DDEETTAAIILLEEDD PPRROOJJEECCTT RREEPPOORRTT
KKAARRIIMMGGAANNJJ--VVII ((KKAACCHHUUAA IIWWMMPP))
PPRREEPPAARREEDD FFOORR:: SSTTAATTEE LLEEVVEELL NNOODDAALL AAGGEENNCCYY ((SSLLNNAA)),, IIWWMMPP,, AASSSSAAMM
RR.. GG.. BBAARRUUAAHH RROOAADD,, GGUUWWAAHHAATTII--55
PPRREEPPAARREEDD BBYY:: CCAACCHHAARR SSOOIILL CCOONNSSEERRVVAATTIIOONN DDIIVVIISSIIOONN,, SSIILLCCHHAARR
2
DETAILED PROJECT REPORT OF IWMP (2010 – 2014)
Micro Watershed : 1. Malua MWS, 2. Chorgola-Goramara MWS, 3. Umorpur MWS, 4. Masli MWS, 5. Lamajuar MWS, 6. Jhum MWS 7. Basail MWS Micro Watershed Code No : 1) 3C2A3Q1, 2) 3C2A3Q2, 3) 3C2A3Q3, 4) 3C2A3Q4,
5) 3C2A3Q5, 6) 3C2A3Q6 & 7) 3C2A3Q7 IWMP project : Kachua IWMP, Karimganj – 6 Block : Badarpur Dev. Block District : Karimganj
Name of the PIA : Divisional Officer, Cachar Soil Conservation Division Silchar
3
Contents
Executive Summary CHAPTER 1 ........................................................................................................................................... Introduction and Background ..................................................................................................................
INTRODUCTION .................................................................................................................................. II). PROFILE OF THE WATERSHED PROJECT: ........................................................................................ Table No.1.1 Project at a Glance .......................................................................................................... Table No. 1.2 Need and Scope for Watershed Development ................................................................... Table no.1.3: Watershed information .................................................................................................... Table No.1.4: Status of other development project in the area ................................................................ Table No. 1.5: Status of previous watershed programme- .......................................................................
CHAPTER 2 ........................................................................................................................................... General Description of Project Area .........................................................................................................
Table 2.1: Location ............................................................................................................................. Details of the types of areas covered under the project ........................................................................... Table no: 2.2 Land Details ................................................................................................................... Table No. 2.3: Details of the types of areas covered under the project ..................................................... Table No. 2.4: Details of Agro-climatic condition..................................................................................... Table No. 2.5 Details of flood and drought in the project area ................................................................. Table No. 2.6: Details of soil erosion in the project area .......................................................................... Table No. 2.7 Details of the Soil pH ....................................................................................................... Table No.2.7.1 Climatic Condition ......................................................................................................... Table No.-2.8 Physiographic Features....................................................................................................
4
Table No. 2.9 Watershed characteristics ................................................................................................ CHAPTER – 3 ........................................................................................................................................ BASE LINE INFORMATION OF WATERSHED .............................................................................................
Table No. 3.1: Demographic features: ................................................................................................... Table No. 3.2: Livestock details: ........................................................................................................... Table No.3.3:Socio- economic status: .................................................................................................... Table No. 3.4: Migration Details: .......................................................................................................... Table No. 3.5: Details of Community Based Organizations existing in the watershed village: ....................... Table No. 3.6: Infrastructure Facilities: ................................................................................................. Table No.3.7 Land use pattern (in Hectares) .......................................................................................... Table No. 3.8: Details of Common Property Resources: ........................................................................... Table No. 3.9: Agriculture implements: ............................................ Table No. 3.10: Crop Classification Table No. 3.11: Crops & Cropping pattern: ............................................................................................ Table No. 3.12: Land capability Classification ........................................................................................ Table No.3.13: Irrigation facilities: ....................................................................................................... Table No. 3.14: Status of water table: ................................................................................................... Table No. 3.15: Assessment of drinking water facility*: ........................................................................... Table No. 3.16: Surface water resources .............................................................................................. Table No. 3.17 Ground Water Structures to be repaired. ......................................................................... Table No. 3.18: Existing Water Saving Practices: .................................................................................... Table No. 3.19: Details of existing livelihoods ......................................................................................... Table No. 3.20: Existing functional assets (Works already completed under different schemes including works undertaken by farmers independently) ......................................................................................... Table No.3.21 PROBLEM TYPOLOGY OF THE WATERSHED ......................................................................
CHAPTER – 4 ........................................................................................................................................
5
Institutional Building and Project Management ......................................................................................... Table No. 4.1 Details of SHGs & UGs newly formed under IWMP: ............................................................ 4.2: Details of Watershed Committees (WC) ......................................................................................... Table No 4.3: WDT Particulars:............................................................................................................. Table No. 4.4: PIA particulars .............................................................................................................. Table No. 4.5 Bank Account Details ....................................................................................................... Institutional Mechanisms: (Enclose the following documents) .................................................................. Documents of Agreements: .................................................................................................................. Table No. 4.8 Convergence plan with IWMP:..........................................................................................
CHAPTER – 5 ........................................................................................................................................ Management/Action Plan ........................................................................................................................
Description on methodology of plan adopted ......................................................................................... 5.2 Details of Natural Resource Management Activities ........................................................................... Table No. 5.2.1 Soil and Moisture Conservation structures ....................................................................... Table No. 5.2.2 Water Harvesting Structures.......................................................................................... Table No. 5.2.2 Vegetative Covers ........................................................................................................ 5.3: Structure or Activity Wise Details of Engineering Structure and Vegetative Measures ........................... Table No.5.3.1 : Engineering structures for Soil Conservation Measures (SMC) ........................................ 5.3.2: Details of engineering structures for Water Harvesting WHS .......................................................... Table No. 5.3.3: Details of activities connected with vegetative cover in watershed works* ........................
Chapter 6.............................................................................................................................................. Capacity Building Plan ............................................................................................................................
Table No. 6.1 Details of Capacity Building .............................................................................................. Chapter 7.............................................................................................................................................. Phasing of Programme and Budgeting ....................................................................................................
Table No. 7.1: Phasing of the action plan .............................................................................................
6
Table No. 7.2 Estimated Benefit Cost Ratio ............................................................................................ Chapter 8.............................................................................................................................................. Consolidation and completion of various works .........................................................................................
Table No. 8.1: Consolidation of Action Plan ............................................................................................ CHAPTER – 9 ........................................................................................................................................ EXPECTED OUTCOMES ...........................................................................................................................
9.1 Describe in detail the “Expected Outcomes” .................................................................................... Table No. 9.2: Summarize in the table given below (Quantifiable indicators) ............................................. Table No.9.3: Backward and Forward Linkages .....................................................................................
List of Maps to be enclosed along with DPR. .............................................................................................
7
EXECUTIVE SUMMARY
Brief about area: The Kachua IWMP (Karimganj – VI) lies in the State of Assam which is located in Badarpur Development Block of Karimganj District. The project area is located in between 24048/0// N to 24054/0// N Latitude and 92024/0// E to 92036/0// E Longitude. The Watershed area covered 41 nos. of revenue villages. This project is a cluster of seven micro watersheds with codes 3C2A3Q1, 3C2A3Q2, 3C2A3Q3,
3C2A3Q4, 3C2A3Q5, 3C2A3Q6 & 3C2A3Q7. The total project area of the watershed is 6906.0 Ha. out of which 5500.0 Ha. area has been undertaken as treatable area under IWMP. Kachua watershed project area has a total of 14,473 House Holds with a population of 59,318 nos. (as per base line survey) out of which 30,357 nos. are male and 28,961 nos. are female. The sex ratio is 954 female to 1000 male. There are 7,563 BPL families. The average family size is 4. The literacy rate is 72.45 %. Male literacy is 80.10 % and female literacy is 64.30%. The major castes in the village are General, SC & OBC. The means of livelihood for most of the population comes from agriculture.
Institutional Arrangement: The Divisional Officer, Cachar Soil Conservation Division is the PIA of Kachua IWMP, Karimganj – VI watershed project. The PIA is responsible for supervising, planning, implementing, documenting and promoting watershed development projects in the area as per guidelines. Having dedicated the experienced staff and a multi disciplinary team enables the PIA to execute the watershed programme. The experienced staff and multi disciplinary teams under the PIA comprises of experts in the field of soil conservation, agriculture, animal husbandry, social science etc. as WDT members.
Salient Project Activities: People’s participation and collective action are essential elements for successful implementation of any watershed project. These has been emphasized in the project and the project activities has been designed keeping in mind sustainability, equity and participation of both the organization as well as the villagers. Water harvesting structure like Gully Control Project and Excavated Pond, Boulder Spurs, Boulder Revetment, Water Distribution Channel, Demonstration Plot to introduce Systematic Rice Intensification (SRI) are some of the activities which have been decided to be executed in the watershed project areas. Various demonstrations would be practiced upon in order to improve agriculture practice and training progammes for capacity building to improve livelihood has been planned to be executed in the village. The development activities will be carried out by the watershed committees under joint supervision of President of Watershed Committee and PIA. Further it will be evaluated by the villagers in the Gaon Sabha who to are stake holders. The WDT Members and PIA will be providing supervisory guidance in the context of technical support and capacity building programme etc. A total 13230 mandays have been estimated and a sum of Rs. 17.1972 Lakhs will be generated as watershed development fund.
8
FUND UTILIZATION PATTERN COMPONENT WISE IN % UNDER IWMP FOR FIVE YEARS
Component
Allocation in %
Total in % Phase – I Preparatory Phase – II : Work Phase – III
Consolidation 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year
Administrative 1 1 2 2 2 2 10 Monitoring 0 0.50 0 0.25 0 0.25 1 Evaluation 0 0.50 0 0.25 0 0.25 1 Entry Point Activities 4 0 0 0 0 0 4 Institution and Capacity Building 0.50 2 1 1 0.50 0 5
DPR 0.50 0.50 0 0 0 0 1 Watershed Development Works 0 7.50 21 10.5 17 0 56
Livelihood Activities (Asset-less) 0 1 3 3 2 0 9
Livelihood Activities (Farmer) 0 1 3 3 3 0 10
Consolidation 0 0 0 0 0 3 3 Total = 6 14 30 20 24.5 5.50 100
9
Overall Breakup of Project Fund under Entire Activities during the Project Period - Treatable Area = 5500 Ha. Total Project Outlay = 660.00 Lakhs Project Duration = 2011 – 12 to 2015 – 16
Component Phase – I
Preparatory Phase – II : Work Phase – III Consolidation Total
1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year Administrative 6.60 6.60 13.20 13.20 13.20 13.20 66.00 Monitoring 0 3.30 0 1.65 0 1.65 6.60 Evaluation 0 3.30 0 1.65 0 1.65 6.60 Entry Point Activities 26.40 0 0 0 0 0 26.40 Institution and Capacity Building 3.30 13.20 6.60 6.60
3.30 0 33.00
DPR 3.30 3.30 0 0 0 0 6.60 Watershed Development Works 0 49.50 138.60 69.30
112.20 0 369.60
Livelihood Activities (Asset-less) 0 6.60 19.80 19.80
13.20 0 59.40
Livelihood Activities (Farmer) 0 6.60 19.80 19.80
19.80 0 66.00
Consolidation 0 0 0 0 0 19.80 19.80 Total = 39.60 92.40 198.0 132.0 161.70 36.30 660.00
10
CHAPTER 1 Introduction and Background
INTRODUCTION Name of the State : Assam Name of the District : Karimganj Names of the Blocks : Badarpur Dev. Block Name of the project : Kachua IWMP, Karimganj – VI Financial Year of sanction : 2011 – 12 Project duration : From 2011 – 12 to 2015 – 16 Map of the project area showing village boundaries, contours and drainage.
II). PROFILE OF THE WATERSHED PROJECT: Table No.1.1 Project at a Glance
1 Name of the State Assam
2 Name of the Project Kachua IWMP, Karimganj – VI
3 Name of the District Karimganj
4 Name of the Blocks Badarpur Dev. Block
5 Name of Gram Panchayats i) Masly, ii) Konkalesh-Basail, iii) Chorgola-Ghoramara, iv) Lamajuar, v) South-Badarpur,vi) Malua-Srigouri, vii) Umarpur, viii) Hasanpur, ix) Mahakal
6 Names & Census Code of Villages covered
Sl no Village Name Census code 1 Lamarjuar -I (224) 2 Mirjapur-I (225) 3 Masli-I (235) 4 Nairgram (228) 5 Lamajuar-II (227)
11
6 Mirjapur -II (226)
6 Names & Census Code of Villages covered
7 Masli-II (234) 8 Kankalesh-II (237) 9 Lamajuar-III (232) 10 Rajpasha ( 233) 11 Jatkapon (214) 12 Barbari (213) 13 Lamajuar-III (232) 14 Lamajuar-IV (230) 15 DeakuriJapur (216) 16 Deakuri (217) 17 Ghuramara-I (231) 18 Ghuramar-II (240) 19 Brahmansasan-I (367) 20 Chinipatan (238) 21 Kalakuri (239) 22 Basail (249) 23 Mohakal-II (250) 24 MarjadKandi (248) 25 KandigramChaitanyanapur (254) 26 Naharpur (255) 27 KandigramMalua (253) 28 Nizmalua (256) 29 Kankalesh (236) 30 Mohakal –I (251) 31 Hasanpur (258) 32 Sri Gouri (257)
12
33 Umarpur-I (276) 34 Umarpur-II (275)
6 Names & Census Code of Villages covered
35 Chapra (277) 36 Alakulipur (278) 37 Jum-II (286) 38 Jum –IV (281) 39 Jum-V (282) 40 Jum-VI (280) 41 Jum-VII (279)
7 Four Major reasons for selection of watershed
1) Congestion of natural Drainage system & other water bodies. 2) Lack of water harvesting & absence of soil moisture conservation along with inadequacy of irrigation facilities to promote a good crop. 3) Insufficient vegetal cover in the project area is a permanent factor effecting the infiltration & percolation of surface flow leading to harsh moisture stress in the soil which affects the economy of the people in the long run. 4) Prevalence of poverty & non availability of other sectors of livelihood for the landless & poorest.
8 Name, Address, Phone No. and Reg No. of the PIA(s) Divisional Officer, Cachar Soil Conservation Division, Silchar
9 Date of approval of Watershed Development Plan by the DPC
10 Area of the Project (ha.) 6906 Ha. 11 Area proposed to be treated (ha.) 5500 Ha. 12 Financial Year of sanction 2011-12 13 Project duration 5 years (2011-12 to 2015-16) 14 Project Cost (Rs. in Lakhs) 660.00 Lakhs 15 Date of Sanction by State Authority
13
16 Date of Release of 1st installment of Central Assistance (To be filled by DoLR)
17 Any other, please specify Table No. 1.2 Need and Scope for Watershed Development
About 60-65% of the total population of the area is totally dependent on agriculture. The area has been facing many
problems right from low ground water table to perennial flesh flood. Due to erratic climatic character, the project area has to face
occasional drought like situation also. Adverse climatic conditions, poor mobilization of the resources and inadequate agriculture
infrastructure are some of the factors responsible for the underdeveloped condition of the area. Hence, it is anticipated that the
project area of over 6906 Ha. would undoubtedly boost the living standards of the people of the area through the improvement in
agriculture and allied activities. The degradation of the natural wet land & drainages has also created the problem of water logging
in the catchment areas.
Degradation of soil & water resources is considered not only as an extreme constraint to sustainable agricultural
development but also a peril to the society. Poor ecosystem management results in poor functioning of watershed, hence there is a
need to protect and preserve the quality of the ecosystem.
Watershed Management is the implementation of management system that guarantees the preservation, conservation and
sustainable use of all land and water resources. Watershed management also integrates various aspects of Forestry, Agriculture,
Hydrology, Ecology, Pedology etc. for choosing acceptable management alternative within the specific social & economic context. As
mentioned above, the area of Kachua IWMP watershed suffers from degradation of natural resources, soil erosion, situation &
therefore there is a tremendous scope of executing watershed development activities in the watershed area.
Project
Name Project Type Weightage Total
Kachua IWMP Others(Plain)
i ii iii iv v vi vii viii ix x xi xii xiii xiv 7.5 3 5 5 2 10 5 7.5 10 10 5 10 NA 80
* As per PPR
14
Sl. No. Criteria Maximum
score Ranges & scores
i Poverty index (% of poor to population) 10 Above 80 % (10) 80 to 50 % (7.5) 50 to 20 % (5) Below 20
% (2.5)
ii % of SC/ ST population 10 More than 40 % (10) 20 to 40 % (5) Less than 20 % (3)
iii Actual wages 5 Actual wages are significantly lower than minimum wages (5)
Actual wages are equal to or higher than minimum wages (0)
iv % of small and marginal farmers 10 More than 80 % (10) 50 to 80 % (5) Less than 50 % (3)
v Ground water status 5 Over exploited (5) Critical (3) Sub critical (2) Safe (0)
vi Moisture index/ DPAP/ DDP Block 15 -66.7 & below (15)
DDP Block -33.3 to -66.6 (10) DPAP Block
0 to -33.2 (0) Non DPAP/ DDP Block
vii Area under rain-fed agriculture 15 More than 90 % (15) 80 to 90 % (10) 70 to 80% (5) Above 70
% (Reject)
viii Drinking water 10 No source (10) Problematic village (7.5) Partially covered (5)
Fully covered (0)
ix Degraded land 15 High – above 20 % (15) Medium – 10 to 20 % (10)
Low- less than 10 % of TGA (5)
x Productivity potential of the land 15
Lands with low production & where productivity can be significantly enhanced with reasonable efforts (15)
Lands with moderate production & where productivity can be enhanced with reasonable efforts (10)
Lands with high production & where productivity can be marginally enhanced with reasonable efforts (5)
15
xi
Contiguity to another watershed that has already been developed/ treated
10
Contiguous to previously treated watershed & contiguity within the micro watersheds in the project (10)
Contiguity within the micro watersheds in the project but non contiguous to previously treated watershed (5)
Neither contiguous to previously treated watershed nor contiguity within the micro watersheds in the project (0)
xii
Cluster approach in the plains (more than one contiguous micro-watersheds in the project) 15
Above 6 micro-watersheds in cluster (15)
4 to 6 micro watersheds in cluster (10)
2 to 4 micro watersheds in cluster (5)
Cluster approach in the hills (more than one contiguous micro-watersheds in the project)
Above 5 micro-watersheds in cluster (15)
3 to 5 micro watersheds in cluster (10)
2 to 3 micro watersheds in cluster (5)
16
Table no.1.3: Watershed information Sl no Name of Project Watershed
Code Villages to be Treated Geographical Area(Ha)
Treatable Area(Ha)
Approval Year
1. Kachua IWMP, Karimganj – VI
3C2A3Q1, 3C2A3Q2,
3C2A3Q3,
3C2A3Q4,
3C2A3Q5,
3C2A3Q6 3C2A3Q7
Lamarjuar –I, Mirjapur-I, Masli-I, Nairgram, Lamajuar-II, Mirjapur –II, Masli-II, Kankalesh-II,
Lamajuar-III, Rajpasha, Jatkapon, Barbari, Lamajuar-III, Lamajuar-IV, DeakuriJapur, Deakuri,
Ghuramara-I, Ghuramar-II, Brahmansasan-I, Chinipatan, Kalakuri, Basail, Mohakal-II,
MarjadKandi, Kandigram Chaitanyanapur, Naharpur, KandigramMalua, Nizmalua, Kankalesh,
Mohakal –I, Hasanpur, Sri Gouri, Umarpur-I, Umarpur-II, Chapra, Alakulipur, Jum-II, Jum –IV,
Jum-V, Jum-VI, Jam-VII
6906.0 5500.0 2011 – 12
Table No.1.4: Status of other development project in the area Sl. No.
Name of the programme /
scheme Sponsoring agency Objectives of the
programme / scheme Year of
commencement Villages covered
Estimated number of
beneficiaries
1. MGNREGA DRDA 1. Income generation 2. Overall area development
2005-06 All villages of
the project --
17
Table No. 1.5: Status of previous watershed programme-
S. No
Project
name
Year starte
d
Name of
villages
No. Of micro
watershed
Watershed codes
Area under
treatment
Funding
source
Nodal agenc
y PIA
Total
cost
Expenditure incurred up to start of IWMP
% financial completio
n
% physical
completion
----------------------NIL---------------------
18
CHAPTER 2 General Description of Project Area
Table 2.1: Location Longitude 92024’0” E to 92036’0” E Latitude 240 48’0” N to 24054”0” N
State Assam District Karimganj
Subdivision Karimganj Block Badarpur Dev. Block
Panchayat Masly, Kankalesh Basail, Chorgola – Ghoramara, Lamajuar, South Badarpur, Malua-Srigouri, Umarpur, Hasanpur, Mahakol
Villages
Lamarjuar –I, Mirjapur-I, Masli-I, Nairgram, Lamajuar-II, Mirjapur –II, Masli-II, Kankalesh - II, Lamajuar - III, Rajpasha, Jatkapon, Barbari, Lamajuar - III, Lamajuar - IV, DeakuriJapur, Deakuri, Ghuramara - I, Ghuramar - II, Brahmansasan - I, Chinipatan, Kalakuri, Basail, Mohakal - II, MarjadKandi, Kandigram - Chaitanyanapur, Naharpur, Kandigram - Malua, Nizmalua, Kankalesh, Mohakal – I, Hasanpur, Sri Gouri, Umarpur - I, Umarpur - II, Chapra, Alakulipur, Jum - II, Jum – IV, Jum - V, Jum - VI, Jum - VII
Approach Road Metal / Gravel Road
19
20
Details of the types of areas covered under the project
The net geographical area of Kachua watershed is about 6906 Ha. out of which 2% is forest area. The forest area is mainly
divided into two parts; one part is hilly while other lies in which is devoid of any sort of vegetation. About 71% of land is under
agriculture which is completely rain-fed; mainly a Kharif crop is taken. About 24% of the total land is classified under wasteland of which 10
percent is cultivable and rest is uncultivable and hilly.
Table no: 2.2 Land Details
Sl. No. Names of villages
Geographical Area of the village (ha)
Forest Area (ha)
Land under agricultural use (ha)
Rain-fed area (ha)
Irrigated Area
Permanent pastures
(ha)
Wasteland
Cultivable (ha)
Non-cultivable
(ha) 1 Lamajuar-I 97.00 1.00 77.00 69.00 8.00 3.00 9.00 9.00
2 Mirjapur-I 225.00 2.00 154.00 148.00 6.00 8.00 25.00 34.00
3 Kankalesh-II 250.00 3.00 169.00 162.00 7.00 8.00 30.00 40.00
4 Masli-I 100.00 1.00 78.00 72.00 6.00 2.00 10.00 11.00
5 Masli-II 136.00 1.00 101.00 96.00 5.00 4.00 15.00 15.00
6 Rajpasa 169.00 1.00 122.00 118.00 4.00 6.00 15.00 25.00
7 Nairgram 266.00 3.00 179.00 174.00 5.00 10.00 31.00 40.00
8 Lamajuar-II 247.00 2.00 167.00 154.00 13.00 9.00 29.00 40.00
9 Lamajuar-III 263.00 3.00 177.00 168.00 9.00 8.00 31.00 44.00
10 Mirjapur-II 245.00 3.00 166.00 162.00 4.00 9.00 28.00 36.00
11 Jatkapan 48.00 1.00 29.00 25.00 4.00 1.00 6.00 7.00
12 Barbari 124.00 1.00 112.00 106.00 6.00 4.00 12.00 14.00
21
13 Lamajuar-IV 52.00 -- 39.00 34.00 5.00 1.00 7.00 8.00
14 Lamajuar-III 60.00 1.00 48.00 43.00 5.00 1.00 5.00 7.00
15 Deakuri Japur 60.00 1.00 56.00 54.00 2.00 1.00 5.00 7.00
16 Deakuri 70.00 1.00 61.00 57.00 4.00 1.00 5.00 7.00
17 Ghoramara-I 276.00 3.00 184.00 182.00 2.00 11.00 32.00 40.00
18 Ghoramara-II 271.00 3.00 182.00 179.00 3.00 8.00 30.00 41.00
19 Brahmansasan-I 79.00 1.00 66.00 64.00 2.00 1.00 8.00 10.00
20 Kandigram Malua 194.00 2.00 135.00 132.00 3.00 6.00 24.00 27.00
21 Kankalesh 134.00 1.00 99.00 96.00 3.00 3.00 13.00 19.00
22 Mohakal-I 242.00 3.00 164.00 161.00 3.00 5.00 28.00 36.00
23 Nizmalua 214.00 2.00 147.00 145.00 2.00 7.00 25.00 32.00
24 Hasanpur 214.00 2.00 140.00 145.00 5.00 5.00 27.00 36.00
25 Kandigram Chaitanyanagar 140.00 1.00 103.00 99.00 4.00 3.00 15.00 21.00
26 Naharpur 81.00 1.00 67.00 64.00 3.00 1.00 5.00 9.00
27 Srigouri 233.00 3.00 159.00 157.00 2.00 6.00 25.00 34.00
28 Umarpur-I 160.00 2.00 115.00 112.00 3.00 4.00 15.00 20.00
29 Umarpur-II 142.00 2.00 103.00 101.00 2.00 3.00 15.00 18.00
30 Capra 266.00 3.00 189.00 178.00 11.00 5.00 33.00 45.00
31 Alakulipur 99.00 1.00 78.00 76.00 2.00 2.00 8.00 11.00
32 Jum-II 46.00 -- 28.00 25.00 3.00 1.00 6.00 7.00
33 Jum-IV 91.00 1.00 73.00 71.00 2.00 2.00 5.00 10.00
22
34 Jum-V 279.00 3.00 205.00 203.00 2.00 10.00 35.00 44.00
35 Jum-VI 143.00 2.00 105.00 102.00 3.00 4.00 15.00 19.00
36 Jum-VII 233.00 3.00 159.00 153.00 6.00 3.00 27.00 39.00
37 Chinipatan 187.00 2.00 131.00 128.00 3.00 5.00 21.00 22.00
38 Kalakuri 149.00 2.00 108.00 105.00 3.00 3.00 15.00 21.00
39 Marzadkandi 226.00 3.00 155.00 152.00 3.00 5.00 21.00 25.00
40 Basail 156.00 2.00 132.00 129.00 3.00 3.00 12.00 18.00
41 Mohakal-II 239.00 3.00 162.00 159.00 3.00 10.00 17.00 26.00
Total :- 6906.00 76.00 4924.00 4760.00 164.00 192.00 740.00 974.00
Table No. 2.3: Details of the types of areas covered under the project
1 2 3
Sl. No. Name of village No. of beneficiaries covered
MF SF LF Landless Total
1 Lamajuar-I 630 281 14 397 1322 2 Mirjapur-I 589 344 13 376 1322 3 Kankalesh-II 265 121 16 165 567 4 Masli-I 382 176 11 237 806 5 Masli-II 103 49 8 65 225 6 Rajpasa 81 37 5 47 170 7 Nairgram 137 46 6 75 264
23
8 Lamajuar-II 22 5 2 8 37 9 Lamajuar-III -- -- -- -- 0 10 Mirjapur-II 154 54 9 97 314 11 Jatkapan 107 46 5 61 219 12 Barbari 123 53 11 69 256 13 Lamajuar-IV 32 13 2 18 65 14 Lamajuar-III 24 5 1 8 38 15 Deakuri Japur 82 28 5 46 161 16 Deakuri 103 37 7 59 206 17 Ghoramara-I 144 78 12 97 331 18 Ghoramara-II 139 54 11 82 286 19 Brahmansasan-I 31 12 2 17 62 20 Kandigram Malua 273 138 14 175 600 21 Kankalesh 255 175 13 228 671 22 Mohakal-I 187 103 16 122 428 23 Nizmalua 132 68 22 65 287 24 Hasanpur 345 158 18 287 808 25 Kandigram Chaitanyanagar 68 32 06 43 149 26 Naharpur 97 47 04 54 202 27 Srigouri 355 158 17 223 753 28 Umarpur-I 337 212 08 236 793 29 Umarpur-II 76 38 04 48 166 30 Capra 122 61 07 112 302 31 Alakulipur 114 52 05 55 226 32 Jum-II 08 03 02 03 16 33 Jum-IV 05 04 01 04 14 34 Jum-V 73 39 03 47 162 35 Jum-VI 11 04 01 07 23 36 Jum-VII 09 05 01 05 20 37 Chinipatan 156 72 05 86 319 38 Kalakuri 08 05 01 06 20 39 Marzadkandi 164 89 14 112 379 40 Basail 380 215 22 255 872
24
41 Mohakal-II 272 151 13 182 618
25
Table No. 2.4: Details of Agro-climatic condition 1 2 3 4 5 6 7
Sl. No.
Name of the Project
Name of the Agro-
climatic zone covers
project area
Area in ha
Names of the villages
Major soil types Major crops
a)Type b) Area in ha a) Name b) Area
in ha 1 Kachua
IWMP, Karimganj –
VI
Barak Valley Zone
6906.0 Lamarjuar–I, Mirjapur–I, Masli–I, Nairgram, Lamajuar–II, Mirjapur–II, Masli–II, Kankalesh–II, Lamajuar–III, Rajpasha, Jatkapon, Barbari, Lamajuar–III, Lamajuar–IV, DeakuriJapur, Deakuri, Ghuramara–I, Ghuramar–II, Brahmansasan–I, Chinipatan, Kalakuri, Basail, Mohakal–II, Marjadkandi, Kandigram-Chaitanyanapur, Naharpur, Kandigram-Malua, Nizmalua, Kankalesh, Mohakal–I, Hasanpur, Sri Gouri, Umarpur–I, Umarpur–II, Chapra, Alakulipur, Jum–II, Jum–IV, Jum–V, Jum–VI, Jum–VII
Clay Loom 6906.0 Rabi &
Kharif
4760.0
26
Table No. 2.5 Details of flood and drought in the project area 1 2 3 4 5
Sl. No. Particulars Villages
Periodicity Not affected Annual Any other
(please specify)
1 Flood
22 Lamarjuar–I, Lamajuar–II, Lamajuar–III, Jatkapon, Lamajuar–III, Lamajuar–IV, DeakuriJapur, Deakuri, Ghuramara–I, Ghuramar–II, Brahmansasan–I, Chinipatan, Kalakuri, Basail, Kandigram-Malua, Nizmalua, Mohakal–I, Sri Gouri, Umarpur–I, Umarpur–II, Chapra, Jum–VI
Annual
2 Drought
41 Lamarjuar–I, Mirjapur–I, Masli–I, Nairgram, Lamajuar–II, Mirjapur–II, Masli–II, Kankalesh–II, Lamajuar–III, Rajpasha, Jatkapon, Barbari, Lamajuar–III, Lamajuar–IV, DeakuriJapur, Deakuri, Ghuramara–I, Ghuramar–II, Brahmansasan–I, Chinipatan, Kalakuri, Basail, Mohakal–II, Marjadkandi, Kandigram-Chaitanyanapur, Naharpur, Kandigram-Malua, Nizmalua, Kankalesh, Mohakal–I, Hasanpur, Sri Gouri, Umarpur–I, Umarpur–II, Chapra, Alakulipur, Jum–II, Jum–IV, Jum–V, Jum–VI, Jum–VII
Occasionally
27
Table No. 2.6: Details of soil erosion in the project area 1 2 3 4 5
Cause Type of erosion Area affected (ha) Run off (mm/ year)
Average soil loss (Tonnes/ ha/ year)
Water erosion a Sheet 4834
1935 mm/year 16 tonnes/Ha./year b Rill 345 c Gully 276
Sub-Total 5455 Wind erosion Nil Total 5455 1935 mm/year 16 tonnes/Ha./year Table No. 2.7 Details of the Soil pH Sl. No. Name of the Villages Sample no Soil Ph Soil Type
1 Lamajuar-I 1 5.2 Clay Loom 2 Basail 2 5.2 Clay Loom 3 Kankalesh-II 3 5.6 Clay Loom 4 Masli-I 4 5.7 Clay Loom 5 Mirjapur-II 5 5.6 Clay Loom 6 Barbari 6 5.4 Clay Loom 7 Kandigram Chaitanyanagar 7 5.2 Clay Loom 8 Naharpur 8 5.3 Clay Loom 9 Umarpur-I 9 5.7 Clay Loom 10 Jum-II 10 5.5 Clay Loom 11 Ghoramara-I 11 5.7 Clay Loom 12 Brahmansasan-I 12 5.3 Clay Loom 13 Kankalesh 13 5.2 Clay Loom 14 Mohakal-I 14 5.7 Clay Loom
28
Table No.2.7.1 Climatic Condition
Sl No Year
Average Monthly Rain fall (in mm)
Average Annual rainfall (in mm)
preceding 5 years
Temp(0C) Wind Velocity
Open pan evaporation
(mm per day)
Relative Humidity
(RH)
Average Annual run off
(mm/year) Max Min
1 2011
6.6
3410.0
24.1 9.8 93
1935
0 29.0 9.2 94 109.6 31.2 13.9 90 169.7 32.4 18.8 88 534.3 32.2 21.7 90 559.3 32.9 22.4 94 564.8 32.3 23.6 95 649.1 32.9 24.1 94 198.6 33.8 21.4 93 107.5 33.9 20.0 91
0 30.9 16.7 95 11.4 28.2 11.3 96
Table No.-2.8 Physiographic Features Elevation
(MSL) Slope
Range(%) Order of
Watershed Major
Stream Top sequence (Soil series)
Average annual soil loss (Ton / hectare/year)
16 m (52 ft.) 1-3 II Kachua Fine, Typic Haplaqupets, Fine-loamy, Dystric Eutrochrepts,
Typic Haplaquepts, Fine-silty, Typic Fluvaquents 16
Table No. 2.9 Watershed characteristics Shape index of the watershed
Length of main stream Drainage density Average slope Watershed relief Perimeter of the
watershed 4.5 3 mtr. 1 – 7 4500 mtr.
29
CHAPTER – 3 BASE LINE INFORMATION OF WATERSHED
Table No. 3.1: Demographic features: 1 2 3 4 5
S.No Feature Male Female Total 1 Population 30357 28961 59318
SC 5299 5125 10424
ST 286 272 558
OBC 7144 6815 13959
Others 17628 16749 34377
2 Children(0-14 years) 3643 3475 7118
3 Sex Ratio 1000 954
4 Literacy 80.10 64.30 72.45
Literates 24328 18647 42975
Illiterates 6029 10314 16343
5 Work Force 23367 12581 35948
Agriculture 12676 5964 18640
Industrial/Business 2009 174 2183
Service 795 89 884
6 Birth Rate 23.2
7 Death Rate 8.2
30
Table No. 3.2: Livestock details:
1 2 3 S.No Feature No./ quantity) 1 Milch Animals Cows 6875 Buffaloes 1624 Goat, sheep 14593 2 Draft Animals Ox 131 He Buffalo 17 3 Others Poultry 49683 Piggery -- Duckery 40717 4 Total Milk production from milch animals (ltrs/day) 16526 5 Fodder Availability Dry (Abundant/Sufficient/ Scarce) Sufficient Green (Abundant/Sufficient/ Scarce) Abundant 6 Fuel wood Availability (Abundant/Sufficient/Scarce) Abundant
31
Table No.3.3: Socio- economic status 1 2 3 4 5 6
S. No Type Total
HHs
No. of BPL HHs
Land Holding (Ha) Annual Gross Income (Rs.) Rain fed Irrigated
SC ST Others Total SC ST Others SC ST Others 1 Marginal 6591 2302 257 6.00 2217 27 5 15 27000 32000 29000 88000 2 Small Farmers 3268 1507 280 8.00 570 18 3 19 29000 28000 29000 86000 3 Big farmers 335 -- 219 5.00 586 17 2 23 42000 40000 42000 124000 4 Landless 4279 3754 181 2.00 428 15 2 18 25000 27000 28000 80000 Total 14473 7563 937 21 3801 77 12 75 123000 127000 128000 378000 Table No. 3.4: Migration Details:
1 2 3 4 5 6 7
Sl. No.
No. of persons migrating No. of days
per year of migration
Major reason(s) for migrating
Distance of destination of
migration from the village (km)
Occupation during migration
Income from such
occupation (Rs.) M F Total
1. 3434 45 3479 120 To get additional income during lean period 252 – 600 km Private Job, Labour
etc.
Average 10000 to
12000 per month
32
Table No. 3.5: Details of Community Based Organizations existing in the watershed village: 1 2 3 4 5 6 7 8 9
Sl. No.
Type of Group
Total no. of CBOs No. of members No. of ST in each category
No. of SC in each category
No. of Others in each category
No. of BPL in each category
Bank linkage
With only Men
With only
Women
With both Total M F Total M F Total M F Total M F Total M F Total
No. of
SHGs
Bank Loan Amount
(Rs.)
1 SHG 67 27 35 129
(i) Landless 269 212 481 2 1 3 62 51 113 215 210 425 103 102 205 -- -- (ii) MF 203 242 445 3 3 6 47 39 86 130 133 263 35 82 117 -- -- (iii) SF 220 207 427 4 2 6 35 37 72 194 185 379 55 46 101 -- -- (iv) LF -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --
Total 67 27 35 129 692 661 1353 9 6 15 144 127 271 539 528 1067 193 230 423 -- --
2 UGs
(i) Landless (ii) MF (iii) SF (iv) LF
Total 3 VSS 4 FG/ FC1 5 WUA 6 F-SHG-C 7 F-SHG-B 8 PG 9 PC
10
Other related Groups
(Specify)
VSS: Van Suraksha Samiti, FG: Farmer’s Group/ Farmer’s Club, WUA: Water User Association, F-SHG: Federation of SHGs (C: at Cluster, B: at Block), PG: Producer’s Group, PC: Producer’s Cooperative.
33
Table No. 3.6: Infrastructure Facilities:
1 2 3 4 5 S. No. Infrastructure type No./Quantity Distance (km) Status (description) 1 Educational Institutions Anganwadi 54 within the village Primary School 172 within the village Secondary school 16 within 1 – 5 km Govt. College 07 within 5 – 15 km Vocational Institutions Nil 2 Service Institutions Bank Nil Post office 14 within 1 – 5 km Primary Health Care Center 11 within 1 – 5 km Veterinary Center 01 within 5 – 15 km Markets/ Village Haat 13 within 1 – 5 km 3 No. of bore wells/pump sets (Functional) -- 4 No. of Milk collection centers
( Union/ Society/ Pvt. Agency/Others) Nil
Total Quantity of surplus milk Nil 5 Road Connectivity (to main road by an all-
weather road) (Yes/No) Yes
6 Bus facility (Yes/No) Yes 7 No. of HHs provided electricity 5914 8 No. of HHs with access to drinking water 2932 9 Access to Agro Industries (Yes/No) No 10 Any other facilities (specify)
34
Table No.3.7 Land use pattern (in Hectares)
1 2 3 4 5 6 7 8 9 10 11 12 13*
S. No
Village Geographical Area#
Forest Area
Community Land
Land under
Agriculture Use
Permanent Pastures
Land Under miscellaneous
use
Uncultivated Private land Cultivated area
Net Sown Area
Net Area sown more than once
Gross Cropped Area
Temporary
fallow
Permanent Fallo
w
Cultivated Rainfed
Cultivated
Irrigated
1 Lamajuar-I 97.00 1.00 -- 77.00 3.00 9.00 9.00 9.00 69.00 8.00 77.00 8.00 85.00 2 Mirjapur-I 225.00 2.00 -- 154.00 8.00 34.00 25.00 34.00 148.00 6.00 154.00 6.00 160.00 3 Kankalesh-II 250.00 3.00 -- 169.00 8.00 40.00 30.00 40.00 162.00 7.00 169.00 7.00 176.00 4 Masli-I 100.00 1.00 -- 78.00 2.00 11.00 10.00 11.00 72.00 6.00 78.00 6.00 84.00 5 Masli-II 136.00 1.00 -- 101.00 4.00 15.00 15.00 15.00 96.00 5.00 101.00 5.00 106.00 6 Rajpasa 169.00 1.00 -- 122.00 6.00 25.00 15.00 25.00 118.00 4.00 122.00 4.00 126.00 7 Nairgram 266.00 3.00 -- 179.00 10.00 40.00 31.00 40.00 174.00 5.00 179.00 5.00 184.00 8 Lamajuar-II 247.00 2.00 -- 167.00 9.00 40.00 29.00 40.00 154.00 13.00 167.00 13.00 180.00
9 Lamajuar-III 263.00 3.00 -- 177.00 8.00 44.00 31.00 44.00 168.00 9.00 177.00 9.00 186.00
10 Mirjapur-II 245.00 3.00 -- 166.00 9.00 36.00 28.00 36.00 162.00 4.00 166.00 4.00 170.00
11 Jatkapan 48.00 1.00 -- 29.00 1.00 7.00 6.00 7.00 25.00 4.00 29.00 4.00 33.00
12 Barbari 124.00 1.00 -- 112.00 4.00 14.00 12.00 14.00 106.00 6.00 112.00 6.00 118.00
13 Lamajuar-IV 52.00 -- -- 39.00 1.00 8.00 7.00 8.00 34.00 5.00 39.00 5.00 44.00
14
Lamajuar-III 60.00 1.00 -- 48.00 1.00 7.00 5.00 7.00 43.00 5.00 48.00 5.00 53.00
15
Deakuri Japur 60.00 1.00 -- 56.00 1.00 7.00 5.00 7.00 54.00 2.00 56.00 2.00 58.00
16 Deakuri 70.00 1.00 -- 61.00 1.00 7.00 5.00 7.00 57.00 4.00 61.00 4.00 65.00
17
Ghoramara-I 276.00 3.00 -- 184.00 11.00 40.00 32.00 40.00 182.00 2.00 184.00 2.00 186.00
35
18
Ghoramara-II 271.00 3.00 -- 182.00 8.00 41.00 30.00 41.00 179.00 3.00 182.00 3.00 185.00
19
Brahmansasan-I 79.00 1.00 -- 66.00 1.00 10.00 8.00 10.00 64.00 2.00 66.00 2.00 68.00
20
Kandigram Malua 194.00 2.00 -- 135.00 6.00 27.00 24.00 27.00 132.00 3.00 135.00 3.00 138.00
21 Kankalesh 134.00 1.00 -- 99.00 3.00 19.00 13.00 19.00 96.00 3.00 99.00 3.00 102.00
22 Mohakal-I 242.00 3.00 -- 164.00 5.00 36.00 28.00 36.00 161.00 3.00 164.00 3.00 167.00
23 Nizmalua 214.00 2.00 -- 147.00 7.00 32.00 25.00 32.00 145.00 2.00 147.00 2.00 149.00
24 Hasanpur 214.00 2.00 -- 140.00 5.00 36.00 27.00 36.00 145.00 5.00 140.00 5.00 145.00
25
Kandigram Chaitanyanagar
140.00 1.00 -- 103.00 3.00 21.00 15.00 21.00 99.00 4.00 103.00 4.00 107.00
26 Naharpur 81.00 1.00 -- 67.00 1.00 9.00 5.00 9.00 64.00 3.00 67.00 3.00 70.00
27 Srigouri 233.00 3.00 -- 159.00 6.00 34.00 25.00 34.00 157.00 2.00 159.00 2.00 161.00
28 Umarpur-I 160.00 2.00 -- 115.00 4.00 20.00 15.00 20.00 112.00 3.00 115.00 3.00 118.00
29 Umarpur-II 142.00 2.00 -- 103.00 3.00 18.00 15.00 18.00 101.00 2.00 103.00 2.00 105.00
30 Capra 266.00 3.00 -- 189.00 5.00 45.00 33.00 45.00 178.00 11.00 189.00 11.00 200.00
31 Alakulipur 99.00 1.00 -- 78.00 2.00 11.00 8.00 11.00 76.00 2.00 78.00 2.00 80.00
32 Jum-II 46.00 -- -- 28.00 1.00 7.00 6.00 7.00 25.00 3.00 28.00 3.00 31.00
33 Jum-IV 91.00 1.00 -- 73.00 2.00 10.00 5.00 10.00 71.00 2.00 73.00 2.00 75.00
34 Jum-V 279.00 3.00 -- 205.00 10.00 44.00 35.00 44.00 203.00 2.00 205.00 2.00 207.00
35 Jum-VI 143.00 2.00 -- 105.00 4.00 19.00 15.00 19.00 102.00 3.00 105.00 3.00 108.00
36
Table No. 3.8: Details of Common Property Resources: 1 2 3 4
Sl. No
CPR Particulars
Total Area (ha) Area owned/ In possession of Area available for treatment (ha)
Pvt. persons Govt. (specify dept.) PRI
Any other (Pl.
Specify) Pvt.
persons Govt.
(specify deptt.)
PRI Any other
(Pl. Specify)
1 Wasteland/ degraded land 1364.00 -- -- -- 740.00 -- -- -- 2 Pastures 192.00 -- -- -- -- -- -- -- 3 Orchards -- -- -- -- -- -- -- -- 4 Village Forest -- -- -- -- -- -- -- -- 5 Forest -- -- -- 76.00 -- -- -- -- 6 Village Ponds/ Tanks -- -- -- -- -- -- -- -- 7 Community Buildings -- 6.00 -- -- -- -- -- -- 8 Weekly Markets -- -- -- -- -- -- -- -- 9 Permanent markets -- -- -- -- -- -- -- -- 10 Temples/ Places of worship 4.00 -- -- -- -- -- -- -- 11 Others (Pl. specify) -- -- -- -- -- -- -- --
Total 1560.00 6.00 76.00 740.00 -- -- --
36 Jum-VII 233.00 3.00 -- 159.00 3.00 39.00 27.00 39.00 153.00 6.00 159.00 6.00 165.00
37 Chinipatan 187.00 2.00 -- 131.00 5.00 22.00 21.00 22.00 128.00 3.00 131.00 3.00 134.00
38 Kalakuri 149.00 2.00 -- 108.00 3.00 21.00 15.00 21.00 105.00 3.00 108.00 3.00 111.00
39 Marzadkandi 226.00 3.00 -- 155.00 5.00 25.00 21.00 25.00 152.00 3.00 155.00 3.00 158.00
40 Basail 156.00 2.00 -- 132.00 3.00 18.00 12.00 18.00 129.00 3.00 132.00 3.00 135.00
41 Mohakal-II 239.00 3.00 -- 162.00 10.00 26.00 17.00 26.00 159.00 3.00 162.00 3.00 165.00
37
Table No. 3.9: Agriculture implements: Table No. 3.10: Crop Classification
Table No. 3.11: Crops & Cropping pattern: 1 2 3 4 5 6
S. No
Season Crop sown
Rain fed Irrigated Total
Area (ha)
Production (Ton/yr)
Productivity (Kgs/ha)
Cost of cultivation (Rs./ha)
Area (ha)
Production (Ton/yr)
Productivity (Kgs/ha)
Cost of cultivation (Rs. /ha)
Area (ha)
Production (Ton/yr)
Productivity (Kgs/ha)
Cost of cultivation (Rs. /ha)
1 Kharif Paddy 3767.0 5243.66 1392 3715 -- -- -- -- 3767.0 5243.66 1392 3715
2 Rabi paddy -- -- -- -- 164.0 227.14 1385 3715 164.0 227.14 1385 3715
Potato &
others 192.0 263.42 1372 14000 -- -- -- -- 192.0 263.42 1372 14000
3 Summer Paddy 993.0 1382.25 1392 3715 -- -- -- -- 993.0 1382.25 1392 3715
Total 4952.0 -- -- -- 164.0 -- -- -- 5116.0 -- -- --
1 2 3 S. No Crop classification Area (Ha.)
1 Single crop 4760 2 Double crop 164 3 Multiple crop --
1 2 3 S. No Implements Nos.
1 Tractor 36 2 Sprayers-manual/ power 84 3 Cultivators/Harrows -- 4 Seed drill --
38
Table No. 3.12: Land capability Classification
* Soil texture (sandy-clay, clayey, loamy-clay, gravel) Table No.3.13: Irrigation facilities:
Table No. 3.14: Status of water table:
1 2 3 4 5 6 7 8 Sl. No.
Source (open well)**
Plot No of the source Name of the Owner* Date of
recording Depth of water table from
ground level (in mts) Source located at
(ridge/middle/valley) Remarks
1 R. C. C. Ring Well Srigouri Jantu Das Dec, 2012 9 – 10 Valley 2 R. C. C. Ring Well Mahakol – I Ramlal Das Dec, 2012 10 – 11 Valley
3 R. C. C. Ring Well Mahakol – I Gouranga Mahaprabhu Akhra Dec, 2012 9 – 10 Valley
4 R. C. C. Ring Well Dakshinkul Jame Masjid Dec, 2012 11 – 12 Valley 5 R. C. C. Ring Well Basail Jakir Hussain Dec, 2012 11 – 12 Valley
** Identify at least five representative open wells in the ridge/middle/valley portion. Collect the data at the time of DPR and maintain a register every Quarter
1 2 3 4 5 6 7
Sl. No Land type
Total Area (ha)
Soil Texture*
Based on Depth (cms)(mention area in ha) Based on Slope (%) (mention area in ha) Erosion (mention area in ha) Land
class
V. Shallow (0.75)
Shallow (7.5-22.5)
Moderate deep (22.5-
45.00)
Deep (45.0-90.0)
Very. Deep (>90)
Nearly Level (0-2)
Moderate slope (2-6)
Strong slope (6-15)
Steep (>15)
Water
Wind
Sheet Rill Gully
1 Agri Land (Kharif) 3767.0
Clay loam
3435.0 3435.0 47.5
4834 345 276
2 Rabi 356.0 232.0 232.0 17.5
3 Habitation 230.0 192.0 192.0 7.5
1 2 3 4 Sl. No. Type of the Source Nos. Command area (in ha)
1 Ponds 84 -- 2 Open wells -- -- 3 Bore wells -- -- 4 Canal irrigation -- -- 5 Natural spring head -- --
39
Table No. 3.15: Assessment of drinking water facility*:
* based on the observation from the field Table No. 3.16: Surface water resources
1 2 3 4 5 Sl. No. Item Units Quantity Source 1 Drinking water requirement Ltrs/day 2,10,000
Ponds, Water Supply, Ring Well
2 Present availability of drinking water Ltrs/day 1,42,000 3 No. of drinking water sources available Nos. --
a) Functional Nos. -- b) Need Repairing Nos. -- c) Defunct Nos. --
4 Short fall if any Ltrs/day 68,000 5 No. of families getting drinking water from outside the Micro watershed area Nos. Nil 6 Requirement of new drinking water sources (if any) Nos. 63 (Farm Pond)
1 2 3 4 5 S.No Type of water resource Nos. Area irrigated (Ha) Storage capacity (Cu.m)
1 Tank -- -- -- 2 Pond 84 -- 50400 3 Lake 05 -- 114300 4 Check dam -- -- -- 5 Percolation tank -- -- -- 6 Channel/Canal -- -- -- 7 Any others (specify) -- -- --
40
Table No. 3.18: Existing Water Saving Practices: Area (Ha)
Name of the Major Crop Under water saving devices$
Under water conserving agronomic
practices#
Any other (Pl. Specify) Total
Current water Saving status as
against flood irrigation. (Cu.m)
-----------------Nil---------------
Table No. 3.17 Ground Water Structures to be repaired.
S.No Type of structure No. available
No. to be Repaired
No. to be rejuvenated
No. with no interventions required Total
-----------------Nil---------------
41
Table No. 3.19: Details of existing livelihoods
1 2 3 4 Sl. No. Name of activity No. of beneficiaries Pre-project average
income per HH (Rs.) SC ST Others Total Women 1 Dairy 12 01 10 23 02 2100 2 Goatary 9 04 54 67 7 1800 3 Duckery 18 02 32 52 4 2100 4 Poultry 19 04 26 49 16 2300 5 Beekeeping 02 02 03 07 -- 2200
Table No. 3.20: Existing functional assets (Works already completed under different schemes including works undertaken by farmers independently)
1 2 3 4 5 6 Sl. No. Name of the work Plot No. Quantity
(No./RMTs) Amount spent
(Rs.) Programme
42
Table No. 3.21 PROBLEM TYPOLOGY OF THE WATERSHED
1 2 3 4 Sl. No. Problem Area Problem Analysis Proposed interventions to overcome
problems
1. Soil Conservation (Slope, erosion, soil loss, rainfall, productivity etc.)
(1) Soil Erosion, and heavy soil loss in upland areas. (2) Sheet erosion is combatively high in many places. (3) Unpredictable nature of soil.
Construction of graded bund and field bund to protect the soil erosion and siltation problems.
2.
Water Conservation (Water budget, Ground water norms, productivity)
(1) Degradation of Natural Resource such as congestion of natural drainage. (2) Lack of water storage facility results in shortage of water during water. (3) Run-off resulting from seasonal rain conquers high velocity due to steep slope in the watershed and thereby causes different types of soil erosion hazards. (4) Due to inadequate irrigation infrastructure mainly mono cropping is done.
(1) Re-generation of drainage channel by excavation and reclamation activities. (2) Reclamation of natural water bodies by excavating and constructing periphery bund etc. to increase water storage capacity. (3) Creation of Farm Pond and related distribution channel for water harvesting/storage and irrigation. (4) Construction of Nalla bund to control the water-logging problem.
3. Crop Coverage – (80% of w/s area should be with canopy)
(1) Rabi crop area is proportionately small due to inadequate irrigation facilities. (2) Predominance Mono cropping. (3) Flooding problem during summer. (4) Scarce vegetative cover over the area.
(1) Agro-forestry, fuel wood plantation. (2) Horticulture Plantation.
4.
Agriculture productivity (crop wise compare with dist. average)
(1) Low agricultural productivity due to high flood during summer, lack of irrigation facility, erratic and uncertain rainfall, low cropping intensity, lack of locally available agri-technologies to match the high ecological diversity of rainfed area etc.
Brick canal and water storage farm pond for irrigation for both Rabi & Kharif crop.
43
44
1 2 3 4
5.
Livestock productivity (Milk yield, Meat yield, eggs, wool yield, kidding etc.)
(1) Dearth of fodder during flood period. (2) Lack of protected shelter for the inhabitants during flood period. (3) Lack of grazing land effects the production of milk and allied products, which in turn results in adequate nutrition. (4) Diseases which reduce the production potential of livestock.
(1) Promotion of Marketing facilities through SHG. (2) Promotion of Dairy, Piggery, Goatery, Duckery and Poultry farming activities.
6. Existing Livelihood Activities for Asset-less persons
(1) Less income generating unsustained activities. (2) Their present occupation is daily wage earning.
(1) Promotion of Dairy, Piggery, Goatery, Duckery and Poultry farming activities. (2) Promotion of weaving activities for asset-less woman.
7. Commonly Based Organizations & Social Capital Base
(1) Most of the SHGs are not functional. (1) Formation of SHG, User Groups for promotion of various income generating activites.
8.
Capacity Building (participating, training, awareness of watershed community)
(1) In many villages it is observed that the participation in Gram Sabha is very low due to lack of awareness towards watershed development activities.
(1) Conducting Awareness programmes among the villagers. (2) Providing training in respect to each activities proposed for watershed development as well as livelihood generation.
9. Others (specify) (1) Lack of Marketing and trading facilities. (1) Providing Market Promotion Centres along with Low Cost go-down for storage of various products.
45
CHAPTER – 4
Institutional Building and Project Management Table No. 4.1 Details of SHGs & UGs newly formed under IWMP: 1 2 3 4 5 6 7 8 9
Sl. No.
Type of Group
Total no. of CBOs No. of members No. of ST in
each category
No. of SC in each
category
No. of Others in
each category
No. of BPL in each
category
Bank linkage
With only Men
With only
Women
With both Total M F Total M F Total M F Total M F Total M F Total
No. of SHGs
Amount (Rs)
1 SHG
Under Process
(i) Landless
(ii) MF (iii) SF (iv) LF
Total
2 UGs
(i) Landless
(ii) MF (iii) SF (iv) LF
Total *Account no. of Watershed Committee, PIA.
46
4.2: Details of Watershed Committees (WC)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Name of
WCs
Date of Registration as a Society
No. of members
in WC
Designation Name M/F SC ST SF MF LF Land
less UG SHG GP Any other
Educl qualifi-cation
Function/s assigned#
Mal
ua M
WS
Unde
r Pro
cess
10 nos.
President Shahida Begum F -- -- LF -- -- -
Mal
ua S
ri Go
uri,
Kank
olos
h Ba
sil,
Mah
a kh
ol,H
asan
pur G
.P
H.S
Secretary Asim Das M SF -- -- -- -- -- H.S
Member Joynal Abedin M -- -- -- Land less
-- -- HSLC
Member Kamala Malakar F SC -- MF -- -- -- - HSLC
Member Kanchan Das M -- MF -- -- -- -- HSLC
Member Abdul Kalam M -- -- -- -- UG -- HSLC
Member Abdul Ahad Kha M -- -- LF -- -- -- H.S
Member Muslim Uddin M -- -- -- -- UG -- HSLC
Member Nitai Das M -- -- -- -- UG -- H.S
Member Bimalendu Das M -- -- -- -- -- SHG X
47
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Name of
WCs
Date of Registration as a Society
No. of members
in WC
Designation Name M/F SC ST SF MF LF Land
less UG SHG GP Any other
Educl qualifi-cation
Function/s assigned#
Chor
gola
Gua
mar
a M
WS
Unde
r Pro
cess
10 nos.
President Fakar Uddin Tapadar M -- MF -- -- UG --
Bark
atpu
r, Ch
orgo
la G
ura
mar
a,
Lam
ajua
r G.P
HS
Secretary Kamal Uddin M SF -- -- -- UG -- HS
Member Shyeed Ahmed M -- -- -- Landless SHG MA
Member Sarif Uddin M SF -- -- -- -- SHG HS
Member Neharul Nessa khanam F -- -- LF -- UG -- VII
Member Altaf Hussian M MF -- -- -- SHG VII
Member Renu Mia M -- -- -- Landless SHG VIII
Member Anwar Hussian M -- MF -- -- UG -- VIII
Member Altaf Hussian M -- MF -- -- UG -- IX
Member Subodh Roy M -- MF -- -- UG -- X
48
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Name of
WCs
Date of Registration as a Society
No. of members
in WC
Designation Name M/F SC ST SF MF LF Land
less UG SHG GP Any other
Educl qualifi-cation
Function/s assigned#
Um
arpu
r MW
S
Unde
r Pro
cess
10 nos.
President Badruz Jaman Tapadar M -- MF -- -- UG --
Mal
ua S
ri Go
uri ,
Um
arpu
r G.P
.
BA
Secretary Jhantu Das M SF -- -- -- -- SHG BA
Member Presanta Das M SC -- -- -- Landless -- SHG HSLC
Member Gias Uddin M -- MF -- -- UG -- BCOM
Member Ishaque Ali M -- MF -- -- UG -- HS
Member Jiaur Rehman M SF -- -- -- -- SHG HSLC
Member Tahir Ahmed M -- -- -- Landless -- SHG HS
Member Asotosh Sukhlabaidya M SC -- MF -- -- -- SHG HSLC
Member Muhibur Rehman M -- MF -- -- UG -- HSLC
Member Miton Dey M -- -- LF -- UG -- HSLC
49
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Name of
WCs
Date of Registration as a Society
No. of members
in WC
Designation Name M/F SC ST SF MF LF Land
less UG SHG GP Any other
Educl qualifi-cation
Function/s assigned#
Mas
li M
WS
Unde
r Pro
cess
10 nos.
President Kanchan Das M SC SF -- -- -- UG --
Lam
ajua
r, Ka
nkol
esh
, Mas
li G.
P.
BA Secretary Srikanta Das M SC -- -- LF -- UG -- HS Member Anjan Das M SC -- MF -- -- -- SHG IX Member Jamal Uddin M SF -- -- -- -- SHG IX
Member Rubi Begum Tapadar F -- -- -- Landl
ess -- SHG HS
Member Bimelendu Das M SC -- MF -- -- -- SHG HSLC
Member Khaled Ahmed M -- -- -- Landless -- SHG HS
Member Abdul Basid M -- MF -- -- SHG VIII Member Ferdusi Begum F SF -- -- -- -- SHG IX Member Numan Uddin M -- MF -- -- UG -- HS
50
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Name of
WCs
Date of Registration as a Society
No. of members
in WC
Designation Name M/F SC ST SF MF LF Land
less UG SHG GP Any other
Educl qualifi-cation
Function/s assigned#
Lam
ajua
r MW
S
Unde
r Pro
cess
10 nos.
President Sifat Ahmed M SF -- -- -- UG --
Lam
ajua
r , N
airg
ram
, Ba
sail
G.P
HS Secretary Zakir Hussian M -- -- LF -- UG -- HS Member Abdul Aziz M -- MF -- -- UG -- HSLC
Member Jamal Uddin M -- -- -- Landless -- SHG IX
Member Badar Uddin M -- -- -- UG -- HS Member Afia Begum F -- MF -- -- -- SHG VI Member Abdul Mannan M -- MF -- -- UG -- VII
Member Azmal Hussian M -- -- Landless -- SHG IX
Member Abidul Rehman M SF -- -- -- -- SHG IX Member Taher ahmed M -- MF -- -- UG -- X
51
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Name of
WCs
Date of Registration as a Society
No. of members
in WC
Designation Name M/F SC ST SF MF LF Land
less UG SHG GP Any other
Educl qualifi-cation
Function/s assigned#
Jhum
MW
S
Unde
r Pro
cess
10 nos.
President Abdul Shakur M SF -- -- -- UG --
Bund
ashi
l G.P
HSLC Secretary Manjural Hasan M -- -- LF -- UG -- HSLC Member Pradip Mallik M -- MF -- -- UG -- HSLC Member Manik Das M SC -- MF -- -- -- SHG VIII Member Sitesh Dutta M SF -- -- -- -- SHG VII
Member Taz Uddin M -- -- -- Landless -- SHG VII
Member Osina Fernandiz F ST -- MF -- -- UG -- IX Member Shibani Rani Das F SC SF -- -- UG -- VII
Member Abdul Rouf M -- -- -- Landless -- SHG IX
Member Abdul Haque M -- MF -- -- -- SHG VII
52
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Name of
WCs
Date of Registration as a Society
No. of members
in WC
Designation Name M/F SC ST SF MF LF Land
less UG SHG GP Any other
Educl qualifi-cation
Function/s assigned#
Basa
il M
WS
Unde
r Pro
cess
10 nos.
President Sarifa Begum Tapadar F -- MF -- -- -- SHG
Kank
eles
h- B
asai
l G.P
., M
aha
khol
G.P
< HS
Secretary Zakir Hussian Tapadar M -- MF LF -- -- SHG HS
Member Eklas Ali M -- MF -- -- -- SHG VI Member Mayur Uddin M -- MF -- -- UG VIII Member Asar Uddin M -- MF -- -- -- SHG VII Member Pronotosh Das M SC SF -- -- -- -- SHG IX Member Abdul Sukkur M -- MF -- -- UG VI
Member Jamil Hussian M -- MF -- Landless -- SHG HS
Member Abdul Matlif M -- MF -- -- -- SHG V
Member Shenaj Shabnam Tapadar F -- MF -- Land
less -- SHG HS
53
Table No 4.3: WDT Particulars: 1 2 3 4 5 6 7 Sl. No Names of WDT members M / F Age Qualification / Experience Description of professional
training Role/ Function*
1 Sri. M.A. Barbhuiya, M 49 Diploma in Civil Engg. WDT Leader
2 Sri. Atul Hazarika, Asstt. Engineer, Irrigation
M 50 Civil Engg. WDT Member
3 Sri. Chandra Mala Singha, Demonstrator, Sericulture, Khola
M 54 M. Sc. WDT Member
4 Sri. Mukul Barman, A.D.O. (Agri.), Badarpur Ghat
M 56 M. Sc. WDT Member
5 Sri. N. U. Choudhury, Social Worker
M 60 H. S. WDT Member
Table No. 4.4: PIA particulars
1 2 3 S.No Particulars Details of PIA
1. Type of organization# Govt. Department 2. Name of organization Department of Soil Conservation 3. Designation & Address Divisional Officer, Cachar Soil Conservation Division, Silchar 4. Telephone 03842 237444 5. Fax 03842 237444 6. E-mail [email protected]
54
Table No. 4.5 Bank Account Details Name of WC/PIA Name of the
Bank/Place Account No. Name of the Signatory Address
Divisional Officer, Cachar Soil Conservation Division, Silchar (PIA)
Union Bank, Silchar Branch
614402010001518 Divisional Officer Cachar Soil Conservation Division, Silchar
55
NLDC
DoLR, GOI
National Rainfed Area Authority
State Level Nodal Agency (SLNA) (Department of Soil Conservation, Govt. of Assam)
Professional Expert
Watershed Cell cum Data Centre (WCDC)
Panchayati Raj Institution (PRI)
Line Department (Agriculture, Soil Conservation, Fishery, Dairy, DRDA, Veterinary etc.)
Project Implementing Agency (PIA)
Watershed Development Team
Watershed Committee
Self Help Group
User Group
Institutional Mechanisms 4.6.1 Flow Chart of Institutional Arrangement from District to Watershed Level
56
DoLR, GOI (90%)
Govt. of Assam (10%)
WCDC
PROJECT IMPLEMENTING AGENCY (PIA) (TRAINING OVERHEAD, EPA)
WATERSHED COMMITTEE
4.6.2 Fund Flow Mechanisms – flow chart
4.6.3 List of Watershed Records to be maintained
A) AT WATERSHED COMMITTEE LEVEL
Registration Certificate By laws Detail Project Report Annual Action Plan Cash Book
STATE LEVEL NODAL AGENCY, ASSAM (100%)
57
Product Fund Passbook Watershed Development Fund Passbook Ledger Book Asset Register Vouchers Land Details Measurement Book Audit Report/Social Audit Report Photo Documents Project Completion Report Common Guidelines MoU between Watershed Committee and Project Implementing Agency Revenue records.
B) AT PROJECT IMPLEMENTING AGENCY LEVEL
• Cash Book • Computerized Accounting System • Vouchers
4.7 Documents of Agreements: 47.1) Watershed Committee Registration certificate - (under Process) 4.7.2 MoU — PIA — WCDC, PIA — WC - (under Process) 4.7.3 Resolution of Gram Sabha, Aam Sabha, WC approving action plan# # the resolution should be done village wise and needs to be approved in Gram/Aam Sabha
58
59
60
4.8 Project Implementation Project Implementation involves a number of activities of which the major are - securing community participation, co-ordination of activities and project management & Controlling, Monitoring. Co-ordination is he practice whereby more people or organizations work together to deal collectively with a shared objective. The rationale for co-ordination shall be- (1) To take immediate curative action for problems encountered in implementation of the project. (2) To promote better relationship among organizations, institution, agencies, departments and individuals connected with the project and to harmonies resources and activities for the achievements of the project objectives. (3) To establish cordial relationship between the target population of the project and all the other segments of the society. (4) Team building, which includes recruiting people with appropriate qualification and capability for positions n the organization, orienting new people to their position to help them learn about their responsibilities and providing training when necessary to upgrade people’s skills. Project Management & Controlling means managing activities to ensure progress towards the project objectives. (1) Evaluating the progress of project by comparing the current situation with established goals and objectives. (2) Submitting reports to account for project activities and finance. (3) Monitoring performance to document the way people carry out their responsibilities. (4) Providing feedback to people on a regular, informal basis including optimistic feedback and constructive criticism. (5) Adjusting plans to respond the changes in the internal and external organizational environment.
61
Monitoring is an important stage of project implementation and it implies the process of routinely gathering information on all aspects of the project. The first level monitoring shall be done by the project staff. The WCDC and PIA shall be responsible for monitoring the staff and task under them and Project Manager shall be accountable for monitoring all aspects of the project. The second level monitoring shall be done by third party. The monitoring team shall be collected the report through field visit, progress and measures performance including financial reporting. Step for Monitoring Process:
Defining the objectives of the monitoring system. Designing a programme to monitor achievements systematically. Selection of indicators/parameters to be monitored, the location, methods/processes and frequency of
observations and the information processing and reporting procedure are essential; and Organizing, motivating and training people to obtain convey and use the information,
Monitoring Tools
Semi-structured interviews. Community workshops to evaluate the extent of adoption and resulting achievements from conservation
practices. Observation and measurement of easily quantifiable field indicators. Farmer’s own records can be prepared which provides vital information to the central theme. Ground photographs taken from the same place before and after remedial measures, depicting details
about landscape CPR’s changes in the status of natural resources. Community evaluation of certain simple technical, ecological, economical, social and essential services
indicators. Remote sensing satellite imageries and aerial photographs taken at the start of the plan are repeated
62
periodically. Geographical Information Systems (GIS). Video monitoring. Comparison with demonstration and research plots/ farms. Comparison with demonstration and research micro-watersheds. Hydro-meteorological measuring. Using the information gathered by other institutional and private enterprises. Combination of above mentioned tools.
63
PIS Tasks Responsibility
Project Co-ordination
Immediate corrective action for problem encountered
WCDC, Project Manager, WDT Member
Create Relationship among staff and institution
Project Manager
Team Building & Capacity Building WCDC /PIA/Project Manager Co-operation and Network Development WCDC /PIA/Project Manager
Project Management & Controlling
Progress of Project Project Manager Report generating to account project activities and financial statement
PIA/Project Manager
Performance monitoring PIA/Project Manager/ WCDC
Monitoring
1st Level Monitoring Staff Performance Work Performance Target Achievement
WCDC / Project Manager /PIA
2nd Level Monitoring Work Quality Deviation Report Financial Statement
WCDC / Third Party
64
Table No. 4.8 Convergence plan with IWMP:
1 2 3 4 5 6 7
S. No. Names of Departments
with Schemes converging with IWMP
Name of activity/task/structure proposed under convergence Period of
Support (Years)
Reference no. of activity/ task/
structure in DPR
Estimated Fund
Proposed Under
Convergence (in Rs.)
Level of decision taken
for convergence Block/district
(a) Structures (b) livelihoods (c) Capacity Building (d) Any other (pl. specify)
1 MGNERGA, DRDA Field Bund, GCP, Drainage Channel, E/Channel, Farm pond.
2013-14 to 2016-17 --- 8,64,500/ District
2 RKVY, Agriculture Field Bund, GCP, Drainage Channel, E/Channel, Farm pond.
2013-14 to 2016-17 --- 5,58,000/- District
3 BRGF, Zillaparisad Field Bund, GCP, Drainage Channel, E/Channel, Farm pond and Horticulture.
2013-14 to 2016-17 --- 7,63,000/- Block
4 NRLM, DRDA Dairy Poultry, Duckery, Weaving, Crafts.
2013-14 to 2016-17 --- 3,57,000/- Block
5 JFM, Forest --- -- --- -- Total 25,42,500/-
65
CHAPTER-5 MANAGEMENT/ACTION PLAN
Description on methodology of plan adopted a) Awareness generation interventions:
i. Awareness campaign through Gram Sabha in all villages of watershed area is essential. Awareness generation programme will be conducted for all project stakeholders at watershed level with the fundamental purpose of educating them and creating more interest in regard to various aspects of the IWMP project.
ii. Awareness campaign through distribution of leaflet and brochures describing about the IWM project. b) Initial Orientation program: For successful completion of the project, orientation of both project personnel and watershed communities according to the changing perspective is vital and it will enhance skill and competency of project staff to work with the villagers. Various training, awareness programme, meeting and seminar shall be conducted to build necessary ability and competency among the project officials, PRls, especially GPs and other Communities Based Organizations (CBOs) about planning, implementation and management of various project activities. c) Formation process UGs & Watershed Committee: The User Group and Watershed Committee are formed through Gram Sabha and awareness programme. d) DPR Preparation Process: The study area is confined to 41 villages of Karimganj district of Assam. Both primary and secondary data pertaining to the study were collected from various sources. While the secondary data were collected from various government organizations, published documents and literatures. The primary data were collected from the villagers staying within the watershed area. Structured questionnaires were used for collecting the primary data. The study team also visited many problem prone areas to obtain
66
first-hand information of natural resources and their uses. Data and information thus collected have been analyzed to know about the characteristics of the problem and prospects. The following are the various steps data collection & report preparation. Secondary data collection, preparations. Village meting & Conduct of Participatory Rural Appraisal (PRA) techniques for problem identification,
need assessment and selection of project activities, All the treatment plan and interventions are identified after elaborate PRA exercise.
• Socio Economic Survey of all Households in Watershed village. Collection of baseline data such as Demographic features, Livestock details, BPL status, Operation
Holdings, Migration particulars, Details of Community Based Organization, Land features, Details of CPR, Crops & Cropping patters, Soil classification & Erosion status, Climate & Hydrological features, Ground water status, Irrigation facilities, Status of water table, Quality and availability of drinking water, Water budget, Details of livelihoods.
Problem Typology Analysis. • Productivity & Livelihoods planning exercise. • Institution & Capacity Building plan. • Data Consolidation & Documentation of DPR. • Integration of various spatial and non-spatial (attribute) data using the Geographical Information System
(GIS). GIS software is an especially effective tool for watershed management. GIS software provides the ability to create a computerized database consisting of spatial (map or image) data.
Approval by Gram Sabha: After the preparation of draft DPR, it has been shared at the village level and approval has been taken from the Gram Sabha by passing a resolution. Further, the overall plan of the project has been approved by the WC.
67
5.2 Details of Natural Resource Management Activities Table No. 5.2.1 Soil and Moisture Conservation structures
1 2 3 4 5 6 7 8 9 10 11
Sl. No.
Name of the Activities
(Structures) Name of the Hamlet / Village
Plot Numbers (including
Name of the local Patch)
Name of Beneficiar
ies
Area (in Ha)/ Dimension ( in M/ Sq. M / CuM) of
Structure
Unit Cost
Total Cost (in
Rs.) Contribution
Total Grant Amount (in
Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
1 Drainage Channel
ChorgolaGhoramara MWS
As per Gaon Sabha
As per Gaon Sabha
0.12
Dewkurijapar 22.42 Ha. 2.6904 0.13 2.5604 3rd & 5th year
Jatkapon 3.26 Ha. 0.3906 0.02 0.3706 4th year
Dewkuri 9.67 Ha. 1.16 0.06 1.10 2nd & 3rd year
Basail MWS
Kalakuri 5.60 Ha. 0.672 0.03 0.642 2nd & 4th year
Marzadkandi 65.74 Ha. 7.8888 0.35 7.5388 3rd & 5th year
Basail 53.58 Ha. 6.4296 0.29 6.1396 3rd & 5th year
Mohakol – II 66.88 Ha. 8.0256 0.36 7.6656 3rd & 5th year
Lamajuar MWS
Nairgram 47.30 Ha. 5.676 0.26 5.416 3rd, 4th & 5th year
Lamajuar – II 49.355 Ha. 5.9226 0.27 5.6526 3rd, 4th & 5th year
Lamajuar – III 50.23 Ha. 6.027 0.28 5.747 4th & 5th year
Mirjapur – II 46.25 Ha. 5.55 0.26 5.29 3rd, 4th & 5th year
Umorpur MWS
Kandigram-Chaityanagar 12.27 Ha. 2.072 0.10 1.972 4th & 5th year
Naharpur 12.14 Ha. 1.4564 0.07 1.3864 3rd & 5th year
Sriguri 46.98 Ha. 5.6376 0.25 5.3876 2nd, 3rd & 4th year
Umorpur – I 48.26 Ha. 5.7912 0.26 5.5312 3rd & 5th year
Chapra 55.25 Ha. 6.6302 0.28 6.3502 3rd, 4th & 5th year
N. B. – 1) Rate as per Model Estimate, 2) Plan & Estimate is enclosed & 3) Contribution as per Common Guide Line of GOI
68
Sl. No.
Name of the Activities
(Structures) Name of the Hamlet /
Village
Plot Numbers (including
Name of the local Patch)
Name of Beneficia
ries
Area (in Ha)/ Dimension ( in
M/ Sq. M / CuM) of Structure
Unit Cost
Total Cost (in
Rs.) Contributio
n
Total Grant
Amount (in Rs)
Year of Implementation (1st/2nd/3rd/4t
h/5th) 1 2 3 4 5 6 7 8 9 10 11
1 Drainage Channel
Masli MWS
As per Gaon Sabha
As per Gaon Sabha
0.12
Malajuar 27.68 Ha. 3.3216 0.15 3.1716 2nd, 3rd, 4th & 5th
Mirjapur – I 15.15 Ha. 1.8168 0.09 1.7268 2nd & 4th year
Konkolesh – II 49.03 Ha. 5.8832 0.27 5.6132 2nd, 3rd & 5th year
Masli – I 25.83 Ha. 3.0996 0.14 2.9596 3rd& 4th year
Masli – II 16.45 Ha. 1.973 0.10 1.873 4th & 5th year
Rajpasha 23.96 Ha. 2.8728 0.13 2.7428 2nd & 4th year
Malua MWS
Kandigram 40.08 Ha. 4.8096 0.22 4.5896 2nd, 4th & 5th year
Niz Malua 60.62 Ha. 7.274 0.33 6.944 2nd, 3rd , 4th & 5th
Mohakol – I 38.18 Ha. 4.581 0.21 4.371 2nd, 4th & 5th year
Konkolesh – II 36.92 Ha. 4.4304 0.20 4.2304 3rd & 5th year
Hasanpur 33.02 Ha. 3.9624 0.19 3.7724 2nd & 3rd year
Jhum MWS
Alakulipur 29.37 Ha. 3.5248 0.16 3.3648 2nd, 4th & 5th year
Jhum – II 11.81 Ha. 1.4172 0.07 1.3472 3rd & 5th year
Jhum – V 17.85 Ha. 2.142 0.10 2.042 2nd year
Jhum – VI 8.775Ha. 1.053 0.05 1.003 2nd year
Jhum – VII 18.90 Ha. 2.268 0.11 2.158 4th year
N. B. – 1) Rate as per Model Estimate, 2) Plan & Estimate is enclosed & 3) Contribution as per Common Guide Line of GOI
69
Sl. No.
Name of the Activities
(Structures) Name of the Hamlet / Village
Plot Numbers (including
Name of the local Patch)
Name of Beneficiar
ies
Area (in Ha)/ Dimension ( in M/ Sq. M / CuM) of
Structure
Unit Cost
Total Cost (in
Rs.) Contribution
Total Grant Amount (in
Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
1 2 3 4 5 6 7 8 9 10 11
2 Boulder Revetment
ChorgolaGhoramara MWS
As per Gaon Sabha
As per Gaon Sabha
0.0215
Jatkapon 65.74 Rm. 1.4136 0.02 1.3936 3rd & 5th year Basail MWS Chinipator 316.02 Rm. 6.7944 0.10 6.6944 3rd & 5th year Malua MWS Kandigram 182.84 Rm. 3.931 0.06 3.871 3rd year Jhum MWS Alakulipur 98.12 Rm. 2.12 0.03 2.09 3rd year
3 Brick
Channel
ChorgolaGhoramara MWS
As per Gaon Sabha
As per Gaon Sabha
0.0068
Borbari 541.57 Rm. 3.6826 0.06 3.6226 2nd, 3rd & 5th year Goramara – I 420.18 Rm. 2.8572 0.05 2.8072 3rd & 4th year Goramara – II 375.20 Rm. 2.5614 0.04 2.5214 4th year Brahmon Sasan 106.95 Rm. 0.7272 0.01 0.7172 4th year Basail MWS Chinipaton 56.00 Rm. 0.381 0.006 0.375 2nd year Morzadkandi 126.00 Rm. 0.8568 0.012 0.8448 2nd & 4th year Basail 165.53 Rm. 1.1256 0.016 1.1096 2nd & 4th year Mohakol – II 135.52 Rm. 0.9216 0.013 0.9086 2nd & 4th year Umorpur MWS Srigouri 546.00 Rm. 3.7128 0.06 3.6528 5th year Masli MWS Konkolesh – II 355.76 Rm. 2.4192 0.04 2.3792 4th year Masli – I 230.27 Rm. 1.5658 0.05 1.5158 2nd & 5th year Malua MWS Mohakol – I 415.45 Rm. 2.8244 0.042 2.7824 3rd & 4th year Hasanpur 100.00 Rm. 0.68 0.01 0.67 4th year Jhum MWS Jhum – IV 100.0 Rm. 0.68 0.01 0.67 2nd year Jhum – V 140.87 Rm. 0.9566 0.014 0.9426 4th & 5th year
N. B. – 1) Rate as per Model Estimate, 2) Plan & Estimate is enclosed & 3) Contribution as per Common Guide Line of GOI
70
Sl. No.
Name of the Activities
(Structures) Name of the Hamlet / Village
Plot Numbers (including
Name of the local Patch)
Name of Beneficiar
ies
Area (in Ha)/ Dimension ( in M/ Sq. M / CuM) of
Structure
Unit Cost
Total Cost (in
Rs.) Contribution
Total Grant Amount (in
Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
1 2 3 4 5 6 7 8 9 10 11
4 Brick Culvert
ChorgolaGhoramara MWS
As per Gaon Sabha
As per Gaon Sabha
0.845
Borbari 1 No. 0.845 0.013 0.832 2nd year Lamajuar – IV 1 No. 0.845 0.013 0.832 5th year Gurama – I 4 Nos. 3.38 0.05 3.33 2nd & 5th year Guramara – II 6 Nos. 5.07 0.08 4.99 3rd & 5th year Umorpur MWS Kandigram-Chaityanagar 5 Nos. 4.225 0.07 4.155 3rd & 5th year Naharpur 2 Nos. 1.69 0.03 1.66 3rd & 5th year Umorpur – II 4 Nos. 3.38 0.05 3.33 3rd & 5th year Masli MWS Masli – I 1 Nos. 0.845 0.013 0.832 5th year Masli – II 4 Nos. 3.38 0.05 3.33 3rd & 5th year Malua MWS Niz Malua 2 Nos. 1.69 0.03 1.66 3rd year Jhum MWS Jhum – V 3 Nos. 2.535 0.04 2.495 4th year Jhum – VI 3 Nos. 2.535 0.04 2.495 3rd year Jhum – VII 4 Nos. 3.38 0.05 3.33 4th year
5 Earthen Bund
ChorgolaGhoramara MWS
As per Gaon Sabha
As per Gaon Sabha
0.00218
Jatkapon 128 Rm. 0.279 0.013 0.266 2nd year Lamajuar – III 1001 Rm. 2.1816 0.10 2.0816 3rd & 5th year Lamajuar – IV 229.45 Rm. 0.5002 0.03 0.4702 4th year Dewkurijapor 585.58 Rm. 1.2744 0.06 1.2144 2nd & 4th year Dewkuri 498.35 Rm. 1.0864 0.05 1.0364 4th & 5th year
Goramara – I 3694.31 Rm. 8.0536 0.37 7.6836 2nd, 3rd & 5th year
Goramara – II 2909.0 Rm. 6.3414 0.29 6.0514 2nd, 3rd & 5th year
Brahman Sasan 1803.31 Rm. 3.9312 0.18 3.7512 2nd, 3rd & 5th year N. B. – 1) Rate as per Model Estimate, 2) Plan & Estimate is enclosed & 3) Contribution as per Common Guide Line of GOI
71
Sl. No.
Name of the Activities
(Structures) Name of the Hamlet / Village
Plot Numbers (including
Name of the local Patch)
Name of Beneficiaries
Area (in Ha)/ Dimension ( in M/ Sq. M / CuM) of
Structure
Unit Cost
Total Cost (in
Rs.) Contribution
Total Grant Amount (in
Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
1 2 3 4 5 6 7 8 9 10 11
5 Earthen Bund
Basail MWS
As per Gaon Sabha
As per Gaon Sabha
0.00218
Chinipator 420.83 0.9174 0.05 0.8674 4th year Kalakri 2510 5.472 0.25 5.222 3rd & 5th year Lamajuar MWS Lamajuar – II 1355.50 2.955 0.14 2.815 2nd & 5th year Lamajuar – III 1800.83 3.9258 0.18 3.7458 2nd & 3rd year Mirjapur – II 1384.40 3.018 0.13 2.888 2nd & 5th year Umorpur MWS Kandigram-Chaityanagar 185.23 0.4038 0.02 0.3838 2nd & 3rd year Naharpur 683.10 1.4904 0.07 1.4204 2nd & 4th year Umorpur – I 818.00 1.7832 0.09 1.6932 2nd & 4th year Umorpur – II 1105.90 2.4112 0.11 2.3012 3rd, 4th & 5th year Chapra 1371.00 2.989 0.14 2.849 2nd & 4th year Masli MWS Mirjapur – I 1618.90 3.5292 0.16 3.3692 5th year Masli – II 966.15 2.1062 0.10 2.0062 2nd & 3rd year Rajpasha 580.18 1.2648 0.06 1.2048 3rd & 5th year Malua MWS Kandigram 358.90 0.7824 0.04 0.7424 5th year Mohakol – I 1108.00 2.4156 0.11 2.3056 5th year Konkolesh – II 639.63 1.3944 0.07 1.3244 2nd & 4th year Hasanpur 970.65 2.116 0.10 2.016 4th & 5th year Jhum MWS Jhum – V 2000 4.36 0.20 4.16 5th year Jhum – VI 1382.73 3.0144 0.14 2.8744 3rd, 4th & 5th year Jhum – VII 1684.40 3.672 0.17 3.502 5th year
N. B. – 1) Rate as per Model Estimate, 2) Plan & Estimate is enclosed & 3) Contribution as per Common Guide Line of GOI
72
Sl. No.
Name of the Activities
(Structures) Name of the Hamlet / Village
Plot Numbers (including
Name of the local Patch)
Name of Beneficiaries
Area (in Ha)/ Dimension ( in M/ Sq. M / CuM) of
Structure
Unit Cost
Total Cost (in
Rs.) Contribution
Total Grant Amount (in
Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
1 2 3 4 5 6 7 8 9 10 11
6 Graded
Bund with Hume Pipe
Lamajuar MWS As per Gaon Sabha
As per Gaon Sabha
0.92
Naigram 3 No. 2.76 0.04 2.72 2nd & 5th year Masli MWS Konkolesh – II 5 No. 4.60 0.06 4.54 3rd year
7 Boulder Spur
Jhum MWS As per Gaon Sabha
As per Gaon Sabha
Jhum – IV 79.59 2.5072 0.04 2.4672 3rd & 5th year
N. B. – 1) Rate as per Model Estimate, 2) Plan & Estimate is enclosed & 3) Contribution as per Common Guide Line of GOI
73
Table No. 5.2.2 Water Harvesting Structures 1 2 3 4 5 6 7 8 9 10 11
Sl. No.
Name of the Activities
(Structures) Name of the Hamlet / Village
Plot Numbers (including
Name of the local Patch)
Name of Beneficiaries
Area (in Ha)/ Dimension ( in M/
Sq. M / Cum) of Structure
Unit Cost Total Cost (in Rs.)
Contribution Total Grant Amount (in
Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
1 Farm Pond
ChorgolaGhoramara MWS
As per Gaon Sabha
As per Gaon Sabha
0.96
Borbari 4185 cum 2.88 0.13 2.75 4th & 5th year Lamajuar – IV 1395 cum 0.96 0.05 0.91 3rd year Dewkuri 2790 cum 1.92 0.09 1.83 3rd & 5th year Basail MWS Chinipaton 2790 cum 1.92 0.09 1.83 2nd & 4th year Kalakuri 2790 cum 1.92 0.09 1.83 2nd & 4th year Marzadkandi 4185 cum 2.88 0.13 2.75 2nd & 4th year Basail 2790 cum 1.92 0.09 1.83 2nd & 4th year Mohakol – II 4185 cum 2.88 0.13 2.75 2nd & 4th year Lamajuar MWS Nairgram 6975 cum 4.80 0.22 4.58 3rd & 5th year Lamajuar – II 4185 cum 2.88 0.13 2.75 3rd year Lamajuar – III 4185 cum 2.88 0.13 2.75 3rd year Mirjapur – II 5580 cum 3.84 0.18 3.66 3rd & 5th year Umorpur MWS Kandigram-Chaityanagar 1395 cum 0.96 0.05 0.91 2nd year Umorpur – I 1395 cum 0.96 0.05 0.91 2nd year Sriguri 4185 cum 2.88 0.13 2.75 3rd year Umorpur – II 1395 cum 0.96 0.05 0.91 4th year Chapra 5580 cum 3.84 0.18 3.66 3rd & 5th year Masli MWS Lamajuar – I 2790 cum 1.92 0.09 1.83 3rd & 5th year Mirjapur – I 2790 cum 1.92 0.09 1.83 2nd & 4th year Rajpasha 6975 cum 4.80 0.22 4.58 3rd & 5th year Malua MWS Kandigram 1395 cum 0.96 0.05 0.91 4th year Niz Malua 2790 cum 1.92 0.09 1.83 5th year Mohakol – I 4185 cum 2.88 0.13 2.75 3rd year Konkolesh – II 1395 cum 0.96 0.05 0.91 4th year Hasanpur 6975 cum 4.80 0.22 4.58 3rd & 5th year Jhum MWS
74
Jhum - IV 2790 cum 1.92 0.09 1.83 4th & 5th year Table No. 5.2.2 Water Harvesting Structures
1 2 3 4 5 6 7 8 9 10 11
Sl. No.
Name of the Activities
(Structures) Name of the Hamlet / Village
Plot Numbers (including
Name of the local Patch)
Name of Beneficiaries
Area (in Ha)/ Dimension ( in M/
Sq. M / Cum) of Structure
Unit Cost Total Cost
(in Rs.) Contribution Total Grant Amount (in
Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
2 Drop Spillway
Jhum MWS
As per Gaon Sabha
As per Gaon Sabha
0.417
Jhum – V 14.39 m2 6.00 0.10 5.90 3rd year
Masli MWS
Mirjapur – I 10.46 m2 4.3596 0.07 4.2896 3rd year
N. B. – 1) Rate as per Model Estimate, 2) Plan & Estimate is enclosed & 3) Contribution as per Common Guide Line of GOI
75
Table No. 5.2.2 Vegetative Covers 1 2 3 4 5 6 7 8 9 10
Sl. No.
Name of the Activities Name of the Hamlet / Village
Plot Numbers (including Name
of the local Patch)
Name of Beneficiaries Area (in Ha) Unit
Cost Total Cost
(in Rs.) Contributio
n
Total Grant
Amount (in Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
1 Road Side Plantation
ChorgolaGhoramara MWS
As per Gaon Sabha
As per Gaon Sabha
Borbari 29 Nos.
0.018
0.522 0.05 0.472 4th year Lamajuar – III 58 Nos. 1.044 0.10 0.944 2nd & 4th year Lamajuar – IV 25 Nos. 0.45 0.04 0.41 2nd & 3rd year
Goramara – I 5 Nos. 0.09 0.009 0.081 2nd & 5th year
Goramara – II 4 Nos. 0.072 0.0072 0.0648 4th year Brahman Sasan 10 Nos. 0.18 0.018 0.162 4th year Lamajuar MWS Nairgram 30 Nos. 0.54 0.054 0.486 5th year Lamajuar – II 30 Nos. 0.54 0.054 0.486 4th year Lamajuar – III 30 Nos. 0.54 0.054 0.486 4th year Mirjapur – II 20 Nos. 0.36 0.036 0.324 5th year Umorpur MWS Umorpur – II 58 Nos. 1.044 0.10 0.944 2nd year Chapra 40 Nos. 0.72 0.07 0.65 4th & 5th year Malua MWS Niz Malua 30 Nos. 0.54 0.054 0.486 5th year Konkolesh – II 30 Nos. 0.54 0.054 0.486 5th year Jhum MWS Jhum – II 37 Nos. 0.666 0.06 0.606 2nd & 4th year Jhum – VI 70 Nos. 1.26 0.126 1.134 4th & 5th year
N. B. – 1) Rate as per Model Estimate, 2) Plan & Estimate is enclosed & 3) Contribution as per Common Guide Line of GOI
76
5.3: Structure or Activity Wise Details of Engineering Structure and Vegetative Measures Table No.5.3.1 : Engineering structures for Soil Conservation Measures (SMC)
1 2 3 4
S. No. Name of structures Area (ha) Farmers
Total units (No./ cu.m./
rmt)
UNIT COST (Rs)
Proposed plan
Estimated cost* (Rs. in lakh) Farmers contribution (Rs. in lakh)
Grant Portion (Rs. in lakh)
M W O T A PRIVATE LAND Boulder Spur 5.00 Ha. 80.00 Rm. 3150/Rm. 1.76 0.76 -- 2.52 0.20 2.32 Boulder Revetment 44.84 Ha. 637.50 Rm. 2150/Rm. 9.59 4.12 -- 13.71 1.09 12.62 Grand total = 49.84 Ha. 717.50 Rm. 11.35 4.88 16.23 1.29 14.94
N. B. – 1) Rate as per Model Estimate, 2) Plan & Estimate is enclosed & 3) Contribution as per Common Guide Line of GOI
77
5.3.2: Details of engineering structures for Water Harvesting WHS
1 2 3 4
S. No. Name of structures Total units (No./
cu.m./ rmt) UNIT COST
(Rs)
Proposed plan Estimated cost (Rs. in lakh)
Farmers contribution (Rs)
M W O T A PRIVATE LAND
A1 Individual structures i. Drop Spillway 14.01 cum 46700 / Sq.m. 6.21 3.10 1.0496 10.3596 0.16
Grand total = 6.21 3.10 1.0496 10.3596 0.16 N. B. – 1) Rate as per Model Estimate, 2) Plan & Estimate is enclosed & 3) Contribution as per Common Guide Line of GOI
Table No. 5.3.3: Details of activities connected with vegetative cover in watershed works* 1 2 3 4
S. No. Name of structure/ work
Area (ha) No. of plants Proposed plan
Unit Cost (Rs)
Estimated cost (Rs. in lakh)
Farmer Contribution (Rs. in lakh)
Grant (Rs. in lakh)
1 Road Side Plantation 76.0 506 1800 / No. 9.078 0.8862 8.1918 Grand Total = 76.0 506 9.078 0.8862 8.1918
N. B. – 1) Rate as per Model Estimate, 2) Plan & Estimate is enclosed & 3) Contribution as per Common Guide Line of GOI
78
Chapter 6 Capacity Building Plan
Table No. 6.1 Details of Capacity Building For the Propose IWMP, the following Capacity Building Plan are proposed to be taken up at PIA Level.
1 2 3 4 5 6 7 8 9 10 11
Sl. No.
Name of the Training & Exposure ( Knowledge, Skill, etc. at both Being
and Doing level)
Number of
events
Number of Participants in an event
Total Number of days
per event
Total Trainee
days (= 3 x 4 x 5)
Cost per Trainee
day (in Rs)
Total Cost required for
the programme (= 6 x7 ; in
Rs.)
Total Grant
Amount (in Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
Monitoring Indicators
SHG/ UG / WC / PI related
1. Formation of SHG 23 14 1 322 555 178710 178710 1st, 2nd, 3rd & 4th Year
No of SHG Formed
2. Awareness to PI 12 110 1 132 100 132000 132000 1st Year No of Events
3. Orientation Programmes to PI, WC, UG, SHG
10 35 1 350 240 84000 84000 1st Year No of Events
4. Formation of UG 21 12 1 252 555 139860 139860 1st, 2nd, 3rd & 4th Year
No of UG Formed
5. Formation of Watershed Committee including Registration
07 1131 1 7917 25 197925 197925 1st Year No of Regd. WC
6.
Regular Meetings to be conducted with Watershed Committee & Planning
07 54 1 378 166 62748 62748 1st, 2nd, 3rd , 4th & 5th Year
No of Events
7. Self Monitoring events ( planning, Review of activities through tool)
12 41 1 492 175 86100 86100 1st, 2nd, 3rd , 4th & 5th Year
No of Events
8. Social Audit Events 27 32 1 864 150 129600 129600 1st, 2nd, 3rd , 4th & 5th Year
No of Events
Subtotal 1010943 1010943
79
NRM related
9
The modules would be fixed on the basis of the activities taken under the projects in respective years.
23 29 1 667 525 350175 350175 1st, 2nd & 3rd Year
Subtotal 350175 350175 Production Enhancement related
10
Specialized Training on the basis of the activities & requirement of the identified UGs & Individuals to be benefited under Project
12 32 10 384 525 201600 201600 1st, 2nd & 3rd Year
No of events & Trainee
days
Subtotal 201600 201600 Livelihoods / Micro-enterprises related
11
Specialized Training on the basis of the Activities & requirement of the Identified SHGs
12 42 1 504 525 264600 264600 1st, 2nd & 3rd Year
No of events & Trainee
days
Subtotal 264600 264600 Convergence / Rights & entitlement / Wel Being related
12 Convergence Meeting with allied Sectors. 12 21 1 252 500 126000 126000 1st Year No of
Events Subtotal 126000 126000 For PIA / WDT staffs level
13 On Institutional Building 3 29 1 88 650 57368 57368 2nd, 3rd & 4th Year No of
Events
14 On Gender Equity 2 28 1 56 650 36400 36400 2nd, 3rd & 4th Year No of Events
15 On Enterprise Promotion 6 26 1 156 525 81900 81900 2nd, 3rd , 4th & 5th
Year No of Events
16 On Productivity Enhancement 4 24 1 96 525 50400 50400 2nd, 3rd , 4th & 5th
Year No of Events
17 On NRM Works 7 26 1 182 525 95550 95550 2nd, 3rd , 4th & 5th Year
No of Events
80
Subtotal 321618 321618
81
Others TOT/CRP/CSP/Related 18 Exposure visit for
WC/UG/SHG 2 45 1 90 1130 101700 101700 1st year No of Events
19 Outside State Training for PIA/WDT 7 1 0 7 19000 133000 133000 2nd year
No of Trained personal
Subtotal 234700 234700 GRAND TOTAL
2508000 2508000
82
Chapter 7 Phasing of Programme and Budgeting
*Please refer to the “Fund Utilization pattern component wise in % under IWMP” letter attached in the Annexure.
Table No. 7.1: Phasing of the action plan
1 2 3 4 5 6 7 8 9 10 11 S.No
Component
Activities Unit Unit Cost (Rs.)
1 year 2nd year 3rd year 4th year 5th year Total Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.) Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
1 Entry Point Activities (4%) i. Village Approach Road No. 24 5.742
4 0 0 0 0 0 0 0 0 24 5.7424
ii. Pond No. 2 1.4304 0 0 0 0 0 0 0 0 2 1.4304
iii. Brick Culvert No. 24 15.7424 0 0 0 0 0 0 0 0 24 15.7424
iv. Construction of RCC Approach with Railing No. 01 3.484
8 0 0 0 0 0 0 0 0 01 3.4848
Subtotal of Entry Point Activity
51 26.40 0 0 0 0 0 0 0 0 51 26.40
2 Institution & Capacity Building (5%)
i) Poor HHs in Watersheds to be covered under SHGs
SC No. ST No. BC No. OC No.
ii) Awareness Generation (events) to be conducted
Pamphlets distribution/Awareness Campaign
No. 0.11 12 1.32 12 1.32
Wall posters/Publicity Materials No. 1.36 0.36 1.72
Wall writings No.
83
1 2 3 4 5 6 7 8 9 10 11 S.No
Component
Activities Unit Unit Cost (Rs.)
1 year 2nd year 3rd year 4th year 5th year Total Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.) Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Rallies No. Kalajatha/ Mass Meetings No. 2.613 3.60 3.20 1.09775 10.51075 Small Group meetings No. Others (specify-----------) No.
iii)
Orientation programmes to GP, WC,UG, SHG,VO, VSS, WUA, Societies, Elected reps.
No. 0.084 5 0.42 2 0.168 2 0.168 1 0.084 10 0.840
iv) Formation of UGs No. 0.0666 10 0.666 8 0.5328 3 0.1998 21 1.3986
No. of women No. No. of men No. v) Formation of SHGs No. 0.0777 10 0.777 8 0.6216 5 0.3885 23 1.7871 No. of women No. No. of men No.
vi) Formation of Watershed Committee No. 0.282
75 7 1.97925 7 1.97925
No. of women No. No. of men No.
vii) Regular Meetings to be conducted
Watershed Committee No.
UGs/LGs No. 0.08964
1 0.08964 1 0.08964 1 0.08964 3 0.26892 VO/SHGs No. 1 0.08964 1 0.08964 2 0.17928 Gram Panchayat No. 1 0.08964 1 0.08964 2 0.17928 viii) No. of Planning events No. ix) Registration of WC No.
x) Self Monitoring events (planning, review of activities through tool)
No. 0.07175 6 0.430
5 4 0.287 2 0.1435 12 0.861
xi) Convergence meetings with LDs/other institutions No. 0.10
5 5 0.525 5 0.525 2 0.21 12 1.26
xii) Social Audit events No. 0.048 2 0.096 5 0.24 10 0.48 10 0.48 27 1.296
84
1 2 3 4 5 6 7 8 9 10 11 S.No
Component
Activities Unit Unit Cost (Rs.)
1 year 2nd year 3rd year 4th year 5th year Total Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.) Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
xiii) Trainings & Exposures
a) On Institutional Building No.Trgs
0.1912 1 0.1912 1 0.1912 1 0.1912 3 0.57368
Women No. Men No. b) On Gender No.
trgs 0.182 1 0.182 1 0.182 2 0.364
Women No. Men No. c) On Natural Resource
Management No. trgs
0.156 2 0.31074 2 0.31074
Women No.
Men No.
d) On Enterprise Promotion No. trgs
0.0668 9 0.6012 5 0.334 5 0.334 6 0.4008 25 1.67
Women No.
Men No.
e) On Productivity Enhancement
No. trgs
0.144 6 0.864 3 0.432 3 0.432 2 0.288 14 2.0214
Women No.
Men No.
f) Exposure Visits Nos 1.4255 0.3279 0.99285 1.71375 4.462
Women No.
Men No.
Sub Total IB & CB {Do not sum Men & Women under CB events (a to f)}2
4.65925
9.24104
8.02116 7.00877
4.0623
33.00
85
3 Productivity Enhancement (10%) Unit Unit Cost
1st year 2nd year 3rd year 4th year 5th year Total Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
Animal Husbandry i) Duckery No. 12000 0 0 16 1.92 49 5.88 49 5.88 54 6.48 168 20.16 ii) Goatery No. 6670 0 0 14 0.98 44 3.08 44 3.08 93 6.51 195 13.65 iii) Bee Keeping No. 20000 0 0 6 1.20 19 3.80 19 3.80 28 5.69 72 14.49 iv) Poultry No. 10000 0 0 16 1.60 48 4.80 48 4.80 65 6.50 177 17.70 Sub-Total = 5.70 17.56 17.56 25.1
8 66.0 4 Enterprise Promotion (9%) i) Duckery No. 12000 0 0 16 1.92 49 5.88 49 5.88 51 6.13 165 19.81 ii) Goatery No. 6670 0 0 14 0.98 44 3.08 44 3.08 45 3.15 147 10.29 iii) Bee Keeping No. 20000 0 0 6 1.20 19 3.80 19 3.80 21 4.20 65 13.00 iv) Poultry No. 10000 0 0 16 1.60 48 4.80 48 4.80 51 5.10 163 16.30 Sub-Total EP 11.40 35.12 35.12 43.76 59.40
86
5 Natural Resource Management (56%) Unit
Unit Cost
1st year 2nd year 3rd year 4th year 5th year Total Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
I) WHS (MI Works) a Drop Spillway Sqm 41700 0 0 24.85 10.3596 0 0 0 0 24.85 10.3596
b Earthen Pond cum 96000 11160 7.68 39060 26.88 18135 12.48 23715 16.32 92070 63.36
II Soil Moisture Conservation (SMC)
a Drainage Channel Rm. 355.00 138.769
16.674
346.1 41.4108 240.155 28.8154 310.0
2 37.2018
1039.40
126.17358
b Earthen Bund Rm. 218.00
6172.69
13.454
8653.48 18.838 26478.
83 10.0182 12651.954
31.3316
33892.38 73.6686
c Brick Channel Rm. 680.00 478.69 3.309 908.6
5 6.1782 1540.74 10.487 812.
21 5.523 4223.34 28.7282
d Brick Culvert No. 84500.00 3 2.535 15 12.675 7 5.915 12 10.14 37 33.80
e Graded Bund with Hume Pipe No. 92000
.00 2 1.84 5 4.60 0 0 1 0.92 8 7.36
f Boulder Revetment Rm. 3150 0 0 492.41 10.5868 0 0 170.
79 3.672 662.72 14.259
g Boulder Spur Rm. 2150 0 0 60.95 1.92 0 0 18.64 0.5872 79.59 2.5072 III Vegetative Measures a Road side Plantation No. 1800.00 119 2.142 4 0.072 199 3.582 184 3.312 506 9.108 Sub Total of NRM 47.6
34 133.52 79.2176 109.
008 369.60
87
1 2 3 4 5 6 7 8 9 10 11
Sl.No.
Component Activities Unit
Unit Cos
t (Rs.)
1 year 2nd year 3rd year 4th year 5th year 6th year Total
6 Administrative Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
a WC office expenditure Rs. 3.30 3.30 3.96 3.96 3.9
6 3.96 22.
44 b WS secretary Salary Rs 0 0 6.60 6.60 6.6
0 6.60 26.
40 c Stationary &
miscillaneous Rs. 3.30 3.30 2.64 2.64 2.64 2.6
4 17.16
Sub Total of Admn. 6.60 6.60 13.20 13.20 13.
20 13.20
66.00
Grand Total (sum of
all sub-totals 1 to 6)
39.6 77.184 190.
09 134.1376
165.968
13.2
554.40
6a WDF Collected Rs. 0 2.13 5.27 9.23 0.5672 17.1
972
88
VILLAGE & MICRO-WATERSHED WISE BUDGETING FOR WATERSHED WORK PHASE (56%) 1. Name of MWS: - JHUM 1. Name of Village: - Alakulipur
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Boulder Revetment Rm. 0.0215 98.60 2.12 0 0 0 0 98.60 2.12 0 0 0 0 2 Drainage Channel Ha. 0.12 29.37 3.5248 0 0 6.30 0.756 0 0 8.82 1.0588 14.25 1.71
2. Name of Village: - Jhum – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Road Side Plantation No. 0.018 37 0.666 0 0 15 0.27 0 0 22 0.396 0 0 2 Drainage Channel Ha. 0.12 11.81 1.4172 0 0 0 0 6.50 0.78 0 0 5.81 0.637
3. Name of Village: - Jhum – IV
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Brick Channel Rm. 0.0068 100 0.68 0 0 100 0.68 0 0 0 0 0 0 2 Pond cum 0.96 2790 1.92 0 0 0 0 0 0 1395 0.96 1395 0.96 3 Boulder Spur Rm. 0.0315 79.59 2.5072 0 0 0 0 60.95 1.92 0 0 18.64 0.5872
4. Name of Village: - Jhum – V Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Drainage Channel Ha. 0.12 17.85 2.142 0 0 17.85 2.142 0 0 0 0 0 0 2 Drop Spillway Sqm. 0.4170 14.39 6.00 0 0 0 0 14.39 6.00 0 0 0 0 3 Brick Culvert No. 0.8450 3 2.535 0 0 0 0 0 0 3 2.535 0 0 4 Earthen Bund Rm. 0.00218 2000 4.36 0 0 0 0 0 0 0 0 2000 4.36 5 Brick Channel Rm. 0.0068 140.67 0.9566 0 0 0 0 60.95 1.92 67.85 0.4614 72.82 0.4952
5. Name of Village: - Jhum – VI Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Drainage Channel Ha. 0.12 8.775 1.053 0 0 8.775 1.053 0 0 0 0 0 0 2 Brick Culvert No. 0.8450 3 2.353 0 0 0 0 3 2.535 0 0 0 0 3 Road Side Plantation No. 0.018 70 1.26 0 0 0 0 0 0 20 0.36 50 0.90 4 Earthen Bund Rm. 0.00218 1382.73 3.0144 0 0 0 0 189.63 0.4134 511.10 1.1142 682 1.4868
89
6. Name of Village: - Jhum – VII Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Brick Channel Rm. 0.0068 408.24 2.776 0 0 238.24 1.62 170 1.156 0 0 0 0 2 Brick Culvert No. 0.8450 4 3.38 0 0 0 0 4 3.38 0 0 0 0 3 Drainage Channel Ha. 0.12 18.90 3.268 0 0 0 0 0 0 18.90 2.268 0 0 4 Earthen Bund Rm. 0.00218 1684.40 3.672 0 0 0 0 0 0 0 0 1684.40 3.672
2. Name of MWS: - CHORGULA–GORAMARA 1. Name of Village: - Jatkapon Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Boulder Revetment Rm. 0.0215 65.74 1.4136 0 0 0 0 36.336 0.7812 0 0 29.41 0.6324 2 Drainage Channel Ha. 0.12 3.26 0.3906 0 0 0 0 0 0 3.26 0.3906 0 0 3 Earthen Bund Rm. 0.00218 128.0 0.279 0 0 128.0 0.279 0 0 0 0 0 0
2. Name of Village: - Barbari
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Brick Channel Rm. 0.0068 541.57 3.6826 0 0 31.92 0.217 438 2.9784 0 0 71.65 0.4872 2 Pond cum 0.96 4185 2.88 0 0 0 0 0 0 1395 0.96 2790 1.92 3 Brick Culvert No. 0.8450 1 0.845 0 0 1 0.845 0 0 0 0 0 0 4 Road Side Plantation No. 0.018 29 0.522 0 0 0 0 0 0 29 0.522 0 0
3. Name of Village: - Lamajuar – III Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Earthen Bund Rm. 0.00218 1001 2.1816 0 0 0 0 555 1.2096 0 0 446 0.972 2 Road Side Plantation No. 0.018 58 1.044 0 0 24 0.432 0 0 34 0.612 0 0
4. Name of Village: - Lamajuar - IV Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Brick Culvert No. 0.845 1 0.845 0 0 0 0 0 0 0 0 1 0.845 2 Excavated Pond cum 0.96 1395 0.96 0 0 0 0 1395 0.96 0 0 0 0 3 Road Side Plantation No. 0.018 25 0.45 0 0 21 0.378 4 0.072 0 0 0 0 4 Earthen Graded Bund Rm. 0.00218 229.45 0.5002 0 0 0 0 0 0 229.45 0.5002 0 0
90
5. Name of Village: - Dewkuri Japar Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Drainage Channel Ha. 0.12 22.42 2.6904 0 0 0 0 12.39 1.4868 0 0 10.03 1.2036 2 Earthen Graded Bund Rm. 0.00218 584.58 1.2744 0 0 243.58 0.531 0 0 3415 0.7434 0 0
6. Name of Village: - Dewkuri Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Drainage Channel Ha. 0.12 9.67 1.16 0 0 4.65 0.558 5.02 0.602 0 0 0 0 2 Excavated Pond cum 0.96 2790 1.92 0 0 0 0 1395 0.96 0 0 1395 0.96 3 Earthen Graded Bund Rm. 0.00218 498.35 1.0864 0 0 0 0 0 0 358.35 0.7812 140 0.3052
7. Name of Village: - Goramara – I Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Brick Channel Rm. 0.0068 420.18 2.8572 0 0 0 0 23.65 0.1608 396.53 5.6964 0 0 2 Brick Culvert No. 0.8450 4 3.38 0 0 2 1.69 0 0 0 0 2 1.69 3 Earthen Graded Bund Rm. 0.00218 3694.31 8.0536 0 0 100 0.218 2400 5.232 0 0 1194.31 2.6036 4 Road Side Plantation No. 0.018 5 0.09 0 0 1 0.018 0 0 0 0 4 0.072
8. Name of Village: - Goramara – II Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Brick Channel Rm. 0.0068 375.20 2.5614 0 0 0 0 0 0 375.20 2.5614 0 0 2 Earthen Graded Bund Rm. 0.00218 2909.0 6.3414 0 0 863 1.881 1253.11 2.7318 0 0 792.94 1.7286 3 Brick Culvert No. 0.8450 6 5.07 0 0 0 0 3 2.535 0 0 3 2.535 4 Road Side Plantation No. 0.018 4 0.072 0 0 0 0 0 0 4 0.072 0 0
9. Name of Village: - Brahman Sahor Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Earthen Graded Bund Rm. 0.00218 1803.31 3.9312 0 0 297.25 0.648 832.30 1.3144 0 0 673.76 1.4688 2 Brick Channel Rm. 0.0068 106.950 0.7272 0 0 0 0 0 0 106.95 0.7272 0 0 3 Road Side Plantation No. 0.018 10 0.18 0 0 0 0 0 0 10 0.18 0 0
91
3. Name of MWS: - BASAIL 1. Name of Village: - Chiripatar Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Boulder Revetment Rm. 0.0215 316.02 6.7944 0 0 0 0 174.64 3.7548 0 0 141.38 3.0396 2 Excavated Pond cum 0.96 2790 1.92 0 0 1395 0.96 0 0 1395 0.96 0 0 3 Brick Channel Rm. 0.0068 56 0.381 0 0 56 0.381 0 0 0 0 0 0 4 Earthen Bund Rm. 0.00218 420.83 0.9174 0 0 0 0 0 0 420.83 0.9174 0 0
2. Name of Village: - Kalakuri Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Earthen Bund Rm. 0.00218 2510 5.472 0 0 0 0 1387 3.024 0 0 1123 2.448 2 Excavated Pond cum 0.96 2790 1.92 0 0 1395 0.96 0 0 1395 0.96 0 0 3 Drainage Channel Ha. 0.12 5.60 0.672 0 0 1 0.12 0 0 4.60 0.552 0 0
3. Name of Village: - Marzadkandi
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Drainage Channel Ha. 0.12 65.74 7.8888 0 0 0 0 36.33 4.3596 0 0 29.41 3.5292 2 Excavated Pond cum 0.96 4185 2.88 0 0 1395 0.96 0 0 2790 1.92 0 0 3 Brick Channel Rm. 0.0068 126 0.8568 0 0 87.80 0.597 0 0 38.20 0.2598 0 0
4. Name of Village: - Basail
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Drainage Channel Ha. 0.12 53.58 6.4296 0 0 0 0 29.61 3.5532 0 0 23.97 2.8764 2 Excavated Pond cum 0.96 2790 1.92 0 0 1395 0.96 0 0 1395 0.96 0 0 3 Brick Channel Rm. 0.0068 165.53 1.1256 0 0 45.44 0.309 0 0 120.09 0.8166 0 0
4. Name of Village: - Mohakal – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Drainage Channel Ha. 0.12 66.88 8.0256 0 0 0 0 36.96 4.4352 0 0 29.92 3.5904 2 Excavated Pond cum 0.96 4185 2.88 0 0 1395 0.96 0 0 2790 1.92 0 0 3 Brick Channel Rm. 0.0068 135.52 0.9216 0 0 91.76 0.624 0 0 43.76 0.2976 0 0
92
4. Name of MWS: - MASLI 1. Name of Village: - Lamajuar – I
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Drainage Channel Ha. 0.12 27.68 3.3216 0 0 5.85 0.702 8.38 1.0056 8.19 0.9828 5.26 0.6312 2 Excavated Pond cum 0.96 2790 1.92 0 0 0 0 1395 0.96 0 0 1395 0.96
2. Name of Village: - Mirjapur – I Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Excavated Pond cum 0.96 2790 1.92 0 0 1395 0.96 0 0 1395 0.96 0 0 2 Drop Spillway Sqm. 0.4170 10.46 4.3596 0 0 0 0 10.46 4.3596 0 0 0 0 3 Drainage Channel Ha. 0.12 15.15 1.8168 0 0 4.98 0.597 0 0 10.17 1.2198 0 0 4 Earthen Bund Rm. 0.00218 1618.90 3.5292 0 0 0 0 0 0 0 0 1618.9 3.5292
3. Name of Village: - Konkalesh – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Drainage Channel Ha. 0.12 49.03 5.8832 0 0 34.40 1.728 1.99 0.2384 0 0 32.64 3.9168
2 Graded Bund with Hume Pipe No. 0.92 5 4.60 0 0 0 0 5 4.60 0 0 0 0
3 Brick Channel Rm. 0.0068 355.76 2.4192 0 0 0 0 0 0 355.76 2.4192 0 0 4. Name of Village: - Masli – I
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Drainage Channel Ha. 0.12 25.83 3.0996 0 0 0 0 17.22 2.0664 8.61 1.0332 0 0 2 Brick Channel Rm. 0.0068 230.27 1.5658 0 0 108.53 0.738 0 0 0 0 121.74 0.8278 3 Brick Culvert No. 0.8450 1 0.845 0 0 0 0 0 0 0 0 1 0.845
5. Name of Village: - Masli – II Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Earthen Bund Rm. 0.00218 966.15 2.1062 0 0 458.26 0.999 507.89 1.1072 0 0 0 0 2 Brick Culvert with slab No. 0.8450 4 3.38 0 0 0 0 2 1.69 0 0 2 1.69 3 Drainage Channel Ha. 0.12 16.45 1.973 0 0 0 0 0 0 11.66 1.3986 4.79 0.5744
93
6. Name of Village: - Rajpasha Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Drainage Channel Ha. 0.12 23.95 2.8728 0 0 9.98 1.197 0 0 13.97 1.6758 0 0 2 Excavated Pond cum 0.96 6975 4.80 0 0 0 0 4185 2.88 0 0 2790 1.92 3 Earthen Bund Rm. 0.00218 580.18 1.2648 0 0 0 0 216.33 0.4716 0 0 363.85 0.7932
5. Name of MWS: - UMORPUR 1. Name of Village: - Kandigram-Chaityana Nagar Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Excavated Pond cum 0.96 1395 0.96 0 0 1395 0.96 0 0 0 0 0 0 2 Brick Culvert with slab No. 0.8450 5 4.225 0 0 0 0 3 2.535 0 0 2 1.69 3 Drainage Channel Ha. 0.12 17.27 2.072 0 0 0 0 0 0 11.97 1.4364 5.30 0.6356 4 Earthen Bund Rm. 0.00218 185.23 0.4038 0 0 30.28 0.066 154.95 0.3378 0 0 0 0
2. Name of Village: - Naharpur Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Drainage Channel Ha. 0.12 12.14 1.4509 0 0 0 0 7.45 0.8938 0 0 4.69 0.5626 2 Brick Culvert with slab No. 0.8450 2 1.69 0 0 0 0 1 0.845 0 0 1 0.845 3 Earthen Bund Rm. 0.00218 683.60 1.4904 0 0 284.86 0.621 0 0 398.80 0.8694 0 0
3. Name of Village: - Srigouri
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Drainage Channel Ha. 0.12 0 0 13.65 1.638 14.22 1.7064 19.11 2.2932 0 0 2 Excavated Pond cum 0.96 4185 2.88 0 0 0 0 4185 2.88 0 0 0 0 3 Brick Culvert with slab No. 0.8450 546 3.7128 0 0 0 0 0 0 0 0 546 3.7128
4. Name of Village: - Umorpur – I Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Drainage Channel Ha. 0.12 48.26 5.7912 0 0 0 0 26.67 3.2004 0 0 21.59 2.5908 2 Excavated Pond cum 0.96 1395 0.96 0 0 1395 0.96 0 0 0 0 0 0 3 Earthen Bund Rm. 0.00218 818 1.7832 0 0 84 0.183 0 0 734 1.6002 0 0
94
5. Name of Village: - Umorpur – II Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Brick Culvert with slab No. 0.8450 4 3.38 0 0 0 0 3 2.535 0 0 1 0.845 2 Earthen Bund Rm. 0.00218 1105.90 2.4112 0 0 0 0 178 0.3882 230 0.5016 697.90 1.5214 3 Excavated Pond cum 0.96 1395 0.96 0 0 0 0 0 0 1395 0.96 0 0 4 Road Side Plantation No. 0.018 58 1.044 0 0 58 1.044 0 0 0 0 0 0
6. Name of Village: - Chapra – II Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Earthen Bund Rm. 0.00218 1371 2.989 0 0 871 1.899 0 0 500 1.09 0 0 2 Excavated Pond cum 0.96 5580 3.84 0 0 0 0 2790 1.92 0 0 2790 1.92 3 Drainage Channel Ha. 0.12 55.25 6.6302 0 0 0 0 28.31 3.3972 10.07 1.2086 16.87 2.0244 4 Road Side Plantation No. 0.018 40 0.72 0 0 0 0 0 0 20 0.36 20 0.36
6. Name of MWS: - LAMAJUAR 1. Name of Village: - Naigram
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Graded Bund with Hume Pipe No. 0.92 3 2.76 0 0 2 1.84 0 0 0 0 1 0.92
2 Excavated Pond cum 0.96 6975 4.80 0 0 0 0 4185 2.88 0 0 2790 1.92 3 Drainage Channel Ha. 0.12 47.3 5.676 0 0 0 0 19.09 2.291 21.53 2.583 6.68 0.802 4 Road Side Plantation No. 0.018 30 0.54 0 0 0 0 0 0 0 0 30 0.54
2. Name of Village: - Lamajuar – II Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Earthen Bund Rm. 0.00218 1355.50 2.955 0 0 755.50 1.647 0 0 0 0 600 1.308 2 Excavated Pond cum 0.96 4185 2.88 0 0 0 0 4185 2.88 0 0 0 0 3 Drainage Channel Ha. 0.12 49.355 49.355 0 0 0 0 14.43 1.7316 14.715 1.7658 20.21 2.4252 4 Road Side Plantation No. 0.018 30 0.54 0 0 0 0 0 0 30 0.54 0 0
95
3. Name of Village: - Lamajuar – III Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Earthen Bund Rm. 0.00218 1800.33 3.9258 0 0 821.56 1.791 979.27 2.1348 0 0 0 0 2 Excavated Pond cum 0.96 4185 2.88 0 0 0 0 4185 2.88 0 0 0 0 3 Drainage Channel Ha. 0.12 50.23 6.027 0 0 0 0 0 0 16.40 1.9674 33.83 4.0596 4 Road Side Plantation No. 0.018 30.00 0.54 0 0 0 0 0 0 30 0.54 0 0
4. Name of Village: - Mirjapur – II Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Drainage Channel Ha. 0.12 46.25 5.55 0 0 0 0 15.90 1.908 19.95 2.394 10.40 1.248 2 Earthen Bund Rm. 0.00218 1384.40 3.018 0 0 784.40 1.71 0 0 0 0 600 1.308 3 Excavated Pond cum 0.96 5580 3.84 0 0 0 0 4185 2.88 0 0 1395 0.96 4 Road Side Plantation No. 0.018 20 0.36 0 0 0 0 0 0 0 0 20 0.36
7. Name of MWS: - MALUA 1. Name of Village: - Kandigram Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Drainage Channel Ha. 0.12 40.08 4.8096 0 0 11.70 1.404 0 0 8.38 1.0056 20 2.40 2 Boulder Revetment Rm. 0.0215 182.84 3.931 0 0 0 0 182.84 3.931 0 0 0 0 3 Excavated Pond cum 0.96 1395 0.96 0 0 0 0 0 0 1395 0.96 0 0 4 Earthen Bund Rm. 0.00218 358.90 0.7824 0 0 0 0 0 0 0 0 358.90 0.7824
2. Name of Village: - Niz-Malua
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Drainage Channel Ha. 0.12 60.62 7.274 0 0 12.75 1.53 21.62 2.594 17.85 2.142 8.40 1.008 2 Brick Culvert with slab No. 0.8450 2 1.69 0 0 0 0 2 1.69 0 0 0 0 3 Excavated Pond cum 0.96 2790 1.92 0 0 0 0 0 0 0 0 2790 1.92 4 Road Side Plantation No. 0.018 3 0.54 0 0 0 0 0 0 0 0 3 0.54
96
3. Name of Village: - Mohakol – I
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Drainage Channel Ha. 0.12 38.18 4.581 0 0 14.18 1.701 0 0 12.00 1.44 12 1.44 2 Brick Culvert with slab No. 0.8450 415.45 2.8242 0 0 0 0 277 1.8828 138.45 0.9414 0 0 3 Excavated Pond cum 0.96 4185 2.88 0 0 0 0 4185 2.88 0 0 0 0 4 Road Side Plantation No. 0.018 1108 2.4156 0 0 0 0 0 0 0 0 1108 2.4156
4. Name of Village: - Konkolesh – II Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Drainage Channel Ha. 0.12 36.22 4.4304 0 0 0 0 22.89 2.7468 0 0 14.03 1.6836 2 Earthen Bund Rm. 0.00218 639.63 1.3944 0 0 450 0.981 0 0 189.63 0.4134 0 0 3 Excavated Pond cum 0.96 1395 0.96 0 0 0 0 0 0 1395 0.96 0 0 4 Road Side Plantation No. 0.018 30 0.54 0 0 0 0 0 0 0 0 30 0.54
5. Name of Village: - Hasanpur Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Drainage Channel Ha. 0.12 33.02 3.9624 0 0 12.90 1.548 20.12 2.4144 0 0 0 0 2 Earthen Bund Rm. 0.00218 17.065 2.116 0 0 0 0 0 0 682.20 1.4872 288.45 0.6288 3 Brick Channel Rm. 0.0068 100 0.68 0 0 0 0 0 0 100 0.68 0 0 4 Excavated Pond cum 0.96 6975 4.80 0 0 0 0 2790 1.92 0 0 4185 2.88
97
VILLAGE & MICRO-WATERSHED WISE BUDGETING FOR LIVELIHOOD FOR ASSET-LESS POOR (9%) 1. Name of MWS: - JHUM 1. Name of Village: - Alakulipur Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 4 0.40 0 0 1 0.10 1 0.10 1 0.10 1 0.10 2 Goatery No. 0.0677 4 0.28 0 0 0 0 0 0 2 0.14 2 0.14 3 Beekeeping No. 0.20 1 0.20 0 0 0 0 1 0.20 0 0 0 0
2. Name of Village: - Jhum – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Duckery No. 0.12 3 0.36 0 0 0 0 1 0.12 1 0.12 1 0.12 2 Goatery No. 0.0677 1 0.07 0 0 1 0.07 0 0 0 0 0 0
3. Name of Village: - Jhum – IV
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 2 0.20 0 0 0 0 2 0.20 0 0 0 0 3 Goatery No. 0.0677 4 0.28 0 0 1 0.07 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 2 0.40 0 0 0 0 0 0 1 0.20 1 0.20
4. Name of Village: - Jhum – V
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 4 0.40 0 0 1 0.10 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 13 1.56 0 0 1 0.12 4 0.48 4 0.48 4 0.48 3 Goatery No. 0.0677 4 0.28 0 0 1 0.07 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20
5. Name of Village: - Jhum – VI
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 3 0.30 0 0 0 0 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 3 0.36 0 0 0 0 1 0.12 1 0.12 1 0.12 3 Goatery No. 0.0677 2 0.14 0 0 2 0.14 0 0 0 0 0 0
98
4 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20 6. Name of Village: - Jhum – VII
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 4 0.40 0 0 1 0.10 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 13 1.56 0 0 1 0.12 4 0.48 4 0.48 4 0.48 3 Goatery No. 0.0677 3 0.21 0 0 0 0 1 0.07 1 0.07 1 0.07
2. Name of MWS: - CHORGULA–GORAMARA 1. Name of Village: - Jatkapon
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Duckery No. 0.12 3 0.36 0 0 0 0 1 0.12 1 0.12 1 0.12 2 Goatery No. 0.0677 1 0.07 0 0 1 0.07 0 0 0 0 0 0
2. Name of Village: - Barbari
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 3 0.30 0 0 0 0 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 4 0.48 0 0 1 0.12 1 0.12 1 0.12 1 0.12 3 Goatery No. 0.0677 3 0.20 0 0 0 0 3 0.20 0 0 0 0 4 Beekeeping No. 0.20 2 0.40 0 0 0 0 0 0 1 0.20 1 0.20
3. Name of Village: - Lamajuar – III
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 3 0.30 0 0 0 0 1 0.10 1 0.10 1 0.10 2 Goatery No. 0.0677 4 0.28 0 0 1 0.07 1 0.07 1 0.07 1 0.07
4. Name of Village: - Lamajuar - IV
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Goatery No. 0.0677 7 0.49 0 0 1 0.07 2 0.14 2 0.14 2 0.14
99
5. Name of Village: - Dewkuri Japar
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 3 0.30 0 0 0 0 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 3 0.36 0 0 0 0 1 0.12 1 0.12 1 0.12 3 Goatery No. 0.0677 1 0.07 0 0 1 0.07 0 0 0 0 0 0
6. Name of Village: - Dewkuri
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 3 0.30 0 0 0 0 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 3 0.36 0 0 0 0 1 0.12 1 0.12 1 0.12 3 Goatery No. 0.0677 1 0.07 0 0 1 0.07 0 0 0 0 0 0
7. Name of Village: - Goramara – I
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 12 1.44 0 0 1 0.10 5 0.50 3 0.30 3 0.30 2 Duckery No. 0.12 1 0.12 0 0 1 0.12 0 0 0 0 0 0 3 Goatery No. 0.0677 3 0.21 0 0 0 0 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 5 1.00 0 0 0 0 1 0.20 2 0.40 2 0.40
8. Name of Village: - Goramara – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 6 0.60 0 0 0 0 2 0.20 2 0.20 2 0.20 2 Duckery No. 0.12 7 0.84 0 0 2 0.24 3 0.36 1 0.36 1 0.36 3 Goatery No. 0.0677 6 0.40 0 0 0 0 0 0 3 0.20 3 0.20 4 Beekeeping No. 0.20 1 0.20 0 0 0 0 1 0.20 0 0 0 0
9. Name of Village: - Brahman Sahor
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 3 0.30 0 0 1 0.10 2 0.20 0 0 0 0 2 Goatery No. 0.0677 3 0.21 0 0 0 0 1 0.07 1 0.07 1 0.07 3 Beekeeping No. 0.20 2 0.40 0 0 0 0 0 0 1 0.20 1 0.20
100
3. Name of MWS: - BASAIL 1. Name of Village: - Chiripatar
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 4 0.40 0 0 1 0.10 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 6 0.72 0 0 0 0 2 0.24 2 0.24 2 0.24 3 Goatery No. 0.0677 7 0.47 0 0 1 0.07 0 0 3 0.20 3 0.20 4 Beekeeping No. 0.20 1 0.20 0 0 0 0 1 0.20 0 0 0 0
2. Name of Village: - Kalakuri
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 1 0.10 0 0 1 0.10 0 0 0 0 0 0 2 Duckery No. 0.12 9 1.08 0 0 0 0 3 0.36 3 0.36 3 0.36 3 Goatery No. 0.0677 4 0.28 0 0 1 0.07 1 0.07 1 0.07 1 0.07
3. Name of Village: - Marzadkandi
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 3 0.30 0 0 0 0 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 4 0.48 0 0 1 0.12 1 0.12 1 0.12 1 0.12 3 Goatery No. 0.0677 10 0.67 0 0 1 0.07 3 0.20 3 0.20 3 0.20 4 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20
4. Name of Village: - Basail
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 1 0.10 0 0 1 0.10 0 0 0 0 0 0 2 Duckery No. 0.12 6 0.72 0 0 0 0 2 0.24 2 0.24 2 0.24 3 Goatery No. 0.0677 4 0.28 0 0 1 0.07 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20
101
4. Name of Village: - Mohakal – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 1 0.10 0 0 1 0.10 0 0 0 0 0 0 2 Duckery No. 0.12 10 1.20 0 0 1 0.12 3 0.36 3 0.36 3 0.36 3 Goatery No. 0.0677 3 0.21 0 0 0 0 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20
4. Name of MWS: - MASLI 1. Name of Village: - Lamajuar – I
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 6 0.60 0 0 1 0.10 3 0.30 1 0.10 1 0.10 3 Beekeeping No. 0.20 2 0.40 0 0 0 0 0 0 1 0.20 1 0.20
2. Name of Village: - Mirjapur – I
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 5 0.50 0 0 0 0 3 0.30 1 0.10 1 0.10 2 Duckery No. 0.12 3 0.36 0 0 0 0 1 0.12 1 0.12 1 0.12 3 Goatery No. 0.0677 6 0.40 0 0 0 0 0 0 3 0.20 3 0.20 4 Beekeeping No. 0.20 4 0.80 0 0 1 0.20 1 0.20 1 0.20 1 0.20
3. Name of Village: - Konkalesh – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 9 0.90 0 0 1 0.10 4 0.40 2 0.20 2 0.20 2 Duckery No. 0.12 1 0.12 0 0 1 0.12 0 0 0 0 0 0 3 Goatery No. 0.0677 3 0.21 0 0 0 0 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 5 1.00 0 0 0 0 1 0.20 2 0.40 2 0.40
4. Name of Village: - Masli – I
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 4 0.40 0 0 1 0.10 1 0.10 1 0.10 1 0.10 2 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20
102
5. Name of Village: - Masli – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 6 0.60 0 0 0 0 2 0.20 2 0.20 2 0.20 2 Goatery No. 0.0677 2 0.14 0 0 2 0.14 0 0 0 0 0 0 3 Beekeeping No. 0.20 1 0.20 0 0 0 0 1 0.20 0 0 0 0
6. Name of Village: - Rajpasha
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 7 0.70 0 0 1 0.10 2 0.20 2 0.20 2 0.20 3 Goatery No. 0.0677 4 0.28 0 0 1 0.07 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20
5. Name of MWS: - UMORPUR 1. Name of Village: - Kandigram-Chaityana Nagar
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 3 0.30 0 0 0 0 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 6 0.72 0 0 0 0 2 0.24 2 0.24 2 0.24 3 Goatery No. 0.0677 5 0.35 0 0 2 0.14 1 0.07 1 0.07 1 0.07
2. Name of Village: - Naharpur
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Duckery No. 0.12 3 0.36 0 0 0 0 1 0.12 1 0.12 1 0.12 2 Goatery No. 0.0677 7 0.49 0 0 1 0.07 2 0.14 2 0.14 2 0.14
3. Name of Village: - Srigouri
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 7 0.70 0 0 1 0.10 2 0.20 2 0.20 2 0.20 2 Duckery No. 0.12 7 0.84 0 0 1 0.12 2 0.24 2 0.24 2 0.24 3 Beekeeping No. 0.20 3 0.21 0 0 0 0 1 0.20 1 0.20 1 0.20
103
4. Name of Village: - Umorpur – I
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 7 0.70 0 0 1 0.10 2 0.20 2 0.20 2 0.20 2 Goatery No. 0.0677 4 0.28 0 0 1 0.07 1 0.07 1 0.07 1 0.07 3 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20
5. Name of Village: - Umorpur – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 3 0.30 0 0 0 0 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 6 0.72 0 0 0 0 2 0.24 2 0.24 2 0.24 3 Goatery No. 0.0677 5 0.35 0 0 2 0.14 1 0.07 1 0.07 1 0.07
6. Name of Village: - Chapra – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 7 0.70 0 0 1 0.10 2 0.20 2 0.20 2 0.20 2 Duckery No. 0.12 9 1.08 0 0 0 0 3 0.36 3 0.36 3 0.36 3 Goatery No. 0.0677 8 0.54 0 0 2 0.14 0 0 3 0.20 3 0.20 4 Beekeeping No. 0.20 1 0.20 0 0 0 0 1 0.20 0 0 0 0
6. Name of MWS: - LAMAJUAR 1. Name of Village: - Naigram
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 9 0.90 0 0 0 0 3 0.30 3 0.30 3 0.30 2 Duckery No. 0.12 8 0.96 0 0 2 0.24 2 0.24 2 0.24 2 0.24 3 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20
104
2. Name of Village: - Lamajuar – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 9 0.90 0 0 1 0.10 4 0.40 2 0.20 2 0.20 2 Duckery No. 0.12 1 0.12 0 0 1 0.12 0 0 0 0 0 0 3 Goatery No. 0.0677 3 0.21 0 0 0 0 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 5 1.00 0 0 0 0 1 0.20 2 0.40 2 0.40
3. Name of Village: - Lamajuar – III
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 6 0.60 0 0 0 0 2 0.20 2 0.20 2 0.20 2 Duckery No. 0.12 8 0.96 0 0 2 0.24 2 0.24 2 0.24 2 0.24 3 Goatery No. 0.0677 3 0.21 0 0 0 0 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20
4. Name of Village: - Mirjapur – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 5 0.50 0 0 1 0.10 0 0 2 0.20 2 0.20 2 Duckery No. 0.12 13 1.56 0 0 1 0.12 4 0.48 4 0.48 4 0.48 4 Beekeeping No. 0.20 1 0.20 0 0 0 0 1 0.20 0 0 0 0
7. Name of MWS: - MALUA 1. Name of Village: - Kandigram
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 3 0.30 0 0 0 0 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 10 1.20 0 0 1 0.12 3 0.36 3 0.36 3 0.36 3 Goatery No. 0.0677 4 0.28 0 0 1 0.07 1 0.07 1 0.07 1 0.07
105
2. Name of Village: - Niz-Malua
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 7 0.70 0 0 1 0.10 2 0.20 2 0.20 2 0.20 2 Duckery No. 0.12 1 0.12 0 0 1 0.12 0 0 0 0 0 0 3 Goatery No. 0.0677 9 0.60 0 0 0 0 3 0.20 3 0.20 3 0.20 4 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20
3. Name of Village: - Mohakol – I
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 10 1.00 0 0 1 0.10 3 0.30 3 0.30 3 0.30 2 Duckery No. 0.12 4 0.48 0 0 1 0.12 1 0.12 1 0.12 1 0.12 3 Goatery No. 0.0677 3 0.21 0 0 0 0 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20
4. Name of Village: - Konkolesh – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 2 0.20 0 0 0 0 2 0.20 0 0 0 0 2 Duckery No. 0.12 4 0.48 0 0 1 0.12 1 0.12 1 0.12 1 0.12 3 Goatery No. 0.0677 3 0.21 0 0 0 0 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 2 0.40 0 0 0 0 0 0 1 0.20 1 0.20
5. Name of Village: - Hasanpur
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 5 0.50 0 0 2 0.20 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 3 0.36 0 0 0 0 1 0.12 1 0.12 1 0.12 3 Goatery No. 0.0677 9 0.60 0 0 0 0 3 0.20 3 0.20 3 0.20 4 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20
106
VILLAGE & MICRO-WATERSHED WISE BUDGETING FOR PRODUCTION SYSTEM & MICRO ENTERPRISE (10%)
1. Name of MWS: - JHUM 1. Name of Village: - Alakulipur Sl No Name of Activities Unit Rate
(in INR) TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 4 0.40 0 0 1 0.10 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 1 0.12 0 0 0 0 0 0 0 0 1 0.12 3 Goatery No. 0.0677 3 0.20 0 0 0 0 0 0 3 0.20 0 0 4 Beekeeping No. 0.20 2 0.40 0 0 0 0 1 0.20 0 0 1 0.20
2. Name of Village: - Jhum – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Duckery No. 0.12 2 0.24 0 0 0 0 1 0.12 1 0.12 0 0 2 Goatery No. 0.0677 2 0.14 0 0 1 0.07 0 0 0 0 1 0.07
3. Name of Village: - Jhum – IV
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 2 0.20 0 0 0 0 2 0.20 0 0 0 0 2 Duckery No. 0.12 1 0.12 0 0 0 0 0 0 0 0 1 0.12 3 Goatery No. 0.0677 4 0.28 0 0 1 0.07 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 1 0.20 0 0 0 0 0 0 1 0.20 0 0
4. Name of Village: - Jhum – V
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 5 0.50 0 0 1 0.10 1 0.10 1 0.10 2 0.20 2 Duckery No. 0.12 12 1.44 0 0 1 0.12 4 0.48 4 0.48 3 0.36 3 Goatery No. 0.0677 3 0.21 0 0 1 0.07 1 0.07 1 0.07 0 0 4 Beekeeping No. 0.20 2 0.40 0 0 0 0 1 0.20 1 0.20 0 0
107
5. Name of Village: - Jhum – VI
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 3 0.30 0 0 0 0 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 3 0.36 0 0 0 0 1 0.12 1 0.12 1 0.12 3 Goatery No. 0.0677 3 0.21 0 0 2 0.14 0 0 0 0 1 0.07 4 Beekeeping No. 0.20 2 0.40 0 0 0 0 1 0.20 1 0.20 0 0
6. Name of Village: - Jhum – VII
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 3 0.30 0 0 1 0.10 1 0.10 1 0.10 0 0 2 Duckery No. 0.12 11 1.32 0 0 1 0.12 4 0.48 4 0.48 2 0.24 3 Goatery No. 0.0677 2 0.14 0 0 0 0 1 0.07 1 0.07 0 0 4 Beekeeping No. 0.20 1 0.20 0 0 0 0 0 0 0 0 1 0.20
2. Name of MWS: - CHORGULA–GORAMARA 1. Name of Village: - Jatkapon
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Duckery No. 0.12 2 0.24 0 0 0 0 1 0.12 1 0.12 0 0 2 Goatery No. 0.0677 2 0.14 0 0 1 0.07 0 0 0 0 1 0.07
2. Name of Village: - Barbari
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 2 0.20 0 0 0 0 1 0.10 1 0.10 0 0 2 Duckery No. 0.12 3 0.36 0 0 1 0.12 1 0.12 1 0.12 0 0 3 Goatery No. 0.0677 4 0.27 0 0 0 0 3 0.20 0 0 1 0.07 4 Beekeeping No. 0.20 2 0.40 0 0 0 0 0 0 1 0.20 1 0.20
108
3. Name of Village: - Lamajuar – III
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 2 0.20 0 0 0 0 1 0.10 1 0.10 0 0 2 Duckery No. 0.12 1 0.12 0 0 0 0 0 0 0 0 1 0.12 3 Goatery No. 0.0677 3 0.21 0 0 1 0.07 1 0.07 1 0.07 0 0
4. Name of Village: - Lamajuar - IV
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Duckery No. 0.12 1 0.12 0 0 0 0 0 0 0 0 1 0.12 2 Goatery No. 0.0677 5 0.35 0 0 1 0.07 2 0.14 2 0.14 0 0
5. Name of Village: - Dewkuri Japar
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 2 0.20 0 0 0 0 1 0.10 1 0.10 0 0 2 Duckery No. 0.12 3 0.36 0 0 0 0 1 0.12 1 0.12 1 0.12 3 Goatery No. 0.0677 1 0.07 0 0 1 0.07 0 0 0 0 0 0
6. Name of Village: - Dewkuri
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 3 0.30 0 0 0 0 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 2 0.24 0 0 0 0 1 0.12 1 0.12 0 0 3 Goatery No. 0.0677 2 0.14 0 0 1 0.07 0 0 0 0 1 0.07
7. Name of Village: - Goramara – I
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 12 1.44 0 0 1 0.10 5 0.50 3 0.30 3 0.30 2 Duckery No. 0.12 1 0.12 0 0 1 0.12 0 0 0 0 0 0 3 Goatery No. 0.0677 6 0.34 0 0 1 0.07 1 0.07 1 0.07 3 0.20 4 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 2 0.40 0 0
109
8. Name of Village: - Goramara – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 5 0.50 0 0 0 0 2 0.20 2 0.20 1 0.10 2 Duckery No. 0.12 8 0.96 0 0 2 0.24 3 0.36 3 0.36 2 0.24 3 Goatery No. 0.0677 6 0.40 0 0 0 0 0 0 3 0.20 3 0.20 4 Beekeeping No. 0.20 2 0.40 0 0 0 0 1 0.20 0 0 1 0.20
9. Name of Village: - Brahman Sahor
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 3 0.30 0 0 1 0.10 2 0.20 0 0 0 0 2 Duckery No. 0.12 1 0.12 0 0 0 0 0 0 0 0 1 0.12 3 Goatery No. 0.0677 3 0.21 0 0 0 0 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 1 0.20 0 0 0 0 0 0 1 0.20 0 0
3. Name of MWS: - BASAIL 1. Name of Village: - Chiripatar
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 4 0.40 0 0 1 0.10 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 6 0.72 0 0 0 0 2 0.24 2 0.24 2 0.24 3 Goatery No. 0.0677 4 0.27 0 0 1 0.07 0 0 3 0.20 0 0 4 Beekeeping No. 0.20 1 0.20 0 0 0 0 1 0.20 0 0 0 0
2. Name of Village: - Kalakuri
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 2 0.20 0 0 1 0.10 0 0 0 0 1 0.10 2 Duckery No. 0.12 6 0.72 0 0 0 0 3 0.36 3 0.36 0 0 3 Goatery No. 0.0677 3 0.21 0 0 1 0.07 1 0.07 1 0.07 0 0 4 Beekeeping No. 0.20 1 0.20 0 0 0 0 0 0 0 0 1 0.20
110
3. Name of Village: - Marzadkandi
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 3 0.30 0 0 0 0 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 5 0.60 0 0 1 0.12 1 0.12 1 0.12 2 0.24 3 Goatery No. 0.0677 8 0.54 0 0 1 0.07 3 0.20 3 0.20 1 0.07 4 Beekeeping No. 0.20 2 0.40 0 0 0 0 1 0.20 1 0.20 0 0
4. Name of Village: - Basail
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 2 0.20 0 0 1 0.10 0 0 0 0 1 0.10 2 Duckery No. 0.12 6 0.72 0 0 0 0 2 0.24 2 0.24 2 0.24 3 Goatery No. 0.0677 3 0.21 0 0 1 0.07 1 0.07 1 0.07 0 0 4 Beekeeping No. 0.20 2 0.40 0 0 0 0 1 0.20 1 0.20 0 0
4. Name of Village: - Mohakal – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 2 0.20 0 0 1 0.10 0 0 0 0 1 0.10 2 Duckery No. 0.12 8 0.96 0 0 1 0.12 3 0.36 3 0.36 1 0.12 3 Goatery No. 0.0677 2 0.14 0 0 0 0 1 0.07 1 0.07 0 0 4 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20
4. Name of MWS: - MASLI 1. Name of Village: - Lamajuar – I
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 7 0.70 0 0 2 0.20 2 0.20 2 0.20 1 0.10 2 Goatery No. 0.0677 2 0.14 0 0 0 0 1 0.07 1 0.07 0 0
111
2. Name of Village: - Mirjapur – I
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 4 0.40 0 0 0 0 3 0.30 1 0.10 0 0 2 Duckery No. 0.12 4 0.48 0 0 0 0 1 0.12 1 0.12 2 0.24 3 Goatery No. 0.0677 6 0.40 0 0 0 0 0 0 3 0.20 3 0.20 4 Beekeeping No. 0.20 3 0.60 0 0 1 0.20 1 0.20 1 0.20 0 0
3. Name of Village: - Konkalesh – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 9 0.90 0 0 1 0.10 4 0.40 2 0.20 2 0.20 2 Duckery No. 0.12 3 0.36 0 0 1 0.12 0 0 0 0 2 0.24 3 Goatery No. 0.0677 3 0.21 0 0 0 0 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 2 0.40 0 0
4. Name of Village: - Masli – I
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 3 0.30 0 0 1 0.10 1 0.10 1 0.10 0 0 2 Goatery No. 0.0677 1 0.20 0 0 0 0 0 0 0 0 0 0 3 Beekeeping No. 0.20 2 0.40 0 0 0 0 1 0.20 1 0.20 1 0.20
5. Name of Village: - Masli – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 4 0.40 0 0 0 0 2 0.20 2 0.20 0 0 2 Duckery No. 0.12 1 0.12 0 0 1 0.12 0 0 0 0 0 0 3 Goatery No. 0.0677 3 0.21 0 0 2 0.14 0 0 0 0 1 0.07 4 Beekeeping No. 0.20 2 0.40 0 0 0 0 1 0.20 0 0 1 0.20
112
6. Name of Village: - Rajpasha
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 5 0.50 0 0 1 0.10 2 0.20 2 0.20 0 0 2 Duckery No. 0.12 1 0.12 0 0 0 0 0 0 0 0 1 0.12 3 Goatery No. 0.0677 3 0.21 0 0 1 0.07 1 0.07 1 0.07 0 0 4 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20
5. Name of MWS: - UMORPUR 1. Name of Village: - Kandigram-Chaityana Nagar
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 2 0.20 0 0 0 0 1 0.10 1 0.10 0 0 2 Duckery No. 0.12 4 0.48 0 0 0 0 2 0.24 2 0.24 0 0 3 Goatery No. 0.0677 5 0.60 0 0 2 0.14 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 1 0.20 0 0 0 0 0 0 0 0 1 0.20
2. Name of Village: - Naharpur
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 1 0.10 0 0 0 0 0 0 0 0 1 0.10 2 Duckery No. 0.12 2 0.24 0 0 0 0 1 0.12 1 0.12 0 0 3 Goatery No. 0.0677 6 0.42 0 0 1 0.07 2 0.14 2 0.14 1 0.07
3. Name of Village: - Srigouri
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 6 0.60 0 0 1 0.10 2 0.20 2 0.20 1 0.10 2 Duckery No. 0.12 5 0.60 0 0 1 0.12 2 0.24 2 0.24 0 0 3 Goatery No. 0.0677 2 0.14 0 0 0 0 0 0 0 0 2 0.14 4 Beekeeping No. 0.20 3 0.21 0 0 0 0 1 0.20 1 0.20 1 0.20
113
4. Name of Village: - Umorpur – I
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 6 0.60 0 0 1 0.10 2 0.20 2 0.20 1 0.10 2 Goatery No. 0.0677 3 0.21 0 0 1 0.07 1 0.07 1 0.07 0 0 3 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20
5. Name of Village: - Umorpur – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 2 0.20 0 0 0 0 1 0.10 1 0.10 0 0 2 Duckery No. 0.12 4 0.48 0 0 0 0 2 0.24 2 0.24 0 0 3 Goatery No. 0.0677 5 0.35 0 0 2 0.14 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 1 0.20 0 0 0 0 0 0 0 0 1 0.20
6. Name of Village: - Chapra – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 6 0.60 0 0 1 0.10 2 0.20 2 0.20 1 0.10 2 Duckery No. 0.12 6 0.72 0 0 0 0 3 0.36 3 0.36 0 0 3 Goatery No. 0.0677 8 0.54 0 0 2 0.14 0 0 3 0.20 3 0.20 4 Beekeeping No. 0.20 2 0.40 0 0 0 0 1 0.20 0 0 1 0.20
6. Name of MWS: - LAMAJUAR 1. Name of Village: - Naigram
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 7 0.70 0 0 0 0 3 0.30 3 0.30 1 0.10 2 Duckery No. 0.12 7 0.84 0 0 2 0.24 2 0.24 2 0.24 1 0.12 3 Goatery No. 0.0677 1 0.07 0 0 0 0 0 0 0 0 1 0.07 4 Beekeeping No. 0.20 3 0.60 0 0 0 0 1 0.20 1 0.20 1 0.20
114
2. Name of Village: - Lamajuar – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 7 0.70 0 0 1 0.10 4 0.40 2 0.20 0 0 2 Duckery No. 0.12 3 0.36 0 0 1 0.12 0 0 0 0 2 0.24 3 Goatery No. 0.0677 2 0.14 0 0 0 0 1 0.07 1 0.07 0 0 4 Beekeeping No. 0.20 4 0.80 0 0 0 0 1 0.20 2 0.40 1 0.20
3. Name of Village: - Lamajuar – III
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 4 0.40 0 0 0 0 2 0.20 2 0.20 0 0 2 Duckery No. 0.12 10 1.20 0 0 2 0.24 2 0.24 2 0.24 4 0.48 3 Goatery No. 0.0677 2 0.14 0 0 0 0 1 0.07 1 0.07 0 0 4 Beekeeping No. 0.20 2 0.40 0 0 0 0 1 0.20 1 0.20 0 0
4. Name of Village: - Mirjapur – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 4 0.40 0 0 1 0.10 0 0 2 0.20 1 0.10 2 Duckery No. 0.12 12 1.44 0 0 1 0.12 4 0.48 4 0.48 3 0.36 4 Beekeeping No. 0.20 1 0.20 0 0 0 0 1 0.20 0 0 0 0
7. Name of MWS: - MALUA 1. Name of Village: - Kandigram
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 3 0.30 0 0 0 0 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 7 0.84 0 0 1 0.12 3 0.36 3 0.36 0 0 3 Goatery No. 0.0677 5 0.35 0 0 1 0.07 1 0.07 1 0.07 2 0.14 4 Beekeeping No. 0.20 1 0.20 0 0 0 0 0 0 0 0 1 0.20
115
2. Name of Village: - Niz-Malua
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 6 0.60 0 0 1 0.10 2 0.20 2 0.20 1 0.10 2 Duckery No. 0.12 3 0.36 0 0 1 0.12 0 0 0 0 2 0.24 3 Goatery No. 0.0677 7 0.47 0 0 0 0 3 0.20 3 0.20 1 0.07 4 Beekeeping No. 0.20 2 0.40 0 0 0 0 1 0.20 1 0.20 0 0
3. Name of Village: - Mohakol – I
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 9 0.90 0 0 1 0.10 3 0.30 3 0.30 2 0.20 2 Duckery No. 0.12 5 0.60 0 0 1 0.12 1 0.12 1 0.12 2 0.24 3 Goatery No. 0.0677 2 0.14 0 0 0 0 1 0.07 1 0.07 0 0 4 Beekeeping No. 0.20 2 0.40 0 0 0 0 1 0.20 1 0.20 0 0
4. Name of Village: - Konkolesh – II
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16 Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Poultry No. 0.10 4 0.40 0 0 0 0 2 0.20 0 0 2 0.20 2 Duckery No. 0.12 3 0.36 0 0 1 0.12 1 0.12 1 0.12 0 0 3 Goatery No. 0.0677 3 0.21 0 0 0 0 1 0.07 1 0.07 1 0.07 4 Beekeeping No. 0.20 1 0.20 0 0 0 0 0 0 1 0.20 0 0
5. Name of Village: - Hasanpur
Sl No Name of Activities Unit
Rate (in
INR)
TOTAL 2011-12 2012-13 2013-14 2014-15 2015-16
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 Poultry No. 0.10 5 0.50 0 0 2 0.20 1 0.10 1 0.10 1 0.10 2 Duckery No. 0.12 3 0.36 0 0 0 0 1 0.12 1 0.12 1 0.12 3 Goatery No. 0.0677 9 0.60 0 0 0 0 3 0.20 3 0.20 3 0.20 4 Beekeeping No. 0.20 2 0.40 0 0 0 0 1 0.20 1 0.20 0 0
116
Table No. 7.2 Estimated Benefit Cost Ratio Sl. No. Name of the activity Total Cost (Rs.) Total Benefit expected
(Rs.) BCR Remarks
1 EPA 26.40 29.04 1.1 2 NRM 369.60 375.18 1.51 3 PE 59.40 60.47 1.8 4 Livelihood for Asset less 66.00 66.86 1.3 5 Institution and Capacity building 33.00 34.16 1.2 6 Overall 521.40 565.71 1.5
117
Chapter 8
Consolidation and completion of various works Table No. 8.1: Consolidation of Action Plan
Component
Allocation in %
Total in % Phase – I Preparatory Phase – II : Work Phase – III
Consolidation 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year
Administrative 1 1 2 2 2 2 10 Monitoring 0 0.50 0 0.25 0 0.25 1 Evaluation 0 0.50 0 0.25 0 0.25 1 Entry Point Activities 4 0 0 0 0 0 4 Institution and Capacity Building 0.50 2 1 1 0.50 0 5
DPR 0.50 0.50 0 0 0 0 1 Watershed Development Works 0 7.50 21 10.5 17 0 56
Livelihood Activities (Asset-less) 0 1 3 3 2 0 9
Livelihood Activities (Farmer) 0 1 3 3 3 0 10
Consolidation 0 0 0 0 0 3 3 Total = 6 14 30 20 24.5 5.50 100
118
Component Phase – I
Preparatory Phase – II : Work Phase – III Consolidation Total
1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year Administrative 6.60 6.60 13.20 13.20 13.20 13.20 66.00 Monitoring 0 3.30 0 1.65 0 1.65 6.60 Evaluation 0 3.30 0 1.65 0 1.65 6.60 Entry Point Activities 26.40 0 0 0 0 0 26.40 Institution and Capacity Building
SLNA (0.3%) 0 1.98 0 0 0 0 1.98
DWDU (0.9%) 0 3.30 1.32 1.32 0 0 5.94
PIA (3.8%) 3.30 7.90 5.29 5.29 3.30 0 25.08
DPR 3.30 3.30 0 0 0 0 6.60 Watershed Development Works 0 49.50 138.60 69.30
112.20 0 369.60
Livelihood Activities (Asset-less) 0 6.60 19.80 19.80
13.20 0 59.40
Livelihood Activities (Farmer) 0 6.60 19.80 19.80
19.80 0 66.00
Consolidation 0 0 0 0 0 19.80 19.80 Total = 39.60 92.40 198.0 132.0 161.70 36.30 660.00
119
CHAPTER – 9 EXPECTED OUTCOMES
9.1 Describe in detail the “Expected Outcomes” Table No. 9.2: Summarize in the table given below (Quantifiable indicators) 1 2 3 4 5 6 S.
No. Item Unit of measurement Pre-project Status Expected Post-project
Status Remarks
1 Status of water table (Depth to Ground water level) Meters 10-15 8-12
2 Ground water structures repaired/ rejuvenated No. Nil Nil 3 Quality of drinking water Description Prone to contamination Potable 4 Availability of drinking water Description 09 11 5 Increase in irrigation potential Hec. 676 6 Change in cropping/ land use pattern Description 7 Area under agricultural crop Hec. 3462 3775 i Area under single crop 3239 3530 ii Area under double crop 204 224 iii Area under multiple crop 19 21 8 Net increase in crop production area Hec. -- 313 9 Increase in area under Vegetation/Forest Hec. -- -- 10 Increase in area under horticulture Hec. -- -- 11 Increase in area under fuel Hec. -- 0.70 12 Increase in area under Fodder Hec. -- -- 13 Increase in milk production Litres/day 21231 21563
14
Environmental Impact Change in Soil Loss Perenniality of flow and change in Run-off Recharge of ground water
Decrease of Soil erosion Decrease of run off Increase of ground
water level
15 No. of SHGs Promoted No. 129 221 16 Increase in no. of livelihoods No. 516 893 17 Increase in income Rs. 29000 38000 18 Status of Migration No. 3434 435 19 SHG Federations formed No. -- -- 20 Credit linkage with banks Rs. -- -- 21 Resource use agreements 22 WDF collection & management Rs. -- 29.56
120
23 Summary of lessons learnt Description Table No.9.3: Backward and Forward Linkages
1 2 3 4 Type of Marketing Facility Name of the institution Pre-project (no.) Expected post project status
(A) Backward linkages (i) Seed certification Govt. of Assam No Will be done
(ii) Seed supply system Agriculture Deptt. & Local seed supplier No Strong seed supply system will be
developed (iii) Fertilizer supply system Co-operative & Local Fertilizer Dealer No Strong fertilizer system will be developed (iv) Pesticide supply system Local Pesticide Dealer No Strong pesticide system will be developed
(v) Credit institutions NABARD, DICI, KVIC, Local Bank etc. Local Bank Strong link among the credit institutions & SHG will be developed
(vi) Water supply
(vii) Extension services KVK, ATMA, Agriculture Deptt., RSETI, NGOs ATMA, Agri Deptt., NGO Strong extension services will be
developed among all institutions (viii) Nurseries Departmental nursery, local nursery Local nursery Strong support will be developed (ix) Tools/machinery suppliers Agriculture Deptt. Agri Deptt. Will continue (x) Price Support system Agriculture Deptt. & Veterinary Deptt. Agri Deptt., Vety. Deptt. Will continue (xi) Labour Local wage labour Local wage labour Strong network will be developed (xii) Any other (please specify) (B) Forward linkages (i) Harvesting/threshing
machinery Local level Local level Strong network will be developed
(ii) Storage (including cold storage) Local level Local level Strong network will be developed
(iii) Road network Local level Local level Strong network will be developed (iv) Transport facilities Local level Local level Strong network will be developed
(v) Markets / Mandis Local market Local market Institution will take initiative so that beneficiaries get better opportunities
(vi) Agro and other Industries Local level Local level Institution will take initiative so that beneficiaries get better opportunities
(vii) Milk and other collection centres Local level No Institution will take initiative so that
beneficiaries get better opportunities (viii) Labour (ix) Any other (please specify) -- -- --
121
122
123
124
125
126
127
128
129
130
SOCIAL MAP OF UMARPUR, MALUA & GHORAMARA VILLAGE
131
PRA EXERCISE, WC FORMATION AT VILLAGE UMARPUR, JHUM, GHURAMARA & BASAIL