

From:NE 124th St

To:E Lake Sammamish Bike Trail @ SR 520

Project ID: 2919

Completion Year:2025

MTP Status: CandidateEstimated Cost: $31,696,314

Type:New Facility-RoadCounty:King County

Page 150: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: REDMONDTitle: Redmond Way

Description:Convert Redmond Way from 159th Pl NE to 170th Ave NE to 1 through lane in each direction and center turn lane except at west end where there would be two westbound through lanes from 159th Ave NE to 160th Ave NE. Improvements include curb bulbouts, sidewalk improvements, pedestrian amenities and parking.Location / Facility:Redmond Way

From:159th Pl NE

To:170th Ave NE

Project ID: 4117

Completion Year:2015

MTP Status: CandidateEstimated Cost: $8,670,398

Type:New Facility-RoadCounty:King County

Sponsor: REDMONDTitle: Redmond Way Widening

Description:Widen Redmond Way bridge at Bear Creek. Improvements would include 2 through lanes in each direction, 2 eastbound left turn lanes to NE 76th St, 1 eastbound right turn lane to westbound SR 520 on-ramp, sidewalks, Bear Creek and E Lake Sammamish Trail connectionsLocation / Facility:Redmond Way

From:Bear Creek (171st Ave NE Vicinity)

To:SR 520 Westbound on-ramp

Project ID: 3662

Completion Year:2030

MTP Status: CandidateEstimated Cost: $23,260,379

Type:New Facility-RoadCounty:King County

Page 151: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: REDMONDTitle: REDMOND-WOODINVILLE RD

Description:Widen Red-Wood Rd from intersection with new 160th Ave NE Extension near the Puget Power trail north to NE 124th St. Improvements include 1 through lane in each direction, left turn and extended right turn lanes if appropriate, access management, bike lanes, curb, gutter, sidewalks, street lights, storm drainage, underground power and right-of-way acquisition. Redmond and WSDOT will coordinate a planning process to finalize final design for segment between 116th and 124th; the latter might not be widened. See also WSDOT project 1755.Location / Facility:REDMOND-WOODINVILLE RD

From:160TH AVE NE

To:NE 124th ST

Project ID: 830

Completion Year:2035

MTP Status: UnprogrammedEstimated Cost: $25,801,963

Type:New Facility-RoadCounty:King County

Sponsor: REDMONDTitle: SR 520/Avondale Rd/Union Hill Rd Intersection

Description:heavily congestions at grade intersection. Solutions to study include: 1. High capacity continuous flow three lane roundabout. 2. Grade separation of critical movements such as: -- Westbound Union Hill Rd to Southbound SR 520 left turn, or -- Northbound and southbound through movements between SR 520 and Avondale Rd., or--All left turns at intersection. Flyover Ramp: This option would provide a flyover ramp from westbound Union Hill Road to westbound SR 520. To accommodate this flyover from center of Union Hill Road to the center of SR 520, it would be necessary to widen both roadways, modify NE 76th Street ramps, build retaining walls and potentially require additional right of way.Location / Facility:Coal Creek Pkwy

From:Novelty Hill Rd

To:Union Hill Road

Project ID: 3476

Completion Year:2030

MTP Status: CandidateEstimated Cost: $43,419,375

Type:New Facility-RoadCounty:King County

Page 152: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: REDMONDTitle: West Lake Sammamish Parkway Widening

Description:Widen West Lake Sammamish Pkwy from NE 51st St to Bel-Red Rd. Improvements include 2 through lane in each direction, left turn lanes, bike lanes, curb, gutter, sidewalks, street lights, storm drainage, underground power and right-of-way.Location / Facility:West Lake Sammamish Parkway

From:NE 51st St

To:Bel-Red Rd

Project ID: 3665

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $15,227,795

Type:New Facility-RoadCounty:King County

Page 153: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: RENTONTitle: Cedar River Trail

Description:Shared use bike pathLocation / Facility:Cedar River Trail

From:Terminus of existing Cedar River Trail

To:Rainier and 88th

Project ID: 2671

Completion Year:2020

MTP Status: CandidateEstimated Cost: $334,602

Type:New Facility-RoadCounty:King County

Sponsor: RENTONTitle: Central Renton Transit Corridor - Rainier Ave S (SR 167) S Grady Way to S 2nd St

Description:Reconfiguration of Rainier Ave S to accommodate Business Access and Transit (BAT) lanes specifically for use by transit, vehicles entering and exiting businesses and for right turn use at intersections. Location / Facility:Rainier Ave S

From:Grady Way

To:N Airport Way

Project ID: 1308

Completion Year:2018

MTP Status: ApprovedEstimated Cost: $52,568,302

Type:New Facility-RoadCounty:King County

Sponsor: RENTONTitle: Duvall Ave NE

Description:Widen to 5 lanes, CGS (curb, gutter, and sidewalk), bike lanes, other amenities, channelization.Location / Facility:Duvall Ave NE

From:NE 4th St

To:NE Sunset Blvd (SR 900)

Project ID: 2326

Completion Year:2020

MTP Status: CandidateEstimated Cost: $14,629,068

Type:New Facility-RoadCounty:King County

Page 154: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: RENTONTitle: Duvall Ave NE

Description:Widen to 5 lanes, CGS (curb, gutter and sidewalks), add bike lanes, add amenities, channelizationLocation / Facility:Duvall Ave NE

From:NE Sunset Blvd

To:NE 25th Ct (Renton City Limit)

Project ID: 4295

Completion Year:2009

MTP Status: CompletedEstimated Cost: $18,744,786

Type:New Facility-RoadCounty:King County

Sponsor: RENTONTitle: Lake Washington Loop Trail

Description:Shared use regional bike pathLocation / Facility:Rainier Ave N/Airport Way/Logan Ave

From:Rainier Ave N (city limits)

To:Cedar River Trail/Logan Ave Bridge

Project ID: 4296

Completion Year:2015

MTP Status: CandidateEstimated Cost: $29,599,269

Type:New Facility-RoadCounty:King County

Sponsor: RENTONTitle: Logan Ave N

Description:Reconstruction of roadway, installation of sidewalks, HOV/Rapid Ride improvements to the Boeing Renton Plant.Location / Facility:Logan Ave N

From:Renton Transit Center

To:I-405 (NE Park Dr)

Project ID: 2347

Completion Year:2020

MTP Status: CandidateEstimated Cost: $14,629,068

Type:New Facility-RoadCounty:King County

Page 155: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: RENTONTitle: NE Sunset Blvd (SR-900) Corridor Improvements

Description:Project involves a series of key improvements in this corridor to improve traffic operations, Transit Signal Priority (TSP) and adaptive system control improvements, pedestrian and bicycle needs. Phase 1 will construct multi-modal improvements along NE Sunset Blvd from Edmonds Ave NE to Monroe Ave NE. Improvements include access management through center medians, non-motorized improvements by adding bicycle lanes, multi-use trail, new sidewalks and landscaped buffers separating the sidewalk from the travel lanes, pedestrian ramps per current ADA standards, streetlights, traffic signal upgrades and coordination.Location / Facility:NE Park Dr and NE Sunset Blvd

From:Garden Ave

To:East City limits (148th)

Project ID: 2341

Completion Year:2020

MTP Status: CandidateEstimated Cost: $31,940,132

Type:New Facility-RoadCounty:King County

Sponsor: RENTONTitle: New P&R Lot-Renton Urban Center North

Description:Construct new Park and Ride lot (250-300 spaces), in conjuction with I-405/N 8th St interchange (WSDOT I-405 BRT Project).Location / Facility:I-405/N 8th St interchange vicinity

From:I-405/N 8th St interchange vicinity

To:-

Project ID: 4468

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $23,679,415

Type:New Facility-RoadCounty:King County

Page 156: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: RENTONTitle: Oakesdale Ave SW

Description:Widen Monster Rd Bridge; widen the roadway to 4/5 lanes +Bike Lanes + CGSLocation / Facility:Oakesdale Ave SW

From:Monster Rd

To:SR 900

Project ID: 2328

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $29,599,269

Type:New Facility-RoadCounty:King County

Sponsor: RENTONTitle: Rainier Ave S Corridor Improvements – Phase 2

Description:Phase 2 improvements include installation of BAT lanes, medians, curb, gutter, wider sidewalks, planted pedestrian buffer, street lighting including pedestrian scale illumination.Location / Facility:Rainier Ave S (SR 167)

From:S 3rd St

To:N Airport Way

Project ID: 4433

Completion Year:2018

MTP Status: CandidateEstimated Cost: $21,311,474

Type:New Facility-RoadCounty:King County

Sponsor: RENTONTitle: SE Carr RD

Description:Widen roadway to provide capacity improvements, assume an estimated 3 lanes each direction for wideningLocation / Facility:SE Carr RD

From:108th Ave SE

To:SR 167

Project ID: 910

Completion Year:2030

MTP Status: CandidateEstimated Cost: $85,245,895

Type:New Facility-RoadCounty:King County

Page 157: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: RENTONTitle: Springbrook/Interurban Connection (SW 27th St)

Description:Shared use bike pathLocation / Facility:Springbrook/Interurban Connection (SW 27th St)

From:Oakesdale Ave SW

To:SR 181

Project ID: 2856

Completion Year:2020

MTP Status: CandidateEstimated Cost: $2,367,942

Type:New Facility-RoadCounty:King County

Sponsor: RENTONTitle: SW 27th St / Strander Blvd Ph 1 Segment 2b

Description:Design and construction of the railroad bridge at the Union Pacific (UP) railroad tracks and a four lane roadway connecting SW27th St (in Renton) to Strander Blvd (in Tukwila).Location / Facility:SW 27th St connecting to Strander Blvd

From:SW 27th St

To:Strander Blvd

Project ID: 4164

Completion Year:2020

MTP Status: CandidateEstimated Cost: $30,062,202

Type:New Facility-RoadCounty:King County

Page 158: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: RENTONTitle: SW 27th St/Strander Blvd Ph 2

Description:Improve the existing access along SW 27th St between Oakesdale Ave SW and East Valley Rd through signalization and/or limited channelization.Location / Facility:SW 27th St

From:Oakesdale Ave SW

To:East Valley Rd

Project ID: 4165

Completion Year:2020

MTP Status: CandidateEstimated Cost: $7,361,234

Type:New Facility-RoadCounty:King County

Sponsor: SAMMAMISHTitle: Sahalee Way NE

Description:3 lanes with raised median/turn lanes, bike lanes and sidewalks Location / Facility:Sahalee Way NE

From:NE 25th Way

To:NE 37th/City Limit

Project ID: 1978

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $30,247,978

Type:New Facility-RoadCounty:King County

Sponsor: SEATACTitle: 28th/24th Ave S

Description:It is to construct a new five lane arterial including bicycle lanes, curb, gutter, sidewalk, storm drainage, street lighting, signalization, channelization, landscaping, utilities, undergrounding of utility lines and paving.Location / Facility:28th/24th Ave S

From:S 200th St

To:S 208th Street

Project ID: 192

Completion Year:2016

MTP Status: ApprovedEstimated Cost: $11,513,447

Type:New Facility-RoadCounty:King County

Page 159: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Seattle Center City Priority Bus Corridor: Jefferson/Yesler

Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:James St

From:Alaskan Way

To:First Hill / Capitol Hill Regional Growth Center

Project ID: 5164

Completion Year:2025

MTP Status: CandidateEstimated Cost: $24,720,300

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Seattle Center City Priority Bus Corridor: Pike/Pine

Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:Pike St

From:1st Ave

To:First Hill / Capitol Hill Regional Growth Center

Project ID: 5219

Completion Year:2024

MTP Status: CandidateEstimated Cost: $30,900,375

Type:New Facility-RoadCounty:King County

Page 160: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Seattle Center city Priority Bus Corridor: Seattle Center East

Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:3rd Ave

From:Seattle Center

To:S Jackson St

Project ID: 5095

Completion Year:2025

MTP Status: CandidateEstimated Cost: $6,180,075

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: 6th Ave Bike Path - Incorporated into 5145

Description:Shared use bike pathLocation / Facility:6th Ave Bike Path

From:Mountain to Sound Trail at Royal Brougham

To:SW Spokane St

Project ID: 2857

Completion Year:2020

MTP Status: CandidateEstimated Cost: $2,656,122

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Alaskan Way Bicycle Facility

Description:Separated bike facility in the Alaskan Way / East Marginal Way corridor.Location / Facility:Alaskan Way

From:Atlantic St

To:SW Spokane St

Project ID: 2859

Completion Year:2020

MTP Status: CandidateEstimated Cost: $1,238,231

Type:New Facility-RoadCounty:King County

Page 161: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Burke-Gilman Trail Extension

Description:The project encompasses design and construction of a final segment of the Burke-Gilman Trail, a multi-use trail located along the north side of the Ship Canal, from 11th Ave NW to the Chittenden LocksLocation / Facility:Burke-Gilman Trail

From:11th Ave NW

To:Chittenden Locks

Project ID: 2668

Completion Year:2019

MTP Status: ApprovedEstimated Cost: $20,430,810

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Chesiahud Lake Union Loop Trail (Columbia Trail)

Description:Provides multi-use trail facilities for the Portage Bay area, connecting to the Burke-Gilman Trail.Location / Facility:NE Columbia Rd/NE Boat St

From:Montlake Bridge

To:University Bridge

Project ID: 5136

Completion Year:2020

MTP Status: CandidateEstimated Cost: $2,476,462

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Chief Sealth Trail--Seattle--Center Segment

Description:Through a partnership between Sound Transit and the City of Seattle, will construct a multi-use, non-motorized, asphalt path within Seattle City Light ROW.Location / Facility:Chief Sealth Trail/Seattle City Light ROW

From:Beacon Ave. S. @ S. Dawson St.

To:51st Ave. S. @ S. Gazelle St.

Project ID: 3610

Completion Year:2006

MTP Status: CompletedEstimated Cost: $12,229,900

Type:New Facility-RoadCounty:King County

Page 162: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Chief Sealth Trail--Seattle--North Segment

Description:Regional multi-use nonmotorized trail linking south and central Seattle Location / Facility:Chief Sealth Trail/Seattle City Light ROW

From:I-90 @ I-5

To:Beacon Ave. S. @ S. Dawson St.

Project ID: 3609

Completion Year:2020

MTP Status: CandidateEstimated Cost: $3,714,693

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Chief Sealth Trail--Seattle--South Segment

Description:Regional multi-use nonmotorized trail linking south and central Seattle.Location / Facility:Chief Sealth Trail/Possibly Seattle City Light ROW

From:51st Ave. S. @ S. Gazelle

To:S. Leo St. @ 59th Ave. S.

Project ID: 3611

Completion Year:2020

MTP Status: CandidateEstimated Cost: $3,714,693

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: First Hill Streetcar Line

Description:Provides streetcar service with connections to First Hill via LINK Light Rail stations at Chinatown / International District and Capitol Hill.Location / Facility:Jackson / Boren / Broadway

From:1st Ave S

To:E Aloha St

Project ID: 5153

Completion Year:2016

MTP Status: CandidateEstimated Cost: $187,422,572

Type:New Facility-RoadCounty:King County

Page 163: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Greenwood Avenue North Corridor Improvement

Description:Widen from an existing 4 lanes 40 ft to 5 lanes 55 ft. and include a center two-way-left turn lane. This improvement will include parking , curb, planting strip and concrete walkways on both sides of street which is a total improvement of the street right-of-way. Upgrade and interconnect two signals in project area. Upgrade street lighting, and drainage systems as needed. Transportation Improvement Board - Arterial Improvement Program funding - TIB FY05Location / Facility:Greenwood Avenue North

From:North 105th Street

To:North 112th Street

Project ID: 5448

Completion Year:2008

MTP Status: CompletedEstimated Cost: $9,649,569

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: King St Multimodal Terminal

Description:Intermodal; MIS Redevelop as inter/multimodal terminalLocation / Facility:King St Multimodal Terminal

From:[Not submitted]

To:

Project ID: 610

Completion Year:2010

MTP Status: CompletedEstimated Cost: $34,670,466

Type:New Facility-RoadCounty:King County

Page 164: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Lake to Bay Loop Trail

Description:Figure-eight pedestrian and bicycling trail connecting Myrtle Edwards Park, Olympic Sculputre Park, Seattle Center, Lake Union Park and area neighborhoods in Uptown/Queen Anne and South Lake Union.Location / Facility:various

From:Elliott Bay Trail

To:Elliott Bay Trail

Project ID: 5167

Completion Year:2020

MTP Status: CandidateEstimated Cost: $1,114,408

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Lake Union Ship Canal Trail

Description:This project completes Phase II of a multi-use trail, extending from the Fremont Bridge to Fisherman's Terminal, just west of 15th Ave. NW. Location / Facility:West Nickerson Street

From:6th Ave W

To:15th Ave W

Project ID: 5168

Completion Year:2020

MTP Status: CompletedEstimated Cost: $3,624,119

Type:New Facility-RoadCounty:King County

Page 165: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Mercer Corridor East Phase

Description:Improvements in the Mercer Corridor area between I-5 and Dexter Ave. Improvements include Roy St and 8th Ave reconstruction between Westlake and Dexter, Thomas St center turn lane and signals between Fairview and 5th, two-way conversion of Westlake Ave and 9th Ave between Aloha and Denny, two-way conversion of Mercer St between Yale Ave N and Dexter, two-way conversion of Valley St between Fairview and Westlake. All project activities will include Complete Street elements. Location / Facility:Roy St, 8th Ave, Thomas St, Westlake Ave, 9th Ave, Mercer St, Valley St

From:I-5

To:Dexter

Project ID: 5509

Completion Year:2012

MTP Status: CompletedEstimated Cost: $235,460,858

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Mercer Corridor West Phase

Description:Improvements in the Mercer Corridor area between Dexter and Elliott Ave. Improvements include two-way conversion of Mercer St between Dexter and 2nd Ave, widening of Mercer St between Dexter and 5th Ave, two-way conversion of Roy St between 6th and Queen Anne Ave N, extension of 6th Ave from Mercer St to Harrison St, demolition of Broad St between 9th Ave and Harrison St. All project activities will include Complete Streets elements. Incorporates prior projects 5510, 5104, 5125, 5179.Location / Facility:Mercer St, Dexter, Roy St, 6th Ave

From:9th Ave N

To:Elliott Ave W

Project ID: 5510

Completion Year:2014

MTP Status: ApprovedEstimated Cost: $107,383,792

Type:New Facility-RoadCounty:King County

Page 166: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: MLK Jr Way Trail

Description:Construct new trail from S Massachusetts St to S McClellan St. Provides access to Mt Baker Station.Location / Facility:MLK Jr Way

From:S Massachusetts St

To:S McClellan St

Project ID: 5183

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $6,191,155

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Montlake Blvd NE HOV Lane and ITS Improvements

Description:Extend HOV lane on s/b Montlake Blvd and install ITS improvements to increase speed of HOV vehicles and encourage new transit service.Location / Facility:Montlake Boulevard

From:NE Pacific Place

To:25th Ave NE

Project ID: 5187

Completion Year:2020

MTP Status: CandidateEstimated Cost: $29,599,269

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Mountain to Sound Trail

Description:Shared use bike pathLocation / Facility:Mountain to Sound Trail

From:western terminus of existing I-90 Trail at 12th Ave

To:E Marginal Way

Project ID: 2895

Completion Year:2020

MTP Status: CandidateEstimated Cost: $7,429,386

Type:New Facility-RoadCounty:King County

Page 167: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Northgate Multimodal Transportation Hub

Description: Make improvements to improve transfer opportunities between transit services. Provide multimodal connectivity to link to regional bus and light rail service, including but not limited to protected bike lanes, enhanced sidewalks, new pedestrian crossing and bicycle/pedestrian bridge over I-5. Location / Facility:3rd Ave NE

From:NE 103rd

To:Pinehurst

Project ID: 5212

Completion Year:2018

MTP Status: CandidateEstimated Cost: $44,496,540

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Northlake Way Trail

Description:Multi-use trail connecting Gasworks and Lake Union Parks, linking more than 35 pocket parks, street ends and waterways that ring Lake Union, and improving lake access from adjacent neighborhoods, downtown, and the University of Washington. Provides local access parallel to the Burke-Gilman Trail.Location / Facility:N/NE Northlake Way

From:University Bridge

To:Stone Way N

Project ID: 5215

Completion Year:2020

MTP Status: CandidateEstimated Cost: $2,476,462

Type:New Facility-RoadCounty:King County

Page 168: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Puget Park Trail

Description:Pedestrian Pathway w/ Bicycles PermittedLocation / Facility:Puget Park

From:SW Dakota St

To:SW Dawson St

Project ID: 5225

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $2,476,462

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Ravenna Ave NE Corridor Trail Improvements

Description:Improve off-street multi-use trail parallel to Ravenna Ave NE.Location / Facility:Ravenna Ave NE

From:NE 55th St

To:NE Ravenna Boulevard

Project ID: 5229

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $495,292

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Seattle Bus Priority Corridor 10

Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:15th Ave NW

From:Northgate Multimodal Transportation Hub

To: Pioneer Square / Chinatown / International District

Project ID: 5091

Completion Year:2020

MTP Status: CandidateEstimated Cost: $8,652,105

Type:New Facility-RoadCounty:King County

Page 169: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Seattle Bus Priority Corridor 13/13A

Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed reliability improvements. Improve accessibility of transit stops.Location / Facility:Seattle

From:32nd Ave NW

To:Children`s Hospital and UW Medical Center

Project ID: 5177

Completion Year:2024

MTP Status: CandidateEstimated Cost: $45,732,555

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Seattle Bus Priority Corridor 15

Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops. Location / Facility:Greenwood Ave N

From:N 145th St (Seattle city limits)

To:N 38th St

Project ID: 5156

Completion Year:2024

MTP Status: CandidateEstimated Cost: $49,440,600

Type:New Facility-RoadCounty:King County

Page 170: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Seattle Bus Priority Corridor 2

Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed and reliability improvements. Improve accessibility of transit stops.Location / Facility:Seattle

From:Downtown Seattle

To:Seattle City Limits

Project ID: 5087

Completion Year:2024

MTP Status: CandidateEstimated Cost: $58,092,705

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Seattle Bus Priority Corridor 5

Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:23rd Ave E / 24th Ave E

From:University District Link Light Rail Station

To:Rainier Beach Link Light Rail Station

Project ID: 5088

Completion Year:2020

MTP Status: CandidateEstimated Cost: $86,521,050

Type:New Facility-RoadCounty:King County

Page 171: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Seattle Center City Connector

Description: Make capital improvements to connect South Lake Union and First Hill Streetcar lines. Provide infrastructure and expand streetcar fleet to ensure good speed and reliabilit5y and access to stations.Location / Facility:1st Ave N

From:South Lake Union

To:Pioneer Square / Chinatown/International District

Project ID: 5084

Completion Year:2020

MTP Status: CandidateEstimated Cost: $135,961,651

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Seattle Center City Priority Bus Corridor: Jackson

Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:Jackson St

From:1st Ave S

To:Martin Luther King Jr Way

Project ID: 5282

Completion Year:2025

MTP Status: CandidateEstimated Cost: $24,720,300

Type:New Facility-RoadCounty:King County

Page 172: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Seattle High Capacity Transit Corridor 11

Description:Make capital improvements to support rail service frequency, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:Dexter / Nickerson

From:NW 65 St

To:King Street Station Multimodal Transportation Hub

Project ID: 5141

Completion Year:2020

MTP Status: CandidateEstimated Cost: $86,521,050

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Seattle High Capacity Transit Corridor 6

Description:Make capital improvements to support high capacity transit service frequency, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:Madison St

From:Colman Dock Multimodal Transportation Hub

To:Martin Luther King Jr Way

Project ID: 5173

Completion Year:2020

MTP Status: CandidateEstimated Cost: $148,321,801

Type:New Facility-RoadCounty:King County

Page 173: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Seattle High Capacity Transit Corridor 8

Description:Make capital improvements to support rail service frequency, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:Fairview Ave E

From:Northgate Multimodal Transportation Hub

To:King Street Station Multimodal Transportation Hub

Project ID: 5152

Completion Year:2020

MTP Status: CandidateEstimated Cost: $152,029,846

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Seattle Priority Bus Corridor 1

Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed and reliability improvements. Improve accessibility of transit stops.Location / Facility:4th Ave S

From:South Lake Union

To:White Center

Project ID: 5097

Completion Year:2020

MTP Status: CandidateEstimated Cost: $30,900,375

Type:New Facility-RoadCounty:King County

Page 174: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Seattle Priority Bus Corridor 12

Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:15th Ave NE

From:Seattle city limits

To:University District Link Light Rail Station

Project ID: 5079

Completion Year:2025

MTP Status: CandidateEstimated Cost: $6,038,251

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Seattle Priority Bus Corridor 14

Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:15th Ave NE

From:32nd Ave NW

To:University District Link Light Rail Station

Project ID: 5075

Completion Year:2035

MTP Status: CandidateEstimated Cost: $12,360,150

Type:New Facility-RoadCounty:King County

Page 175: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: SEattle Priority Bus Corridor 3

Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed and reliability improvements. Improve accessibility of transit stops.Location / Facility:14th Ave

From:Othello Link Light Rail Station

To:University district Link Light Rail Station

Project ID: 5073

Completion Year:2035

MTP Status: CandidateEstimated Cost: $38,791,493

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Seattle Priority Bus Corridor 4

Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed and reliability improvements. Improve accessibility of transit stops. Location / Facility:Cherry St

From:King Street Station Multimodal Transportation Hub

To:Mount Baker Transit Center

Project ID: 5165

Completion Year:2025

MTP Status: CandidateEstimated Cost: $1,854,023

Type:New Facility-RoadCounty:King County

Page 176: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Seattle Priority Bus Corridor 7

Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops. Location / Facility:E John St

From:W Garfield St

To:23rd Ave

Project ID: 5218

Completion Year:2025

MTP Status: CandidateEstimated Cost: $12,360,150

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Seattle Priority Bus Corridor 9: Aurora Village to Downtown via SR 99

Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both diretions, including business, access and transit lanes, where necessary. Make speed and reliability improvements, including ITS improvements. Improve accessibility of transit stops. Corridor incorporates T2040 project 4092, 1743.Location / Facility:SR 99

From:Battery Street Tunnel

To:N 145th St.

Project ID: 4092

Completion Year:2040

MTP Status: CandidateEstimated Cost: $187,067,381

Type:New Facility-RoadCounty:King County

Page 177: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Ship Canal Trail Extension

Description:Shared use bike pathLocation / Facility:Ship Canal Trail Extension

From:Nickerson

To:15th W

Project ID: 2902

Completion Year:2008

MTP Status: CompletedEstimated Cost: $10,974,930

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: SODO Rail Corridor Grade Separations

Description:Improve access to manufacturing and industrial center and Port facilities.Location / Facility:BNSF RR

From:S Royal Brougham Way

To:S Spokane St

Project ID: 5252

Completion Year:2030

MTP Status: CandidateEstimated Cost: $21,431,029

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: South Lander Street Grade Separation

Description:This project develops a grade separation of the Lander St. roadway and the Burlington Northern mainline railroad tracks between 1st Ave. S near the Starbucks Center and 4th Ave. S. to facilitate freight movementLocation / Facility:S Lander St

From:1st Ave S

To:4th Ave S

Project ID: 5254

Completion Year:2030

MTP Status: CandidateEstimated Cost: $213,114,737

Type:New Facility-RoadCounty:King County

Page 178: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Spokane St.

Description:Shared use bike pathLocation / Facility:Spokane St.

From:6th Ave S

To:E Marginal Way

Project ID: 2905

Completion Year:2010

MTP Status: CompletedEstimated Cost: $705,565

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Spokane Street

Description:Widening, bridge strengthening and seismic improvements. Improve transit operations and access to the Port of Seattle by: a) removing and replacing traffic signal controllers; b) installing a full signal interconnect; c) providing loops for signal actuation; d) providing left turn lanes at 6th Ave S and at 4th Ave S; e) providing spot pavement resurfacing; f) providing transit a separate turn lane; g) installing a video system to monitor traffic in the corridor and on the viaduct; h) providing U-Turn facilities for trucks; i) improving signing to Port of Seattle facilities; j) improving x-walls; k) connecting signals to the central traffic computer, and; l) proving landscaping enhancements.Location / Facility:SPOKANE STREET VIADUCT

From:I-5

To:SR 99

Project ID: 958

Completion Year:2012

MTP Status: CompletedEstimated Cost: $177,824,767

Type:New Facility-RoadCounty:King County

Page 179: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Spokane Street Viaduct 4th Avenue Off-Ramp

Description:Construct an off-ramp from the eastbound S. Spokane St Viaduct connecting to 4th Avenue South. The new ramp will help relieve congestion by providing a grade-separated route over three Burlington Northern-Santa Fe rail lines. The ramp will help relieve congestion by providing an alternate route over the rail lines and helping redistribute traffic across the arterial network, making more efficient use of local street capacity to help move regional traffic. The ramp will be part of a continuous HOV connection from West Seattle to the Seattle CBD and will also provide significant mitigation for the Alaskan Way Viaduct Project by providing an alternate access to I-5, I-90 and the Seattle CBD when SR 99 is closed for construction.Location / Facility:4th Ave Off-ramp

From:EB Spokane St. Viaduct

To:4th Ave S.

Project ID: 4263

Completion Year:2010

MTP Status: CompletedEstimated Cost: $58,348,752

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Westcrest Park Trail

Description:Pedestrian Pathway w/ Bicycles PermittedLocation / Facility:Watercrest Park/4th Ave SW

From:SW Webster St

To:4th Ave SW

Project ID: 5274

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $2,476,462

Type:New Facility-RoadCounty:King County

Page 180: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SEATTLETitle: Westlake Multimodal Transportation Hub

Description:Make improvements to improve transfer opportunities between transit and other modes, create clear routes and improved wayfinding, provide real-time transit rider information and maximize fare integration. Location / Facility:2nd, 3rd, 4th Ave

From:Pine St

To:

Project ID: 5279

Completion Year:2035

MTP Status: CandidateEstimated Cost: $6,180,075

Type:New Facility-RoadCounty:King County

Sponsor: SEATTLETitle: Woodland Park Trail

Description:Pedestrian Pathway w/ Bicycles PermittedLocation / Facility:Woodland Park Ave N

From:N 50th St

To:W Green Lake Way N

Project ID: 5281

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $2,476,462

Type:New Facility-RoadCounty:King County

Page 181: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SHORELINETitle: 145th Street Improvements

Description:Construct improvements that include the following: * Improvements to vehicular capacity, safety and traffic flow, transit speed and reliability and accessibility to I-5 and the future light rail station. * Upgrade existing substandard, non-ADA compliant sidewalks and construct new sidewalk for a continuous system along the corridor * Install continuous illumination and landscaping, bus stop improvements. * Upgrade existing stormwater management system to improve water quality and provide flow control. * Install bicycle facilities.Location / Facility:145th Street

From:3rd Avenue NW

To:Bothell Way NE (SR 522)

Project ID: 4434

Completion Year:2023

MTP Status: CandidateEstimated Cost: $236,794,153

Type:New Facility-RoadCounty:King County

Sponsor: SHORELINETitle: 15th Ave NE Corridor Improvement

Description:A corridor study will be performed for this Principal Arterial to identify a preferred transportation solution for this roadway segment, which could include a lane reduction from four to three and installation of bicycle lanes. This project would construct sidewalks where needed to result in continuous sidewalks along the corridor.Location / Facility:15th Ave NE

From:NE 172nd St

To:NE 195th St

Project ID: 4435

Completion Year:2018

MTP Status: CandidateEstimated Cost: $1,889,617

Type:New Facility-RoadCounty:King County

Page 182: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SHORELINETitle: Aurora Avenue North Multi-Modal Corridor Project (N 185th St to N 192nd St)

Description:The corridor improvement will include access management, sidewalks, pedestrian crossings, landscaping and urban amenities, intersection improvements, congestion reduction and Business Access and Transit (BAT) lanes. The improvements will occur on Aurora Avenue N (SR 99) between N 185th Street and N 192nd Street. Partners include: WSDOT, King Count Metro and TIB. Location / Facility:SR 99

From:N 185th St

To:N 192nd St

Project ID: 3569

Completion Year:2012

MTP Status: CompletedEstimated Cost: $19,057,936

Type:New Facility-RoadCounty:King County

Sponsor: SHORELINETitle: Aurora Avenue North Multi-Modal Corridor Project (N 192nd St to N 205th St)

Description:The corridor improvement will include access management, sidewalks, pedestrian crossings, landscaping and urban amenities, intersection improvements, congestion reduction and Business Access and Transit (BAT) lanes. The improvements will occur on Aurora Avenue N (SR 99) between N 192nd Street and N 205th Street. Partners include: WSDOT, King Count Metro and TIB.Location / Facility:SR 99

From:N 192nd St

To:N 205th St/ 244th St SW

Project ID: 4283

Completion Year:2015

MTP Status: ApprovedEstimated Cost: $54,684,245

Type:New Facility-RoadCounty:King County

Page 183: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SHORELINETitle: N 175th St

Description:Roadway capacity improvements (additional turn and through lanes, extension of turn pockets), sidewalks, bicycle lanes, transit transfer upgrade at Meridian Avenue N and intersection improvements at Meridican Avenue N.Location / Facility:N 175th St

From:Stone Avenue N

To:Interstate 5

Project ID: 1028

Completion Year:2018

MTP Status: CandidateEstimated Cost: $24,478,467

Type:New Facility-RoadCounty:King County

Sponsor: SHORELINETitle: SR 99--Shoreline--North Segment

Description:This corridor improvement will include access management, sidewalks, pedestrian crossings, landscaping and urban amenities, intersection improvements, congestion reduction, and Business Access and Transit (BAT) lanes. The improvements will occur on Aurora Avenue N (SR 99) between N 165th Street and N 185th Street.Location / Facility:SR 99 (Aurora Ave N)

From:N 165th St.

To:N 185th St.

Project ID: 4277

Completion Year:2011

MTP Status: CompletedEstimated Cost: $57,465,684

Type:New Facility-RoadCounty:King County

Page 184: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SNOHOMISHTitle: Riverfront Trail, Western Section

Description:Shared Use Bike Path along Snohomish RiverLocation / Facility:Riverfront alignment S. of First St.

From:Hwy 9 on the Snohomish River

To:Avenue D

Project ID: 3577

Completion Year:2020

MTP Status: CandidateEstimated Cost: $1,427,226

Type:New Facility-RoadCounty:Snohomish County

Sponsor: SNOHOMISHTitle: Snohomish Centennial Trail

Description:The Centennial Trail Extension project will construct approximately 0.75 miles of 12’-wide asphalt nonmotorized trail completing the missing link between the City’s existing Centennial Trail terminus at Bowen Street and the existing Snohomish County Centennial Trail at Pine Avenue. The project includes approximately 4 acres of landscaping, five street crossings, street frontage and other improvements. The trail will be located within abandoned railroad right-of-way purchased by the City using FHWA STP(E), CMAQ and City funds.Location / Facility:Former BNSF RR route

From:Bowen Street (existing Centennial Trail)

To: intersection of Maple and Pine Avenues

Project ID: 2823

Completion Year:2011

MTP Status: CompletedEstimated Cost: $3,125,683

Type:New Facility-RoadCounty:Snohomish County

Page 185: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SNOHOMISH COUNTYTitle: 112th Street SW/Beverly Edmonds Road

Description:Improve to 5 lanes urban standards with bicycle lanes Location / Facility:Beverly Park Rd

From:Airport Road

To:SR 525

Project ID: 1956

Completion Year:2009

MTP Status: CompletedEstimated Cost: $19,460,698

Type:New Facility-RoadCounty:Snohomish County

Sponsor: SNOHOMISH COUNTYTitle: Airport Way

Description:Widening to 2/3 lane urban standards with bicycle lanesLocation / Facility:Airport Way

From:SR 9

To:Snohomish C/L

Project ID: 584

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $13,427,159

Type:New Facility-RoadCounty:Snohomish County

Sponsor: SNOHOMISH COUNTYTitle: Centennial Trail

Description:Shared use bicycle pathLocation / Facility:Centennial Trail

From:Monroe southern city limits

To:High Rock Rd

Project ID: 2822

Completion Year:2025

MTP Status: CandidateEstimated Cost: $37,524,711

Type:New Facility-RoadCounty:Snohomish County

Page 186: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SNOHOMISH COUNTYTitle: Centennial Trail

Description:Shared use bicycle pathLocation / Facility:Centennial Trail

From:City of Snohomish city limits

To:Existing Centennial Trail at Monroe city limits

Project ID: 2842

Completion Year:2025

MTP Status: UnprogrammedEstimated Cost: $37,524,711

Type:New Facility-RoadCounty:Snohomish County

Sponsor: SNOHOMISH COUNTYTitle: Centennial Trail

Description:Shared use bicycle pathLocation / Facility:Centennial Trail

From:Snohomish/Skagit County Line

To:Arlington City limits

Project ID: 2850

Completion Year:2012

MTP Status: CompletedEstimated Cost: $24,535,388

Type:New Facility-RoadCounty:Snohomish County

Page 187: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SNOHOMISH COUNTYTitle: Eastside BNSF Trail (Segment C, Woodinville to Snohomish)

Description:Study and possibly implement acquisition, design, and construction of a paved and soft-surface regional trail. Rail freight to continue from Woodinville to BNSF main Stevens pass East-West line while trail is under consideration.Location / Facility:BNSF Corridor

From:Woodinville rail junction@rail spur coming from Redmond at Woodinville-Redmond Road/SR202

To:City of Snohomish

Project ID: 4161

Completion Year:2020

MTP Status: CandidateEstimated Cost: $5,353,624

Type:New Facility-RoadCounty:Snohomish County

Sponsor: SNOHOMISH COUNTYTitle: Granite Falls Alternative Route (Bypass)

Description:New 2-lane principal arterial Location / Facility:Granite Falls Alternative Route

From:State Route 92

To:Mountain Loop Highway

Project ID: 1950

Completion Year:2011

MTP Status: CompletedEstimated Cost: $16,679,407

Type:New Facility-RoadCounty:Snohomish County

Page 188: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SNOHOMISH COUNTYTitle: Interurban Trail--124th Street SW I-5 overcrossing

Description:Shared use bicycle path. See http://www1.co.snohomish.wa.us/Departments/Public_Works/Services/Roads/Projects/RC1022.htmLocation / Facility:Interurban Trail--124th St SW I-5 overcrossing

From:128th St SE

To:I-5

Project ID: 2805

Completion Year:2006

MTP Status: CompletedEstimated Cost: $206,242

Type:New Facility-RoadCounty:Snohomish County

Sponsor: SNOHOMISH COUNTYTitle: North Creek Trail - Bothell to Mill Creek

Description:Regional Non-motorized trailLocation / Facility:North Creek Trail

From:North Creek Park

To:Filbert Road

Project ID: 4016

Completion Year:2025

MTP Status: CandidateEstimated Cost: $6,946,280

Type:New Facility-RoadCounty:Snohomish County

Sponsor: SNOHOMISH COUNTYTitle: North Creek Trail Link

Description:New Class I bike/ped trail. Construct missing links in the North Creek Trail from Bothell to Everett.Location / Facility:North Creek Trail Link

From:North Creek Park

To:McCollum Pk

Project ID: 2263

Completion Year:2025

MTP Status: CandidateEstimated Cost: $5,427,422

Type:New Facility-RoadCounty:Snohomish County

Page 189: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SNOHOMISH COUNTYTitle: Riverfront/Interurban Connector

Description:Shared use bike path Not in local plansLocation / Facility:Riverfront/Interurban Connector

From:Planned Riverfront Trail

To:Everett City Limits

Project ID: 2679

Completion Year:2025

MTP Status: CandidateEstimated Cost: $499,323

Type:New Facility-RoadCounty:Snohomish County

Sponsor: SNOHOMISH COUNTYTitle: White Horse Trail

Description:Shared use bike path, currently gravel, future will be paved. Existing bridge structures will need to be decked and railed.Location / Facility:White Horse Trail

From:Intersection of White Horse Trail and the Centennial Trail north of Arlington

To:Darrington

Project ID: 2853

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $23,880,656

Type:New Facility-RoadCounty:Snohomish County

Page 190: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SNOQUALMIETitle: Meadowbrook Farm Trail Extension

Description:Shared use bike path In local plansLocation / Facility:Meadowbrook Farm Trail Extension

From:Planned Meadowbrook Trail southern terminus

To:Snoqualmie City Boundary

Project ID: 2676

Completion Year:2012

MTP Status: UnprogrammedEstimated Cost: $911,807

Type:New Facility-RoadCounty:King County

Sponsor: SNOQUALMIETitle: SR 202/Tokul Road Roundabout

Description:Intersections of Tokul Rd/SR 202 and Mill Pond Rd/SR 202 will be reconstructed and combined into a single lane modern roundaboutLocation / Facility:SR 202

From:SR 202/Tokul Road

To:-

Project ID: 4409

Completion Year:2014

MTP Status: CandidateEstimated Cost: $5,302,511

Type:New Facility-RoadCounty:King County

Page 191: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: Auburn Station improvements

Description:Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities, parking management and capacity expansion (up to 500 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.Location / Facility:Auburn Sounder Station

From:23 A St (Auburn)

To:

Project ID: 4081

Completion Year:2023

MTP Status: CandidateEstimated Cost: $41,265,569

Type:New Facility-RoadCounty:King County

Sponsor: SOUND TRANSITTitle: Bellevue Way HOV Lanes and Transit Priority

Description:Construct an inside southbound HOV lane and transit signal priority improvements between I-90 and the South Bellevue Park and Ride. The project will be designed and constructed in coordination with Sound Transit and will be designed to accommodate the potential extension of the HOV lane between the park and ride and the “Y” intersection between Bellevue Way and 112th Avenue SE.Location / Facility:Bellevue Way

From:South Bellevue P&R

To:I-90

Project ID: 3477

Completion Year:2015

MTP Status: ApprovedEstimated Cost: $5,327,868

Type:New Facility-RoadCounty:King County

Page 192: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: BNSF - Eastside

Description:Utilize the Eastside BNSF rail corridor from Snohomish - Woodinville to Renton/ Tukwila for Commuter RailLocation / Facility:Eastside BNSF alignment

From:Snohomish

To:Tukwila

Project ID: 5296

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $1,650,493,801

Type:New Facility-RoadCounty:Multicounty

Sponsor: SOUND TRANSITTitle: East Link light rail extension

Description:Light rail. Extension from International District/Chinatown Station to Overlake Transit Center. Stations at Rainier Ave S/I-90 (Rainier), 77th Ave SE/I-90 (Mercer Island), Bellevue Way SE/112th Ave SE (South Bellevue), Main St/112th Ave SE (East Main), NE 4th St/110th Ave NE (Bellevue Transit Center), NE 8th St/116th Ave NE (Hospital), NE 15th St/120th Ave NE (120th), NE 16th St/130th Ave NE (130th), and 152nd Ave NE/SR520 (Overlake Village). Construct up to 2000 parking spaces at three stations.Location / Facility:HCT Extension

From:Downtown Bellevue

To:Overlake Transit Center

Project ID: 2523

Completion Year:2021

MTP Status: ApprovedEstimated Cost: $3,284,228,474

Type:New Facility-RoadCounty:King County

Page 193: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: Edmonds Station

Description:Commuter Rail Station including two platforms, shelters for weather protection, off-street bus area, short-term parking, and about 150 parking spacesLocation / Facility:Sounder Commuter Rail

From:Edmonds Way / James Street @ BNSF RR

To:

Project ID: 4050

Completion Year:2011

MTP Status: CompletedEstimated Cost: $18,428,641

Type:New Facility-RoadCounty:Snohomish County

Sponsor: SOUND TRANSITTitle: Extension of Tacoma Link to Tacoma Community College with Tacoma Link Technology

Description:Construct a 5.5-mile at-grade extension of the existing Tacoma Link system from the 9th Street/Theater District Station in Downtown Tacoma to Tacoma Community College. Stations under consideration: stations at Stadium High School, Tacoma General Hospital (see project 5459), 6th/Sprague, the University of Puget Sound (on 6th), 6th/Stevens, 6th/Pearl, Tacoma Community College (S. 19th and Mildred in University Place). NOTE: This alignment is also subject to change, extension to Pacific Lutheran University (121st ST. S and Park Ave S in Parkland) is being considered. Undetermined which aligment will be chosen at this time but funded by ST2.Location / Facility:25th/Pacific/6th

From:Mary Bridge Children's Hospital

To:Tacoma Community College

Project ID: 4075

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $925,814,088

Type:New Facility-RoadCounty:Pierce County

Page 194: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: HCT Extension from South Bellevue to Issaquah

Description:HCT Corridor. COST ESTIMATE ASSUMES GRADE-SEPARATED AERIAL ALIGNMENT. PER-MILE AERIAL COST ESTIMATE USED. PROJECT COMPLETION POST-2027.Location / Facility:I-90 Corridor

From:S Bellevue

To:Issaquah

Project ID: 2529

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $1,650,622,756

Type:New Facility-RoadCounty:King County

Sponsor: SOUND TRANSITTitle: HCT Northgate to Bothell

Description:HCT (mode TBD) from Northgate to Bothell via Roosevelt, NE 125th St., SR 522Location / Facility:Roosevelt, NE 125th St., SR 522

From:Northgate

To:Bothell

Project ID: 5359

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $2,063,278,445

Type:New Facility-RoadCounty:King County

Page 195: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: HCT Redmond to UW

Description:New HCT alignment (mode and exact alignment TBD) starting from Redmond TC and generally following the Link LRT Extension from Overlake to Redmond (MTP 2524) but then following SR 520 to vicinity of the UW LRT station.Location / Facility:LRT new alignment (SR 520 corridor, N 45th St)

From:Redmond

To:UW

Project ID: 5294

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $2,063,278,445

Type:New Facility-RoadCounty:King County

Sponsor: SOUND TRANSITTitle: I-405 HCT Corridor from I-5 Interchange (Lynnwood) to Burien

Description:HCT Corridor. COST ESTIMATE ASSUMES GRADE-SEPARATED AERIAL ALIGNMENT. PER-MILE AERIAL COST ESTIMATE USED. PROJECT COMPLETION POST-2027. HAS ABSORBED 2528, 2531, AND 2532. Intersects the Central Link line between the Airport and downtown Seattle but does not serve the airport directly.Location / Facility:I-405 / SR 518 Corridor

From:I-5 / I-405 Interchange (Alderwood)

To:Burien Transit Center

Project ID: 2527

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $7,221,474,558

Type:New Facility-RoadCounty:King County

Page 196: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: I-90 Two-Way Transit & HOV Operations (Stage 2)

Description:Stage 2: This stage will design and construct (a) an eastbound HOV lane in the outer roadway between 80th Ave SE (Mercer Island) and Bellevue Way. Components of the project include: New HOV lane in the eastbound outer roadway; (b) 80th Ave SE HOV ramp modification to connect to the eastbound HOV lane; (c) Modification of Bellevue Way and I-405 HOV direct access from the eastbound HOV lane; (d) Eastbound I-90 to I-405 auxiliary lane extension west to East Mercer Way' and Variable speed limit system eastbound from 80th Ave SE to Bellevue Way. Location / Facility:I-90, I-405, Bellevue Way, Rainier Ave/I-5 in Seattle

From:80th Avenue SE (Mercer Island)

To: Bellevue Way / I-405

Project ID: 4276

Completion Year:2012

MTP Status: CompletedEstimated Cost: $48,204,585

Type:New Facility-RoadCounty:King County

Sponsor: SOUND TRANSITTitle: I-90 Two-Way Transit & HOV Operations (Stage 3)

Description:Stage 3: This stage will design and construct eastbound and westbound HOV lanes in the outer roadway between I-5 in Seattle and 80th Avenue SE in Mercer Island. Components of the project include: Mount Baker Ridge and First Hill Lid tunnel system improvementsLocation / Facility:I-90, 80th Avenue SE (Mercer Island)

From:Rainier Ave/I-5 in Seattle

To:80th Avenue SE (Mercer Island)

Project ID: 3658

Completion Year:2016

MTP Status: ApprovedEstimated Cost: $67,600,000

Type:New Facility-RoadCounty:King County

Page 197: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: Kent Station improvements

Description:Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities, parking management and capacity expansion (up to 450 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.Location / Facility:Kent Station P&R

From:SR 167

To:

Project ID: 2644

Completion Year:2023

MTP Status: CandidateEstimated Cost: $38,686,471

Type:New Facility-RoadCounty:King County

Sponsor: SOUND TRANSITTitle: Kirkland Transit Center(3rd Street Downtown)

Description:Provide a new transit center on 3rd Street between Central Way and Kirkland Avenue. The project will transform the existing bus facility into a regional transit hub with expanded bus capacity and routing options, improved waiting areas and passenger shelters, and enhanced pedestrian crossings. Signal, intersection, and traffic circulation improvements will increase bus speed and schedule reliability. Bicycle amenities, landscaping and public art are also elements of the project.Location / Facility:Transit Center

From:3rd Street between Central Way and Kirkland Avenue

To:

Project ID: 4160

Completion Year:2010

MTP Status: CompletedEstimated Cost: $18,477,105

Type:New Facility-RoadCounty:King County

Page 198: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: Lakewood Station improvements

Description:Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities, parking management and capacity expansion (up to 600 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.Location / Facility:Lakewood Station

From:Pacific Hwy SW near 47th Ave SW @ BNSF RR

To:

Project ID: 4086

Completion Year:2023

MTP Status: CandidateEstimated Cost: $47,713,314

Type:New Facility-RoadCounty:Pierce County

Sponsor: SOUND TRANSITTitle: Link LRT Extension from Federal Way Transit Center to South Federal Way

Description:Alignment and stations. From Federal Way TC (see #2525 for Fed Way TC info) to S 348th (vicinity: W side of I-5 and S. 348th).Location / Facility:I-5 Corridor

From:Federal Way Transit Center

To:South Federal Way

Project ID: 4088

Completion Year:2040

MTP Status: CandidateEstimated Cost: $486,517,450

Type:New Facility-RoadCounty:King County

Page 199: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: Link LRT Extension from Highline Community College to Redondo/Star Lake Station

Description:Alignment and Stations: From S 272nd St to Kent-DesMoines Rd (Near Highline CC). Location / Facility:SR 99 Corridor

From:Highline Community College

To:Redondo/Star Lake

Project ID: 5391

Completion Year:2023

MTP Status: CandidateEstimated Cost: $572,559,769

Type:New Facility-RoadCounty:King County

Sponsor: SOUND TRANSITTitle: Link LRT Extension from Lynnwood to Everett

Description:Light Rail extension. COST ESTIMATE ASSUMES GRADE-SEPARATED AERIAL ALIGNMENT. PER-MILE AERIAL COST ESTIMATE USED. PROJECT COMPLETION POST-2027.Location / Facility:I-5 Corridor Link LRT

From:Everett

To:Lynnwood Transit Center (202nd St SW & 46th Ave W)

Project ID: 2519

Completion Year:2040

MTP Status: CandidateEstimated Cost: $2,888,589,823

Type:New Facility-RoadCounty:Snohomish County

Page 200: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: Link LRT Extension from Overlake Transit Center to Redmond

Description:Alignment and Stations. East Link project from the Overlake Transit Center to downtown Redmond. This segment would have three stations at SR-202 @ SR-520 (SE Redmond), BNSF ROW @ ~ 165th Ave. NE (Redmond Town Center), 161st Ave. NE @ NE 83rd St. (Redmond TC)Location / Facility:Link LRT Extension

From:Overlake Transit Center

To:Redmond

Project ID: 2524

Completion Year:2030

MTP Status: CandidateEstimated Cost: $1,037,774,229

Type:New Facility-RoadCounty:King County

Sponsor: SOUND TRANSITTitle: Link LRT Extension from Port of Tacoma to Tacoma Dome

Description:HCT Corridor. COST ESTIMATE ASSUMES GRADE-SEPARATED AERIAL ALIGNMENT. PER-MILE AERIAL COST ESTIMATE USED. PROJECT COMPLETION POST-2027.Location / Facility:I-5 Corridor

From:Port of Tacoma

To:Tacoma Dome

Project ID: 2526

Completion Year:2040

MTP Status: CandidateEstimated Cost: $1,111,404,796

Type:New Facility-RoadCounty:Pierce County

Page 201: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: Link LRT Extension from Redondo/Star Lake Station to Federal Way Transit Center

Description:Alignment and Stations: Federal Way Transit Center (at S. 316/317th - track extends E from SR99 btwn 312th and 316th to meet the transit station) to S 272nd (272nd Street Station - S of 272nd to serve existing Redondo Heights P&R but opposite side of SR99 from P&R to be connected by ped bridge).Location / Facility:SR 99 Corridor

From:Redondo/Star Lake

To:Federal Way Transit Center

Project ID: 5392

Completion Year:2040

MTP Status: CandidateEstimated Cost: $541,610,592

Type:New Facility-RoadCounty:King County

Sponsor: SOUND TRANSITTitle: Link LRT Extension from SeaTac Airport to Highline Community College

Description:Alignment and Stations : Kent-DesMoines Rd (Near Highline CC) to S 200th St (Station). From 200th to SeaTac/ Airport StationLocation / Facility:SR 99 Corridor

From:SeaTac Airport Station

To:Highline Community College

Project ID: 2525

Completion Year:2020

MTP Status: ApprovedEstimated Cost: $959,424,477

Type:New Facility-RoadCounty:King County

Sponsor: SOUND TRANSITTitle: Link LRT Extension from South Federal Way to Port of Tacoma

Description:Alignment and stations. From S 348th St. to Port of Tacoma (station in vicinity between I-5 and 58th Ave).Location / Facility:I-5 Corridor

From:South Federal Way

To:Port of Tacoma

Project ID: 4089

Completion Year:2040

MTP Status: CandidateEstimated Cost: $819,383,186

Type:New Facility-RoadCounty:King County

Page 202: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: LRT Ballard, Seattle, W Seattle

Description:Light Rail from Ballard to Seattle CBD then to West Seattle (exact alignment TBD but potentially along previously studied monorail alignment)Location / Facility:LRT new alignment (TBD)

From:Ballard

To:West Seattle

Project ID: 5295

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $2,269,606,290

Type:New Facility-RoadCounty:King County

Sponsor: SOUND TRANSITTitle: LRT UW to Ballard

Description:New LRT alignment (exact alignment TBD) generally following Pacific St. from the UW LRT station to the U District, then along N 45th St. to Ballard (at 15th) Location / Facility:New LRT alignment

From:UW

To:Ballard

Project ID: 5345

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $618,983,534

Type:New Facility-RoadCounty:King County

Page 203: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: Lynnwood Link light rail extension

Description:Light rail. Extension from Northgate to Lynnwood. Potential stations at NE 130th St, NE 145th ST or NE 155th ST along I-5 (Jackson Park/North Seattle), NE 185th St/I-5 (Shoreline), 236th St SW or 220th St SW along I-5 (Montlake Terrace), and at or adjacent to Lynnwood Transit Center (Lynnwood). Construct up to 1500 parking spaces at four stations.Location / Facility:Link LRT Extension

From:Lynnwood Transit Center (202nd St SW & 46th Ave W)

To:Northgate

Project ID: 2520

Completion Year:2023

MTP Status: CandidateEstimated Cost: $1,894,353,222

Type:New Facility-RoadCounty:King County

Sponsor: SOUND TRANSITTitle: New Permanent Sounder Station at Edmonds Crossing

Description:This project would relocate the interim station at Edmonds to the permanent location and expand parking by up to 300 structured stalls for Sound Transit riders, in conjunction with Washington State Ferries' Edmonds Crossing multimodal terminal project.Location / Facility:Edmonds Crossing

From:11400 Block Admiral Way @ BNSF RR

To:

Project ID: 4072

Completion Year:2023

MTP Status: CandidateEstimated Cost: $33,758,921

Type:New Facility-RoadCounty:Snohomish County

Page 204: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: New Sounder Station at Broad Street

Description:Construct new station at the north end of the downtown Seattle core in the vicinity of Broad StreetLocation / Facility:Broad Street

From:Vicinity Broad Street@BNSF tracks

To:

Project ID: 4073

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $47,873,762

Type:New Facility-RoadCounty:King County

Sponsor: SOUND TRANSITTitle: New Station in North Sumner

Description:Construct a new Sounder station including station facilities, bus boarding area, and a surface parking lot with up to 400 stalls upon completion.Location / Facility:North Sumner Sounder Station

From:SW of East Valley Hwy / 8th St E @ BNSF RR (Sumner)

To:

Project ID: 4082

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $80,243,426

Type:New Facility-RoadCounty:Pierce County

Page 205: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: North Link light rail extension

Description:Light rail. Extension from University of Washington to Northgate. Stations at Brooklyn/NE 45th (U-District), 12th Ave NE/NE 65th St (Roosevelt), and Northgate Transit Center @ 1st Ave NE/NE 103rd St (Northgate). Construct up to 450 parking spaces at one station.Location / Facility:Link LRT Extension

From:Northgate

To:University of Washington Station

Project ID: 2492

Completion Year:2021

MTP Status: ApprovedEstimated Cost: $2,486,338,604

Type:New Facility-RoadCounty:King County

Sponsor: SOUND TRANSITTitle: Pacific Avenue at S.26th/South Tacoma Way Rail grade separation crossing

Description:Build a rail grade separation crossing on Pacific Avenue in Tacoma to eliminate construction of two new at-grade crossings at Pacific Avenue and South Tacoma Way and would substantially improve safety and capacity for future operating expansion of passenger train service along the rail corridor. Cost reflected in 4047.Location / Facility:Pacific Avenue@S 26th Street (downtown Tacoma)

From:S 26th St

To:S 26th St (over Pacific Ave)

Project ID: 4110

Completion Year:2010

MTP Status: CompletedEstimated Cost: $0

Type:New Facility-RoadCounty:Pierce County

Page 206: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: Parking Garage at Mukilteo Sounder Station

Description:Joint Development of a garage at the Mukilteo Sounder station. ST to provide funding to construct up to 130 additional structured parking stalls for Sounder riders in a joint-use parking garage developed as part of Washington State Ferries' Mukilteo Landing multimodal terminal project. See 808 for main terminal project.Location / Facility:Mukilteo Sounder Station

From:First St E of SR 525 (Mukilteo)

To:

Project ID: 4071

Completion Year:2023

MTP Status: CandidateEstimated Cost: $19,366,229

Type:New Facility-RoadCounty:Snohomish County

Sponsor: SOUND TRANSITTitle: Permanent Station at Tukwila

Description:Build permanent station facilities, bus loading area, and new parking facilities (400 new stalls) for a total of 620 stalls at the station upon completion. See also 3557 for Tukwila street access project.Location / Facility:Tukwila Sounder Station

From:Longacres Way @ BNSF RR (Tukwila)

To:

Project ID: 4080

Completion Year:2015

MTP Status: ApprovedEstimated Cost: $43,844,667

Type:New Facility-RoadCounty:King County

Page 207: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: Puyallup Station improvements

Description:Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities,parking management and capacity expansion (up to 600 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.Location / Facility:Puyallup Sounder Station

From:131 W Main St (Puyallup)

To:

Project ID: 4084

Completion Year:2023

MTP Status: CandidateEstimated Cost: $73,504,295

Type:New Facility-RoadCounty:Pierce County

Sponsor: SOUND TRANSITTitle: Renton HOV Access/N 8th

Description:Construct a direct-access HOV interchange on I-405 at North 8th Street in north Renton. PROJECT IMPLEMENTATION IS DEPENDENT ON WSDOT OBTAINING FUNDING FOR THE I-405 WIDENING PROJECT.Location / Facility:I-405 @ N 8th St

From:I-405@N 8th St.

To:

Project ID: 2372

Completion Year:2011

MTP Status: ApprovedEstimated Cost: $89,773,928

Type:New Facility-RoadCounty:King County

Page 208: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: S. 200th Park and Ride

Description:630 new stallsLocation / Facility:S. 200th Park and Ride

From:I-5 South

To:

Project ID: 2640

Completion Year:2020

MTP Status: ApprovedEstimated Cost: $0

Type:New Facility-RoadCounty:King County

Sponsor: SOUND TRANSITTitle: Sounder Commuter Rail Auburn-Tacoma Track & Signal

Description:Track and signal improvements.Location / Facility:Sounder Commuter Rail

From:Auburn

To:Tacoma

Project ID: 2502

Completion Year:2008

MTP Status: CompletedEstimated Cost: $255,330,708

Type:New Facility-RoadCounty:King County

Sponsor: SOUND TRANSITTitle: Sounder Lakewood to Dupont Extension

Description:Extension of service to DuPont, upgrade of track & signals between Lakewood and DuPont, and a new station at DuPont HAS ABSORBED 3314Location / Facility:Sounder Commuter Rail

From:Lakewood

To:Dupont

Project ID: 2533

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $161,542,687

Type:New Facility-RoadCounty:Pierce County

Page 209: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: Sounder South service expansion

Description:Expansion of Seattle-Tacoma-Lakewood Sounder service beyond the level provided in Sound Move, and related track and signal improvements along the Seattle/Tacoma Sounder line to support the service expansion. Up to 26 trains (13 round trips) in the south will be provided through agreements with the BNSF. Location / Facility:Sounder Commuter Rail

From:Seattle

To:Lakewood

Project ID: 4087

Completion Year:2023

MTP Status: CandidateEstimated Cost: $229,652,441

Type:New Facility-RoadCounty:Pierce County

Sponsor: SOUND TRANSITTitle: Sounder station in Ballard

Description:Sounder commuter rail. Construct new station (boarding platforms and related access improvements ) along north Sounder line at approximately NW 70th St in Ballard (Seattle).Location / Facility:Sounder Commuter Rail

From:NW 70th Block @ BNSF RR

To:

Project ID: 3311

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $43,199,892

Type:New Facility-RoadCounty:King County

Page 210: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: South Tacoma Station improvements

Description:Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities, parking management and capacity expansion (up to 400 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.Location / Facility:South Tacoma Station

From:S 56th St & Washington St (Tacoma)

To:

Project ID: 4085

Completion Year:2023

MTP Status: CandidateEstimated Cost: $49,002,863

Type:New Facility-RoadCounty:Pierce County

Sponsor: SOUND TRANSITTitle: Sumner Station improvements

Description:Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities, parking management and capacity expansion (up to 400 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.Location / Facility:Sumner Sounder Station

From:810 Maple St (Sumner)

To:

Project ID: 4083

Completion Year:2023

MTP Status: CandidateEstimated Cost: $51,581,961

Type:New Facility-RoadCounty:Pierce County

Page 211: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: Surface Parking Expansion at Tacoma Dome Station

Description:Construct a new surface parking lot with up to 300 stalls, for a total of 2,700 stalls upon completion.Location / Facility:Tacoma Dome Station

From:605 Puyallup Ave (Tacoma)

To:

Project ID: 4079

Completion Year:2023

MTP Status: CandidateEstimated Cost: $16,764,137

Type:New Facility-RoadCounty:Pierce County

Sponsor: SOUND TRANSITTitle: Tacoma Link light rail expansion

Description:Light rail. Expansion of existing Tacoma Link system. Places served include: Tacoma General and St. Joseph's medical campuses; mixed-use centers at Stadium High School.Location / Facility:new

From:UWT Station

To:Via Mary Bridge Hospital to MLK Jr. Way and 19th

Project ID: 5459

Completion Year:2023

MTP Status: CandidateEstimated Cost: $177,595,615

Type:New Facility-RoadCounty:Pierce County

Page 212: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SOUND TRANSITTitle: Tacoma-Lakewood Track & Signal

Description:Track and signal improvements needed to implement the Tacoma-to-Lakewood Commuter Rail project. May include a rail grade-separated overcrossing at Pacific Avenue and S 26th Street in downtown Tacoma listed in project 4110.Location / Facility:Sounder Commuter Rail

From:Tacoma

To:Lakewood

Project ID: 4047

Completion Year:2012

MTP Status: CompletedEstimated Cost: $232,118,825

Type:New Facility-RoadCounty:Pierce County

Sponsor: SOUND TRANSITTitle: University Link light rail extension

Description:Light rail. Extension from downtown Seattle transit tunnel to University of Washington. Stations at Broadway Ave/E John St (Capitol Hill) and Montlake Blvd/NE Pacific St (UW).Location / Facility:Link Light Rail

From:Westlake Station

To:University of Washington Station (stadium)

Project ID: 2493

Completion Year:2016

MTP Status: ApprovedEstimated Cost: $2,249,544,451

Type:New Facility-RoadCounty:King County

Sponsor: SOUTH PRAIRIETitle: Foothills Trail

Description:Shared use bike pathLocation / Facility:Foothills Trail

From:eastern city limits

To:western city limits

Project ID: 2814

Completion Year:2010

MTP Status: CandidateEstimated Cost: $868,387

Type:New Facility-RoadCounty:Pierce County

Page 213: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SUMNERTitle: Stewart Road (8th Street) Bridge

Description:Replace existing bridge over the White River with a four lane bridge The Stewart Road corridor provides service to West Valley Highway, East Valley Highway and SR-167 from Auburn, Pacific, Bonney Lake, Pierce County and Sumner. Stewart Road sees significant truck traffic from the industrial and manufacturing centers located in north Sumner and south Pacific. The existing bridge structure consists of two 12-foot lanes, with no shoulders, and has been classified as “functionally obsolete”. This project will replace the existing two lane bridge over the White River at Stewart Road. The bridge replacement will accommodate four lanes of traffic, two 12-foot center lanes, two 15-foot outer lanes to accommodate both motorized and bicycle traffic, a 6.5-foot sidewalk on the south side, and a 10.5-foot sidewalk on the north side of the roadway. The overall bridge width, with guardrail, will be approximately 74-feet. The overall bridge length will be approximately 260-feet. Location / Facility:Stewart Road (8th Street) in Sumner WA

From:East bank of the White River

To:West bank of the White River

Project ID: 4460

Completion Year:2018

MTP Status: CandidateEstimated Cost: $12,438,132

Type:New Facility-RoadCounty:Pierce County

Sponsor: SUMNERTitle: Stuck River Bridge

Description:Widen existing bridge to improve access to Sumner and SR-410 weaveLocation / Facility:Stuck River Bridge

From:Vicinity of Stuck River

To:

Project ID: 499

Completion Year:2016

MTP Status: UnprogrammedEstimated Cost: $15,533,696

Type:New Facility-RoadCounty:Pierce County

Page 214: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SUMNERTitle: Sumner Trail

Description:Construct multiuse trail on the east side of the Stuck River from the Tacoma Avenue Bridge to 24th Street E. This trail will provide access to the proposed Interurban and Foothill Trail extensions to the north and to the Foothills and Puyallup Trails to the south.Location / Facility:Sumner Pacific Trail Extension

From:Tacoma Avenue Bridge

To:24th Street

Project ID: 2684

Completion Year:2014

MTP Status: CandidateEstimated Cost: $6,202,768

Type:New Facility-RoadCounty:Pierce County

Sponsor: SUMNERTitle: Sumner Trail

Description:Construct multiuse trail on the east side of the Stuck River from the Stuck River Bridge on Stewart Road to 16th Street E in the City of Sumner. This project will include constructed a trail along the western edge of the golf course and constructing a pedestrian bridge over the Stuck River.Houston Road to 24th Street E. This trail will provide access to the proposed Interurban and Foothill Trail extensions to the north and to existing, developer-built trails on the west bank of the Stuck River to the south.Location / Facility:Sumner Pacific Trail

From:The Stuck River Bridge on Stewart Road

To:16th Street E

Project ID: 2913

Completion Year:2012

MTP Status: CompletedEstimated Cost: $5,427,422

Type:New Facility-RoadCounty:Pierce County

Page 215: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SUMNERTitle: Sumner Trail

Description:Construct multiuse trail on the east side of the Stuck River from the SR 410 overpass on State Street to the Tacoma Avenue Bridge. This trail will provide access to the proposed Interurban and Foothill Trail extensions to the north and to the Foothills and Puyallup Trails to the south.Location / Facility:Sumner Pacific Trail

From:SR 410 Overpass on State Street

To:Tacoma Avenue Bridge Terminus

Project ID: 2914

Completion Year:2014

MTP Status: CandidateEstimated Cost: $4,652,076

Type:New Facility-RoadCounty:Pierce County

Sponsor: SUMNERTitle: Traffic Ave/Puyallup Riv Bridge Replacement

Description:Widen Traffic Ave in Sumner and replace bridge across Puyallup River.Location / Facility:Traffic Ave/Puyallup Riv Bridge Replacement

From:Main (Sumner)

To:Puyallup

Project ID: 500

Completion Year:1998

MTP Status: CandidateEstimated Cost: $7,753,460

Type:New Facility-RoadCounty:Pierce County

Page 216: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: SUMNERTitle: West bound ramps Highway 410 and 166th Avenue E.

Description:Reconstruct West bound on and off ramps to tie into 64th Street East.Location / Facility:SR 410

From:SR 410 mile post 2.3

To:SR 410 mile post 2.8

Project ID: 4466

Completion Year:2018

MTP Status: CandidateEstimated Cost: $2,221,095

Type:New Facility-RoadCounty:Pierce County

Page 217: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: TACOMATitle: Brewery District Roadway Improvement

Description:This project will implement the “Complete Streets” concept in the area of south downtown known as the brewery district. Improvements will include bike lanes, sidewalks, street bulb outs, transit improvements, signalization improvements, channelization, stormwater improvements, utilities and more to transform several arterial streets into a multimodal network that improves efficiency for all modes of transportation. The project will improve connections to the LINK Light Rail transit center and to the Tacoma Dome Station, (Regional Transit Center).Location / Facility:Tacoma Brewery District

From:Pacific Avenue to Jefferson Street and from S. 19th Street to S. 25th Street

To:S. 19th St. and S. 21st St. also extend to Tacoma Avenue South

Project ID: 4432

Completion Year:2019

MTP Status: CandidateEstimated Cost: $22,210,951

Type:New Facility-RoadCounty:Pierce County

Sponsor: TACOMATitle: Historic Water Ditch Trail

Description:Phase II--construct a Class 1 trail aligned on Tacoma's flume line right-of-way along Clement Ave. The trail length is approximately 1.8 miles. Trail amenities include bike racks, signage, trash receptacles, benches, and lighting. An existing small parking lot at South 76th Street and Cedar Street will be bought up to standards and will include trailhead elements. Location / Facility:Tacoma's flume line right-of-way along Clement Ave

From:Washington Street/S. 43rd to S. 47th Street, South 56th to South 60th Street, and South 72nd to South Tacoma Way, Trail to Sounder Rail Station in South Tacoma along S. 58th Street

To:S. 80th at South Tacoma Way

Project ID: 2847

Completion Year:2013

MTP Status: CompletedEstimated Cost: $2,140,063

Type:New Facility-RoadCounty:Pierce County

Page 218: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: TACOMATitle: Historic Water Ditch Trail

Description:Phase I--construct a Class 1 trail aligned on Tacoma's flume line right-of-way along Clement Ave. Total trail length all phases is approximately 6.5 milesLocation / Facility:0

From:South 47th Street to South 56th Street, South 60th Street to South 72nd Street

To:-

Project ID: 4291

Completion Year:2009

MTP Status: CompletedEstimated Cost: $1,875,933

Type:New Facility-RoadCounty:Pierce County

Sponsor: TACOMATitle: Historic Water Ditch Trail Phase III

Description: Phase III --construct an active transportation shared use path adjacent to South Tacoma Way between S. Pine Street and S. M Street. Location / Facility:South Tacoma Way

From:S.Pine St.

To:S. M St.

Project ID: 4292

Completion Year:2018

MTP Status: CandidateEstimated Cost: $3,800,000

Type:New Facility-RoadCounty:Pierce County

Sponsor: TACOMATitle: Historic Water Ditch Trail Phase IV

Description: Phase IV -- construct an active transportation shared use path adjacent to South Tacoma Way from South M Street to South C Street. Location / Facility:South Tacoma Way

From:South M Street

To:South C Street

Project ID: 4293

Completion Year:2015

MTP Status: CandidateEstimated Cost: $2,489,828

Type:New Facility-RoadCounty:Pierce County

Page 219: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: TACOMATitle: Hylebos Bridge, on E. 11th Street corridor between Taylor Way and Marine View Drive

Description:Bridge ConstructionLocation / Facility:Hylebos Bridge

From:Taylor Way

To:Marine View Drive

Project ID: 4104

Completion Year:2011

MTP Status: CompletedEstimated Cost: $21,079,896

Type:New Facility-RoadCounty:Pierce County

Sponsor: TACOMATitle: Lincoln Ave Grade Separation

Description:Grade Separation. This project will construct a three-lane overpass on Lincoln Avenue from Thorne Road to Marc Avenue for a total length of 3,000 feet. The completion of the Lincoln Avenue Overpass will allow for the unimpeded movement of vehicles and trains that move freight and goods in the Port of Tacoma. The overpass will allow rail-switching activity to take place without compromising over the road freight movements between Port Terminals and other businesses in the Puget Sound Region and beyond. The bridge will be a 3-lane structure at the time of implementation in 2009, but will be built to support five lanes; the additional lanes are expected to be added based on capacity needs by 2015. The total cost for all phases of this project (2006 estimate) is $42.5 M.Location / Facility:Lincoln Ave

From:Thorne Ave

To:Marc Ave

Project ID: 3550

Completion Year:2011

MTP Status: CompletedEstimated Cost: $56,882,259

Type:New Facility-RoadCounty:Pierce County

Page 220: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: TACOMATitle: MLK Mixed Use Center Complete Streets Improvement Project

Description:This project will implement the “Complete Streets” concept in the area anchored by our two major healthcare facilities. Improvements will include bike lanes, sidewalks, street bulb outs, transit improvements, signalization improvements, channelization, stormwater improvements, utilities and more to transform several arterial streets into a multimodal network that improves efficiency for all modes of transportation. The project will improve connections to the LINK Light Rail transit center and to the Tacoma Dome Station, (Regional Transit Center).Location / Facility:MLK Jr. Way

From:MLK Jr. Way to J St. and from Division St. to S. 25th St.

To:-

Project ID: 4431

Completion Year:2019

MTP Status: CandidateEstimated Cost: $35,537,521

Type:New Facility-RoadCounty:Pierce County

Sponsor: TACOMATitle: Pacific Ave. Safety and Mobility Improvements

Description:Increase SOUNDER passenger rail capacity without degrading existing/future arterial capacity by grade separating the two travel modes.Location / Facility:Pacific Ave

From:S. 17th Street

To:S. 25th Street

Project ID: 4121

Completion Year:2013

MTP Status: CompletedEstimated Cost: $5,548,119

Type:New Facility-RoadCounty:Pierce County

Page 221: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: TACOMATitle: Pipeline Trail

Description:Multimodal trail on Pipeline ROW from E. 40th to south City limits at S. 72nd St. Location / Facility:Existing Roadways and existing Tacoma Water Pipeline Trail

From:Tacoma Dome Sounder Station

To:South City Limits

Project ID: 2827

Completion Year:2016

MTP Status: CandidateEstimated Cost: $4,143,898

Type:New Facility-RoadCounty:Pierce County

Sponsor: TACOMATitle: Prairie Line Trail

Description:Active transportation path in the heart of downtown Tacoma along the historic Prairie Line trail corridor from 400' south of S. 25th, through University of Washington Tacoma campus and down to the Foss Waterway. Location / Facility:Prairie Line Rail ROW

From:South Tacoma Way

To:Thea Foss Waterway

Project ID: 2688

Completion Year:2016

MTP Status: CandidateEstimated Cost: $5,919,854

Type:New Facility-RoadCounty:Pierce County

Sponsor: TACOMATitle: Puyallup Bridge F16A & F16B Replacement

Description:Bridge Construction, from 3 to 4 lanes.Location / Facility:Puyallup Ave/Ells Street

From:Portland Ave

To:Milwaukee Way

Project ID: 3648

Completion Year:2015

MTP Status: CandidateEstimated Cost: $47,358,831

Type:New Facility-RoadCounty:Pierce County

Page 222: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: TACOMATitle: Puyallup River Bridge Rehabilitation (F16C, F16D, F16E).

Description:Bridge Construction. Widen from 1 to 2 lanes WBLocation / Facility:Puyallup Ave/Ells Street

From:Portland Ave

To:Milwaukee Way

Project ID: 4105

Completion Year:2021

MTP Status: UnprogrammedEstimated Cost: $71,038,246

Type:New Facility-RoadCounty:Pierce County

Sponsor: TACOMATitle: Schuster Parkway Promenade

Description: Multimodal Trail along Schuster Parkway linking downtown Tacoma with Ruston Way and north end neighborhoods.Location / Facility:Thea Foss Esplanade to Ruston Way

From:McCarver

To:S 4th Street

Project ID: 5514

Completion Year:2020

MTP Status: CandidateEstimated Cost: $10,079,921

Type:New Facility-RoadCounty:Pierce County

Sponsor: TACOMATitle: Train To The Mountain Trail

Description:Shared use path from Tacoma to Mt. RainierLocation / Facility:Tacoma Rail ROW

From:Downtown Tacoma

To:Elbe

Project ID: 5507

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $96,716,177

Type:New Facility-RoadCounty:Pierce County

Page 223: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: TUKWILATitle: BNSF Intermodal Railyard Access

Description:Design and construct a new access to BNSF intermodal railyardLocation / Facility:BNSF Intermodal Railyard Access

From:[Not submitted]

To:

Project ID: 1294

Completion Year:2020

MTP Status: CandidateEstimated Cost: $5,295,613

Type:New Facility-RoadCounty:King County

Sponsor: TUKWILATitle: E Marginal Way

Description:Design and construct widening to 3 lanes including curbs, gutters, sidewalks, drainage, and pavingLocation / Facility:E Marginal Way

From:Boeing Access Road

To:S 112th St

Project ID: 1299

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $3,031,603

Type:New Facility-RoadCounty:King County

Sponsor: TUKWILATitle: Interurban Trail/Green River Trail

Description:Construct a bicycle and pedestrian trail between and Strander and Southcenter Blvds completing the Green River / Interurban trail between Alki and Flaming Geyser trail. Segment is expected to interface with future multimodal center.Location / Facility:Interurban Trail

From:Southcenter Blvd

To:Strander Blvd

Project ID: 3429

Completion Year:2010

MTP Status: CompletedEstimated Cost: $1,053,045

Type:New Facility-RoadCounty:King County

Page 224: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: TUKWILATitle: SR 99/ Pacific Highway South (Tukwila)

Description:Reconstruct existing roadway which is two (2) through lanes in each direction, a center two-way left turn lane, left and right turn lanes at intersections, and bus pullouts. Other improvements will include curb and gutter, sidewalks, landscaping, drainage, curb ramps, signing, illumination, burying of overhead utilities, traffic signal modifications, and interconnect.Location / Facility:0

From:S 152nd St

To:S 138th St

Project ID: 3431

Completion Year:2012

MTP Status: CompletedEstimated Cost: $11,513,188

Type:New Facility-RoadCounty:King County

Sponsor: TUKWILATitle: Tukwila International Blvd

Description:Design and construct widening including paving, curbs, gutters, sidewalks, drainageLocation / Facility:Tukwila International Blvd

From:Boeing Access Road

To:S 116th Way

Project ID: 1300

Completion Year:2018

MTP Status: UnprogrammedEstimated Cost: $4,652,076

Type:New Facility-RoadCounty:King County

Page 225: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: TUKWILATitle: Tukwila Station Access with 156th St to 16th Ave S Link

Description:The project will construct approximately 1500 feet of new roadway, curb, gutter and sidewalks, and rail bridges to pass under the BNSF and UP tracks; connecting S 156th St in Tukwila to 16th Ave in Renton. Projects 4051 and 4080 describe the accompanying rail station (for Sound Transit and Amtrak) and Park & Ride facilities. Express bus and light rail may also serve the site.Location / Facility:I-405

From:156th St

To:16th Ave S

Project ID: 3557

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $39,077,437

Type:New Facility-RoadCounty:King County

Sponsor: TUKWILATitle: Tukwila Urban Center Transit Center

Description:Construct Transit Center in the CBDLocation / Facility:Tukwila CBD Bus Transit Center

From:Strander Blvd

To:Tukwila Parkway

Project ID: 1303

Completion Year:2015

MTP Status: CompletedEstimated Cost: $15,506,919

Type:New Facility-RoadCounty:King County

Page 226: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: TULALIP TRIBESTitle: I-5 @ 116th Street NE Interchange

Description:This project replaces and upgrades a bottlenecked two signal diamond interchange overcrossing with a higher capacity Single Point Urban Interchange with one signal. Key project elements include adding an additional thru lane in each direction on 116th ST NE, widening of all interchange ramps and turn lanes, HOV bypass lanes on the on ramps, ramp metering, ITS equipment, replacement of the existing 3-lane overpass (116th ST NE) with an 8-lane bridge, bike lanes and sidewalks across I 5, and local road improvements.Location / Facility:I-5 (at 116th ST NE Interchange)

From:I-5 @ 116th Street NE I/C

To:#N/A

Project ID: 5429

Completion Year:2015

MTP Status: CandidateEstimated Cost: $39,140,941

Type:New Facility-RoadCounty:Snohomish County

Page 227: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WOODINVILLETitle: BNRP: Trestle Replacement and Sammamish Bridge Replacement

Description:Trestle Replacement: Widen existing roadway, including bridge sections, trestle removal, re-channelization, additional lanes, non-motorized improvements, signal and operational studies as needed to improve travel time and LOS. SBRP: Widen two-lane road and bridge section to provide additional lanes, curb-gutter, sidewalks and bike lanes for travel and queue storage.Location / Facility:SR 202

From:NE 175th

To:SR 522

Project ID: 2377

Completion Year:2011

MTP Status: CandidateEstimated Cost: $16,315,398

Type:New Facility-RoadCounty:King County

Sponsor: WOODINVILLETitle: SR 202 Corridor Widening Improvement

Description:Widening, bike and ped facilities, ped bridge, landscaping, widened to 3 lanesLocation / Facility:SR 202

From:NE 145th

To:SR 202 (NE 175th)

Project ID: 2383

Completion Year:2010

MTP Status: UnprogrammedEstimated Cost: $8,030,437

Type:New Facility-RoadCounty:King County

Page 228: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WOODINVILLETitle: SR 202 Intersection Corridor Improvement (CCRP)

Description:Rechannelization and reconfiguration of SR 202, including new turn pockets, widening, new traffic signal, and on-ramps, New connection between SR 202 and 175th. New ramp.Location / Facility:SR 202

From:NE 175th

To:NE 182nd

Project ID: 4019

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $49,521,026

Type:New Facility-RoadCounty:King County

Sponsor: WOODINVILLETitle: Woodinville Valley Trail

Description:Shared use bike path (exact location needs to be verified)Location / Facility:Woodinville Valley Trail

From:Tolt Pipeline Trail in vicinity of 145th

To:Tolt Pipeline Trail

Project ID: 2815

Completion Year:2010

MTP Status: CandidateEstimated Cost: $249,661

Type:New Facility-RoadCounty:King County

Sponsor: WOODINVILLETitle: Woodinville-Sno Rd Widening

Description:Widen existing two lanes to provide additional lanes, turn lanes, curb/gutter and bike lanes, street lighting and signal improvements, 2 lanes to 3 lanesLocation / Facility:Woodinville-Snohomish

From:NE 195th St

To:NE 205th St

Project ID: 4017

Completion Year:2015

MTP Status: UnprogrammedEstimated Cost: $4,282,900

Type:New Facility-RoadCounty:King County

Page 229: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WOODINVILLETitle: Woodinville-Sno Rd Widening

Description:Widen existing two lanes to provide an additional continuous left turn lane; also bike lanesLocation / Facility:Woodinville-Snohomish

From:NE 185th St

To:NE 195th St

Project ID: 4018

Completion Year:2012

MTP Status: UnprogrammedEstimated Cost: $4,015,218

Type:New Facility-RoadCounty:King County

Page 230: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: Bel-Red Regional Connectivity - SR 520 @ 124th I/C

Description:Pending Interchange Justification effort currently underway. Upgrade the interchange to provide additional access to and from the east and construct an auxilary lane each direction between 124th and 148th Ave. NE.Location / Facility:SR 520 @ 124th I/C

From:SR 520 @ 124th I/C

To:

Project ID: 4528

Completion Year:2025

MTP Status: CandidateEstimated Cost: $334,601,525

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: Cedar River Trail / Lake WA Blvd Connector

Description:Add ped / bike facilitiesLocation / Facility:Cedar River Trail / Lake WA Blvd Connector

From:Cedar River Trail

To:Lake Washington Blvd Loop

Project ID: 3541

Completion Year:2030

MTP Status: CandidateEstimated Cost: $6,357,837

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: Cedar-Duwamish Trail Connection

Description:Add ped / bike facilityLocation / Facility:Cedar-Duwamish Trail

From:I-405

To:Interurban Ave S

Project ID: 3542

Completion Year:2030

MTP Status: CandidateEstimated Cost: $3,721,661

Type:New Facility-RoadCounty:King County

Page 231: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: East D Street Slip Ramps at SR 509

Description:Construct a half diamond interchange at East D Street.Location / Facility:SR-509 and D Street

From:East D Street@SR 509

To:East D Street

Project ID: 4106

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $24,720,300

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: I-405 Corridor: Cedar River Trail S Extension

Description:Add ped / bike facilityLocation / Facility:Cedar River Trail S

From:I-405

To:Burnett Ave

Project ID: 3540

Completion Year:2030

MTP Status: CandidateEstimated Cost: $6,692,030

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: Green River Crossing

Description:(b) Rebuilds the Green River crossing.Location / Facility:I-405 @ Green River Crossing

From:I-405 @ Green River Crossing

To:

Project ID: 4304

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $35,844,435

Type:New Facility-RoadCounty:King County

Page 232: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: I-405 / SR 167 Trail Connection

Description:Add trail connectionLocation / Facility:I-405 / SR 167 Trail

From:Lind Ave SE

To:Talbot Rd S

Project ID: 3543

Completion Year:2030

MTP Status: CandidateEstimated Cost: $5,892,629

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: I-405 interchange at 132nd St. NE

Description:Build half diamond interchange to and from north at the NE 132nd St. Location / Facility:I-405 @ NE 132nd St

From:I-405 @ NE 132nd St

To:

Project ID: 4148

Completion Year:2025

MTP Status: CandidateEstimated Cost: $29,664,360

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: I-405/I-90 HOV/HOT connections

Description:WB I-90 to NB I-405 Freeway to Freeway HOV/HOT ConnectionLocation / Facility:I-405 @ I-90 I/C

From:I-405 @ I-90 I/C

To:

Project ID: 5441

Completion Year:2030

MTP Status: CandidateEstimated Cost: $127,309,545

Type:New Facility-RoadCounty:King County

Page 233: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: I-405@I-5 bike/ped facility via or around I-405@I-5 Interchange

Description:Add ped / bike facilityLocation / Facility:I-405

From:I-5

To:

Project ID: 3544

Completion Year:2030

MTP Status: CandidateEstimated Cost: $3,721,661

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: I-5 Improvements

Description:(g) Reconstructs NB I-5 through the interchange.Location / Facility:I-5

From:I-5 through I-405 I/C

To:

Project ID: 4363

Completion Year:2030

MTP Status: CandidateEstimated Cost: $70,452,855

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: I-5 Interchange

Description:(a) Reconstruct the following I-5/I-405 Interchange ramps: NB I-5 to NB I-405 (c) adds new GP direct connector flyover ramp from SB I-405 to SB I-5 (d) SB I-5 to NB I-405Location / Facility:I-405 @ I-5 I/C

From:I-405 @ I-5 I/C

To:

Project ID: 4360

Completion Year:2030

MTP Status: CandidateEstimated Cost: $140,905,711

Type:New Facility-RoadCounty:King County

Page 234: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: I-5 to SR 169 - Stg. 2 (SR 167 to SR 169: Widening)

Description:SR 167 to SR 169: (a) Widens I-405 from SR 167 to SR 169 by one lane NB and SB resulting in 4 lanes (1 HOV, 2 GP & 1 Aux.) in each direction. Minimizes investments in non-future compatible elements by using some non-standard lanes and shoulders. Location / Facility:I-405

From:SR 167

To:SR 169

Project ID: 4311

Completion Year:2011

MTP Status: CompletedEstimated Cost: $173,042,101

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: I-5 to SR 169 - Stg. 2 (Benson Crossing)

Description:(c) Reconstruct the Benson Rd. crossing. Cost included in 4311.Location / Facility:0

From:I-405 @ Benson

To:-

Project ID: 4313

Completion Year:2011

MTP Status: CompletedEstimated Cost: $0

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: I-5 to SR 169 (Rainier Ave HOV direct access)

Description:(l) Add HOV direct access ramp in vicinity of Rainier Ave S. Location / Facility:I-405 @ Rainier Ave I/C

From:I-405 @ Rainier Ave I/C

To:

Project ID: 4368

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $35,844,435

Type:New Facility-RoadCounty:King County

Page 235: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: I-5 to SR 169 (SR 167 component)

Description:(n) SR 167 - Add one lane NB and SB from SW 41st to I-405 resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP). Location / Facility:SR 167

From:SW 41st St

To:I-405

Project ID: 4369

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $0

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: I-5 to SR 169 (SR 167 I/C and HOV direct access)

Description:SR 167 Interchange: (k) Add GP direct connection ramp from SR 167 NB to I-405 SB. (m) Add NB and SB HOV flyover direct connector ramps connecting I-405 HOV lanes south of SR 167 I/C and SR 167 HOV/HOT lanes. Location / Facility:I-405 @ SR 167 I/C

From:I-405 @ SR 167 I/C

To:

Project ID: 4367

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $530,250,437

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: I-5 to SR 169 (SR 181 direct access)

Description:(j) HOV direct access in SR 181 vicinity south of I-405. Location / Facility:I-405 @ SR 181I/C

From:I-405 @ SR 181I/C

To:

Project ID: 4366

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $140,905,711

Type:New Facility-RoadCounty:King County

Page 236: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: I-5 to SR 169 Widening Stage 1 (SR 167 component)

Description:(c) On SR 167, extend the SB HOV lane north to I-405 and add a SB auxiliary lane from I-405 to the off-connection at SW 41st St.Location / Facility:0

From:SW 41st St

To:I-405

Project ID: 4302

Completion Year:2010

MTP Status: CompletedEstimated Cost: $5,847,067

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: I-5 to SR 181 Widening

Description:(h) Add one lane NB and SB resulting in 5 lanes (1 HOV & 4 GP) between I-5 and SR 181Location / Facility:I-405

From:I-5

To:SR 181

Project ID: 4364

Completion Year:2030

MTP Status: CandidateEstimated Cost: $140,905,711

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: I-5/ I-405 HOV direct connector ramps

Description:(f) adds HOV direct connector ramps between I-405 and I-5 in all directions. Location / Facility:I-405 @ I-5 I/C

From:I-405 @ I-5 I/C

To:

Project ID: 4362

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $705,764,568

Type:New Facility-RoadCounty:King County

Page 237: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: I-90 I/C and braided ramps

Description:(a) Add NB I-405 to EB I-90 and (b) EB I-90 to SB I-405 braided ramps between Coal Ck Pkwy. and I-90. Location / Facility:I-405 @ I-90 I/C

From:I-405 @ I-90 I/C

To:I-90

Project ID: 4330

Completion Year:2030

MTP Status: CandidateEstimated Cost: $229,898,791

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: I-90 to NE 6th Street (widening)

Description:Add one lane NB and SB between I-90 and NE 6th Street resulting in 6 lanes NB and SB.Location / Facility:I-405

From:I-90

To:SR 520

Project ID: 4336

Completion Year:2030

MTP Status: ROW Conditionally ApEstimated Cost: $43,260,525

Type:Major Widening-GPCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: I-90 to SR 520 (114th Ave NE ramps)

Description:(d) Modify ramps to accommodate lane addition and reconstruct and close a portion of 114th Ave NE. Costs included in 4382.Location / Facility:I-405 @ 114th Ave NE

From:I-405 @ 114th Ave NE

To:

Project ID: 4339

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $0

Type:New Facility-RoadCounty:King County

Page 238: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: I-90 to SR 520 (Main St. Bridge component)

Description:(b) Reconstruct the Main Street bridge. Cost included in 4336.Location / Facility:I-405 @ Main St bridge

From:I-405 @ Main St bridge

To:

Project ID: 4337

Completion Year:2030

MTP Status: ROW Conditionally ApEstimated Cost: $70,452,855

Type:Bridge ReplaceCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: I-90 to SR 520 (SE 8th braided ramps)

Description:(c) Construct NB and SB braided crossings for the on and off ramps on the north legs of the SE 8th St Interchange. Location / Facility:I-405 @ SE 8th St I/C

From:I-405 @ SE 8th St I/C

To:

Project ID: 4338

Completion Year:2030

MTP Status: CandidateEstimated Cost: $239,786,911

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: NE 10th I/C

Description:(b) Includes the EB SR 520 off-ramp to NE 10th.Location / Facility:SR 520 @ NE 10th I/C

From:SR 520 @ NE 10th I/C

To:

Project ID: 4345

Completion Year:2030

MTP Status: CandidateEstimated Cost: $70,452,855

Type:New Facility-RoadCounty:King County

Page 239: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: NE 10th ramp

Description:(c) Includes constructing the NE 10th to EB SR 520 ramp. Location / Facility:SR 520 @ NE 10th I/C

From:SR 520 @ NE 10th I/C

To:

Project ID: 4341

Completion Year:2012

MTP Status: CompletedEstimated Cost: $936,210

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: NE 12th improvements

Description:(e) Requires replacement of the NE 12th structure and ramp and collector distributor revisions on EB SR 520. Location / Facility:I-405 @ NE 12th structure/ SR 520

From:I-405 @ NE 12th structure/ SR 520

To:

Project ID: 4343

Completion Year:2012

MTP Status: CompletedEstimated Cost: $936,210

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: NE 2nd St

Description:(e) NE 2nd St.: Construct half-diamond interchange with ramps to and from the south. Costs included in 4382.Location / Facility:I-405 @ NE 2nd St I/C

From:I-405 @ NE 2nd St I/C

To:

Project ID: 4380

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $0

Type:New Facility-RoadCounty:King County

Page 240: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: NE 4th to SR 520 and NE 8th to SR 520 -NB Braided Ramps

Description:(a) Construct NB to SR 520 EB braided ramp to separate NB I-405 to EB SR 520 off-ramp from NE 8th to NB I-405 on-ramp and (b) Separating I-405 to EB SR 520 traffic from SR 520 EB off-ramp to 124th Ave NE traffic. (d) Adds one NB auxiliary lane from NE 4th to SR 520. (f) Convert WB SR 520 to SB I-405 ramp to auxiliary lane.Location / Facility:I-405 @ SR 520 I/C

From:I-405 @ SR 520 I/C

To:#N/A

Project ID: 4340

Completion Year:2012

MTP Status: CompletedEstimated Cost: $274,295,023

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: NE 6th Street to SR 520 (widening):

Description:Add one lane NB and SB between NE 6th Street and SR 520 resulting in 6 lanes NB and SB.Location / Facility:I-405

From:NE 6th St

To:SR 520

Project ID: 4479

Completion Year:2020

MTP Status: CandidateEstimated Cost: $18,540,225

Type:Major Widening-GPCounty:King County

Page 241: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: NE 85th - NE 124th

Description:(h) NE 85th to NE 116th: Add one lane NB and SB resulting in 6 lanes (1 HOV, 4 GP & 1 Aux. or 2 HOV, 3 GP & 1 Aux.) in each direction including Managed Lanes buffer. (i) NE 116th to NE 124th: Add one lane NB and SB resulting in 6 lanes (1 HOV, 4 GP & 1 Aux. or 2 HOV, 3 GP & 1 Aux.) in each direction including Managed Lanes buffer.Location / Facility:I-405

From:NE 85th

To:NE 124th

Project ID: 4351

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $38,316,465

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: NE 8th St

Description:(f) NE 8th St.: Revise NE 8th Interchange configuration. Costs included in 4382.Location / Facility:I-405 @ NE 8th St I/C

From:I-405 @ NE 8th St I/C

To:

Project ID: 4381

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $0

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: NE 8th to SR 520 - SB Braided Ramps

Description:(a) Construct SB braided ramp to separate SB I-405 to NE 8th and EB SR 520 to NE 10th traffic from EB SR 520 to SB I-405 traffic.Location / Facility:I-405 @ SR 520 I/C

From:I-405 @ SR 520 I/C

To:

Project ID: 4344

Completion Year:2030

MTP Status: CandidateEstimated Cost: $70,452,855

Type:New Facility-RoadCounty:King County

Page 242: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 167 Direct HOV Ramps

Description:SR 167 Interchange: Construct NB and SB HOV flyover ramps directly connecting SR 167 HOV/HOT lanes with I-405 HOV lanes north of the SR 167 Interchange. (a) Provides SB I-405 HOV/HOT to SB SR 167 HOV/HOT and (b) NB SR 167 HOV/HOT to NB I-405 HOV/HOT.Location / Facility:I-405

From:SR 167

To:SR 167

Project ID: 4133

Completion Year:2018

MTP Status: ApprovedEstimated Cost: $396,203,923

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 167 Interchange

Description:(a) Add one GP lane NB and SB through the SR 167 Interchange resulting in 1 HOV and 3 GP lanes in each direction.Location / Facility:I-405 @ SR 167 I/C

From:I-405 @ SR 167 I/C

To:

Project ID: 4306

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $35,844,435

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 167 Interchange

Description:(d) Construct GP ramp connecting I-405 SB to SR 167 SB.Location / Facility:I-405 @ SR 167 I/C

From:I-405 @ SR 167 I/C

To:

Project ID: 4309

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $106,297,290

Type:New Facility-RoadCounty:King County

Page 243: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 167 Interchange (Lind half-diamond component)

Description:(b) Construct half-diamond interchange at Lind Ave.Location / Facility:I-405 @ Lind Ave

From:I-405 @ Lind Ave

To:

Project ID: 4307

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $70,452,855

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 167 Interchange (Lind to Talbot frontage roads)

Description:(c) Construct NB and SB frontage roads connecting half-diamond interchanges at Lind and Talbot (SR 515).Location / Facility:Frontage roads parallel to I-405

From:Lind

To:Talbot (SR 515)

Project ID: 4308

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $17,304,210

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 167 Interchange (SR 167 component)

Description:(e) Add one NB lane on SR 167 between S 180th (SW 43rd) and I-405 resulting in 4 lanes (1 HOV and 3 GP).Location / Facility:SR 167

From:S 180th (SW 43rd)

To:I-405

Project ID: 4310

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $61,800,750

Type:New Facility-RoadCounty:King County

Page 244: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 167 to SR 169 Widening

Description:(a) Rebuilds I-405 to Master Plan resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP) in each direction. Includes the 4 ft. HOV buffer. Location / Facility:I-405

From:SR 167

To:SR 169

Project ID: 4314

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $194,040,760

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 167 to SR 169 Widening

Description: (b) Rebuilds the SR 169 Interchange.Location / Facility:I-405 @ SR 169 I/C

From:I-405 @ SR 169 I/C

To:

Project ID: 4315

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $87,757,065

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 167 to SR 169 Widening (BNRR and Cedar Bridge crossings)

Description:(d) Reconstructs the bridge over the Cedar R and realigns and reconstructs the BNRR over the Cedar River.Location / Facility:I-405 @ Cedar River crossing

From:I-405 @ Cedar River crossing

To:

Project ID: 4317

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $123,601,500

Type:New Facility-RoadCounty:King County

Page 245: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 167 to SR 169 Widening (Renton Hill access component)

Description:(c) Reconstructs access to Renton Hill. Location / Facility:unknown

From:unknown

To:

Project ID: 4316

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $35,844,435

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 169 Direct Connection Ramp

Description:(a) Construct NB SR 169 to NB I-405 direct connection ramp. Location / Facility:I-405 @ SR 169 I/C

From:I-405 @ SR 169 I/C

To:

Project ID: 4373

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $35,844,435

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90

Description:(b) Modify or rebuild N 3rd St. I/C (to accommodate future direct ramp to SR 169); Cost includes part of the 4318 widening through this segment.Location / Facility:I-405 @ N 3rd St

From:I-405 @ N 3rd St

To:

Project ID: 4320

Completion Year:2020

MTP Status: ROW Conditionally ApEstimated Cost: $247,203,001

Type:Major Interchange-GPCounty:King County

Page 246: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (112th St I/C component)

Description:(f) Modify or rebuild 112th St I/C (to accommodate future flyer stop and park & ride expansion). Cost includes part of the 4318 widening through this segment.Location / Facility:I-405 @ 112th St I/C

From:I-405 @ 112th St I/C

To:

Project ID: 4324

Completion Year:2020

MTP Status: ROW Conditionally ApEstimated Cost: $144,613,756

Type:Major Interchange-HOVCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (Coal Creek Pkwy component NB lane)

Description:Add 1 NB GP/Aux lane between 112th and I-90Location / Facility:I-405

From:112th St

To:I-90

Project ID: 4478

Completion Year:2025

MTP Status: CandidateEstimated Cost: $71,688,870

Type:Major Widening-GPCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (Coal Creek Pkwy Component)

Description:(g) Modify or rebuild Coal Ck Pkwy I/C; add SB lane and rebuild the existing roadway half way to the 112th St interchanges in the south and all the way to I-90 in the north. Cost includes part of the 4318 widening through this segment.Location / Facility:I-405 @ Coal Creek Pkwy

From:I-405 @ Coal Creek Pkwy

To:

Project ID: 4325

Completion Year:2025

MTP Status: ROW Conditionally ApEstimated Cost: $71,688,870

Type:Major Interchange-GPCounty:King County

Page 247: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (Lk Wa bike path realignment)

Description:(l) Realignment and reconstruction of Lk. Washington bike path.Location / Facility:Lk. Washington bike path

From:SR 169

To:I-90

Project ID: 4329

Completion Year:2020

MTP Status: ROW Conditionally ApEstimated Cost: $15,506,919

Type:Regional Trail (Sep.)County:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (NE 30th I/C component)

Description:(d) Modify or rebuild NE 30th I/C. Cost includes part of the 4318 widening through this segment. Cost includes part of the 4318 widening through this segment.Location / Facility:I-405 @ NE 30th St

From:I-405 @ NE 30th St

To:

Project ID: 4322

Completion Year:2020

MTP Status: ROW Conditionally ApEstimated Cost: $144,613,756

Type:Major Interchange-GPCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (NE 44th I/C component)

Description:(e) Modify or rebuild NE 44th I/C (to accommodate future HOV Direct Access); Cost includes part of the 4318 widening through this segment.Location / Facility:I-405 @ NE 44th I/C

From:I-405 @ NE 44th I/C

To:

Project ID: 4323

Completion Year:2020

MTP Status: ROW Conditionally ApEstimated Cost: $247,203,001

Type:Major Interchange-HOVCounty:King County

Page 248: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (SR 169 Direct Connection Ramp)

Description:(i) Construct SB I-405 to SB SR 169 direct connection ramp. Cost includes part of the 4318 widening through this segment.Location / Facility:I-405 @ SR 169 I/C

From:I-405 @ SR 169 I/C

To:

Project ID: 4326

Completion Year:2020

MTP Status: ROW Conditionally ApEstimated Cost: $95,173,155

Type:Major Interchange-GPCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (SR 900 I/C component)

Description:(c) Modify or rebuild SR 900 I/C; Cost includes part of the 4318 widening through this segment.Location / Facility:I-405 @ SR 900 I/C

From:I-405 @ SR 900 I/C

To:

Project ID: 4321

Completion Year:2020

MTP Status: ROW Conditionally ApEstimated Cost: $206,414,506

Type:Major Interchange-GPCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (widening)

Description:(a) Add lanes NB and SB and rebuild the existing roadway from SR 169 to I-90, including the 4 ft. HOV buffer, resulting in 6 lanes (1 HOV & 4 GP & 1 Aux or 2 HOV & 3 GP & 1 Aux) in both directions. Costs of this widening are split between the various interchange projects (4320, 4321, 4322, 4323, 4324, 4325 and 4326).Location / Facility:I-405

From:SR 169

To:I-90

Project ID: 4318

Completion Year:2020

MTP Status: ROW Conditionally ApEstimated Cost: $0

Type:Major Widening-GPCounty:King County

Page 249: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 181 I/C

Description:(c) Rebuilds the SR 181 Interchange.Location / Facility:I-405 @ SR 181

From:I-405 @ SR 181

To:

Project ID: 4305

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $140,905,711

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 181 to SR 167

Description:(i) 6 lanes (1 HOV, 4 GP & 1 Aux.) between SR 181 and SR 167 in each direction. Location / Facility:I-405

From:SR 181

To:SR 167

Project ID: 4365

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $283,047,436

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 181 to SR 167 Widening

Description:(a) Rebuilds I-405 adding one auxiliary lane NB and SB from SR 181 to the SR 167 I/C resulting in 5 lanes (1 HOV, 3 GP & 1 Aux.) in each direction in this section. I-5 to SR 181 remains at 4 lanes (1 HOV & 3 GP) each direction. Includes the 4 ft. HOV buffer from SR 181 to SR 167. Location / Facility:I-405

From:SR 181

To:SR 167

Project ID: 4303

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $106,297,290

Type:New Facility-RoadCounty:King County

Page 250: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 515/Talbot half diamond

Description:(b) Constructs the SR 515 (Talbot Rd.) half diamond interchange which is a first phase of the redevelopment of the SR 167 Interchange. Provides SR 515 to NB I-405 and SB I-405 to SR 515 movements. Cost included in 4311.Location / Facility:0

From:I-405 @ SR 515/Talbot Rd

To:-

Project ID: 4312

Completion Year:2011

MTP Status: CompletedEstimated Cost: $0

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 518 Interchange

Description:(b) Reconstruct of the following Interchange ramps: EB SR 518 to NB I-5, (e) EB SR 518 to SB I-5 Location / Facility:I-405 @ SR 518 I/C

From:I-405 @ SR 518 I/C

To:

Project ID: 4361

Completion Year:2030

MTP Status: CandidateEstimated Cost: $140,905,711

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 Interchange

Description:Rebuild the interchange to include direct HOV connectors in the SE quadrant. This requires shifting the NB I-405 and EB SR 520 mainline lanes to accommodate this rebuild.Location / Facility:I-405 @ SR 520 I/C

From:I-405 @ SR 520 I/C

To:

Project ID: 4383

Completion Year:2040

MTP Status: CandidateEstimated Cost: $355,314,016

Type:New Facility-RoadCounty:King County

Page 251: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 Interchange (HOV direct connection ramps)

Description:(g) Rebuild the interchange to include direct HOV connectors in the NW and SW quadrants. Location / Facility:I-405 @ SR 520 I/C

From:I-405 @ SR 520 I/C

To:

Project ID: 4382

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $1,320,865,755

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to I-5 Widening

Description:(a) Add one lane SB from SR 520 to NE 85th St resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP) in this section. Cost included in 4354.Location / Facility:I-405

From:SR 520

To:NE 85th

Project ID: 4352

Completion Year:2015

MTP Status: ROW Conditionally ApEstimated Cost: $0

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to I-5 Widening (NB NE 195th to SR 527)

Description:(e) Add one NB lane from between NE 195th St. and SR 527 resulting in 4 lanes (1 HOV & 3 GP) in this section and includes Managed Lanes buffer. Location / Facility:0

From:NE 195th St

To:SR 527

Project ID: 4356

Completion Year:2010

MTP Status: CompletedEstimated Cost: $43,962,153

Type:New Facility-RoadCounty:King County

Page 252: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to I-5 Widening (NB NE 70th to NE 85th)

Description:(b) Add one lane NB between NE 70th and NE 85th Streets resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP) in this section. Cost included in 4354.Location / Facility:I-405

From:NE 85th

To:NE 70th

Project ID: 4353

Completion Year:2015

MTP Status: ROW Conditionally ApEstimated Cost: $0

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to I-5 Widening (NE 124th to SR 522)

Description:(c) Add one lane NB and SB from NE 124th St. to SR 522 resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP) in each direction. Includes Managed Lanes buffer. Managed Lanes: Should the decisions be made to implement Managed Lanes they could be incorporated Location / Facility:I-405

From:NE 124th St

To:SR 522

Project ID: 4354

Completion Year:2015

MTP Status: ApprovedEstimated Cost: $391,816,756

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to I-5 Widening (NE 132nd structures)

Description:(d) Rebuild the structures over NE 132nd St. Cost included in 4354.Location / Facility:I-405 @ NE 132nd St

From:I-405 @ NE 132nd St

To:

Project ID: 4355

Completion Year:2025

MTP Status: ApprovedEstimated Cost: $0

Type:New Facility-RoadCounty:King County

Page 253: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522

Description:(e) SR 522: Add SB climbing auxiliary lane through NE 160th Interchange to SR 522. Location / Facility:I-405

From:NE 160th I/C

To:SR 522

Project ID: 4390

Completion Year:2020

MTP Status: ApprovedEstimated Cost: $16,068,195

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (aux lanes)

Description:(a) Add NB and SB auxiliary lanes from SR 520 to NE 70th including Managed Lanes buffer. Location / Facility:I-405

From:SR 520

To:NE 70th

Project ID: 4346

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $30,900,375

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (Central Kirkland Transit Station)

Description:(h) Transit/HOV: Central Kirkland Transit Station. Location / Facility:Central Kirkland Transit Station

From:Central Kirkland Transit Station

To:

Project ID: 4393

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $40,965,693

Type:New Facility-RoadCounty:King County

Page 254: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (NB Aux lane NE 160th to NE 195th)

Description:(g) Add NB auxiliary lane extending from NE 160th to NE 195th. Location / Facility:I-405

From:NE 160th

To:NE 195th

Project ID: 4392

Completion Year:2020

MTP Status: CandidateEstimated Cost: $24,720,300

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (NE 124th I/C)

Description:(c) Reconfigure and rebuild the NE 124th St. Interchange. Location / Facility:I-405 @ NE 124th St I/C

From:I-405 @ NE 124th St I/C

To:

Project ID: 4388

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $306,494,997

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (NE 160th I/C)

Description:(d) Rebuild the NE 160th St. Interchange. Location / Facility:I-405 @ NE 160th St I/C

From:I-405 @ NE 160th St I/C

To:

Project ID: 4389

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $60,564,735

Type:New Facility-RoadCounty:King County

Page 255: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (NE 70th I/C)

Description:(c) Reconfigure and rebuild the NE 70th and NE 85th Interchanges including HOV bypasses. Rebuilding of NE 70th requires abandonment of the Houghton Park & Ride.Location / Facility:I-405 @ NE 70th I/C and NE 85th I/C

From:I-405 @ NE 70th I/C and NE 85th I/C

To:

Project ID: 4348

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $247,203,001

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (NE 85th I/C connections and direct access)

Description:(d) Construct HOV direct access at NE 85th (g) Improve NE 85th connection to I-405 from Kirkland Way to 148th Ave NE including transit and HOV queue bypass and upgrade arterial. Location / Facility:NE 85th IC and I-405 @ NE 85th I/C

From:Kirkland Way

To:148th

Project ID: 4349

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $24,720,300

Type:New Facility-RoadCounty:King County

Page 256: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (SR 522 I/C and HOV direct access)

Description:(f) SR 522 Interchange Rebuild: Reconfigure and rebuild the SR 522 Interchange. The existing SR 522 WB to I-405 SB ramp will remain. Include HOV direct connection in center. Location / Facility:I-405 @ SR 522 I/C

From:I-405 @ SR 522 I/C

To:

Project ID: 4391

Completion Year:2020

MTP Status: CandidateEstimated Cost: $577,219,007

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (Widening - SR 520 to NE 124th St)

Description:(b) Add one lane NB and SB resulting in 6 lanes (1 HOV, 4 GP & 1 Aux. or 2 HOV, 3 GP & 1 Aux.) in each direction.Location / Facility:I-405

From:SR 520

To:NE 124th St

Project ID: 4387

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $152,578,295

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (240th St. SE direct access ramp)

Description:(d) Construct direct access ramp to 240th St. SE. Location / Facility:I-405 @ 240th St SR I/C

From:I-405 @ 240th St SR I/C

To:

Project ID: 4399

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $123,601,500

Type:New Facility-RoadCounty:Snohomish County

Page 257: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (Canyon Park Transit Station)

Description:(j) Canyon Park Transit Station, Location / Facility:Canyon Park Transit Station

From:Canyon Park Transit Station

To:

Project ID: 4403

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $40,965,693

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (Direct Access to Canyon Park P&R)

Description:(e) Construct direct access to the Canyon Park - Park & Ride. Location / Facility:I-405 @ Canyon Park - Park & Ride

From:I-405 @ Canyon Park - Park & Ride

To:

Project ID: 4400

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $56,856,690

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (DT Woodinville Transit Center)

Description:(l) Downtown Woodinville Transit Center, Location / Facility:Downtown Woodinville Transit Center

From:Downtown Woodinville Transit Center

To:

Project ID: 4405

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $40,965,693

Type:New Facility-RoadCounty:King County

Page 258: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (I-5 north/ I-405 I/C and HOV direct access ramps)

Description:(g) Construct HOV direct connection ramps connecting I-405 managed lanes with I-5 HOV lanes north and south of the I-5 Interchange. (h) Reconfigure the NB I-405 to NB I-5 from 1 lane to a 2 lane on connection. (i) Addresses I-5 connecting capacity to I-405 as necessary by adding one lane approaching ramp to I-405 to avoid congestion. Location / Facility:I-405 @ I-5 I/C

From:I-405 @ I-5 I/C

To:

Project ID: 4402

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $317,655,856

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (NE 195th I/C)

Description:(c) Rebuild the NE 195th St. Interchange. Location / Facility:I-405 @ NE 195th St I/C

From:I-405 @ NE 195th St I/C

To:

Project ID: 4398

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $56,856,690

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (SR 522 I/C braided ramps)

Description:(b) Remove ramp weaves north of the SR 522 Interchange by constructing NB and SB braided ramps. Location / Facility:I-405 @ SR 522 I/C

From:I-405 @ SR 522 I/C

To:

Project ID: 4397

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $112,477,365

Type:New Facility-RoadCounty:King County

Page 259: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (SR 527 I/C)

Description:(f) Reconfigure the SR 527 Interchange.Location / Facility:I-405 @ SR 527 I/C

From:I-405 @ SR 527 I/C

To:

Project ID: 4401

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $161,917,966

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (UW Bothell Transit Station)

Description:(k) UW Bothell Transit Station, Location / Facility:UW Bothell Transit Station

From:UW Bothell Transit Station

To:

Project ID: 4404

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $40,965,693

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (widening between NE 195th St to SR 527)

Description:(a) Add 2 lanes NB and SB, except 1 lane NB between NE 195th St. and SR 527 where NB lane previously built, resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP) in each direction. Includes the 4 ft. managed lane buffer. Location / Facility:I-405

From:NE 195th

To:SR 527

Project ID: 4396

Completion Year:2030

MTP Status: CandidateEstimated Cost: $236,897,879

Type:New Facility-RoadCounty:Snohomish County

Page 260: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405 Corridor: SR 900 to NE 30th

Description:(k) Construct NB auxiliary lane between SR 900 and NE 30th. Cost included in 4321Location / Facility:I-405

From:SR 900

To:NE 30th

Project ID: 4328

Completion Year:2020

MTP Status: CandidateEstimated Cost: $0

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405 Corridor: Sunset Blvd undercrossing

Description:(j) Realign and reconstruct undercrossing at Sunset Blvd. Cost included in 4320.Location / Facility:I-405 @ Sunset Blvd undercrossing

From:I-405 @ Sunset Blvd undercrossing

To:

Project ID: 4327

Completion Year:2020

MTP Status: ROW Conditionally ApEstimated Cost: $0

Type:Bridge RehabCounty:King County

Sponsor: WSDOTTitle: I-405/I-90 Interchange (HOV direct connector ramps)

Description: (a) Construct HOV direct connector ramps between I-405 and I-90 in all four quadrants of the interchange. Location / Facility:I-405 @ I-90 I/C

From:I-405 @ I-90 I/C

To:

Project ID: 4376

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $1,002,408,169

Type:New Facility-RoadCounty:King County

Page 261: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405/I-90 Interchange (I--90 approach)

Description:I-90 Interchange: (d) Address I-90 connecting capacity to I-405 as necessary by adding one lane approaching ramp to I-405 to avoid congestion. Cost included in 4376. Location / Facility:I-405 @ I-90 I/C

From:I-405 @ I-90 I/C

To:

Project ID: 4379

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $0

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-405/I-90 Interchange (new NB bridge)

Description:I-90 Interchange: (c) Construct a new 5 lane NB bridge over I-90 including 4 ft. HOV buffer replacing the existing two bridges. Cost included in 4376. Location / Facility:I-405 @ I-90 I/C

From:I-405 @ I-90 I/C

To:

Project ID: 4378

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $0

Type:New Facility-RoadCounty:King County

Page 262: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-405/I-90 Interchange (SB bridge widening)

Description:I-90 Interchange: (b) Widen SB bridge by 2 lanes including 4 ft. HOV buffer resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP). Cost included in 4376. Location / Facility:I-405 @ I-90 I/C

From:I-405 @ I-90 I/C

To:

Project ID: 4377

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $0

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-5 @ SR 512 Interchange (Tier 1)

Description: Tier 1 -Constructs short term improvements to address congestion at the SR 512 interchange; including auxiliary lanes between NB I-5 Bridgeport Way and EB SR 512, NB I-5 between SR 512 and 84th.Location / Facility:I-5

From:SR 512 I/C

To:E Steele St.

Project ID: 4190

Completion Year:2020

MTP Status: CandidateEstimated Cost: $65,118,392

Type:New Facility-RoadCounty:Pierce County

Page 263: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-5 @ SR 512 Interchange (Tier 2)

Description:"Tier 2 - In addition to the short term improvements described in Tier 1, Tier 2 rebuilds the interchange to provide free movements for all directions. Flyover ramps will be provided for the movements from I-5 NB to SR 512 EB, SR 512 EB to I-5 NB and I-5 NB to SR 512 WB. A loop ramp will be provided for the movement from SR 512 WB to I-5 SB."Location / Facility:I-5

From:I-5/SR 512 I/C

To:

Project ID: 4425

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $620,389,552

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: I-5 @ 100th and Everett Mall: South Everett Interchange Improvements

Description:Construct a new crossing under I-5 at 100th St and provide NB and SB HOV access south of SR 526/SR527/South Broadway interchange. This entails a new on-ramp from NB ever mall way to SB I-5 Undercrossing at 100th St. SE which terminates at E side of freeway. This involves an arterial under I-5 then surface on W side of I-5. Those arterial improvements extend on that side up to 7th. NB Everett mall way to SB I-5 (on collector distributor on W side of I-5) starts from 526 to SB I-5 - on ramp traffic will connect.Location / Facility:I-5; 100th Street SE

From:SR 527/South Broadway I/C

To:SB I-5; 7th Avenue SE

Project ID: 4006

Completion Year:2030

MTP Status: CandidateEstimated Cost: $55,541,548

Type:New Facility-RoadCounty:Snohomish County

Page 264: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-5 @ 196th St (SR 524) Interchange Northbound Braided Ramp Project

Description:This project adds a braided ramp NB at the I-5/ 196th St I/CLocation / Facility:I-5 @ 196th St

From:I-5 @ 196th St

To:

Project ID: 4278

Completion Year:2030

MTP Status: CandidateEstimated Cost: $74,160,900

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: I-5 @ 196th St (SR 524) Interchange Southbound Braided Ramp Project

Description:This project will construct a braided ramp configuration where the SR 525 to southbound I-5 ramp and the I-405 to southbound I-5 ramp will be grade separated over the southbound I-5 to 196th St. ramp. It is expected this concept will improve the I-5 mainline operations, eliminate the weave and address a high accident location.Location / Facility:0

From:I-5 @ 196th St

To:-

Project ID: 1625

Completion Year:2012

MTP Status: CompletedEstimated Cost: $39,864,210

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: I-5 @ 272nd Street Interchange

Description:Reconstruct the S. 272nd Street I/C. Current concept is for a SPUI, This project includes a flyer stop.Location / Facility:I-5 @ 272nd Street Interchange

From:I-5 @ 272nd Street Interchange

To:

Project ID: 4091

Completion Year:2030

MTP Status: CandidateEstimated Cost: $100,661,773

Type:New Facility-RoadCounty:King County

Page 265: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-5 @ 88th St. N Interchange

Description:Reconstruct interchange to a SPUI configurationLocation / Facility:I-5 @ 88th Street NE I/C

From:I-5 @ 88th Street NE I/C

To:-

Project ID: 1945

Completion Year:2020

MTP Status: CandidateEstimated Cost: $63,000,000

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: I-5 @ Airport/Industrial Way

Description:HOV direct access connection to South Industrial Way/E3 bus way.Location / Facility:I-5

From:0.5 miles south of West Seattle Freeway

To:Metro's E3 Busway

Project ID: 1595

Completion Year:2025

MTP Status: CandidateEstimated Cost: $95,516,451

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-5 @ Lake City Way

Description:Extend right lane that drops to Lake City Way up to the N 85th St. exit and braid the N 70th on ramp into the mainline.Location / Facility:I-5

From:Lake City Way I/C

To:

Project ID: 4198

Completion Year:2025

MTP Status: CandidateEstimated Cost: $72,433,309

Type:New Facility-RoadCounty:King County

Page 266: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-5 @ Mercer and SR 520 I/C's

Description:Reconstruct the Mercer Street and SR 520 Interchanges to eliminate the left side exit ramps. Location / Facility:I-5

From:E Denny Way

To:NE 45th St.

Project ID: 4200

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $876,059,886

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-5 @ Port of Tacoma Interchange Improvement

Description:Reconstruct the Port of Tacoma Road interchange (study underway to determine final configuration)Location / Facility:I-5

From:Port of Tacoma Road

To:Port of Tacoma Road

Project ID: 4529

Completion Year:2025

MTP Status: CandidateEstimated Cost: $35,444,286

Type:New Facility-RoadCounty:Pierce County

Page 267: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-5 @ SR 18/SR 161 (Triangle) - phase 1

Description:Phase 1 - The interchange will be modified to eliminate the current weave ramps on I-5 both southbound and northbound, and on SR 18 westbound and eastbound. The project will rebuild the I-5 / SR-18 interchange by replacing the northwest and southeast cloverleaf ramps with a westbound SR 18 to southbound I -5 "flyover" ramp and an eastbound SR 18 to northbound I-5 flyover" ramp. It will also build a new direct connection from westbound SR 18 to SR 161 in the vicinity of S 359th ST, realign the eastbound SR 18 to Southbound I-5 at-grade access ramp and associated elements.Location / Facility:I-5 @ SR 18/SR 161 I/C

From:I-5 @ SR 18/SR 161 I/C

To:

Project ID: 2567

Completion Year:2012

MTP Status: CompletedEstimated Cost: $129,052,813

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-5 @ SR 18/SR 161 (Triangle) - phase 2

Description:Phase 2 - This project completes the reconstruction of the I-5/SR 18/SR 161 interchange by constructing a southbound Collector-Distributor lane from SB I-5 to the intersection of 359TH ST and 356TH St along SR 161, Weyerhauser Way to westbound SR 18 flyover ramp, replace the SR 161 Bridge that crosses over I-5, and making other interchange modifications.Location / Facility:I-5 @ SR 18/SR 161 I/C

From:I-5 @ SR 18/SR 161 I/C

To:

Project ID: 5535

Completion Year:2020

MTP Status: ROW Conditionally ApEstimated Cost: $125,566,166

Type:New Facility-RoadCounty:King County

Page 268: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-5 @ SR 526 I/C

Description:Construct on ramp to southbound I-5. Either at SR 526 I/C or SR 99/ Everett Mall Way. Exact location TBDLocation / Facility:I-5

From:SR 526 I/C

To:SR 526 I/C

Project ID: 5430

Completion Year:2015

MTP Status: UnprogrammedEstimated Cost: $4,000,000

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: I-5 @ SR 96 / 128th St SW

Description:Reconstruct interchange. Current concept is for a SPUILocation / Facility:I-5

From:SR 96/128th St. SW I/C

To:

Project ID: 1706

Completion Year:2035

MTP Status: UnprogrammedEstimated Cost: $119,478,912

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: I-5 HOV to HOT lane Conversion: I-405 to US 2

Description:Convert HOV lanes to HOT lanes. Assume existing HOV conversion and shoulder for dual HOT lanes. Cost does not include shoulder prep.Location / Facility:I-5

From:I-405 (Tukwila)

To:US 2

Project ID: 5427

Completion Year:2020

MTP Status: CandidateEstimated Cost: $312,000,000

Type:New Facility-RoadCounty:King County

Page 269: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-5 HOV to HOT lane Conversion: Pierce/ King County Line to S. 260th

Description:Convert HOV lanes to HOT lanes. Assume existing HOV conversion and shoulder for dual HOT lanes. Cost does not include shoulder prep.Location / Facility:I-5

From:Pierce/King County Line

To:S. 260th St

Project ID: 5425

Completion Year:2020

MTP Status: CandidateEstimated Cost: $31,000,000

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-5 HOV to HOT lane Conversion: S. 260th to I-405

Description:Convert HOV lanes to HOT lanes. Assume existing HOV conversion and shoulder for dual HOT lanes. Cost does not include shoulder prep.Location / Facility:I-5

From:S. 260th St

To:I-405

Project ID: 5426

Completion Year:2020

MTP Status: CandidateEstimated Cost: $192,000,000

Type:New Facility-RoadCounty:King County

Page 270: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-5 HOV to HOT lane Conversion: SR 16 to Pierce/ King County Line

Description:Convert HOV lanes to HOT lanes. Assume existing HOV conversion and shoulder for dual HOT lanes. Cost does not include shoulder prep.Location / Facility:I-5

From:SR 16

To:Pierce/King County Line

Project ID: 5424

Completion Year:2015

MTP Status: CandidateEstimated Cost: $28,000,000

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: I-5 Steilacoom/DuPont I/C to Thorne Lane

Description:Construct additional SB and NB lanesLocation / Facility:I-5 Steilacoom/DuPont I/C to Thorne Lane I/C

From:Sreilacoom/DuPont I/C

To:Thorne Lane I/C

Project ID: 4194

Completion Year:2024

MTP Status: CandidateEstimated Cost: $48,000,000

Type:New Facility-RoadCounty:Pierce County

Page 271: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-5/JBLM Berkeley Drive I/C

Description: This project would replace the interchange with a more modern design that could accommodate the levels of traffic anticipated in the future as well as provide additional width to add new lanes on I-5.Location / Facility:I-5

From:Berkeley Drive I/C

To:Berkeley Drive I/C

Project ID: 4421

Completion Year:2018

MTP Status: CandidateEstimated Cost: $71,000,000

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: I-5/JBLM Corridor Planning and NEPA documentation

Description:Complete interchange justification reports and begin NEPA documentation for DuPont Steilacoom Road, 41st Division St. Berkley St., and Thorne Lane interchanges reconstruction and corridor widening.Location / Facility:I-5

From:JBLM Vicinity

To:JBLM Vicinity

Project ID: 4430

Completion Year:2015

MTP Status: CandidateEstimated Cost: $6,598,689

Type:New Facility-RoadCounty:Pierce County

Page 272: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-5/JBLM DuPont-Steilacoom-New Interchange

Description:This project would replace the interchange with one that would have more capacity to move more traffic and allow additional lanes to be added to I-5.Location / Facility:I-5

From:Dupont-Steilacoom I/C

To:Dupont-Steilacoom I/C

Project ID: 4419

Completion Year:2018

MTP Status: CandidateEstimated Cost: $149,000,000

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: I-5/JBLM Thorne Lane Interchange

Description:This project would replace the interchange with a more modern design that could accommodate the levels of traffic anticipated in the future as well as provide additional width to add new lanes on I-5.Location / Facility:I-5

From:Thorne Lane I/C

To:Thorne Lane I/C

Project ID: 4422

Completion Year:2018

MTP Status: CandidateEstimated Cost: $77,000,000

Type:New Facility-RoadCounty:Pierce County

Page 273: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-5/JBLM, 41st Division Dr. I/C

Description:This project builds a new bridge that allows one ramp to pass over the other allowing traffic to flow smoother. This results in a reduction of congestion and an improvement of safety on I-5.Location / Facility:I-5

From:41st Division Dr. I/C

To:41st Division Dr. I/C

Project ID: 4420

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $24,195,193

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: I-5/Mounts Road to Center Drive Auxiliary Lane Extension

Description:This project will extend the NB auxiliary lane south for approximately 1.5 miles between the Mounts Rd and Center Dr. Interchanges. This auxiliary lane will be an interim configuration until the full corridor improvements are completed.Location / Facility:I-5

From:Mounts Rd Interchange

To:Center Dr Interchange

Project ID: 4477

Completion Year:2017

MTP Status: ApprovedEstimated Cost: $8,000,000

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: I-5/Thorne Lane to Gravelly Lake Drive - Auxiliary Lanes

Description:Construct SB and NB auxiliary lanesLocation / Facility:I-5

From:Thorne Lane

To:Gravelly Lake Drive

Project ID: 4424

Completion Year:2025

MTP Status: UnprogrammedEstimated Cost: $26,821,526

Type:New Facility-RoadCounty:Pierce County

Page 274: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-5: 220th St. SW to 44th Ave W

Description:Construct a northbound auxiliary lane.Location / Facility:I-5

From:220th St SW

To:44th Ave W

Project ID: 1624

Completion Year:2025

MTP Status: CandidateEstimated Cost: $8,755,675

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: I-5: Mounts-Old Nisqually Road to 41st Division Drive, JBLM

Description:Add one lane each direction (GP or HOV/HOT) - Mounts-Old Nisqually Road to 41st Division DriveLocation / Facility:I-5

From:Mounts-Old Nisqually Road

To:41st Division Drive, JBLM

Project ID: 1803

Completion Year:2023

MTP Status: CandidateEstimated Cost: $181,500,809

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: I-5: NB Express Lanes Northgate Vic - Merge Revision

Description:Separate the northbound HOV and GP merge from the express lanes to the mainline by moving the GP merge south to the 92nd Street vicinity. Location / Facility:I-5 Express lanes

From:I-5 @ Northgate Way

To:I-5 @ 92nd St. vicinity

Project ID: 5336

Completion Year:2020

MTP Status: CandidateEstimated Cost: $24,381,780

Type:New Facility-RoadCounty:King County

Page 275: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-5: Port of Tacoma Rd Interchange to Pierce/King County Line

Description:Core HOV lanes, interchange improvements, ITS, enhanced transit.Location / Facility:I-5

From:Port of Tacoma Rd Interchange

To:Pierce/King County Line

Project ID: 5343

Completion Year:2012

MTP Status: CompletedEstimated Cost: $433,831,572

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: I-5: S. 96th to SR 16 - Widening (HOV/HOT)

Description:Extends HOV lanes south in both directions between the SR 512 interchange and the SR 16 interchange. Reconstructs the 72nd Street and 84th Street interchanges to accommodate the widening and improve traffic movements on and off the interstate, replace the S 48th St. Bridge.Location / Facility:I-5

From:SR 512

To:SR 16

Project ID: 4189

Completion Year:2025

MTP Status: ApprovedEstimated Cost: $351,930,073

Type:New Facility-RoadCounty:Pierce County

Page 276: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-5: Seneca to Mercer St - Additional lane

Description:The project will provide an additional NB lane to relieve congestion in the Downtown Seattle area of I 5. Requires narrowing traveled lanes to 11 feet and widening a structureLocation / Facility:I-5

From:Seneca

To:Mercer

Project ID: 5508

Completion Year:2020

MTP Status: CandidateEstimated Cost: $12,190,890

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-5: SR 104 to NE 175th

Description:Construct a southbound auxiliary lane on I-5 from SR 104 down to NE 175th Street.Location / Facility:I-5

From:SR 104 I/C

To:NE 175th St.

Project ID: 4199

Completion Year:2025

MTP Status: CandidateEstimated Cost: $19,103,290

Type:New Facility-RoadCounty:King County

Page 277: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-5: SR 16 to Port of Tacoma Rd Interchange

Description:Core HOV lanes, interchange improvements, ITS, enhanced transit. Actual restriping and opening of HOV lanes south of the Port of Tacoma Interchange is likely to occur during or after POT Bridge replacement work (2017) since existing POT Interchange does not have enough existing span width to accommodate HOV lane widening underneath bridge.Location / Facility:I-5

From:SR 16

To:Port of Tacoma Rd Interchange

Project ID: 1644

Completion Year:2017

MTP Status: ApprovedEstimated Cost: $948,449,717

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: I-5: SR 2 to SR 528

Description:Construct HOV/HOT Lanes in each direction and reconstruct the SR 528 I/CLocation / Facility:I-5

From:SR 2

To:SR 528

Project ID: 1708

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $660,151,709

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: I-5: SR 528 to SR 531

Description:Add one lane in each direction (from 3-4 lanes)Location / Facility:I-5

From:SR 528

To:SR 531

Project ID: 4204

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $143,542,273

Type:New Facility-RoadCounty:Snohomish County

Page 278: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-5: Thorne Lane to SR 512.

Description:Add HOV/HOT Lanes in both directions.Location / Facility:I-5

From:Thorne Lane I/C

To:Gravelly Lake Dr.

Project ID: 1720

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $164,585,142

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: I-5:Thorne Lane to Gravelly Lake Dr.-Frontage Road

Description:This project improves traffic flow on I-5 by completing a missing local connection. Location / Facility:I-5

From:Thorne Lane

To:Gravelly Lake Dr.

Project ID: 4423

Completion Year:2018

MTP Status: CandidateEstimated Cost: $30,000,000

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: I-90

Description:On West Lake Sammamish Parkway, convert single lane roundabout to a dual lane roundaboutLocation / Facility:I-90

From:West Lake Sammamish Parkway

To:West Lake Sammamish Parkway

Project ID: 5437

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $2,472,030

Type:New Facility-RoadCounty:King County

Page 279: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-90

Description:Construct a westbound auxiliary lane between West Lake Sammamish Parkway and Sunset Way.Location / Facility:I-90

From:West Lake Sammamish Parkway

To:Sunset Way

Project ID: 5438

Completion Year:2020

MTP Status: CandidateEstimated Cost: $54,005,642

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-90

Description:Reconstruct the Front Street I/CLocation / Facility:I-90

From:Front St. I/C

To:Front St. I/C

Project ID: 5439

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $111,241,350

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-90 @ SR 18

Description:Construct freeway to freeway interchange at SR 18, widen to four lanes in each direction, maintain truck lanes, and reconstruct interchange ramps.Location / Facility:I-90 @ SR 18

From:I-90 @ SR 18

To:

Project ID: 4223

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $268,199,578

Type:New Facility-RoadCounty:King County

Page 280: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-90 @ SR 18

Description:Construct a westbound I-90 to WB SR 18 flyover ramp and widen SR 18 to four lanes between Deep Creek to I-90.Location / Facility:I-90 @ SR 18

From:I-90 @ SR 18

To:

Project ID: 4414

Completion Year:2020

MTP Status: CandidateEstimated Cost: $219,436,019

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-90 Highpoint to Preston Trail

Description:Shared use bike pathLocation / Facility:Highpoint Trail

From:Terminus of existing Highpoint Trail near Issaquah eastern city limits

To:Western terminus of existing Preston-Snoqualmie Trail

Project ID: 2882

Completion Year:2012

MTP Status: CompletedEstimated Cost: $5,751,889

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: I-90 HOV to HOT

Description:Convert HOV lanes to HOT lanesLocation / Facility:I-90

From:I-5

To:SR 900

Project ID: 5435

Completion Year:2020

MTP Status: CandidateEstimated Cost: $42,000,000

Type:New Facility-RoadCounty:King County

Page 281: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: I-90: Eastgate to W. Lake Sammamish Pkwy (Lakemont) - Added Aux. Lane

Description:Construct an eastbound auxiliary lane or Hard Should Running between Eastgate and West Lake Sammamish Parkway (Lakemont).Location / Facility:I-90

From:Eastgate

To:West Lake Sammamish Parkway (Lakemont)

Project ID: 5436

Completion Year:2020

MTP Status: CandidateEstimated Cost: $61,800,750

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: Interurban Ave Capacity Expansion

Description:Expand capacity on North-South arterialsLocation / Facility:SR 181

From:144th St

To:Southcenter Blvd

Project ID: 3528

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $22,795,172

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: NE Park Drive Ped/Bike

Description:Add sidewalk / paved shoulder crossing I-405 from SR 900 / Sunset Blvd to Lake Washington BlvdLocation / Facility:NE Park Drive

From:SR 900 / Sunset Blvd

To:Lake Washington Blvd

Project ID: 3536

Completion Year:2030

MTP Status: CandidateEstimated Cost: $6,667,975

Type:New Facility-RoadCounty:King County

Page 282: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 104

Description:Add one lane each direction on SR 104 from 178th to SR 522 with intersection channelization improvements at 178th, 175th and SR 522.Location / Facility:SR 104

From:SR 522

To:178th

Project ID: 1682

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $10,721,726

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 104

Description:NFS - New connection from existing SR 104 alignment to proposed multimodal terminal location.Location / Facility:SR 104

From:Pine St. I/S

To:Proposed ferry terminal

Project ID: 1711

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $13,545,963

Type:New Facility-RoadCounty:Snohomish County

Page 283: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 16

Description:Approved in 24, 2003. Core HOV lanes, new interchange, TSM/TDM, ITS, enhanced transit. Cost unknown for expanding North Gig Harbor Park and Ride lot (Kimball), therefore not in estimate. SR 16/36th St to Olympic Dr NW - Add HOV Lanes is programmed for completion in 2010.Location / Facility:0

From:Tacoma Narrows Bridge (36th St E)

To:Olympic Drive

Project ID: 1650

Completion Year:2010

MTP Status: CompletedEstimated Cost: $12,171,381

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: SR 16

Description:Construct Core HOV lanes, interchange improvements, frontage road, Intelligent Transportation Systems. This project has several Conditions approved by EB on September 29th, 2000: a) No additional freeway capacity expansion NW of SR-16/Wollochet Drive NW/Pioneer Way interchange until a complete grade-separated exchange is developed on SR-16 in the vicinity of the intersection with SE Burley-Olalla Road. This condition does not preclude development of interim measures to address safety and access controls at SE Burley/Olalla Road. b) Future HOV capacity expansion entire SR 16 corridor from I-5 to SR3 should include full implementation of surveillance control and driver information (SC&DI) system improvements to include conventional electronic flow monitoring and on-ramp metering for preferential HOV access.Location / Facility:SR 16

From:Olympic Drive

To:SR 302 Vicinity

Project ID: 1651

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $151,064,172

Type:New Facility-RoadCounty:Pierce County

Page 284: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 16

Description:Widen from 4 lanes to 6 lanes creating HOV lanes, I/C improvements, TDM, ITS, enhanced transit. Cost not included for Park and Ride Lots at Armory and Landfill.Location / Facility:SR 16

From:SR 160 (Sedgwick Rd) Vicinity

To:SR 166

Project ID: 1727

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $94,142,508

Type:New Facility-RoadCounty:Kitsap County

Sponsor: WSDOTTitle: SR 16

Description:Widen from 4 lanes to 6 lanes creating HOV lanes, interchange improvements, TSM/TDM, ITS, enhanced transitLocation / Facility:SR 16

From:SR 302 Vicinity

To:Pierce/Kitsap County Line

Project ID: 1811

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $78,294,437

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: SR 16

Description:Widen from 4 lanes to 6 lanes creating HOV lanes, I/C improvements, TDM, ITS, enhanced transit. Cost unknown for expansion of Park and Ride Lot at Mullenix, therefore not in estimateLocation / Facility:SR 16

From:Pierce/Kitsap County Line

To:SR 160 (Sedgwick Rd) Vicinity

Project ID: 1833

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $108,191,777

Type:New Facility-RoadCounty:Kitsap County

Page 285: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 16

Description:Approved in April 24, 2003. Core HOV lanes, interchange improvements, TSM/TDM, ITS, enhanced transit. Location / Facility:SR 16

From:I-5

To:Tacoma Narrows Bridge

Project ID: 4099

Completion Year:2014

MTP Status: CompletedEstimated Cost: $168,138,427

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: SR 16

Description:Construct EB and WB auxiliary lanesLocation / Facility:SR 16

From:Burnham Drive I/C

To:SR 302 Bridges

Project ID: 4213

Completion Year:2017

MTP Status: UnprogrammedEstimated Cost: $7,193,933

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: SR 16 @ Wollochet Interchange

Description:The current interchange in Gig Harbor is more than 40 years old and has marginal onramps that make it difficult for vehicles entering the freeway to merge into traffic creating potential conflicts. This project will add a new onramp and modernize the rest of the interchange to improve capacity, relieve congestion and reduce the potential for collisions.Location / Facility:SR 16

From:SR 16

To:Gig Harbor I/C

Project ID: 4426

Completion Year:2020

MTP Status: CandidateEstimated Cost: $9,143,167

Type:New Facility-RoadCounty:Pierce County

Page 286: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 161

Description:SR 161/24th St E to Jovita - Add Lanes is programmed for completion in 2011, but majority of work likely to be done by 2010.Location / Facility:SR 161

From:24th St. E

To:Jovita Blvd.

Project ID: 1658

Completion Year:2014

MTP Status: CompletedEstimated Cost: $42,024,510

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: SR 161

Description:SR 161/36th to Vicinity 24th St E -Widen to 5 lanes (creating 5 lane roadway with center two-way left turn).Location / Facility:SR 161

From:36th St. E

To:24th St. E

Project ID: 5344

Completion Year:2022

MTP Status: ApprovedEstimated Cost: $38,316,465

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: SR 162: SR 410 - 96th St E

Description:Widen to 4 lanes with restricted median. Make operational improvements at the SR 410/SR 167 Interchange.Location / Facility:SR 162

From:SR 410

To:96th St. E

Project ID: 497

Completion Year:2030

MTP Status: CandidateEstimated Cost: $131,609,190

Type:New Facility-RoadCounty:Pierce County

Page 287: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 167

Description:Construct auxiliary lanes between interchanges.Location / Facility:SR 167

From:S 277th St.

To:SR 516

Project ID: 4229

Completion Year:2025

MTP Status: CandidateEstimated Cost: $165,879,260

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 167

Description:Add 1 GP lane each direction from 15th St. NW to S. 180th St.Location / Facility:SR 167

From:15th St. NW

To:S 180th (SW 43rd)

Project ID: 5325

Completion Year:2030

MTP Status: UnprogrammedEstimated Cost: $1,588,279,281

Type:New Facility-RoadCounty:King County

Page 288: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 167 Corridor Completion Phase 1

Description:Phase I includes one lane in each direction from the existing SR167 terminus at the Meridian interchange in Puyallup to I-5. There will be two lanes in each direction from the I-5/SR 167 Extension to the SR 167 / 54th Avenue interchange in Fife, where two lanes would drop and a single lane in each direction would continue to a connection at SR 509 in Tacoma. The SR 167 Extension – Phase I includes full interchanges at Meridian Avenue and Valley Avenue in Puyallup as well as a freeway-to-freeway interchange connections with I-5. A partial interchange (NB on/SB off) would be included at 54th Avenue in Fife. All necessary right-of-way for the SR 167 extension full-build would be purchased.Location / Facility:SR 167

From:SR 509

To:I-5

Project ID: 1659

Completion Year:2015

MTP Status: ROW Conditionally ApEstimated Cost: $850,598,385

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: SR 167 Corridor Completion Phases 2 and 3.

Description:Phase 2 will widen the SR 167 to 2 general purpose lanes in each direction from SR 509 (Port of Tacoma) to the Meridian Interchange (SR 161) in Puyallup. Phase 3 will add HOV lanes each direction between I-5 and the Meridian Interchange.Location / Facility:SR 167

From:SR 509

To:Puyallup/ Sumner vicinity (SR 161)

Project ID: 1722

Completion Year:2040

MTP Status: CandidateEstimated Cost: $425,299,192

Type:New Facility-RoadCounty:Pierce County

Page 289: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 167 HOV lane completion

Description:Extend HOV/HOT Lanes from current termini to SR 410 in Sumner.Location / Facility:SR 167

From:SR 410 (Sumner)

To:15th St. SW/ NW

Project ID: 1652

Completion Year:2017

MTP Status: ApprovedEstimated Cost: $395,643,958

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: SR 169

Description:Construct a southbound truck climbing lane.Location / Facility:SR 169

From:SE 383rd St.

To:Green River

Project ID: 4231

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $13,718,874

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 169

Description:Replace the existing northbound truck climbing shoulder with a truck climbing lane and extend it to the north.Location / Facility:SR 169

From:Green River

To:Crest of Hill (ARMP 6.32)

Project ID: 4232

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $24,720,300

Type:New Facility-RoadCounty:King County

Page 290: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 169

Description:Construct a southbound truck climbing lane.Location / Facility:SR 169

From:Near Cedar River (ARM 16.02 to 17.02

To:

Project ID: 4233

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $12,360,150

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 169 Widening SR 516 to 231st

Description:Widen to 4 lanes with turn lanes where warranted.Location / Facility:SR 169

From:SR 516

To:SE 231st St.

Project ID: 3644

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $149,615,914

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 169 Widening: I-405 to 152nd Ave. SE

Description:Widen SR 169 from 4 to 6 lanes between I-405 and 152nd Ave. SELocation / Facility:SR 169

From:I-405

To:152nd Ave. SE

Project ID: 5327

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $113,713,380

Type:New Facility-RoadCounty:King County

Page 291: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 18

Description:Add an Auxiliary lane each direction on SR 18 from C Street to SR 164.Location / Facility:SR 18

From:C Street

To:SR 164 I/C

Project ID: 4214

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $43,173,239

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 18

Description:Widen to four lanes, interchange improvementsLocation / Facility:SR 18

From:Issaquah-Hobart Road

To:Tigergate

Project ID: 4216

Completion Year:2040

MTP Status: ApprovedEstimated Cost: $89,957,076

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 18

Description:Widen to four lanes, interchange improvements. The first phase (Tier 2 investment) is to make improvements to the existing truck climbing lane in the 'raging river' vicinity.Location / Facility:SR 18

From:Tigergate

To:I-90

Project ID: 4217

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $107,534,251

Type:New Facility-RoadCounty:King County

Page 292: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 204

Description:Relocate Frontier Village access out of intersection with SR 9 and look at removing signal at 91st. Add storage for traffic from eastbound SR 204 to northbound SR 9.Location / Facility:SR 204

From:US 2

To:SR 9

Project ID: 1712

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $6,485,371

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: SR 3 @ SR 16 Interchange (Gorst)

Description:Eliminate lane drop on SR 16 to northbound SR 3 by extending the lane north of the railroad bridge and extending the northbound SR 3 on-ramp.Location / Facility:SR 3

From:SR 3/ SR 16 Vicinity (Gorst)

To:SR 3/ SR 16 Vicinity (Gorst)

Project ID: 4185

Completion Year:2017

MTP Status: CandidateEstimated Cost: $22,704,034

Type:New Facility-RoadCounty:Kitsap County

Sponsor: WSDOTTitle: SR 3 @ SR 304 I/C - Interchange Reconstruction

Description:Reconstruct Interchange.Location / Facility:SR 3

From:SR 3/SR 304 Interchange Vicinity

To:SR 3/SR 304 Interchange Vicinity

Project ID: 4183

Completion Year:2035

MTP Status: UnprogrammedEstimated Cost: $59,328,720

Type:New Facility-RoadCounty:Kitsap County

Page 293: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 3 @ SR 304 I/C - Ramp Modification

Description:Extend SB SR 3 two-lanes though SR 304 Interchanges and adjust SR 304 SB ramp to merge instead of add lane.Location / Facility:SR 3

From:SR 3/SR 304 Interchange Vicinity

To:SR 3/SR 304 Interchange Vicinity

Project ID: 4182

Completion Year:2017

MTP Status: CandidateEstimated Cost: $12,407,791

Type:New Facility-RoadCounty:Kitsap County

Sponsor: WSDOTTitle: SR 3: Kinman-Big Valley Rd to SR 104

Description:Add northbound (NB) truck/climbing holding laneLocation / Facility:SR 3

From:Kinman/Big Valley Road

To:SR 104

Project ID: 1832

Completion Year:2030

MTP Status: CandidateEstimated Cost: $33,695,747

Type:New Facility-RoadCounty:Kitsap County

Sponsor: WSDOTTitle: SR 3: Pioneer Way to Kinman-Big Valley Rd

Description:Southbound truck/climbing lane between Pioneer Way and Kinman-Big Valley Road.Location / Facility:SR 3

From:Pioneer Way

To:Kinman-Big Valley Road

Project ID: 4181

Completion Year:2016

MTP Status: UnprogrammedEstimated Cost: $16,453,143

Type:New Facility-RoadCounty:Kitsap County

Page 294: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 3: SR 16 to SR 304 - HOV Widening

Description:Widen from four to six-lane divided facility (creating one HOV lane in each direction) between the SR 3/SR 16 Interchange and the SR 3/SR 304 Interchange.Location / Facility:SR 3

From:SR 16

To:SR 304

Project ID: 4184

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $317,359,025

Type:New Facility-RoadCounty:Kitsap County

Sponsor: WSDOTTitle: SR 3: SR 304 to Loxie Eagens Blvd - HOV Widening

Description:Widen to 6 lanes (creating one HOV lane in each direction) from SR 304 to Loxie Eagans Boulevard; and maintain the northbound auxiliary lane.Location / Facility:SR 3

From:SR 3/SR 304 Interchange Vicinity

To:Loxie Eagens Blvd.

Project ID: 1828

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $18,395,865

Type:New Facility-RoadCounty:Kitsap County

Sponsor: WSDOTTitle: SR 3: SR 305 to SR 104

Description:Widen to a 4-lane, median divided facility Location / Facility:SR 3

From:SR 305

To:SR 104

Project ID: 4180

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $70,114,203

Type:New Facility-RoadCounty:Kitsap County

Page 295: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 302

Description:Construct a new corridor from the vicinity of 144th Street NW to a new interchange on SR 16 in the vicinity of SE Pine Road.Location / Facility:SR 302

From:144th Street

To:SR 16

Project ID: 5440

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $325,260,949

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: SR 302 Capacity Improvements--Elgin-Clifton Road to SR 16

Description:Widen SR 302 to 4 lanes from Elgin-Clifton Road to 144th St NW to tie in with planned new alignment from 144th St NW to SR 16.Location / Facility:SR 302

From:Elgin Clifton Rd.

To:SR 16

Project ID: 3618

Completion Year:2017

MTP Status: UnprogrammedEstimated Cost: $25,591,485

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: SR 303

Description:Construct Business Access and Transit Lanes.Location / Facility:SR 303

From:11th Street (Bremerton)

To:Fairgrounds Road

Project ID: 4095

Completion Year:2018

MTP Status: UnprogrammedEstimated Cost: $200,867,894

Type:New Facility-RoadCounty:Kitsap County

Page 296: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 305: Bainbridge Ferry Terminal to Suquamish Way - Mobility

Description:Intersection improvements with transit queue jump lanes.Location / Facility:SR 305

From:Bainbridge Ferry Terminal

To:Suquamish Way

Project ID: 4237

Completion Year:2016

MTP Status: CandidateEstimated Cost: $7,246,359

Type:New Facility-RoadCounty:Kitsap County

Sponsor: WSDOTTitle: SR 410: 214th Ave E - 234th add lanes

Description:Widen from 2 lanes to 4 lanes, realign 234th Ave E to create a "split intersection" and add a signal --per Route Development Plan/Design. SR 410/214th Ave E to 234th - Add Lanes is programmed for completion in 2011, but it appears majority of CN will be done by 2010Location / Facility:SR 410

From:214th Ave E Vicinity

To:234th Ave E Vicinity

Project ID: 1661

Completion Year:2011

MTP Status: CompletedEstimated Cost: $33,943,096

Type:New Facility-RoadCounty:Pierce County

Page 297: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 509 Extension (with I-5), Phase 1

Description:SR 509 Connection and I-5 Freight Mobility Project Phase 1 includes one lane in each direction between S 188th Street and S 24th/26th Ave, and two lanes in each direction between S 24th/26th Ave and I-5 with both GP &HOV/express toll lane connections to I-5, a full diamond interchange at SR509/S 188th Street, a half diamond interchange at SR 509/S 24th Ave to provide access to the airport via S 24/26th Ave and an improved air cargo road from S 188th Street to the airport, and a direct access to I-5 from the Kent Valley via S 228th Street and reconstruction of the SR 516 interchange. On I-5, Phase 1 also includes adding SB auxiliary lane from the extension to S 272nd St and NB auxilary lane from the SR 516 Interchange to the extension, converting the existing I-5 HOV lanes to ETL and the upgrading inside shoulders as ETL during peak periods from the SR 509 Connection to Federal Way.Location / Facility:SR 509

From:I-5

To:Existing SR 509

Project ID: 1613

Completion Year:2019

MTP Status: ROW Conditionally ApEstimated Cost: $740,020,595

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 509 Extension (with I-5), Phase 2

Description:SR 509 Connection and I-5 Freight Mobility Project Phase 2 includes widening the extension to two lanes each direction between S 188th Street and S 24th/26th Ave, construct partial interchange at 200th St. to link with the Airport South Access Road. Location / Facility:SR 509

From:I-5

To:Existing SR 509

Project ID: 4429

Completion Year:2040

MTP Status: CandidateEstimated Cost: $148,854,717

Type:New Facility-RoadCounty:King County

Page 298: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 512

Description:Construct eastbound and westbound auxiliary lanes from Meridian to Pioneer with two lane off-ramps at each Interchange.Location / Facility:SR 512

From:Meridian/ SR 161

To:Pioneer

Project ID: 4243

Completion Year:2025

MTP Status: CandidateEstimated Cost: $38,137,343

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: SR 512

Description:Covert shoulders for use as additional lane during peak periods in the peak direction of travelLocation / Facility:SR 512

From:I-5

To:Meridian Street

Project ID: 5442

Completion Year:2030

MTP Status: CandidateEstimated Cost: $67,812,355

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: SR 512/94th Ave WB Ramps to SR 161 - Widening

Description:Widen the westbound off ramp to SR 161 to two lanes, widen the eastbound on ramp from SR 161 to two lanes, widen the SR 512/SR 161 under-crossing from two to six lanes and extend the westbound climbing lane through interchange to tie in with the westbound on-ramp from 94th Ave. SE to SR 512.Location / Facility:SR 512 @ Meridian/ SR 161 I/C

From:SR 512 @ Meridian/ SR 161 I/C

To:SR 512/SR 161 I/C

Project ID: 1821

Completion Year:2025

MTP Status: CandidateEstimated Cost: $15,595,486

Type:New Facility-RoadCounty:Pierce County

Page 299: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 512/Canyon Rd Interchange EB & WB - Mobility

Description:Construct a two lane eastbound and westbound off-ramps to Canyon Road.Location / Facility:SR 512 @ Canyon Road I/C

From:SR 512 @ Canyon Road I/C

To:SR 512Canyon Road I/C

Project ID: 4242

Completion Year:2015

MTP Status: CandidateEstimated Cost: $9,038,000

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: SR 512/SR 7 Interchange - Mobility

Description:Construct a two lane eastbound off-ramp to SR 7.Location / Facility:SR 512 @ SR 7

From:SR 512 @ SR 7

To:SR 512/SR 7 I/C

Project ID: 4241

Completion Year:2015

MTP Status: CandidateEstimated Cost: $8,000,000

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: SR 518

Description:Add a second eastbound lane from the I-5 southbound drop lane to the I-5 northbound add lane at the Tukwila I/C.Location / Facility:SR 518 @ I-5 Interchange

From:SR 518 @ I-5 Interchange

To:SR 518/I-5 Interchange

Project ID: 4245

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $90,229,095

Type:New Facility-RoadCounty:King County

Page 300: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 518

Description:Relocate the I-5 northbound ramp to the right side and combine I-5 northbound, I-5 southbound and the 51st Ave. S ramps at the Tukwila I/C. Location / Facility:SR 518 @ I-5 Interchange

From:SR 518 @ I-5 Interchange

To:SR 518/I-5 Interchange

Project ID: 4246

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $79,769,032

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 518

Description:Construct a new interchange at SR 99Location / Facility:SR 518 @ SR 99

From:SR 518 @ SR 99

To:I-5

Project ID: 5390

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $111,404,504

Type:New Facility-RoadCounty:King County

Page 301: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 518 at Des Moines Memorial Drive Interchange Phase I - Eastbound Off Ramp

Description:The project is located within the city limits of Burien and incorporates an area within Section 20 Township 23N and Range 4E. The project will construct a new eastbound off-ramp from SR 518 to Des Moines Memorial Drive including a new ramp bridge over 8th Avenue South. The new off-ramp will be located primarily within the existing WSDOT right-of-way. This project will also include storm drain conveyance, stormwater treatment, retaining walls, illumination, and sidewalks on both sides of 8th Avenue South from S 148th Street to south of the new bridge over 8th Avenue South. Stormwater detention will be accomplished off-site utilizing an equivalent area swap approved by the Department of Ecology.Location / Facility:SR 518

From:SR 509

To:Des Moines Memorial Drive

Project ID: 4416

Completion Year:2020

MTP Status: ApprovedEstimated Cost: $14,057,986

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 518 at Des Moines Memorial Drive Interchange Phase II - Westbound Ramps

Description:Reconstruct the existing half diamond interchange at Des Moines Memorial Drive. Phase 2 includes adding a westbound off- ramp from SR 518 to northbound SR 509 that diverges from SR 518 prior to the Des Moines Memorial Drive Interchange and an on-ramp from Des Moines Memorial Drive to westbound SR 518.Location / Facility:SR 518

From:SR 509

To:Des Moines Memorial Drive

Project ID: 4476

Completion Year:2020

MTP Status: CandidateEstimated Cost: $67,316,204

Type:New Facility-RoadCounty:King County

Page 302: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 519 Intermodal Access Project - Phase 2: South Atlantic Corridor

Description:I-90 Off-Ramp to South Atlantic Street. A new two-lane elevated ramp connection would be built from westbound I 90 to terminate at a signalized T-intersection at South Atlantic Street. The new South Atlantic Street connection would serve westbound freeway traffic from I 90 and I-5. The new ramp would be entirely elevated, passing over Fourth Avenue South and Third Avenue South and connecting to the South Atlantic Street overpass southeast of Safeco Field. Exiting northbound I-5 traffic would be routed to South Atlantic Street, while exiting southbound I-5 traffic would have the option of taking either the new off-ramp to South Atlantic Street or the existing I-90 off-ramp to Fourth Avenue South. South Royal Brougham Way Railroad Overpass. The South Royal Brougham Way at-grade railroad crossing would be closed and a new two-lane elevated structure would be constructed, connecting Occidental Avenue South to Third Avenue South. The new overpass would transport vehicular, pedestrian, and bicycle traffic over the BNSF Railway tracks and provide a new connection from South Royal Brougham Way into the second level of Qwest Field Event Center parking garage. The new ramp would accommodate local two-way traffic.Location / Facility:0

From:I-90

To:Seattle Waterfront

Project ID: 1866

Completion Year:2010

MTP Status: CompletedEstimated Cost: $92,923,924

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 520

Description:Widen SR 520 to 8 lanes including HOV Lanes and auxiliary lanes. Construct a new SR 520/SR 202 interchange.Location / Facility:0

From:W Lake Sammamish Parkway

To:SR 202

Project ID: 4101

Completion Year:2010

MTP Status: CompletedEstimated Cost: $96,210,542

Type:New Facility-RoadCounty:King County

Page 303: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 520

Description:Construct new six lane connection between I-5 and Montlake Blvd. This includes reconstruction of the Portage Bay Bridge. Construct a westbound to southbound freeway-to-freeway Core HOV Connection at the I-5/SR520 interchange.Location / Facility:SR 520

From:I-5

To:Foster Island Vicinity

Project ID: 4250

Completion Year:2022

MTP Status: ROW Conditionally ApEstimated Cost: $1,249,673,569

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 520 @ 148th Ave NE I/C Vicinity - I/C Improvments

Description:Provide 2nd eastbound grade separated off ramp access to the east of 148th Ave NE. Improve interchange ped and bike facilities along 148th Ave NE.Location / Facility:SR 520

From:148th Ave NE

To:

Project ID: 4418

Completion Year:2020

MTP Status: CandidateEstimated Cost: $62,173,539

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 520 Eastbound Auxiluary Lane: NE 148th Ave to NE 40th St.

Description:Construct a auxilary lane eastbound between NE 148th Ave to NE 40th St.Location / Facility:SR 520

From:NE 148th Ave.

To:NE 40th St.

Project ID: 4462

Completion Year:2022

MTP Status: CandidateEstimated Cost: $14,207,649

Type:New Facility-RoadCounty:

Page 304: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 520 HOV to HOT

Description:Convert HOV lanes to HOT lanesLocation / Facility:SR 520

From:I-405

To:SR 202

Project ID: 5443

Completion Year:2020

MTP Status: CandidateEstimated Cost: $20,000,000

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 520 Trail

Description:Shared use bike path pending outcome of Trans-Lake Corridor studyLocation / Facility:SR 520 Trail

From:Montlake

To:east to Seattle city limits at water's edge

Project ID: 2906

Completion Year:2017

MTP Status: CandidateEstimated Cost: $976,936

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 520 Trail

Description:Shared use bike path Pending outcome of Trans-Lake Corridor studyLocation / Facility:SR 520 Trail

From:Medina western city limits

To:Medina eastern city limits

Project ID: 2907

Completion Year:2015

MTP Status: CompletedEstimated Cost: $713,318

Type:New Facility-RoadCounty:King County

Page 305: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 520 Trail over 520 Bridge

Description:Shared use bike path Pending outcome of Trans-Lake Corridor studyLocation / Facility:SR 520 Trail over 520 Bridge

From:Eastern Seattle city limits

To:Western Medina city limits

Project ID: 2910

Completion Year:2016

MTP Status: ROW Conditionally ApEstimated Cost: $2,496,614

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 520: Eastside Transit and HOV

Description:Add HOV lanes eastbound between Evergreen Point Road and 108th Ave. Move existing HOV lanes and upgrade to full standard lanes to the inside and add a direct HOV access at 108th Avenue. Cost for this project includes the HOV restriping between I-405 (108th Ave) and SR 202 (MTP 4284).Location / Facility:SR 520

From:Evergreen Point Road

To:108th Ave

Project ID: 4252

Completion Year:2015

MTP Status: ApprovedEstimated Cost: $590,276,795

Type:New Facility-RoadCounty:King County

Page 306: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 520: I-5 to Medina - Evergreen Point Floating Bridge and Landings

Description:The Floating Bridge and Landings Project is one of four projects in the SR 520 Bridge Replacement and HOV Program. The proposed project would replace the SR 520 floating bridge and landings, including the connections to the existing structure east of Foster Island, and to the existing roadway in Medina. The new bridges will meet current design standards for windstorms and earthquakes. The road will have six lanes including two HOV lanes, bicycle/pedestrian facilities, and the ability to accommodate future light rail.Location / Facility:SR 520

From:West end of floating bridge

To:Evergreen Point Road

Project ID: 4251

Completion Year:2016

MTP Status: ApprovedEstimated Cost: $1,136,779,255

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 522 (Nickel)

Description:This project will widen SR 522 from the existing two lanes to four lanes with median separation from the Cathcart Road vicinity (Snohomish River Bridge) to US 2. The proposed action evaluated in this EA includes a new bridge across the Snohomish River, a wildlife crossing near milepost 22, improvements to the 164th St. SE (W Main St) interchange, and a new ramp connection and improvements to the US 2 interchange.Location / Facility:SR 522

From:Snohomish River Bridge

To:US 2

Project ID: 4159

Completion Year:2015

MTP Status: ApprovedEstimated Cost: $150,000,000

Type:New Facility-RoadCounty:Snohomish County

Page 307: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 522 @ 195th

Description:Construct second half of the existing half-diamond interchange making a full diamond interchange.Location / Facility:SR 522

From:NE 195th Street

To:NE 195th Street

Project ID: 2380

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $46,182,070

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 522 @ Paradise Lake Road Interchange

Description:Construct a new grade separated diamond interchange.Location / Facility:SR 522

From:Paradise Lake Road

To:Paradise Lake Road

Project ID: 4257

Completion Year:2020

MTP Status: CandidateEstimated Cost: $106,060,742

Type:New Facility-RoadCounty:Snohomish County

Page 308: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 522 UW Bothell Campus South Access

Description:Construct a new interchange on SR 522 providing direct access to/from the UW-Bothell/Cascadia Community College joint campus in Bothell. Provide a new signalized intersection approx. one half mile west of the I-405 interchange where a new public street will be constructed from the campus to meet the existing "T" intersection of Woodinville Drive and Brackett's landing. A new bridge over this intersection will allow traffic exiting I-405 to merge onto WB SR 522 unimpeded by turns at the new intersection. The SB I-405 off-ramp to WB SR 522 will be widened to give motorists the option of entering the campus or using the new overpass to SB SR 522.Location / Facility:0

From:UW Bothell/Cascadia Community College

To:one half mile west of I-405

Project ID: 3621

Completion Year:2007

MTP Status: CompletedEstimated Cost: $39,454,870

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 522: Paradise Lk Rd to Snohomish River - Widening

Description:Add two lanes converting a two lane highway to a four lane divided highway. Complete construction of the Fales/Echo Lake Interchange.Location / Facility:SR 522

From: Paradise Lake Rd.

To:Snohomish River

Project ID: 1698

Completion Year:2020

MTP Status: CandidateEstimated Cost: $69,488,073

Type:New Facility-RoadCounty:Snohomish County

Page 309: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 524

Description:Widen to five lanes adding two general purpose lanes and a two-way-left-turn-lane.Location / Facility:SR 524

From:24th Ave.

To:SR 527

Project ID: 1714

Completion Year:2025

MTP Status: ApprovedEstimated Cost: $111,000,000

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: SR 524

Description:Widen to five lanes adding two general purpose lanes and a two-way-left-turn-lane.Location / Facility:SR 524

From:SR 527

To:35th/39th Street

Project ID: 4259

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $95,512,919

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: SR 524

Description:Widen to five lanes adding two general purpose lanes and a two-way-left-turn-lane.Location / Facility:SR 524

From:35th/39th Street

To:SR 522

Project ID: 4260

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $72,771,748

Type:New Facility-RoadCounty:Snohomish County

Page 310: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 525

Description:NFS - Connect to proposed ferry terminal location. Costs are develop a new three-lane roadway on new alignment that would access the relocated Mukilteo Ferry Terminal down an environmentally sensitive drainage known as Japanese GulchLocation / Facility:SR 525

From:SR 526

To:Proposed Mukilteo Multimodal Terminal.

Project ID: 1715

Completion Year:2027

MTP Status: UnprogrammedEstimated Cost: $207,617,394

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: SR 527 Ped/Bike I-405 Overcrossing

Description:Add ped / bike facility crossing I-405 from 220th St SE to 228th St SELocation / Facility:SR 527

From:220th St SE

To:228th St SE

Project ID: 3539

Completion Year:2030

MTP Status: CandidateEstimated Cost: $5,272,353

Type:New Facility-RoadCounty:Snohomish County

Page 311: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 529 - Ebey Slough Bridge 529/25 Replacement

Description:This project will replace the existing Ebey Slough Bridge, 529/25, with a new fixed span structure and remove the existing bridge structure. The bridge will be widened from two to four lanes to match the four-lane roadway sections immediately before and after the bridge.Location / Facility:SR 529

From:MP 6.21

To:MP 6.35

Project ID: 5543

Completion Year:2010

MTP Status: CompletedEstimated Cost: $53,686,904

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: SR 531

Description:Four-lane widening with intersection improvementsLocation / Facility:SR 531

From:43rd Ave.

To:SR 9

Project ID: 1639

Completion Year:2030

MTP Status: CandidateEstimated Cost: $52,958,220

Type:New Facility-RoadCounty:Snohomish County

Page 312: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 704 - Cross Base Highway, I-5 to Spanaway Loop Rd

Description:Construct new four-lane, limited access facility between Fort Lewis and McCord Air Base. Includes reconstructed interchange at I-5. Includes Gravelly Thorne Connector: Construct one mile single lane SB roadway connecting Gravelly Lake Drive to Thorne Lane west of the Sound Transit/Burlington Northern Railroad tracks. Also includes bike/ ped separated path.Location / Facility:SR 704 - new alignment located approx. along the common boundary of Ft. Lewis and McChord AFB

From:I-5

To:SR 7

Project ID: 112

Completion Year:2035

MTP Status: UnprogrammedEstimated Cost: $503,240,693

Type:New Facility-RoadCounty:Pierce County

Sponsor: WSDOTTitle: SR 9

Description:Widen to four/ five lanes.Location / Facility:SR 9

From:176th St SE

To:SR 96

Project ID: 4206

Completion Year:2020

MTP Status: CandidateEstimated Cost: $74,364,429

Type:New Facility-RoadCounty:Snohomish County

Page 313: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 9

Description:Widen to 4 lanes and intersection improvements at Marsh RoadLocation / Facility:SR 9

From:Marsh Rd

To:Snohomish River Bridge

Project ID: 4207

Completion Year:2030

MTP Status: CandidateEstimated Cost: $12,051,057

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: SR 9

Description:Widen to 4/5 lanes from US-2 to Lake Stevens RoadLocation / Facility:SR 9

From:US 2

To:Market Place

Project ID: 4208

Completion Year:2035

MTP Status: CandidateEstimated Cost: $82,666,490

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: SR 9

Description:Add third NB and third SB through lanesLocation / Facility:SR 9

From:Market Place

To:Lundeen Parkway

Project ID: 4209

Completion Year:2025

MTP Status: CandidateEstimated Cost: $16,000,000

Type:New Facility-RoadCounty:Snohomish County

Page 314: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 9

Description:Widen to 4 lanes and intersection improvementsLocation / Facility:SR 9

From:Snohomish River Bridge

To:US 2

Project ID: 5432

Completion Year:2030

MTP Status: CandidateEstimated Cost: $63,799,716

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: SR 9

Description:Intersection improvements at Division Street and 84th StreetLocation / Facility:SR 9

From:SR 92

To:SR 530

Project ID: 5434

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $6,427,278

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: SR 9 / US2 Interchange

Description:Reconstruct the SR 9/US 2 I/CLocation / Facility:SR 9 @ US 2

From:SR 9 @ US 2

To:

Project ID: 5433

Completion Year:2030

MTP Status: CandidateEstimated Cost: $24,811,000

Type:New Facility-RoadCounty:Snohomish County

Page 315: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 9 @ SR 204 Intersection Improvement

Description:Widen SR 9 for both northbound and southbound to provide one additional through lane at the SR 9/SR 204 intersection. A grade separated option is also being evaluated.Location / Facility:SR 9

From:SR 9 / SR 204 Intersection

To:SR 9 / SR 204 Intersection

Project ID: 4413

Completion Year:2020

MTP Status: CandidateEstimated Cost: $54,842,362

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: SR 9 Widening: 212th St. SE to 176th St. SE

Description:Widen SR 9 to 4/5 lanesLocation / Facility:SR 9

From:212th St SE

To:176th St SE

Project ID: 1627

Completion Year:2015

MTP Status: CompletedEstimated Cost: $81,069,418

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: SR 9 Widening: SR 522 to 212th St SE

Description:Widen SR 9 to 4/5 lanesLocation / Facility:SR 9

From:SR 522

To:212th

Project ID: 4428

Completion Year:2011

MTP Status: CompletedEstimated Cost: $0

Type:New Facility-RoadCounty:Snohomish County

Page 316: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 9: Snohomish River Bridge

Description:Replace bridge with new 4-lane bridge across river. Also, new 4-lane overflow bridge south of Snohomish River with ramp and interchange improvements.Location / Facility:SR 9

From:Snohomish River Bridge

To:Snohomish River Bridge

Project ID: 5431

Completion Year:2030

MTP Status: CandidateEstimated Cost: $108,459,516

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: SR 9: Lundeen Pkwy to SR 92

Description:This project adds new northbound and southbound SR-9 through lanes, improves or adds the left and right turn lanes on northbound and southbound SR-9 as needed, adds a left turn lane and extends the right turn lane on SR 92, and upgrades illumination and signal systems at Lundeen Parkway, Soper Hill Rd and SR 92 intersections. The project will treat and detain new impervious stormwater runoff. Location / Facility:SR 9

From:Lundeen Parkway

To:SR 92

Project ID: 4267

Completion Year:2013

MTP Status: CompletedEstimated Cost: $48,155,868

Type:New Facility-RoadCounty:Snohomish County

Page 317: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 9: SR 96 to Marsh Road

Description:This project will widen SR 9 to two lanes in each direction and add left and right turn lanes at SR 96 and Marsh Rd. Other improvements include upgrading the existing lighting and traffic signals and modifying the drainage system at each intersection. Location / Facility:0

From:SR 96

To:Marsh Road

Project ID: 4265

Completion Year:2011

MTP Status: CompletedEstimated Cost: $42,437,544

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: SR 900

Description:Widen to 4 lanes w/ TWLTL. Location / Facility:0

From:Issaquah WCL

To:I-90

Project ID: 1617

Completion Year:2010

MTP Status: CompletedEstimated Cost: $51,154,226

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 99

Description:Add a southbound thru lane on Hwy 99 from 54th to NB On Ramp to I-5. Improve intersection of HWY 99 and 54th Avenue.Location / Facility:SR 99

From:I-5

To:Pacific Highway East/54th Ave

Project ID: 1812

Completion Year:2017

MTP Status: UnprogrammedEstimated Cost: $5,582,031

Type:New Facility-RoadCounty:Pierce County

Page 318: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 99/ Evergreen Way: 148tth St SW to Airport Rd

Description:Construct BAT lanes on Evergreen Way / Highway 99 from 148th Street SW to airport Road.Location / Facility:Evergreen Way Transit HOV Treatments

From:148th Street SW

To:Airport Road

Project ID: 4415

Completion Year:2020

MTP Status: CandidateEstimated Cost: $36,572,670

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: SR 99/Viaduct Surface Restoration & Construction Transit Center

Description:Restoration and improvements of Surface Street Alaskan Way following the demolition of the Alaskan Way Viaduct Structure. The project includes an allowance for construction mitigation to replace the loss of parking stalls from under the existing structure.Location / Facility:SR 99

From:S King Street

To:Roy Street

Project ID: 4282

Completion Year:2018

MTP Status: ROW Conditionally ApEstimated Cost: $253,254,054

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 99: 244TH ST. SW to 240th St. SW - BAT Lanes

Description:Add one lane each direction to connect with Business Access and Transit (BAT) lanes that cities have built or are planning to build on each side of the HWY 99 and SR 104 Interchange.Location / Facility:0

From:244th Ave SW

To:240th St. SW

Project ID: 1630

Completion Year:2010

MTP Status: CompletedEstimated Cost: $78,021,696

Type:New Facility-RoadCounty:Snohomish County

Page 319: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: SR 99: S Holgate St to S King St - Viaduct Replacement

Description:Remove and replace the seismically vulnerable viaduct by adding new SR 99 on and off ramps, constructing a new undercrossing at S. Atlantic St, constructing new bicycle/pedestrian paths, signing, illumination, utilities, and drainage.Location / Facility:SR 99

From:S Holgate St.

To:S King St

Project ID: 4280

Completion Year:2013

MTP Status: CompletedEstimated Cost: $445,326,900

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: SR 99: S. King Street to Roy Street – Central Waterfront Viaduct Replacement

Description:The proposed bored tunnel would be constructed under downtown Seattle between the vicinity of S. King Street and Roy Street to replace the seismically vulnerable Alaskan Way Viaduct along the central waterfront. The proposed bored tunnel would move SR 99 to a below-ground alignment under downtown Seattle and would bypass the existing Battery Street Tunnel. The project includes removal of the existing viaduct structure and decommissioning of Battery Street Tunnel.Location / Facility:SR 99

From:S King St

To:Roy St

Project ID: 4281

Completion Year:2016

MTP Status: ApprovedEstimated Cost: $2,546,661,831

Type:New Facility-RoadCounty:King County

Page 320: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: Tukwila Urban Access Improvement Project

Description:The project will widen Southcenter Parkway to the east from south of Strander Boulevard to the 1-5 northbound off-ramp to provide added storage length for the back-to-back dual left turn lanes between Strander Boulevard and Klickitat Drive. The southbound lanes of Southcenter Parkway will be re-profiled to provide a grade separation at the Klickitat Drive intersection. A new bridge structure maintains the connection between the existing surface grades of Klickitat Drive and northbound and southbound Southcenter Parkway. A new signal on Southcenter Parkway south of Strander Boulevard provides for access management to adjacent businesses and collision reduction. Traffic signal interconnections, pedestrian facilities on the east side of Southcenter parkway will be included.Location / Facility:Southcenter Pkwy

From:Tukwila Pkwy

To:Strander Blvd

Project ID: 3527

Completion Year:2012

MTP Status: ApprovedEstimated Cost: $29,873,559

Type:New Facility-RoadCounty:King County

Sponsor: WSDOTTitle: US 2 "Trestle" ATM

Description:Restripe the east bound carriageway to allow hard shoulder running (3 lanes) during the PM peak and install other companion ATM devices.Location / Facility:0

From:I-5

To:SR 204

Project ID: 5323

Completion Year:2010

MTP Status: CompletedEstimated Cost: $356,807

Type:New Facility-RoadCounty:Snohomish County

Page 321: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: US 2: Bickford to Monroe

Description:Widen to four lanes. The alignment may be on the existing highway or it may be on R/W purchased for a bypass in the 1960s. The final decision should be resolved in an EIS.Location / Facility:US 2

From:Bickford Ave.

To:City of Monroe (SR 522)

Project ID: 4176

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $420,245,102

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: US 2: Monroe Bypass - phase 1

Description:Construct a two lane SR 522 extension to the north and terminate at Chain Lake Road that connects to the local street system.Location / Facility:SR 522 Extension

From:North of the SR 522 I/C

To: North of the SR 522 I/C

Project ID: 5444

Completion Year:2020

MTP Status: CandidateEstimated Cost: $45,106,293

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: US 2: Monroe Bypass phases 2 & 3

Description:Construct a four- lane, limited access bypass around Monroe on new alignment to the north of the city. This project could be constructed in two stages. Location / Facility:US 2 (on new alignment)

From:(west of) SR 522

To:Monroe east City limits

Project ID: 1620

Completion Year:2020

MTP Status: UnprogrammedEstimated Cost: $177,986,161

Type:New Facility-RoadCounty:Snohomish County

Page 322: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: US 2: Monroe to City of Sultan

Description:Widen the corridor to four lanes.Location / Facility:US 2

From:Monroe east city limits

To:Sultan west city limits

Project ID: 4177

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $304,772,248

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: US 2: SR 204 to Bickford

Description:Widen to 4 lanes. Location / Facility:US 2

From:SR 204

To:Bickford Ave.

Project ID: 4175

Completion Year:2040

MTP Status: CandidateEstimated Cost: $82,813,005

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: US 2: Sultan to Goldbar

Description:In between Sultan and Gold Bar would be a four lane section (two lanes in each direction) separated by a four foot median with rumble strips to improve safety.Location / Facility:US 2

From:City of Sultan east city limits

To:Goldbar West City Limits

Project ID: 1704

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $93,937,140

Type:New Facility-RoadCounty:Snohomish County

Page 323: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: US 2: Trestle Widening - Stage 1

Description:Build a new westbound US-2 structure over Ebey Slough for the future configuration of 2 general purpose lanes and 1 HOV lane. Realign the westbound SR 204 to westbound US-2 on-ramp utilizing the new westbound structure, improving the weaving conditions for the interchange.Location / Facility:US 2

From:I-5

To:SR 204

Project ID: 4412

Completion Year:2020

MTP Status: CandidateEstimated Cost: $195,054,239

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: US 2: Trestle Widening - Stage 2

Description:Widen the trestle to 3 lanes each direction (with HOV lane) with standard lane and shoulder widths and improve the US 2/I-5 interchange. Location / Facility:US 2

From:I-5

To:SR 204

Project ID: 5324

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $731,453,396

Type:New Facility-RoadCounty:Snohomish County

Page 324: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: US 2: within Baring

Description:Widen to four lanes (safety related widening)Location / Facility:US 2

From:Enter Baring

To:Leave Baring

Project ID: 5420

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $53,148,645

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: US 2: within Goldbar

Description:Within the city of Goldbar, this will be a four-lane section (two lanes in each direction with bike lanes, sidewalks and a center median). The existing signalized intersections would be replaced with roundabouts.Location / Facility:US 2

From:Gold Bar WCL

To:Gold Bar ECL

Project ID: 5419

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $56,856,690

Type:New Facility-RoadCounty:Snohomish County

Sponsor: WSDOTTitle: US 2: within Sultan

Description:The long term vision through Sultan is a four-lane section (two lanes in each direction with bike lanes, sidewalks and a center median). The existing signalized intersections would be replaced with roundabouts.Location / Facility:US 2

From:City of Sultan west city limits

To:City of Sultan east city limits

Project ID: 4178

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $173,440,397

Type:New Facility-RoadCounty:Snohomish County

Page 325: d v } ] } v î ì ð ì u v ] v î ì í ñ v ] Æ E W Z P ] } v o ] Ç W } i ·  · 2016-11-10d ] o WW v P K v o Ç & Ç W < v u } rht ] ] } v W

Sponsor: WSDOTTitle: US 3

Description:Widen from Imperial Way to SR 16 to four lanesLocation / Facility:SR 3

From:Imperial Way

To:Gorst (SR 16)

Project ID: 5422

Completion Year:2040

MTP Status: UnprogrammedEstimated Cost: $134,725,636

Type:New Facility-RoadCounty:Kitsap County

Sponsor: WSDOT MARINE DIV. (PSRC REGION ONLY)Title: Colman Dock

Description:WSF facility improvementsLocation / Facility:Alaskan Way S

From:Marion St

To:

Project ID: 5135

Completion Year:2040

MTP Status: CandidateEstimated Cost: $301,141,372

Type:New Facility-RoadCounty:King County

Sponsor: WSDOT MARINE DIV. (PSRC REGION ONLY)Title: Mukilteo Terminal Relocation/Expansion

Description:Terminal relocation/expansionLocation / Facility:Mukilteo Terminal

From:Loveland

To:Cornelia St.

Project ID: 2486

Completion Year:2019

MTP Status: CandidateEstimated Cost: $129,000,000

Type:New Facility-RoadCounty:Snohomish County


Recommended