26
8/6/2019 D2S2 INO2 Presentation http://slidepdf.com/reader/full/d2s2-ino2-presentation 1/26 The views expressed in this paper/presentation are the views of the author and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent. ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequence of their use. Terminology used may not necessarily be consistent with ADB official terms.
Transcript
Page 1: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 1/26

The views expressed in this paper/presentation are theviews of the author and do not necessarily reflect the

views or policies of the Asian Development Bank (ADB),

or its Board of Governors, or the governments theyrepresent. ADB does not guarantee the accuracy of thedata included in this paper and accepts no responsibilityfor any consequence of their use. Terminology used may

not necessarily be consistent with ADB official terms.

Page 2: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 2/26

"New Thinking on Water Governance“Conference

Public Private PartneshipCity of Jakarta Example

Lee Kuan Yew School of Public Policy Singapore July 2009 

Barce Simarmata

Luc Martin

Page 3: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 3/26

1

2

3 Challenges for the Future

PALYJA and its concession contract

Public Private Partnership (PPP) Principles

Page 4: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 4/26

1

2

3 Challenges for the Future

PALYJA and its concession contract

Public Private Partnership (PPP) Principles

Page 5: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 5/26

PPP Contract Structures

Contract Duration in Years

3 ∞5 10 3020

AFFERMAGE(Lease Contract)

Operations&

Maintenance

BOT / ROT

Degreeof PrivatePartner Involvement

Design BuildOperate

TechnicalAssistance

ManagementContract

CONCESSION

Joint VenturePublic/Private

Private Company

Municipality

FullyPrivately Owned

Page 6: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 6/26

Partnership Approach

• Integration of SUEZ ENVIRONMENT global water skills into

the local context.

• Partnership with local industrial and commercial

organisations.

• Formalised partnership relationship with community

leadership on long term basis.

• Mutual respect & understanding.

• Combining strengths.

Creation of specialised

LOCAL WATER COMPANY

to SERVE the COMMUNITY

Page 7: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 7/26

Key Elements of 

PPP• Contract provides:

 –  Clear objectives

 –  Clear standards –  Strong control

 –  Regulated price (decided by the Public Authority)

• Assets ownership remains with public authority

• Operational responsibilities delegated to private

sector 

• Long term planning and control firmly in hands

of public authority

Page 8: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 8/26

Balance of Stakeholder Interests

Consumers

Public Authority Operator 

ServiceQuality &

Performance

Political Sphere Commercial Sphere

Market Sphere

Page 9: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 9/26

Who Owns the Infrastructure ?

Who Takes the Decisions ?

Who Sets the Water Tariff ?

Who Operates ?

Who Regulates?

Public Authority

Defined in the Contract

Public Authority

Private Operator 

Public Authority

Review of Key Questions

Page 10: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 10/26

1

2

3 Challenges for the Future

PALYJA and its concession contract

Public Private Partnership (PPP) Principles

Page 11: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 11/26

Concession Area

PALYJA

Western Part of DKI Jakarta

Westward of Ciliwung river 

UPP BaratUPP

Pusat

UPP Selatan

3 UPP : Unit Pelayanan Pelanggan+ 1 UPP for Key Account

Page 12: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 12/26

PALYJA Ownership(since July 2006)

Suez Environnement

51 %

- Lead Operator - PT. Astratel Nusantara(ASTRA Group)

30%

CitigroupFinancial Products Inc.

19%

PALYJA

Page 13: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 13/26

Institutional Stakeholders Mapping

DKI Jakarta

Administration

PAM JAYA

Customers

Regulatory

Body

PALYJA

Cooperation Agreement 

DPRD

City Council

Page 14: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 14/26

Contractual Performance Objectives

Technical Targets

• Volume of water billed.

• Water production.

• Non Revenue water.• Number of connections.

• Service coverage ratio.

Service Standards

• Quality of water supplied tothe customers.

• Pressure at customersconnection level.

• Customer care.

• Interruptions in distributionnetwork.

• New connections.

Page 15: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 15/26

Raw Water & Bulk Treated Water Supplies

Cikokol90 L/sec

62%

32%

1%

5%

Page 16: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 16/26

2 majors Water Treatment Plants(62 % of the total supply)

WTP Pejompongan 1(Degremont 1953)

WTP Pejompongan 2(Degremont 1965)

Page 17: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 17/26

1998 2008

Continuous supply No waterUnstable supply

Approximate limit of salinity in shallow wells

Extension & Improvement of Water Supply1998-2008

Page 18: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 18/26

201 662

398 557

0

50 000

100 000

150 000

200 000

250 000

300 000

350 000

400 000

Feb 1998 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

   N   u

   m

   b   e   r   o   f   C   u   s

   t   o   m

   e   r   s

Number of Customers

Number of customers increased by almost 100%

Page 19: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 19/26

Coverage Ratio

Page 20: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 20/26

Customer base evolution

+ 31 %

+ 92 %

+ 46 %

+ 614 %

+ 76 %

6 M th A S l d NRW i

Page 21: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 21/26

6-Month Average Sales and NRW sinceTake Over 

61 %

51 %

45 %

Page 22: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 22/26

1

2

3 Challenges for the Future

PALYJA and its concession contract

Public Private Partnership (PPP) Principles

Page 23: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 23/26

New business model : Output Based Aid

Page 24: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 24/26

New business model : Output Based Aid

DKIJakarta

PALYJA

Concession Contract

Jakarta

Water Services

Communitiesnot yet connected (at least legally)

Connect Communities +Provide Service

GPOBA

World Bank 

EscrowAccount Bank

Subsidy

Outputs

PAM JayaRegulator 

First Output: connections laid75% re-imbursement

Second Output: 3 consecutive billswith water consumption > 10 m3/month

25% re-imbursement

With the GPOBA grant of US$ 2.5 million, PALYJA will provide accessto the water system to about 7,000 low-income households by 2009

Page 25: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 25/26

Main challenges faced by Jakarta

The city of Jakarta is still looking for anincrease of the piped water coverage

Groundwater usage, on which rely

currently 25% of the population, is likelyto be gradually reduced: – The city of Jakarta is “sinking” becauseof the groundwater over-exploitation andrisk of flooding increase

 – Groundwater is getting more and morepolluted (salt intrusion, chemical andmicrobiological pollutants)

 – Groundwater tariffs will be increasedand aligned with piped water tariffs

Therefore, new water resources andadditional treatment facilities will beneeded within the next 5 years to face

growing demand and service coverageexpansion

Page 26: D2S2 INO2 Presentation

8/6/2019 D2S2 INO2 Presentation

http://slidepdf.com/reader/full/d2s2-ino2-presentation 26/26

Thank you

Terima Kasih

Merci

Muchas Gracias

Matur Nuwun

Hatur Nuhun

MauliateTeşekkürler 

Xie-xie

Obrigado


Recommended