INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
1
(Internship Program Report)
UNITED REFRIGRATOR COMPANY LTD. NO. OF WEEKS :- 1 WEEKS INTERSHIP PROGRAM
Date : 13-06-2011 To 18-06-2011
Submitted To: HUMAN RESORCE DEPARTMENT
Submitted By: MOHAMMAD YOUNUS (08IN70)
JASWANT (09IN03) MANOJ KUMAR THAKUR (09IN46)
DEPARTMENT OF
MEHRAN UNIVERSITY OF ENGINEERING & TECHNOLOGY, JAMSHORO
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
2
PREFACE This report contains the information about those
departments which are visited by the internees. Whatever the machinery
seen and the processes are observed, attracting the human mind and
realizes the men what science has achieved and what kind of mericals has
been done by it. Basically United refrigerator company ltd. (dawlance) is
quite attention attracting industry it provides lot of opportunities to see, to
observe, to achieve and to get the lot of experience about the industry as
well as about the machinery.
The technology installed at United refrigerator company ltd. (dawlance) is
the latest one and it includes the hardworking labors, employess who give
their best for the over all effectiveness of the company.
This report may also contains the facts and the real figures of the various
departments which are very beneficial for our experience and the also for
the practical knowledge. The functions and the details of their working and
the process as well as the timing and work break down structure is also
mentioned in this report. This is edit by the students of the INDUSTRIAL
ENGINEERING AND MANAGEMENT DEPARTMENT of the
nominated university of jamshoro named MEHRAN UNIVERSITY OF
ENGINEERING AND TECHNOLOGY JAMSHORO SINDH
PAKISTAN. The details of the students are as under:-
MUHAMMAD YOUNUS (08IN70).
MANOJ KUMAR THAKUR (09IN46).
JASWANT SINHA (09IN03).
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
3
ACKNOWLEDGEMENT
We are very thankful from the core of my heart to
honorable ASSITANT VICE PRESIDENT , “United Refrigerator
company ltd. (DAWLANCE) “ , ABDUL ALEEM KHAN for
providing us opportunity for training and whose intelligent, wise
and sound leadership has converted manpower into wining
combination by this industry into a gold mine.
We wish to express my deep gratefulness to
Whole HRD)for their consideration and supervision. It was a
memorable time in United refrigerator company ltd. (Dawlance)
due to his kind concern.
We are also thankful to all concerned manufacturing
supervisor and engineer’s for their precious advice and for the
great encouragement and cooperation, because of which We have
successfully completed our internship training of UNITED
REFRIGRATOR COMPANY LTD. (DAWLANCE ) where we
learned a lot.
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
4
CONTENTS
Days of internships
Departments Page no.
Day no. 1 Production II (shearing, sheet Metal and welding )
• Shearing section
• Sheet metal section
• Welding section
• Cabinet
• PC sheet
• Freezer door
• Basic panel
• side panel
• Compressor support
• Ref door and many more
7 to 11
Day no. 1 PRODUCTION III ( THE PAINTING SHOP )
• CABINET painting shop
• EVAPORATER painting shop
• CONDENSOR painting shop
• DIP- COATING (Shelf painting
shop )
12 to 16
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
5
DAY NO. 2 PROUCTION IV (CONDENSOR MANUFACTURING AND OTHERS )
• Shelf making section
• Condenser making
• Iron handing section
• Chrome section
• U-V Light section.
17 to 23
Day no. 3 PROUCTION V ( PRE – FOAMING )
• What is PRE – FOAMING ??
• Process of PRE – FOAMING &
Stages.
24 to 27
Day no. 3 PRODUCTION V ( FOAMING )
• What is FOAMING ??
Process of FOAMING ??
28 to 29
Day no. 3 PRODUCTION VI ( ASSEMBLY LINE )
• What is Assembly line ???
30 to 31
Day no. 4 PRODUCTION I (PLASTIC MOULDING SECTION)
• Compounding section
• Injection section
• Hot stepping section
• Steam print section.
• Extrudes section
• Cable section
32 to 36
Day no. 5 MAINTENANCE
• What is MAINTENANCE ??
• Objective of Plant Maintenance
??
Importance of maintenance.
37 to 39
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
6
• Methods of maintenance.
• Maintenance at Dawlance.
Day no. 6 QUALITY CONTROL
DEPARTMENT
• QUALITY AND CONTROL
(Definations)
• What is QUALITY CONTROL
???
• Quality Control At Dawlance.
• Quality Engineering Cell.
• Incoming Quality Control.
• Self Quality Inspection.
40 to 48
SUGGESTION’S
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
7
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
8
SHEARING, SHELF METAL AND WELDING
Shearing => To shear off the requires size of sheet is called a shearing process.
Sheet -Metal => the various process that has been perform over the metal sheet sop that give is the requires shape is to be called a sheet metal.
Welding => A process of permanent fastening important type used the most important type used in dawlance is tug welding.
• It is the refer color; production eleven is the section where the man body of
refrigerator is to be manufactured.
• Though the production elevens section is used to manufacture a lot of
component put the cabinets is of the important component of production eleven
section.
RAW-MATERIAL OF PRODUCTION - II The raw- material of production of to (in the sheet form)
1) Metal steel 2) Galvanized iron 3) Vinyl coated Material (VCM) 4) Aluminum SHEARING SECTION: One the raw-material is receive from the store the sharing section is something
that actually share of the sheet according to the requires size of specifications.
The cabinet sheet is to be share of the sizing of
• Length = 3824mm
• Width = 655mm
• Thickness = 0.4mm
Other thing also shares off according the specifications.
SHEET METAL SECTION: There are basically no of parts has manufactured in this section.
The sheet metal section is basically best upon the 4 major area which are as follows.
1: Automatic sheet feed 2: Whole processing and notch (bending) 3; forming section 4. Pressing section The sheet metal is basically used to produces a no of parts of refrigerator, such as
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
9
1. Cabinet 2. PC sheet 3. Freezer door 4. Basic panel 5. side panel 6. Compressor support 7. Ref door and many more
CABINET: The cabinet is to manufacturing once the sheet is receive from sharing the
automatic sheet feeder suck the sheet and feed the sheet then sheet through crame is to
be shift into the forming section where the form of profile and embossing can take
place and after ward that formed embossed is equally bended to form a cabinet. PC-SHEET: The pc sheet is the sheet that makes separates the freezer unit ref :a in other
word we can say that the I.C sheet is used to make separate n/n ref and free from the
upper side of refrigerator
PROCESS: It can be making by follow the following operation.
1. Notching process
2. Forming process
3. embossing process
4. Whole process
BACK PANEL: It is back side of refrigerator body that is to be attached with the
cabin net.
It is to be noted that is in small size refrigerate there Is only back panle and there is
no need for the bottom end as it also requirement in the refrigerator.
PROCESS: The back panel is to be made by the
1) Drilling the piece of M.S of sheet
2) Notching that piece
3) Whole also with the machine
4) first bending
5) 2nd bending
After that this do of is to welded with the cabinet by spot welding process. SODE RANGE:
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
10
It just like the side panel it also require 1st cutting and the 2nd cutting and then
just and 2nd pending.
FREEZER DOOR: it is the front door of the refrigerator and it is to be made by
the VCD material sheet.
The size of VC sheet used a freezer door
• Length = 546 mm
• Width = 768 mm
PROCESS OF FREEZER DOOR The freezer door is according following the process
1: Notching
2: Handle pressing
3: Embossing
4: first banding
5: final banding
REFRIGRATOR DOOR: It is also be made with the VCD type of material and it make we
of same process as that of freezer door each and every step in same.
COMPRESSOR SUPPORT: It is the part that can be placed in the both part of the ailment and it
support the compressor.
PROCESS: The process to manufacture the compressor is as
1: whole plating
2: further 2 more whole
3: just bending
4: final banding
WELDING SECTION: Basically welding is the process of permanent fastening
therefore is the section all or same part are to fastened by tug welding so that the
required type and shape of cabinets is to be shift the painting shop.
Basically at sheet metal the welding section is used to perform that activity
so that the form bended and imposed cabinet is to be welded with the back panel and
sight panel and the it is screwed with the compressor support.
At the end of the welded section the welded cabinet is to be shift to the paint shop for
the further paint processing.
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
11
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
12
PRODUCTION III THE PAINTING SHOP It is basically the painting section used to paint the various iron so that it
could be transfer into the final assembly shop.
It includes the,
• CABINET painting shop
• EVAPORATER painting shop
• CONDENSOR painting shop
• DIP- COATING (Shelf painting shop )
We had already discussed the dip-coating (shelf painting) and were here now we
learned the cabinet and evaporator painting
• CANBINET PAINTING SHOP As we know that whenever we are painting any thing first of
we need phosphating process so that the cabinet is to be easily painted. The cabinet
here though the following painted stages.
STAGES # 1 High pressuring over the refrigerator so that to remove as the welded
particle.
STAGES # 2 PHOSPHATING The phasphating process is actually though the following tank There
are basically 4 different tankers. Out of them 2 of the chemical tank , 1 of water
tank and 1 of di-ionized tank.
The phosphating process begins after following the first step now the cabinet is
dipped into the tank 1 ( which has the metaphoric chemical ) and then dipped into
the tank2 ( which Laos has the same chemical ).
Once the cabinet taken –off from the tank 2 then it is to be dipped into the tank 3
which has the raw water.
Finally the cabinet is to be placed into the di-ionbized tank and then the cabinet is
to be phosphated.
STAGE # 3 :- DRY OVEN At this stage the phosphated cabinet is placed into the dry even which
has the temperature of 110 ;140 degree centigrade . the dry oven has two function
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
13
fisrt it is use to dry the water and moisture and secondly it is also make able the
cabinet sheet to be attain the more powder ( as in next step ).
STAGE # 4 :- POWDER ROOM After dry oven the cabinets are to be hanged into the conveyor hanger
and it is to be transferred towards the powder room.
A powder room is a highly automated room that is used for powdering or coating
of powder over the cabinets.
The powder room has 15 gm over the cabinets and this powder can be done by the
gun system in a powder room so that the layer of powder is to be coated over the
cabinet.
The functioning of powder room is done by the automated system which is
controlled by then computer based system and its basic to coated a layer of powder
over the cabinet.
In powder room by gun system the cabinets are coated with the JOTUN powder of
layer 35 to 70 micron.
STEP # 5 :- BACK OVEN This is the end process of painting shop here the powder cabinets
are to be backed into the oven so that the powder is to melted and forming in the
paint over the cabinet.
Actually in back oven the polymerization process takes place because once the
temperature has been provided to the powder tends to polymerized and forming a
chain so that it is to be transmitted over the cabinet.
IMPORTANT TO REMEMBER • The cabinet paint shop has the capacity to paint 1800 to 1900 cabinet
paint per 24 hours i-e capacity = 1800 to 1900 cainets paint per 24 hours.
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
14
• EVAPORATER PAINTING SHOP As we know that the evaporator in consider to be the heart of
refrigerator and without the evaporator refraction is not exist. Evaporator is the part
that makes cooling within the refrigerator.
Evaporator is fitted inside the refrigerator and it is to be painted in white color.
The process of evaporator painting is as same as that of cabinets one within certain
amendments. However evaporator painting are requires phosphating and
powdering etc.
We can put forward the evaporator painting in the following stages.
STAGES # 1 :- EVAPORATER PHOSPHATING The evaporator phosphating process is done in 4 different tanks.
First of all the evaporator is dipped into the tank -1 which has the met clean
chemical.
After that the evaporator stays in tank-2 and tank-3 which is rinsing water tanks.
After that it is to be dipped into the tank-4 which has the metachrome chemical.
Finally again it is to be dipped into the rinsing water tank.
STAGE # 2 :- DRY OVEN After phophating the evaporator is to be dried into the dry oven which
is at the temperature of 140 to 160 degree centigrade so that to remove all the
moisture effect and also make the evaporator to sustain the powder.
STAGE # 03 :- POWDER COATING The powder coating over the evaporator is to be done on both the front
and back side of the evaporator.
STEP # 04 :- BACKING OVEN In last the evaporator is to be shifted towards the back oven which is al
the temperature of 205 to 220 degree centigrade and where the powder is
polymerized and evaporator is to be painted.
• CONDERSOR PAINTING Like all other painting section shops the condenser painting is also follwed
the same process as that of other painting process.
PROCESS OF CONDENSOR PAINTING The process of the condenser painting is being done in the following two
different stages.
i) Phosphating
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
15
ii) Painting
PHOSPHATING The phosphating if condenser is to be done by passing through the no. of
condenser to various chemicals which is in the tank .
First of all the manufactured condenser is dipped into the metaclean 375 tank and it
stayed over there at 1 to 5 min.
Now the condenser is then dipped into the fresh rinsing water into the 2nd tank.
After that it is to be dipped into the tank of metaphor 247 chemical tank. And after that
through pressure vessel it is to be dried.
At the end of phosphating the condenser suppose to shift into the dry oven and where
the all moisture are dried from the phosphate condenser.
PAINTING The painting begins when JOTUN powder is to be paint over the
condenser after phosphating on both sides of condenser and this condenser with the
help of crank is to be inserted into the back oven so that powder is to be converted into
the layer of painted color. The temperature of back oven is about to be of 250 degree
centigrade and it is placed within the back oven for the period of 11 min.
It is important that the JOTUN powder use in condenser painting section if of different
form and have it own load.
Important to Remember …..
• The capacity of condenser paint shop is 1700 condenser paint per day.
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
16
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
17
Like all other production section the PRODUCTION IV is also on e of the
most important section of refrigerator production. It is use to make some important and
value able item of refrigerator.
There are various sections those are comes under production IV category
i) Shelf making section ii) Condenser iii) Bottom condenser iv) Iron handle making section v) Galvanized section vi) Chrome section vii) U-V light section Through out all section of PRODUCTION IV have their own importance and
without them the processing is incomplete but the most importance item produce
by production iv is the condenser because without the functioning of refrigerator is
impossible.
Now we shall discuss each section in detail….
SHELF MAKING SECTION The shelf of the refrigerator is to be manufactured in this section. This
shop is used to make all different type of the shelf of different refrigerator model
and its highly depends upon the customer requirement e.g if the administration of
the production Iv receive the plan from production planning department to
manufacture 9175 WBM’s shelf so they suppose to act according to the
requirement.
� The capacity of the shelf section is to produce 31000 shelf per day and its make use of 7 different type of machine and also having the strength of 57 peoples.
EQUPMENT IN USE The shelf manufacturing makes use of different machines and welding
device.
• Starter and cutting machine
• Pressing machines of different type
• Tag welding
PROCESS OF SHELF MAKING The processing of shelf manufacturing begins when the raw coil of
thickness 2.5 mm is been receive through store and then the starter cutting
machines first make starter the coil and then cutted of required size ( depends upon
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
18
the requirement ) , now the cutted coil is then bended and it is to be welded now
the frame of the shelf is been and also ready for the further processing.
Now again the no. of strip is also to be cutted so that there can fixed into
the shelf and then the shelf is to be welded by the tug welding process.
Now in order to support the shelf various section of straight shapes, L –
shapes, Z- shapes, the basic purpose of these section is that they used to provide the
support to the shelf of the refrigerator.
DIP- COATING / PAINTING SHOP It is basically the shop which is use to painting the manufactured shelf
but very few other parts are also been painted in this shop.
PROCESS OF DIP COATING PAINITNG The actually process is begins with the PHOSPHATING.
The phosphate process is based upon the various chemical in different tanks,
therefore first of all the manufactured shelf is first dipped into the tank -1 ( which
contain the dioxide chemical ) within 10 to 15 min , the shelf is to be placed in this
tank and then it is dipped into the 2nd tank (which contain only raw water ) and
within few minutes the it is to be dipped into the 3rd tank ( which is of Guadine 20
chemical ) and it is placed up to 5-7 min and finally again dipped into the rinse
water.
Once the phosphating the next is the coating painting
The phosphated shelf is then placed within the Backing oven ( which has the
temperature of 225 degree centigrade) after a few min these shelf are then to be
dipped into the powder ( JOTUN POWDER ) and then these are placed into the dry
oven ( has the temperature of 225 degree centigrade) and in last it is to be dipped
into the water.
� Capacity of DIP-COATING section is 1000 shelf paint per day
CONDESNSOR MANUFACTURING Every manufacturer knows the importance of condenser in refrigeration
process and without condenser the existence of the refrigerator is almost
impossible because it is something that maintain the refrigeration cycle. Therefore
in order to make the condenser manufacture the condenser much careful analysis
are required.
This section is use to make two different condenser.
i) Back panel condenser ( actually called as condenser ) ii) Bottom condenser
� The actually the first step towards condenser manufacturing is taken by
the engineering department.
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
19
� Engineering department through critical analysis used to check the
actual condenser and then give the effective and efficient proposed way
to manufacturing in the shape of drawings, equipments etc.
�
BOTTOM CONDENSOR Most of people even don’t know is there any condenser in the refrigerator
that place in the bottom of the refrigerator. The basic function of this condenser is
also to reduce the temperature like other condenser do so .
PROCESSING OF MANUFACTURING THE BOTTON CONDENSOR The process of manufacture a bottom condenser requires a drawing and
the drawing varies from model to model of refrigerator therefore the size and coil
of bottom condenser also varies.
With the help of different pressing machine to complete the sheet and bending the
coil as per requirement through tug welding is then to be fitted.
BACK PANEL CONDENSOR (ACTUAL CONDENSOR) It is one of the most important and more meaningful part of the refrigerator
and the effectiveness of condenser is necessary for the active life of the
refrigerator.
PROCESS TO MANUFACTURE A CONDENSOR Once the plan has receive by the PPC to the production IV section and
according to this plan the condenser of particular quantity of particular model has
to manufacture.
The first is to make use of MS sheets cutting strips then with the help of
shutter machine a late form in which certain operation carried out one by one such
as embossing, fins making is to be done.
The bending section first to cut the coil and straight it with the straighter
shutter machine and then bend the coil through is winches and dies is that the
required bending is to be obtain.
Once the plate and bending is prepared now with the help of tug welding
there plate with bended is to be welded.
Now the end plates of condenser that has been manufactured by pressing
machine is also to be welded by tug welding process.
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
20
Now at the end the strip of MS also welded so that to provide the proper
reinforcement to the condenser .
By following the above stages the condenser is said to be manufactured.
GALVANIZED SECTION It is the very little type of section and its purpose is to nickel the various
parts such as
i) leg holder
ii) top middle bottom hinchees.
iii) Screws and others parts.
The basic behind this section is to do the nickel plating so that to remove
all the abrasive material, oil, Greece etc.
CHEMINCAL IN USE
Following ar he chemical those are used in this section
• Zinc brightener
• Zinc Californiazinc anodenitric acid
ALUMINIUM HANDLING SECTION It is the section which is bound to make the aluminum handling for the
refrigerator for the opening and closing of the door.
PROCESS OF ALUMINIUM HANDLING SECTION Already manufactured profile of aluminum is to be purchased from abroad
and then this profile is cutted according to specification of handle requirement.
Once the size is to be cutted then with the help of numerically control milling
machine a profile is being made to provide groove type of section so that the
handle is to be fixed.
CHROME SECTION Once the handle cover is been made by the modeling section to make the
handle cover then the crossing of that part is to be taken place.
PRCESS OF CHROMESECTION The chroming is to be done by following the certain steps
STEP # 1 :- ETCHING BATH First of all the handle cover is dipped into the chromic acid in the etching bath
which is al the temperature of 65 degree centigrade.
STEP # 2 :- WATER TANK After the etching process the handle cover is to be dipped into the raw water .
STEP # 3 :- After that it is to be dipped into the HCL and also into the
neutralization drum.
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
21
STEP # 4 :- After wards it is to be placed into the activation bath which also
include certain amount of HCL.
STEP # 05 :- Now at this the nickel sulphate electroplating is to be done.
STEP $ 06 :- after that the it is to be dipped into the copper the layer of copper
in comes over the handle.
STEP # 07 :- Nickling is to be done at this stage hence the nickling also to be
placed over the handle.
STEP # 08:- At the very last stage the chroming is to be done over the handle.
U-V LIGHT SECTION The only haxon model of refrigerator inn which there is type of fan placed
within the refrigerator.
The function of that fan s that when door is closed its used to provide the air sot
that the ice is to be melted for the effective cooling of refrigerator.
So in this section fan with its parts to be assembled here.
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
22
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
23
PRODUCTION V (PRE- FOAMING) Till production we are making, painting the certain parts so that they
should combined to form the original product.
• The production V ( i-e PRE – FOAMING ) as the name suggest it is the pre
of the foaming that is it the place where the various operation is to carried
before it is to be placed to formed.
• At the pre foaming the necessary item such as the liner, freezer and anti-
moisture tube, evaporator are to be inserted into the actual body of cabinet.
PREFOAMING PROCESS The actual process of pre-foaming is starts when the painted cabinets
from the cabinet painting shop are comes to the pre-foaming zone.
We can underline the each and every step of pre foaming now
STEP # 01:- First of all the compressor support is un-screwed from the
painted cabinet.
STEP # 02:- The gum- type material named as slent is to be inserted into the
corner edge of the painted cabinet in order to make proper isolation.
STEP # 03:- Washer type material is tape within the four whole if the back panel
so that condenser is to be screwed easily in it.
STEP 04:- Bottom profile is inserted within the embossing area in the bottom.
STEP 07:- spaces in fixed in the back panel so that the pipe which is fitted in it.
STEP 06:- Groemr also fitted with the wholes.
STEP 07 :- Anti moisture strip a black pipe is to be inserted within the profile
cabinet.
The anti-moisture strip has two functions first as the name suggest its used to
prevent from the corrosion effect also the gas kit ( rubber type ) within the door is
causes to crack because of cooling inside so it is also prevent this as it is connected
with the compressor.
STEP # 09 :- the freezer box is to be further includes the following sub- systems
Sub – step 1:- the painted evaporator from the EMD is bend by the press
machine.
Sub-step 2:- the bended evaporator is then to be check for the little inspection.
There are basically two different inspection tests,
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
24
i) A LEAD DETECTOR MACHINE :- A machine which is used to detect the all the pipe and join of the
evaporator by inserted the Freon gas.
The detector even has the capability to detect 1.0 micro gram of area.
Once the evaporator is OK then it is to be shifted for the next test.
The statistics show that there are basically 8 to 10 evaporators rejected in lead
detector test.
Once the purpose is established hen the Freon gas is to be ejected and stored and
from the evaporator.
ii) The 2nd inspection include is to check the mass flow rate within the evaporator
and it is to be done by inserting the Nitrogen gas from the capillary. It is also gives
the benefits in the shape that it tends to clean the evaporator by the nitrogen gas.
Sub- stage 03:- Obtaining a evaporator frame.
The evaporator from is to be make by joining the evaporator the side plate
thorough a silicon type of material.
Now this flow is to be fitted with the freezer side of the cabinet.
STEP # 10:- The ref portion of the refrigerator is to be undertaken and it can be
divided into the following sub steps.
Sub – step 01:- the liner which is come form the thermosetting section is first
sized and cutted by the press machine. With the size the whole also produce which
is of evaporator and thermocouple.
Sub-system 02:- after that the head after and thermostat cover is taped within
the liner.
Sub- system 03:- a light pipe is having the wire which is the fitted with the
thermostat on one hand and head after on the other hand.
STEP # 11:- Liner is fitted within the cabinet i-e liner completely fitted within
the cabinet.
That’s the end of the pre-foaming suction.
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
25
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
26
FOAMING SECTION The foaming section is a place when the pre-foamed cabinet is to foamed by
the automated machine.
The foam which is to be inserted within the pre-foamed foam than it is solidifying
within a few minutes.
The foam is basically made of two different type of chemicals.
i) Polyoal ii) Iso – cynate iii) R141B ( a gas whch is used as a catalyst )
• The foaming section has the capacity to filled 81 mould foam per hour i-e capacity = 81 mould foam per hour.
PROCESS OF FAOMING The process of foaming section begins by fixing the jigs and fixture within
the ref section so that while foaming the inside the refrigerator is not bend etc.
After that the highly automated the mixture of foam is to be inserted within the
cabinet.
The dawlance has 9 moulding foam hangers which is highly automated and used to
operate according to the sensors and actuators and various other things.
Basically the mixing of chemicals as to form the foam is to be as
100 % of polyoal
1260 % of iso –cyanides
16 % of R141B. It can be termed as ,
P : g : I
100 : 16 : 1260
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
27
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
28
ASSEMBLY LINE
This is the very last portion of this shop also the refrigerator
manufacturing.
At this stage the all parts that we have made in deferent section such as sheet
items or main body items we made in sheet metal section, plastic items we have
marked in moulding, condenser e have made in production IV , shelf we have
make in production IV , freezer and ref door also assembled
Therefore is assembling shop we are the assemble all items to make the
refrigerator.
At the end certain inspection made refrigerator takes such as vacuum generation
and then the Freon gas is also inserted into the refrigerator.
At the end of assembled line the refrigerator are to be packed and transferred to the
store room as a inventory so that it is it be distributed.
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
29
PRODUCTION I (PLASTIC MOULDING SECTION)
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
30
As the name suggest plastic molding the production is said to manufacture
all plastic type of equipment that can be used in refrigerator manufacturing.
There are 6 section includes in moulding each section have its own task to with
they can act these are as follows,
i) Compounding section ii) Injection section iii) Hot stepping section iv) Steam print section. v) Extrudes section vi) Cable section
• The compounding and injection are the most basic sections and these are
those which used to produce they different plastics items in proper
quality and quantity.
COMPOUNDING SECTION The raw material of various plastics material in the form of huge grain is
received in compounding portion through store room.
These raw materials includes,
� PS � ABS � HIPS � LIPS � PC � NYLONE & � PP.
The compounding section used to mix the raw material with the pigment so
that required color of particular item is obtained.
The mixing can be done by two different type of devices.
i) DRUM MIXTURE ii) VERTICAL MIXTURE
DRUM MIXTURE Drum mixture is a device which consist of two different drum and b/w the
there is a motor that has the rotatory function. The motor used to rotate the drum.
Each drum has the capacity to take two beg ( each beg of 25 kg i-e 50 kg ) so we
can say that drum mixture can take 100kg of a material in a time.
PROCESSING OF DRUM MIXTURE The processing of mixing of material through drum mixture is such that
mixture the beg of 25 kg of material insert into the drum then the amount of
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
31
pigment according to the standard weighted and insert into the drum and then again
another beg also inserted into the drum and similarly the next drum also filled.
Now the drum mixture start rotating and mixed the material with the pigment and
in 5 min the material is kept out just within the 5 min.
Therefore we can say that the drum mixture has the capacity of 100 kg of material
to be mix in 5 min.
VERTICAL MIXTURE : It is also the mixing device and used to mix the material with the
pigments go that the required material can be obtained.
Though it can be used to mix all type of material but in compounding section of
dawlance it is specifically used to mix the poly storing (IS) material with the pigment
of T- brown , T green, smooth gray. Height impact poly strien (HIPS) material with
the pigment of brilliant white.
INJECTION SECTION: • It is heart of the moulding section here all plain parts are been manufacture
through injection mould mallina.
• The highly automated machine CLF- INJECTION MOULDING MACHINE
use in this section.
• The machine can varies clapping force i.e the injection moulding machine
(CLF- 8OT) has the minimum clapping force injection moulding machine
(CLF- 800T) has the maximum clapping force.
• There are basically 52 CLF-MOULDING MACHINE’S are used and can vary
in diff: clapping force to make very small item to the heavy plastic item.
PROCESS OF CLF (INJECTION MOULDING MACHINE) Basically the processing of CLf is based in the four different sections.
1. Hooper 2. Bassell 3. Injection side 4. Eject side
1. HOOPER: First of all material (mixed material) has come from the compounding
section. Hooper actually use to collected the inserted material alive is the shifted in to
into the bassel.
2. BASSEL:
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
32
After Hooper the material hydraulic piers machine comes into the bassel. In
bassl this material first heated thorough 7- different zone and reach zone has two
heaters.
3. INJECTION: Once the material is to be melted with the help of heated now the material is to
be injected through layer 6 to 7 different stage into the injected mould.
EJECT: After completing the ague the maked part in then eject from the machine so
that to perform the work.
From all these the other part i-e. carriage is used to be mixed
HOT STEPPING SECTION: It is little section in which chosen stepping is to be done over the
freezer door pocket that desirable the various sign.
EXTRUADES SECTION: It is the of section actually injection moulding process and it is also
used to make the profile that has been mould plastic material and give the shape of
profile.
CABEL SECTION: The refrigerator wire connection from the electric require a plug and
cable so in this there things are to manufactured.
Once the wire (cables to be purchased that first of on this cable are cables are to cutted
the required size and then the folly steps are to be taken
1. Core stepping 2. Wire stepping 3. Pinch moulding 4. Pinch foulding 5. Princh moulding machine
SCREEN PAINTING: As one have seen that there is numbering over thermometer regulator,
also we have is painting over the shelf “wider shelf “ similarly these is certain
coding we have seen, so in thing reaction i-e “ screen painting , there coating has
been painted over the items.
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
33
MAINTENANCE
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
34
Today, in modern industry, equipment and a machinery are a very
important part of the total productive effort than was the case years ago. Moreover,
with the developments of special purpose and sophistical machines, equipment and
machinery cost a lot more money and there fore their and does time becomes much
more expensive. For this reason, it is vitally important that the plant machinery
should be properly maintained.
OBJECTIVES OF PLANT MAINTENANCE i) The objective of plant maintenance is to achieve minimum breakdown and to keep the
plant in good working condition at he lowest possible cost.
ii) Machines and other facilities should be kept in such a condition which permits them to
be used at their optimum (profit making) capacity without any interruption or
hindrance.
iii) Maintenance division of factory ensures the availability of the machines, buildings,
and services required by other section of the factory for the performance of their
function at optimum return on investment whether this investment be in material,
machinery or personnel.
IMPORTANCE OF THE MAINTENANCE
i) The importance of the plant maintenance is varies with the type of the plant and its
production.
ii) Equipment breaks down leads to the inevitable loose of production.
iii) An improperly maintained or neglected plant will sooner or later requires expensive
and frequent repairs, because with the passage of the time all machines or other
facilities (such as transportation facilities), buildings, etc wear out and need to be
maintained to function properly.
iv) Plant maintenance plays a prominent role in production management the plant break
down create problems such as,
• Loss in production
• Rescheduling of production
• Split material (because sudden stoppage of process damages in-process
materials).
• Failures to recover overheads (because of loss in production hours).
• Need for over time.
• Temporary work shortage- workers require alternative work.
METAINENCE METHODS There are basically two different maintenance methods i-e
i) Tribology
ii) Tero technology
TRIBOLOGY
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
35
It is the method of maintenance that deals with the lubrications impact of
the machine by proper maintenance.
It includes oiling, greasing etc.
TETO-TECHNOLOGY It is also the methods of maintenance that deals with the mechanical
effect of the maintenance such as repairing of the part of machine, overhauling of
the machine.
MAINTENACE AT DAWLANCE (United Refrigerator Company)
At dawlance there is a separate maintenance which constitute of several
engineers, technicians, and a skilled labors.
Their work is basically based upon the team efforts in which each persons has
certain responsibilities.
This section is centrally connected but all other section of industry by means of
computer network software (ORACLE) and also within the telephone.
They use to work into different format first they have collect the data of all bug to
small machines procession and divided these data of each part of machine into
various activities and also assign a scheduled of maintenance of each activity so
that to work accordingly.
The second format on which they work is that whenever any break down occur in a
production as per receive the compliance of particular maintenance they work upon
it.
Except production work their are other areas such as puncher shop, compressor
maintenance shop, generator maintenance, electrical maintenance department.
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
36
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
37
QUALITY CONTROL DEPARTMENT QUALITY:- Though there are no. of definition of quality but in very simple works it can
be term as “ To meet the customer’s specification “.
CONTROL:- The provision to control the action or plan is to be control so that to meet
the requires as per planned.
QUALITY CONTROL:- Quality control refers to the control level of quality si that to lead to the
customer satisfaction.
• It is the provision under which the proper and effective quality it to be obtain so
that to lead the market position.
• In an organization the term quality is as big as it can and under a no. of quality
units are working their work to inspect the ongoing activity as per standard and
then mark as OK, HOLD, USAI, REOWRK & SCRAPE.
QUALITY CONTROL AT DAWLANCE The quality is given the major relaibnility at dawlance and therefore the
central quality control department is been devied in deffrent quality section
i) Quality engineering cell
ii) Incoming quality control
iii) Quality assurance
iv) Self quality at each manufacturing section
v) Quality process lab.
And many other departments ……
QUALITY ENGINEERING CELL It is basically the quality section is which all the documentation are to be
taken places
It is use to keep the documentation like of each section and even each section’s
item that has produces….
a) Quality instruction b) Work instruction c) ITI ( Instruction Testing Inspection ) d) Sampling Inspection e) Quality status
Now we shall discuss each section in detail..
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
38
QUALITY STATUS While inspected anything the doud full item are to be taken into 4 basic
consideration rather than just to be called as scraped i-e by reviewing whole
parameter the decision regarding the item is to be taken.
There are basically four quality status .
i) HOLD ii) UAI (use as is) iii) REWORK iv) S CRAPED It can be illus trade as ,
HOLD = During inspection the defective part is to be hold.
UAI
HOLD
REWORK
SCRAPED
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
39
USE AS IS (UAI) = Though the part is not fully mismatched with the
standard but the negotiation between the manufacture and quality incharge is to be
taken and the item is it be USE AS IS (UAI).
REWORK = There are few items those are require to rework so that to be
come into the required expectation
.
SCRAPE = The item is to be scarped.
QUALITY CONTROL MANUAL It is basically a manual that can help the operator to perform the work takes
as it includes all type of activities.
These are those type of manual which use to perform the training function to the
operation because its includes set of instruction of every used item.
SAMPLING TABLE As we know when raw material receive there are basically a no. of lots and
each lot having a no. of item therefore is extremely difficult to check each and
every item and also time consuming because if we are doing to inspect every item
so it is very difficult for us to meet the required demand.
Therefore the process begins by checking first 3 lots completely i-e 100 % and then
if the fault rate is same or reducing the accordingly move toward the sample mood
in which according to lot size the item are randomly selected.
The sampling mood sheet can be illustrate as ,
SAMPLING TABLE
LOT SIZE ACCEPT QUALITY LEVEL
SAMPLE SIZE ACCEPT REJECT
2 to 8 2 0 1
51 to 90 3 0 1
500001 to
over
13 1 2
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
40
• ITI (INTRUCION TESTING INSPECTION) It is basically a document in which whole process and way of doing of
each and every part is given.
It is a document which includes all the defects even that has observed before in the
form of major and minor defects.
Basically there are 872 type of ITI’S are there.
• DC / IDC FORM DC = DECIPLANE CHECK
IDC = INTER DECIPLANE CHECK It is the document which bund to check the discipline of particular item i-e
the item like sheet coil is been check by the sheet metal inspector. After that it is
inter disciplinary check by the concerned related section.
• RELIABILITY IN AN ACTION PROGRAM (RIAP) It includes basically a proframa which describe how training programs are to
be undertaken.
What are the progress of training i-e how to be calculate.
What is the procedure of doing the basic task etc.
• INCOMING QUALITY CONTROL DEPARTMENT Incoming quality control is basically a quality section whose function is to
inspect all incoming raw material that can be utilized for different purpose in
different place. They used to work according to the instruction has given in ITI of
particular item and each ITI is different for different items.
We also know the dawlance (united refrigerator) can purchase the material both
expert from other countries and also taken from the local suppliers.
PROCESS OF INCOMING Q.C The procedure of incoming quality control section to inspect the raw item
can be under line in the following steps.
STEP # 1:- RECEIVE PROCESS It is the visually process once the raw material is receive the proforma that
has been given within the raw material by the supplier is to check whatever written
in the from of quality is placed or not.
STEP # 2:- QUALTY INSEPCTION It is the main inspection in which the raw material quality is to be
inspect to mismatch with the standards
Initially the first three lot are to fully inspected i-e 100 % checking and after that
the defect level over in first 3 lots are satisfactory the we shall proceeds to the
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
41
sample mood when according to the lot size sample is randomly selected and then
be inspected.
It is very much important to remember the incoming Q.C is not able to
inspect all items just like chemical type of material is to be inspected in Q.C lab
and hence the C-FORM is to be make for that.
Incoming Q.C usually make visual dimensional inspection.
Now we shall discuss the item as follows,
• EVAPORATER Evaporator is the type of item which is no. of time to be inspected starts
from the Q.C and then final assembly inspection.
The dawlance exports evaporator from china the suppler name “Jau-su-shanfe”.
Though testing supplier are also inspected but the existing supplier “Jau-su-shanfe”
is the major and more reliable supplier of evaporator.
Evaporator is 100% inspected and there is no concept of sample mood.
PROCESS OF EVAPORATER INSPECTION AT INCOMING Q.C First of all the sizing of evaporator is to be inspected visually and then observe the
dent to be placed over the evaporator more importantly if that case the dent to be
over the bended area ( as is pre-foaming shop) the evaporator is to be rejected
because no more risk is to be taken.
• JOTUM POWDER We know the usage of JOTUN powder i-e its use for the paining purpose if items .
The inspection of JOTUN is begins by batch the powder in term of their respective
code and colors.
After that the C- form is made and its sample of every batch shifted to the Q.C lab
where the chemical is to be inspected in order to match the existing composition
with the standard one.
• CABLE ASSEMBLY LINE SWITCH As we have seen in pre-foaming stage when liner is prepared for fixed
into the cabinet so the hold assembly with thermo state is taped over there.
Therefore the cable is to be termed as cable assembly switch and it is to be
inspected in terms of equal dimension.
The multimeter is used to check continuity of cable etc
And many other item are to be inspected at Incoming Quality Control ( we are not
in a position to describe each ).
SELF QUALITY SECTION
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
42
Every manufacturing side have its own self quality section whose
purpose is to check the quality of manufactured item that make in his section as per
required specification.
There are basically two different type of inspection is to be taken place
i) First piece Inspection ii) Roval inspection
FIRST PIECE INSPECTION As the name suggest the inspected that has been taken from the first
piece according to the required drawing specification
Then the first piece is to be filled into the shape of document certificates are as
follows ,…..
FRONT SIDE
BACK SIDE
REQUIRED FOUND SIZE VARIATION MEASURING
UNITED REFRIGRATION INDUSTRIES LTD IN PROCESS QUALITY CONTROL DEPARTMENT
(SHEET METAL)
FIRST PIECE / MACHINES SETTING CERTIFICATE
DATE___________________SHIFT______________________ TIME_______________________
MACHINE:______________________________________________________________________
PART____________________________OPERATION____________________________________
DIE/ MACHINE SETTER__________________________________________________________
DRAWING NO.___________________________MODEL_________________________________
SIGNATURE PROD. SUPERVISOR _________________________________________________
REMARK BY QC INSPECTOR ______________________________________________
Certificate no. -----
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
43
SIZE TOOL NAME
ROVAL INSPECTION As we know that the variation over the item can be occur at any stage because of any
fault in an machine therefore after first piece inspection the roval inspection i-e after
every hour of same item also done to maintain the quality.
The roval inspection certificate is filled according to the dimension.
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
44
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
45
SUGGESTION NO. 1:-
There should be a supply chain department.
A supply chain is a process that includes the chain of supply
from purchasing of raw material to the shifting to end consumer. It
defines as the supplier-customer interaction and intermediaries’ b/w
them.
I have seen while doing internship at dawlance there is no
concept of supply chain management and there is no supply chain
department and instead of having the separate supply chain department
the PPC ( production planning and control ) dealing with the affairs of
supply chain .
IFFECT OVER THE INDUSTRY IN THE ABSENCE OF SUPPLY CHAIN DEPARTMENT In dawlance the process of manufacturing is to be start when
the tentative schedule is been given to each manufacturing section that
they has to produce this much amount of this and this much amount of
that in a particular period of time. Every manufacturing within the
industry is been produce its own tentative work plan on which they
have to work but unfortunately this tentative plane does not define the
interaction b/w two manufacture i-e supplier –customer relationship.
For example :- Pre-foaming is the customer of cabinet painting shop
and cabinet painting shop and cabinet painting shop is the customer of
sheet metal and welding section hence its form a chain of supplier and
customers.
For example :- thermo foaming is the supplier of pre-forming or in
other words pre-foaming is the customer of thermo foaming but the
supplier of thermo foaming is out siders .
In dawlance (united refrigerator company) instead of having a supply
chain department there is general meeting among the supervisors and
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
46
engineers of manufacturing staff and this meeting every supplier is
interacting with his customer so that to know the current situation of
each other and share their problems to each other.
Hence just based on the general meeting the result as any
stoppage or draw back in production they used to blaming to one
another which in term leads to create conflict.
Therefore if there will be a supply chain department so I think is a
perfect accountability of each section and hence over all performance
get improved.
SUGGESTION # 2 :-
There should be an effective maintenance department. As we have discussed that there is a maintenance department
but to be very much frank it is not suppose to fulfill the required
production expectation which in tern causes to create the conflict b/w
the maintenance and manufacturing section.
Manufacturing section complains that ,
• Maintenance not working properly .
• They don’t find the root mean cause of the problem instead they just
try to put their effort so that the production has start.
• They donot react on time usually we call them a lot and at the end
they used to react.
On the other hand,
The maintenance compliance that,
• They don’t have enough work force to reduce the causes of
unhappenings.
• Manufacturing too easily too band toward their improvemental
thinking and its being extremely difficult to maintenance to meet
all this.
And there are various other factor that lead to create the conflict among
the manufacturing and maintenance section.
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
47
SOLUTION The main dramatic lack is also that there is no shutdown
maintenance of machine been allow by administration because
shutdown maintenance required 2 to 4 hours and obviously while
doing shutdown maintenance the production gets stops and
management not want any action that leads to stop the production . But
if wee look from a close eye the machines get stops any time because of
any lack then to give ordering to the maintenance and then it assign the
optimal crew according to the work and then act this also requires a lot
of time and in this period also gets stops therefore I think there ha to be
same period of shutdown maintenance.
INTERNSHIP PROGRAME
UNITED REFRIGRATOR COMPANY LTD. DAWLANCE
PREPARED BY MOHAMMAD YOUNUS (08IN70)
48
PREPARED BY
Name: Mohammad Younus
Fathers Name: Mohammad Anwar Qureshi
Surname: Qureshi
Nationality: Pakistani
Date of birth: 24th November 1988
Place of Birth: Hyderabad
Domicile: Hyderabad Urban
Profession: Student
Degree: Graduation (B.E Industrial Engineering & Management)
Year of Study: Final year.
Roll No. 08IN70
University: Mehran University of Engineering and Technology (M.U.E.T) Jamshoro.