Econ 240 C Econ 240 C Lecture 14 Lecture 14 1
Transcript
Page 1: Econ 240 C

Econ 240 CEcon 240 C

Lecture 14Lecture 14

1

Page 2: Econ 240 C

2

Part I: Exponential SmoothingPart I: Exponential Smoothing

Exponential smoothing is a technique Exponential smoothing is a technique that is useful for forecasting short that is useful for forecasting short time series where there may not be time series where there may not be enough observations to estimate a enough observations to estimate a Box-Jenkins modelBox-Jenkins model

Exponential smoothing can be Exponential smoothing can be understood from many perspectives; understood from many perspectives; one perspective is a formula that one perspective is a formula that could be calculated by handcould be calculated by hand

Page 3: Econ 240 C

3Simple exponential Simple exponential smoothingsmoothing

Simple exponential smoothing, also Simple exponential smoothing, also known as single exponential smoothing, known as single exponential smoothing, is most appropriate for a time series is most appropriate for a time series that is a random walk with first order that is a random walk with first order moving average error structuremoving average error structure

The levels term, L(t), is a weighted The levels term, L(t), is a weighted average of the observation lagged one, average of the observation lagged one, y(t-1) plus the previous levels, L(t-1):y(t-1) plus the previous levels, L(t-1):

L(t) = a*y(t-1) + (1-a)*L(t-1)L(t) = a*y(t-1) + (1-a)*L(t-1)

Page 4: Econ 240 C

4

Single exponential smoothingSingle exponential smoothing

The parameter a is chosen to minimize The parameter a is chosen to minimize the sum of squared errors where the the sum of squared errors where the error is the difference between the error is the difference between the observation and the levels term: e(t) = observation and the levels term: e(t) = y(t) – L(t)y(t) – L(t)

The forecast for period t+1 is given by The forecast for period t+1 is given by the formula: L(t+1) = a*y(t) + (1-a)*L(t)the formula: L(t+1) = a*y(t) + (1-a)*L(t)

Example from John Heinke and Arthur Example from John Heinke and Arthur Reitsch, Reitsch, Business Forecasting, 6Business Forecasting, 6thth Ed. Ed.

Page 5: Econ 240 C

5observations Sales

1 500

2 350

3 250

4 400

5 450

6 350

7 200

8 300

9 350

10 200

11 150

12 400

13 550

14 350

15 250

16 550

17 550

18 400

19 350

20 600

21 750

22 500

23 400

24 650

Page 6: Econ 240 C

6

Single exponential smoothingSingle exponential smoothing

For observation #1, set L(1) = For observation #1, set L(1) = Sales(1) = 500, as an initial conditionSales(1) = 500, as an initial condition

As a trial value use a = 0.1As a trial value use a = 0.1So L(2) = 0.1*Sales(1) + 0.9*Level(1) So L(2) = 0.1*Sales(1) + 0.9*Level(1)

L(2) = 0.1*500 + 0.9*500 = 500 L(2) = 0.1*500 + 0.9*500 = 500And L(3) = 0.1*Sales(2) + And L(3) = 0.1*Sales(2) +

0.9*Level(2) L(2) = 0.1*350 + 0.9*Level(2) L(2) = 0.1*350 + 0.9*500 = 4850.9*500 = 485

Page 7: Econ 240 C

7observations Sales Level

1 500 500

2 350  

3 250  

4 400  

5 450  

6 350  

7 200  

8 300  

9 350  

10 200  

11 150  

12 400  

13 550  

14 350  

15 250  

16 550  

17 550  

18 400  

19 350  

20 600  

21 750  

22 500  

23 400  

24 650  

Page 8: Econ 240 C

8observations Sales Level

1 500 500

2 350 500

3 250 485

4 400  

5 450  

6 350  

7 200  

8 300  

9 350  

10 200  

11 150  

12 400  

13 550  

14 350  

15 250  

16 550  

17 550  

18 400  

19 350  

20 600  

21 750  

22 500  

23 400  

24 650  

a = 0.1

Page 9: Econ 240 C

9

Single exponential smoothingSingle exponential smoothing

So the formula can be used to So the formula can be used to calculate the rest of the levels calculate the rest of the levels values, observation #4-#24values, observation #4-#24

This can be set up on a spread-sheetThis can be set up on a spread-sheet

Page 10: Econ 240 C

10observations Sales Level

1 500 500

2 350 500

3 250 485

4 400 461.5

5 450 455.4

6 350 454.8

7 200 444.3

8 300 419.9

9 350 407.9

10 200 402.1

11 150 381.9

12 400 358.7

13 550 362.8

14 350 381.6

15 250 378.4

16 550 365.6

17 550 384.0

18 400 400.6

19 350 400.5

20 600 395.5

21 750 415.9

22 500 449.3

23 400 454.4

24 650 449.0

a = 0.1

Page 11: Econ 240 C

11

Single exponential smoothingSingle exponential smoothing

The forecast for observation #25 is: The forecast for observation #25 is: L(25) = 0.1*sales(24)+0.9*(24)L(25) = 0.1*sales(24)+0.9*(24)

Forecast(25)=Levels(25)=0.1*650+0.9Forecast(25)=Levels(25)=0.1*650+0.9*449*449

Forecast(25) = 469.1Forecast(25) = 469.1

Page 12: Econ 240 C

Single Exponential Smoothing

0

100

200

300

400

500

600

700

800

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Observation

Val

ue Sales

Levels

Page 13: Econ 240 C

13Single exponential Single exponential distributiondistribution

The errors can now be calculated: The errors can now be calculated: e(t) = sales(t) – levels(t) e(t) = sales(t) – levels(t)

Page 14: Econ 240 C

14observations Sales Level error

1 500 500 0

2 350 500 -150

3 250 485 -235

4 400 461.5 -61.5

5 450 455.4 -5.35

6 350 454.8 -104.8

7 200 444.3 -244.3

8 300 419.9 -119.9

9 350 407.9 -57.9

10 200 402.1 -202.1

11 150 381.9 -231.9

12 400 358.7 41.3

13 550 362.8 187.2

14 350 381.6 -31.6

15 250 378.4 -128.4

16 550 365.6 184.4

17 550 384.0 166.0

18 400 400.6 -0.6

19 350 400.5 -50.5

20 600 395.5 204.5

21 750 415.9 334.1

22 500 449.3 50.7

23 400 454.4 -54.4

24 650 449.0 201.0

a = 0.1

Page 15: Econ 240 C

15observations Sales Level error

error squared

1 500 500 0 0

2 350 500 -150 22500

3 250 485 -235 55225

4 400 461.5 -61.5 3782.25

5 450 455.4 -5.35 28.62

6 350 454.8 -104.8 10986.18

7 200 444.3 -244.3 59698.86

8 300 419.9 -119.9 14376.05

9 350 407.9 -57.9 3353.58

10 200 402.1 -202.1 40852.14

11 150 381.9 -231.9 53780.95

12 400 358.7 41.3 1704.33

13 550 362.8 187.2 35027.05

14 350 381.6 -31.6 996.06

15 250 378.4 -128.4 16487.67

16 550 365.6 184.4 34016.68

17 550 384.0 166.0 27553.51

18 400 400.6 -0.6 0.37

19 350 400.5 -50.5 2554.91

20 600 395.5 204.5 41823.74

21 750 415.9 334.1 111594.53

22 500 449.3 50.7 2565.62

23 400 454.4 -54.4 2960.80

24 650 449.0 201.0 40412.28

a = 0.1

Page 16: Econ 240 C

16observations Sales Level errorerror squared    

1 500 500 0 0    

2 350 500 -150 22500    

3 250 485 -235 55225    

4 400 461.5 -61.5 3782.25    

5 450 455.4 -5.35 28.62    

6 350 454.8 -104.8 10986.18    

7 200 444.3 -244.3 59698.86    

8 300 419.9 -119.9 14376.05    

9 350 407.9 -57.9 3353.58    

10 200 402.1 -202.1 40852.14    

11 150 381.9 -231.9 53780.95    

12 400 358.7 41.3 1704.33    

13 550 362.8 187.2 35027.05    

14 350 381.6 -31.6 996.06    

15 250 378.4 -128.4 16487.67    

16 550 365.6 184.4 34016.68    

17 550 384.0 166.0 27553.51    

18 400 400.6 -0.6 0.37    

19 350 400.5 -50.5 2554.91    

20 600 395.5 204.5 41823.74    

21 750 415.9 334.1 111594.53    

22 500 449.3 50.7 2565.62    

23 400 454.4 -54.4 2960.80    

24 650 449.0 201.0 40412.28    

          sum sq res 582281.2

a = 0.1

Page 17: Econ 240 C

17

Single exponential smoothingSingle exponential smoothing

For a = 0.1, the sum of squared For a = 0.1, the sum of squared errors is: errors is: errors)errors)2 2 = 582,281.2= 582,281.2

A grid search can be conducted for A grid search can be conducted for the parameter value a, to find the the parameter value a, to find the value between 0 and 1 that value between 0 and 1 that minimizes the sum of squared errorsminimizes the sum of squared errors

The calculations of levels, L(t), and The calculations of levels, L(t), and errors, e(t) = sales(t) – L(t) for a =0.6errors, e(t) = sales(t) – L(t) for a =0.6

Page 18: Econ 240 C

18observations Sales Levels

1 500 500

2 350 500

3 250 410

4 400 314

5 450 365.6

6 350 416.2

7 200 376.5

8 300 270.6

9 350 288.2

10 200 325.3

11 150 250.1

12 400 190.0

13 550 316.0

14 350 456.4

15 250 392.6

16 550 307.0

17 550 452.8

18 400 511.1

19 350 444.4

20 600 387.8

21 750 515.1

22 500 656.0

23 400 562.4

24 650 465.0

a = 0.6

Page 19: Econ 240 C

19

Single exponential smoothingSingle exponential smoothing

Forecast(25) = Levels(25) = Forecast(25) = Levels(25) = 0.6*sales(24) + 0.4*levels(24) = 0.6*sales(24) + 0.4*levels(24) = 0.6*650 + 0.4*465 = 7760.6*650 + 0.4*465 = 776

Page 20: Econ 240 C

20observations Sales Levels error

error square    

1 500 500 0 0    

2 350 500 -150 22500    

3 250 410 -160 25600    

4 400 314 86 7396    

5 450 365.6 84.4 7123.36    

6 350 416.2 -66.2 4387.74    

7 200 376.5 -176.5 31150.84    

8 300 270.6 29.4 864.45    

9 350 288.2 61.8 3814.38    

10 200 325.3 -125.3 15699.02    

11 150 250.1 -100.1 10023.67    

12 400 190.0 210.0 44080.13    

13 550 316.0 234.0 54747.14    

14 350 456.4 -106.4 11322.57    

15 250 392.6 -142.6 20324.22    

16 550 307.0 243.0 59036.75    

17 550 452.8 97.2 9445.88    

18 400 511.1 -111.1 12348.55    

19 350 444.4 -94.4 8920.73    

20 600 387.8 212.2 45037.39    

21 750 515.1 234.9 55172.40    

22 500 656.0 -156.0 24349.97    

23 400 562.4 -162.4 26379.58    

24 650 465.0 185.0 34237.15    

          Sum of Sq Res 533961.9

a = 0.6

Page 21: Econ 240 C

21

Single exponential smoothingSingle exponential smoothing

Grid search plotGrid search plot

Page 22: Econ 240 C

Grid Search for Smoothing Parameter

490000

500000

510000

520000

530000

540000

550000

560000

570000

580000

590000

0 0.2 0.4 0.6 0.8 1 1.2

Smoothing Parameter

Su

m o

f S

qu

ared

Res

idu

als

Page 23: Econ 240 C

23

Single Exponential SmoothingSingle Exponential Smoothing EVIEWS: Algorithmic search for the EVIEWS: Algorithmic search for the

smoothing parameter asmoothing parameter a In EVIEWS, select time series sales(t), and In EVIEWS, select time series sales(t), and

openopen In the sales window, go to the PROCS menu and In the sales window, go to the PROCS menu and

select exponential smoothingselect exponential smoothing Select singleSelect single the best parameter a = 0.26 with sum of squared the best parameter a = 0.26 with sum of squared

errors = 472982.1 and root mean square error = errors = 472982.1 and root mean square error = 140.4 = (472982.1/24)140.4 = (472982.1/24)1/21/2

The forecast, or end of period levels mean = 532.4The forecast, or end of period levels mean = 532.4

Page 24: Econ 240 C

24

Page 25: Econ 240 C

25

Page 26: Econ 240 C

26Forecast = L(25) = 0.26*Sales(24) + 0.74L(24) = 532.4

Page 27: Econ 240 C

27

Page 28: Econ 240 C

28Part II. Three Perspectives on Part II. Three Perspectives on Single Exponential SmoothingSingle Exponential SmoothingThe formula perspectiveThe formula perspective

L(t) = a*y(t-1) + (1 - a)*L(t-1)L(t) = a*y(t-1) + (1 - a)*L(t-1)e(t) = y(t) - L(t)e(t) = y(t) - L(t)

The Box-Jenkins PerspectiveThe Box-Jenkins PerspectiveThe Updating Forecasts PerspectiveThe Updating Forecasts Perspective

Page 29: Econ 240 C

29

Box Jenkins PerspectiveBox Jenkins PerspectiveUse the error equation to substitute for L(t) Use the error equation to substitute for L(t)

in the formula, L(t) = a*y(t-1) + (1 - a)*L(t-1)in the formula, L(t) = a*y(t-1) + (1 - a)*L(t-1)L(t) = y(t) - e(t)L(t) = y(t) - e(t)y(t) - e(t) = a*y(t-1) + (1 - a)*[y(t-1) - e(t-1)] y(t) y(t) - e(t) = a*y(t-1) + (1 - a)*[y(t-1) - e(t-1)] y(t)

= e(t) -y(t-1) - (1-a)*e(t-1)= e(t) -y(t-1) - (1-a)*e(t-1)or or y(t) = y(t) - y(t-1) = e(t) - (1-a) e(t-1)y(t) = y(t) - y(t-1) = e(t) - (1-a) e(t-1)

So y(t) is a random walk plus MAONE noise, So y(t) is a random walk plus MAONE noise, i.e y(t) is a (0,1,1) process where (p,d,q) are i.e y(t) is a (0,1,1) process where (p,d,q) are the orders of AR, differencing, and MA.the orders of AR, differencing, and MA.

Page 30: Econ 240 C

30

Box-Jenkins PerspectiveBox-Jenkins Perspective

In Lab Eight, we will apply simple In Lab Eight, we will apply simple exponential smoothing to retail sales, exponential smoothing to retail sales, a process you used for forecasting a process you used for forecasting trend in Lab 3, and which can be trend in Lab 3, and which can be modeled as (0,1,1).modeled as (0,1,1).

Page 31: Econ 240 C

31

Box-Jenkins PerspectiveBox-Jenkins Perspective

If the smoothing parameter approaches If the smoothing parameter approaches one, then y(t) is a random walk:one, then y(t) is a random walk:y(t) = y(t) - y(t-1) = e(t) - (1-a) e(t-1)y(t) = y(t) - y(t-1) = e(t) - (1-a) e(t-1)if a = 1, then if a = 1, then y(t) = y(t) - y(t-1) = e(t) y(t) = y(t) - y(t-1) = e(t)

In Lab Eight, we will use the price of In Lab Eight, we will use the price of gold, which we used in Lab 4, to make gold, which we used in Lab 4, to make this pointthis point

Page 32: Econ 240 C

32Box-Jenkins PerspectiveBox-Jenkins PerspectiveThe levels or forecast, L(t), is a The levels or forecast, L(t), is a

geometric distributed lag of past geometric distributed lag of past observations of the series, y(t), hence observations of the series, y(t), hence the name “exponential” smoothingthe name “exponential” smoothingL(t) = a*y(t-1) + (1 - a)*L(t-1)L(t) = a*y(t-1) + (1 - a)*L(t-1)L(t) = a*y(t-1) + (1 - a)*ZL(t)L(t) = a*y(t-1) + (1 - a)*ZL(t)L(t) - (1 - a)*ZL(t) = a*y(t-1) L(t) - (1 - a)*ZL(t) = a*y(t-1) [1 - (1-a)Z] L(t) = a*y(t-1) [1 - (1-a)Z] L(t) = a*y(t-1) L(t) = {1/ [1 - (1-a)Z]} a*y(t-1) L(t) = {1/ [1 - (1-a)Z]} a*y(t-1) L(t) = [1 +(1-a)Z + (1-a)L(t) = [1 +(1-a)Z + (1-a)2 2 ZZ2 2 + …] a*y(t-1)+ …] a*y(t-1)L(t) = a*y(t-1) + (1-a)*a*y(t-2) + (1-L(t) = a*y(t-1) + (1-a)*a*y(t-2) + (1-

a)a)22a*y(t-3) + ….a*y(t-3) + ….

Page 33: Econ 240 C

33The Updating Forecasts The Updating Forecasts PerspectivePerspective

Use the error equation to substitute for Use the error equation to substitute for y(t) in the formula, L(t) = a*y(t-1) + (1 - y(t) in the formula, L(t) = a*y(t-1) + (1 - a)*L(t-1)a)*L(t-1)y(t) = L(t) + e(t)y(t) = L(t) + e(t)L(t) = a*[L(t-1) + e(t-1)] + (1 - a)*L(t-1)L(t) = a*[L(t-1) + e(t-1)] + (1 - a)*L(t-1)

So L(t) = L(t-1) + a*e(t-1), So L(t) = L(t-1) + a*e(t-1), i.e. the forecast for period t is equal to the i.e. the forecast for period t is equal to the

forecast for period t-1 plus a fraction a of the forecast for period t-1 plus a fraction a of the forecast error from period t-1.forecast error from period t-1.

Page 34: Econ 240 C

34Part III. Double Exponential Part III. Double Exponential

Smoothing Smoothing With double exponential smoothing, one With double exponential smoothing, one

estimates a “trend” term, R(t), as well estimates a “trend” term, R(t), as well as a levels term, L(t), so it is possible to as a levels term, L(t), so it is possible to forecast, f(t), out more than one periodforecast, f(t), out more than one period

f(t+k) = L(t) + k*R(t), k>=1f(t+k) = L(t) + k*R(t), k>=1L(t) = a*y(t) + (1-a)*[L(t-1) + R(t-1)]L(t) = a*y(t) + (1-a)*[L(t-1) + R(t-1)]R(t) = b*[L(t) - L(t-1)] + (1-b)*R(t-1)R(t) = b*[L(t) - L(t-1)] + (1-b)*R(t-1)

so the trend, R(t), is a geometric distributed so the trend, R(t), is a geometric distributed lag of the change in levels, lag of the change in levels, L(t)L(t)

1k 1k 1k

1k

Page 35: Econ 240 C

35

If the smoothing parameters a = b, If the smoothing parameters a = b, then we have double exponential then we have double exponential smoothingsmoothing

If the smoothing parameters are If the smoothing parameters are different, then it is the simplest different, then it is the simplest version of Holt-Winters smoothingversion of Holt-Winters smoothing

Part III. Double Exponential Part III. Double Exponential SmoothingSmoothing

Page 36: Econ 240 C

36Part III. Double Exponential Part III. Double Exponential SmoothingSmoothing

Holt- Winters can also be used to forecast Holt- Winters can also be used to forecast seasonal time series, e.g. monthlyseasonal time series, e.g. monthly

f(t+k) = L(t) + k*R(t) + S(t+k-12) k>=1f(t+k) = L(t) + k*R(t) + S(t+k-12) k>=1L(t) = a*[y(t)-S(t-12)]+ (1-a)*[L(t-1) + R(t-L(t) = a*[y(t)-S(t-12)]+ (1-a)*[L(t-1) + R(t-

1)]1)]R(t) = b*[L(t) - L(t-1)] + (1-b)*R(t-1)R(t) = b*[L(t) - L(t-1)] + (1-b)*R(t-1)S(t) = c*[y(t) - L(t)] + (1-c)*S(t-12)S(t) = c*[y(t) - L(t)] + (1-c)*S(t-12)

Page 37: Econ 240 C

37Part IV. Dickey Fuller Tests: Part IV. Dickey Fuller Tests: TrendTrend

Page 38: Econ 240 C

38Stochastic Trends: Random Stochastic Trends: Random

Walks with DriftWalks with DriftWe have discussed earlier in the We have discussed earlier in the

course how to model the Total Return course how to model the Total Return to the Standard and Poor’s 500 Indexto the Standard and Poor’s 500 Index

One possibility is this time series could One possibility is this time series could be a random walk around a be a random walk around a deterministic trend”deterministic trend”

Sp500(t) = exp{a + d*t +WN(t)/[1-Z]}Sp500(t) = exp{a + d*t +WN(t)/[1-Z]}And taking logarithms,And taking logarithms,

Page 39: Econ 240 C

39Stochastic Trends: Random Stochastic Trends: Random

Walks with DriftWalks with Drift Lnsp500(t) = a + d*t + WN(t)/[1-Z]Lnsp500(t) = a + d*t + WN(t)/[1-Z] Lnsp500(t) –a –d*t = WN(t)/[1-Z]Lnsp500(t) –a –d*t = WN(t)/[1-Z] Multiplying through by the difference Multiplying through by the difference

operator, operator, = [1-Z]= [1-Z] [1-Z][Lnsp500(t) –a –d*t] = WN(t-1)[1-Z][Lnsp500(t) –a –d*t] = WN(t-1)

[LnSp500(t) – a –d*t] - [LnSp500(t-1) – a –[LnSp500(t) – a –d*t] - [LnSp500(t-1) – a –d*(t-1)] = WN(t)d*(t-1)] = WN(t)

Lnsp500(t) = d + WN(t)Lnsp500(t) = d + WN(t)

Page 40: Econ 240 C

40

So the fractional change in the total return So the fractional change in the total return to the S&P 500 is drift, d, plus white noiseto the S&P 500 is drift, d, plus white noise

More generally, More generally, y(t) = a + d*t + {1/[1-Z]}*WN(t)y(t) = a + d*t + {1/[1-Z]}*WN(t)[y(t) –a –d*t] = {1/[1-Z]}*WN(t)[y(t) –a –d*t] = {1/[1-Z]}*WN(t)[y(t) –a –d*t]- [y(t-1) –a –d*(t-1)] = WN(t)[y(t) –a –d*t]- [y(t-1) –a –d*(t-1)] = WN(t)[y(t) –a –d*t]= [y(t-1) –a –d*(t-1)] + WN(t)[y(t) –a –d*t]= [y(t-1) –a –d*(t-1)] + WN(t)Versus the possibility of an ARONE:Versus the possibility of an ARONE:

Page 41: Econ 240 C

41

[y(t) –a –d*t]=b*[y(t-1)–a–d*(t-1)]+WN(t)[y(t) –a –d*t]=b*[y(t-1)–a–d*(t-1)]+WN(t) Or y(t) = [a*(1-b)+b*d]+[d*(1-b)]*t+b*y(t-1) Or y(t) = [a*(1-b)+b*d]+[d*(1-b)]*t+b*y(t-1)

+wn(t)+wn(t) Subtracting y(t-1) from both sides’Subtracting y(t-1) from both sides’ y(t) = [a*(1-b)+b*d] + [d*(1-b)]*t + (b-1)*y(t-y(t) = [a*(1-b)+b*d] + [d*(1-b)]*t + (b-1)*y(t-

1) +wn(t)1) +wn(t) So the coefficient on y(t-1) is once again So the coefficient on y(t-1) is once again

interpreted as b-1, and we can test the null that interpreted as b-1, and we can test the null that this is zero against the alternative it is this is zero against the alternative it is significantly negative. Note that we specify the significantly negative. Note that we specify the equation with both a constant, equation with both a constant,

[a*(1-b)+b*d] and a trend [d*(1-b)]*t [a*(1-b)+b*d] and a trend [d*(1-b)]*t

Page 42: Econ 240 C

42

ExampleExample

Lnsp500(t) from Lab 2Lnsp500(t) from Lab 2

Page 43: Econ 240 C

43

Page 44: Econ 240 C

44

Page 45: Econ 240 C

45

Page 46: Econ 240 C

46

Page 47: Econ 240 C

47

Part V. Intervention AnalysisPart V. Intervention Analysis

Page 48: Econ 240 C

48

Intervention AnalysisIntervention Analysis

The approach to intervention The approach to intervention analysis parallels Box-Jenkins in that analysis parallels Box-Jenkins in that the actual estimation is conducted the actual estimation is conducted after pre-whitening, to the extent after pre-whitening, to the extent that non-stationarity such as trend that non-stationarity such as trend and seasonality are removedand seasonality are removed

Example: preview of Lab 8Example: preview of Lab 8

Page 49: Econ 240 C

49Telephone Directory Telephone Directory AssistanceAssistance

A telephone company was receiving A telephone company was receiving increased demand for free directory increased demand for free directory assistance, i.e. subscribers asking assistance, i.e. subscribers asking operators to look up numbers. This operators to look up numbers. This was increasing costs and the was increasing costs and the company changed policy, providing a company changed policy, providing a number of free assisted calls to number of free assisted calls to subscribers per month, but charging subscribers per month, but charging a price per call after that number. a price per call after that number.

Page 50: Econ 240 C

50Telephone Directory Telephone Directory AssistanceAssistance

This policy change occurred at a This policy change occurred at a known time, March 1974known time, March 1974

The time series is for calls with The time series is for calls with directory assistance per monthdirectory assistance per month

Did the policy change make a Did the policy change make a difference?difference?

Page 51: Econ 240 C

51

Page 52: Econ 240 C

52

The simple-minded approachThe simple-minded approach

Page 53: Econ 240 C

53

Page 54: Econ 240 C

54

Page 55: Econ 240 C

55

Page 56: Econ 240 C

56

PrinciplePrinciple

The event may cause a change, and The event may cause a change, and affect time series characteristicsaffect time series characteristics

Consequently, condider the pre-Consequently, condider the pre-event period, January 1962 through event period, January 1962 through February 1974, the event March February 1974, the event March 1974, and the post-event period, 1974, and the post-event period, April 1974 through December 1976April 1974 through December 1976

First difference and then seasonally First difference and then seasonally difference the entire seriesdifference the entire series

Page 57: Econ 240 C

57Analysis: Entire Differenced Analysis: Entire Differenced SeriesSeries

Page 58: Econ 240 C

58

Page 59: Econ 240 C

59

Page 60: Econ 240 C

60

Page 61: Econ 240 C

61

Page 62: Econ 240 C

62Analysis: Pre-Event Analysis: Pre-Event DifferencesDifferences

Page 63: Econ 240 C

63

Page 64: Econ 240 C

64

Page 65: Econ 240 C

65

Page 66: Econ 240 C

66

So Seasonal NonstationaritySo Seasonal Nonstationarity

It was masked in the entire sample It was masked in the entire sample by the variance caused by the by the variance caused by the difference from the eventdifference from the event

The seasonality was revealed in the The seasonality was revealed in the pre-event differenced series pre-event differenced series

Page 67: Econ 240 C

67

Page 68: Econ 240 C

68

Pre-Event AnalysisPre-Event Analysis

Seasonally differenced, differenced Seasonally differenced, differenced series series

Page 69: Econ 240 C

69

Page 70: Econ 240 C

70

Page 71: Econ 240 C

71

Page 72: Econ 240 C

72

Page 73: Econ 240 C

73

Pre-Event Box-Jenkins ModelPre-Event Box-Jenkins Model

[1-Z[1-Z12 12 ][1 –Z]Assist(t) = WN(t) – a*WN(t-][1 –Z]Assist(t) = WN(t) – a*WN(t-12)12)

Page 74: Econ 240 C

74

Page 75: Econ 240 C

75

Page 76: Econ 240 C

76

Page 77: Econ 240 C

77

Modeling the EventModeling the Event

Step functionStep function

Page 78: Econ 240 C

78

Entire SeriesEntire Series

Assist and StepAssist and StepDassist and DstepDassist and DstepSddast sddstepSddast sddstep

Page 79: Econ 240 C

79

Page 80: Econ 240 C

80

Page 81: Econ 240 C

81

Page 82: Econ 240 C

82

Model of Series and EventModel of Series and Event

Pre-Event Model: [1-ZPre-Event Model: [1-Z12 12 ][1 –Z]Assist(t) = ][1 –Z]Assist(t) = WN(t) – a*WN(t-12)WN(t) – a*WN(t-12)

In Levels Plus Event: Assist(t)=[WN(t) – In Levels Plus Event: Assist(t)=[WN(t) – a*WN(t-12)]/[1-Z]*[1-Za*WN(t-12)]/[1-Z]*[1-Z1212] + (-b)*step] + (-b)*step

Estimate: [1-ZEstimate: [1-Z12 12 ][1 –Z]Assist(t) = WN(t) ][1 –Z]Assist(t) = WN(t) – a*WN(t-12) + (-b)* [1-Z– a*WN(t-12) + (-b)* [1-Z12 12 ][1 –Z]*step][1 –Z]*step

Page 83: Econ 240 C

83

Page 84: Econ 240 C

84

Page 85: Econ 240 C

85

Policy Change EffectPolicy Change Effect

Simple: decrease of 387 (thousand) Simple: decrease of 387 (thousand) calls per monthcalls per month

Intervention model: decrease of 397 Intervention model: decrease of 397 with a standard error of 22with a standard error of 22