+ All Categories
Home > Documents > ER WORKBENCH

ER WORKBENCH

Date post: 03-Feb-2016
Category:
Upload: kumiko
View: 67 times
Download: 0 times
Share this document with a friend
Description:
ER WORKBENCH. Dennis Adams First Energy Nuclear Operating Company. Objectives of Presentation. On Going Communication of ER Process Review Status of ER Philosophy Review ER Tools Integrate Chemistry into Plant Health Demonstrate Plant IQ for Chemistry Dept. “Zero Tolerance”. - PowerPoint PPT Presentation
Popular Tags:
42
ER WORKBENCH Dennis Adams First Energy Nuclear Operating Company
Transcript
Page 1: ER WORKBENCH

ER WORKBENCH

Dennis Adams

First Energy Nuclear Operating Company

Page 2: ER WORKBENCH

Objectives of Presentation

• On Going Communication of ER Process

• Review Status of ER Philosophy

• Review ER Tools

• Integrate Chemistry into Plant Health

• Demonstrate Plant IQ for Chemistry Dept

Page 3: ER WORKBENCH

No UNPLANNED FAILURES of CRITICAL COMPONENTSResulting in:

Plant trips

Risk-significant Functional Failures

Large sustained MW losses

Offsite Dose Limits Exceeded

“Zero Tolerance”

Page 4: ER WORKBENCH

BACKGROUND

• In November 2001, INPO issued Rev. 01 – AP-913 “Equipment Reliability Process Description”.

• The purpose of AP-913 was to describe an equipment reliability process to ensure all utilities maintained high levels of safe and reliable plant operation in an efficient manner.

• One of the major changes involved identifying critical components, and improved guidance for continuing Equipment Reliability (ER) improvement.

Page 5: ER WORKBENCH

6 Copyright © 2003 Electric Power Research Institute, Inc. All rights reserved.

Equipment ReliabilityStates

ImplementationStrategy

Reactive Preventive Proactive

Major emphasis is on –quickly fixing equipment that breaksthat impacts plant operation or safety,reducing maintenance backlog andaccomplishing planned outagemaintenance activities.

Major emphasis is on –preventive actions to keepequipment from breaking.

Major emphasis is on –strategies to address vulnerabilitiesto long-term viability, throughcontingencies or planned changes.

Page 6: ER WORKBENCH

PERFORMANCE MONITORING

ASSET CLASSIFICATION

CORRECTIVE ACTION

WO FEEDBACK

PM TEMPLATES AND SPV

MANAGEMENT

LONG RANGE MANAGEMENT

6 BASIC STEPS SUPPORTING “EXCELLENT MATERIAL CONDITION”

INPO AP-913

Page 7: ER WORKBENCH

Yes

Change Requestfrom Anyone

Equipment Reliability Process Flow chart

Yes

Docum ent and NotifyOriginator as

Necessary

PM ImplementationPerformance M onitoring

Corrective Action

Equipm ent Failure

Yes

Yes

No

Yes

No

2

No

32

Long -Term Planning & Life-Cycle M anagement

Yes

No

Docum ent Basis for RTF

1

1

Start Equipm entReliability Im provem ent

Predictive Results Equipment Test

Program Results Operator Rounds System Engineer

Walkdowns

No

Yes

Yes

Yes

No

Yes

Yes

No

No

YesNo

No

No

No

EPRI SysMonG uidelines

MaintenanceRule

PSA/R iskSignificance

License Renewal,including passiveSSCs

Industry OE

EPRI PM templates Vendor

Recommendations EPIX Aging Studies INPO W eb Site

(events, JIT OE) New Predictive

Technology

IN PO AP-913(R evis ion 1)

Yes

No

Business P lan

M aintenanceResults

Identify Im portantFunctions

1.1

W ill Com ponentFailure Defeat or Degrade

Im portant Function?

1.2

Establish Perform anceCriteria & Monitoring

Param eters

2.1

Monitor/TrendSystem /Function

Perform ance

2.2

Monitor/TrendCom ponent

Perform ance

2.3

Has Perform anceDegraded?

2.4

Yes

Is the Failure aPotential Functional

Failure?

3.3

Perform CorrectiveMaintenance

3.2

W ork Mgmt

Determ ine Cause& Corrective

Action

3.5

Corr. Action

Key equipm entProblem s Prioritization

by Managem ent

3.6

Does PM Basis Exist?

4.3

Is Change Justified?

4.4

Initiate PM Change

4.5

Does an ApplicablePM Tem plate Exist?

4.6

Can Degradation beDetected?

4.7

Identify ConditionMonitoring or

Predictive Task

4.8

Adjust Perform anceMeasures or Criteria?

4.2

Periodically AssessSystem /Com ponent

Health & Vulnerabilities

5.1

Enter Activitiesinto Appropriate

Schedule

5.6

W ork Mgmt

Develop StandardPostm aintenance Test

(PMT)

6.1

Update W orkManagem ent

Database

6.2

W ork Mgmt

Does Model PM W orkOrder Exist?

6.3

Develop Model PMW ork Order

6.4

W ork Mgmt

Begin Perform anceMonitoring

Can the Com ponent beRun to Failure?

1.3

Noncritical

No

Docum ent As-Found Equipm ent

Condition

6.6

W ork Mgmt

Perform predictive,periodic PM, test,

or inspection

6.5

W ork Mgmt

Determ ineMaintenance Rule

Status

3.4

No

Integrate, Prioritize, andReconcile SSC Plans

with the StationBusiness P lan

5.5

Critical

Is There a Cost- E ffectivePeriodic or P lanned PM to

Prevent Failure?

4.9

Develop New PMTem plate to Address

Predom inantFailure Modes

4.10

Select PM Tasks,Establish Frequency,and Docum ent Bases

4.11

Initiate ProactiveStrategy for Aging and

ObsolescenceConcerns

5.4

3

Change to Task orFrequency?

4.1

Can Failure orConsequences be

Controlled?

4.12

InitiateDesign Change toEliminate Failure

4.13

Conf Mgmt

Apply ConfigurationChange or Strategy to

Control Failure

4.14

Conf Mgmt

Docum entClassification of Criticaland Noncritical SSCs

1.4

Yes

Continuing Equipment Reliability Improvement

Scoping and Identificationof Critical Components

Develop/UpdateSystem /Com ponentLong-Term Health

Strategy

5.2

Is Therean Aging or

ObsolescenceConcern?

5.3

UnanticipatedFailure that Should be

Prevented?

3.1

INPO AP-913 - “If you build the process, success will follow”

Page 8: ER WORKBENCH

PullsPushStore

PullsPushStore

PullsPush

PdM StoreWarehouse

PullsPushStore

PullsPushStore

PullsPushStore

PullsPushStore

PullsPushStore

PullsPushStore

PullsPushStore

PullsPushStore

PullsPushStore

PullsPushStore

PullsPushStore

PullsPushStore

PullsPushStore

PullsPushStore

PullsPush

Index Store

ExistingTransition Pulls

Development Push

Upcoming StoreOE Database Link

6.6

5.6

4.10, 5.1

3.6, 4.13, 4.14, 5.2, 5.4, 5.5

4.12, 4.13, 4.14, 5.1, 5.2

PM Template Effectiveness Review

Calibration Monitor(Existing at BV)

16

2.1, 4.1, 4.3, 4.4, 4.5, 4.8, 4.9, 4.11

4.14, 5.1, 5.2, 5.3, 5.4

5.3

EPRI - SysMon2.1, 4.2, 4.7

1.1, 1.2, 1.3, 1.4, 4.12

1.2, 2.2, 3.1, 3.3, 3.4, 3.5

2.2, 2.4, 3.6, 4.13, 4.14, 5.1, 5.2, 5.3,

3.1, 3.3, 3.5, 6.6

4.1

4.3, 4.4, 4.11

3.2, 3.6, 5.4, 5.6, 6.5

2.1, 2.3, 2.4, 4.2, 4.8, 5.1

3.6

2.1, 4.3, 4.6, 4.7, 4.10, 4.12

6 Ranking Index of Orders (RIO)

LOTUS NOTES

SQL

Supply Chain Parts &

Capital Spares

CM/EM WO Feedback

PM WO Feedback 6.6

PM Revision Request 4.5, 4.11

PM Deferrals

FENOC Key Performance Indicators (KPI's)

DASHBOARD(Similar to Fossil's SPOT)

2

11

9 System Health Monitor

10 Proactive Maint. (PAM), CM/EM Review

Comp. Health Monitor & PdM Warehouse

8

5 Obsolescence & Parts Modernization

OSI Pi (Ghent Server)

SOMS(Operator Rounds)

GATS

14

CREST 3.1, 3.5(Condition Reports)

PORTALER-Link

2.1, 2.3, 2.4, 4.2, 4.5, 4.7, 4.8

13

RBMWare (oil results only)

7

12E

R W

OR

KB

EN

CH

OR

AC

LE

DA

TA

TA

BL

ES

System Health Report and Data Compiler

3 Comp. Template Implementation

4 Long-Range Asset Management

1 Asset Classification

Just in Time (JIT) PM Review

Component Template Building

Comp. Tracking Module

Lubrication Manual SAP

(The heart of it all) Business Warehouse

or ODS Interfaces

1.4, 4.1, 4.3, 4.11, 3.2, 5.6, 6.1, 6.2, 6.3, 6.4, 6.5, 6.6

EMPAC ENTERPRISE WAREHOUSE

Note: RED numbers correspond to AP-913

Flow Chart

17 Plant Health Long Range Plan & Budget

18 SPV Reduction and Management

Maintenance Rule Monitoring

NUCLEAR IT SOFTWARE FOR EXCELLENT MATERIAL CONDITION

PM Rev. Basis and Long Range Monitor

15 Outage Scope Review and Validation

Page 9: ER WORKBENCH
Page 10: ER WORKBENCH

(IF) Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

1. Forced Loss Rate 3 1.87 1.80 0.58 0.73 5.30 5.80 80.02 9.752. Online CM Backlog 1 83 69 84 57 60 46 120 743. Secondary Chemistry 1 1.210 1.210 1.130 1.130 1.006 1.006 n/a 1.0004. Average Plant Health Report Rating 2 3.440 2.918 3.020 3.082 3.200 3.200 3.160 3.2105. AFW Unavailability (RHR @ Perry) 2 0.004 0.003 0.002 0.002 0.012 0.014 0.008 0.0086. HPI Unavailability 2 0.002 0.002 0.001 0.002 0.032 0.034 0.003 0.0057. EDG Unavailability 2 0.008 0.010 0.005 0.010 0.018 0.020 0.010 0.0108. Work Management Effectiveness 2 100.0% 95.0% 82.0% 82.4% 77.0% 80.0% 52.0% 31.0%9. % Equipment on Pdm Watch List 2 3.03% 1.86% 1.63% 3.14% 0.19% 0.89% 5.34% 5.22%10. PM's w/ Multiple Deferrals 2 0 0 0 1 1 6 148 7411. Unexpected Equip Related LCO Events 3 6 2 4 3 8 3 7 412. Emergent Equipment Failures (CMU) 3

13. # Equip Problems Affecting Capability Factor 3 2 2 2 2 1 1 1 614. MR Functional Failures 3 1 1 3 4 1 1 4 215. Rate of PM Template Implementation 1

85 92 94 91 64 74 58 62

Parameter Sources

1. MPR EMC-04 Forced Loss.xls

2. MPR EMC-02 CM Backlog.xls

3. INPO Plant Information Center

4. Quarterly Plant Health Report

5. MPR EMC-06 AuxFeed (RHR).xls

6. INPO Plant Information Center

7. INPO Plant Information Center

8. Quarterly Plant Health Report

9. PdM Coordinator

10. MPR MWM-01

11. MPR OPS-01 (LRF Risk Indicator)

12. Future SAP Function (CEPM)

13. Site Monthly Operating Report

14. Mainteance Rule Coordinator

15. Future SAP Function (CEPM)

Weighted Score (Max score 128)

< 0.92

0 - 3%

Points

GREEN

4

Beaver Valley U 1 Beaver Valley U 2 PerryParameter

Imp

ac

t F

ac

tor

FENOC Equipment Reliability '04 Data

Davis-Besse

< 0.0023

< 0.0097

<1.001

>90%

< 50

3.25 - 4.00

< 0.0034

0 - 5

< 3

0 - 4

0

< 3

100%

FENOC '04 Quarterly Totals

0

10

20

30

40

50

60

70

80

90

100

110

120

130

1 2 3 4Quarter

To

tal

Beaver Valley U 1 Beaver Valley U 2 Perry Davis-Besse

Page 11: ER WORKBENCH

Reasons for an Equipment Reliability Program

– Long standing equipment problems

– Eng, Maint, and Ops not aligned in prioritizing and correcting equipment problems

– Inconsistencies in System Monitoring

– Ineffective Corrective Action Programs

– PM Program weaknesses contribute to equipment problems

Page 12: ER WORKBENCH

Reliability Program Initiatives

• Capture PM “As-Found” equipment conditions

• Maintain PM bases and monitoring plans as “living documents”

• Develop long term system and station plans which include aging and obsolescence issues. (Preventive Replacement)

• Any chemistry issues associated with each of the systems will be included in the system health report

Page 13: ER WORKBENCH

Benefits and Features• Consistent system performance rating calculations across the Fleet

• Centralized Online access of Issue; tracking and status, comments, decision notes, FVR details, Project options

• Integrated with Long Range Planning

• Automated interfaces with SAP, CREST, Asset Mgmt, Plant IQ

• Pre-defined PM Templates, standard consistent language

• Automated report generation, centralized hard-copy assembly and distribution and access to current and historical reports

Page 14: ER WORKBENCH

Plant Health Monitor

October 2006

Page 15: ER WORKBENCH

Quarterly Health Report

ad

hoc

System HealthImprovement Plans

CorePrograms

PlantHealth Committee

System Health AlgorithmNOBP-ER-3009

Core ProgramsAlgorithms

Plant Health MonitorER Workbench Module 09

System Health Risks(SPV’s, OE, Chemistry)

Fleet One-List

ER CLOCK

Obsolete Components

MPRER Index

ADMIN MODULE

Site Top Ten

Site Long RangePlan

PerformanceMonitoring

Maint Rule

Future

Plant IQ(PdM)

Page 16: ER WORKBENCH

Site Matrix

• Graphical representation of Site System Health• Provides management with one concise view of a site’s

System Health

Page 17: ER WORKBENCH

• Personalized• Quick glance

at your system’s performance compared to last quarter

• Quick view of quarterly

System Inbox

report progress for your systems• Identifies list of new items that are related to Systems

assigned to you

Page 18: ER WORKBENCH

• System Counts and Calculations updated nightly• Influenced by your Fleet’s specific criteria • Displays break down of algorithm counts, individual scores,

overall system score, and historical system scores.

System Health Summary

Page 19: ER WORKBENCH

Rating Criteria Metrics

• Graphical representation of the influences to your System Health

• Graphical view of current system health versus previous system health

Page 20: ER WORKBENCH

Order Aging Report

• Provides System Engineers the ability to maintain and control their Corrective Maintenance backlogs

• Displays listings of the oldest open corrective maintenance work, corrective maintenance orders greater than 12 months old, and all corrective maintenance orders closed within the quarter

Page 21: ER WORKBENCH

Building System Report• Two Methods to build System Report:

1) Report Builder:-Step by Step report building

-Simple to use

2) Main Report Section:-Advanced Report options

-Verify and Submit reports

-View other System reports and/or Executive Summaries.

Page 22: ER WORKBENCH

Report Builder (1/3)

Page 23: ER WORKBENCH

Report Builder (2/3)

Page 24: ER WORKBENCH

Report Builder (3/3)

Page 25: ER WORKBENCH

Plant Health Report: System Issues

Page 26: ER WORKBENCH

Improvement Plan

• Provides System Engineers the ability to effectively manage their System to identify what work needs to be completed during the next quarter to improve their System Health

• Unfinished items automatically copy from quarter to quarter so that work is not missed

Page 27: ER WORKBENCH

Executive Summary

• Preview the Site Breakdown of System Health before publishing report

Page 28: ER WORKBENCH

Organizational Effectiveness

• Lets site management know how well Systems are being managed• Easily view for the site, what percentage of System Health related work was completed.

View System breakdown

Page 29: ER WORKBENCH

Solving Obsolescence Issues

• Determine the relative importance of your Obsolete stock• Roll Obsolete stock up to the component and system level• Items Rated to give relative importance

• Integrated with:

– System Inbox

– System Health rating

– Long Range Planning

Page 30: ER WORKBENCH

Solving Obsolescence Issues• Displays rating data for the

Obsolete issue

• Determine the impact of the obsolete stock part

Page 31: ER WORKBENCH

Solving Obsolescence Issues• View System related

obsolescence issues at the component & stock level on the System Inbox

Create System Issue and future Long

Range Plan project based off

obsolescence item

View additional

obsolescence details

Page 32: ER WORKBENCH

Plant Health Committee Issues

• Draft System Issues to submit to the Plant Health Committee• Integrate Fleet Value Ranking and Prescreening Form• Integrates System related issues such as Obsolescence directly to the Plant

Health Committee

Page 33: ER WORKBENCH

Draft New Issue:NOBP-ER-1004 Fleet Value Rating (FVR) Methodology

FVR Form:• Provides a qualitative analysis to objectively provide each issue

with a relative rating• Administratively controlled to enable users to change and

required

Page 34: ER WORKBENCH

Plant Health Committee

• Seamlessly transition issues to the Technical Oversight Sub-Committee (TOS), Project Review Committee (PRC), or Executive Project Review Committee (EPRC)

• Don’t lose anything: view meeting history and decisions made to issues gone past. • Same workflow and input screens for PRC, EPRC, and TOS

• Integrates System Related data directly to the Plant Health Committee

• Create new meetings and agendas. Stay on top of all current open issues

• Track meeting minutes and issue decisions all in one place

Page 35: ER WORKBENCH

Long Range Planning

• Integrates System Issues and the Plant Health Committee directly with the Long Range Plan

• Build and maintain budget information for approved projects

• Define and track the One List and the Site Top 10 List

Page 36: ER WORKBENCH

Long Range Planning

• Define project level details• Link System Issues to projects• Integrates with Fleet Data Warehouse

Page 37: ER WORKBENCH

Long Range PlanningMonthly Cash flow

• Track the monthly cash flow per year per project• Automatically calculates variance • Graphically displays when projects are over budget

Page 38: ER WORKBENCH

Long Range PlanningCapitol One-List

• Build your site’s Capitol One List• Preview and print report

Page 39: ER WORKBENCH

Long Range PlanningFinancial Forecast

• Forecast future spending per project per investment type

• Proactively determine funding for projects for future years

Page 40: ER WORKBENCH

Long Range PlanningPlant Maintenance Plan

• Keep track of the cost of the Plant Maintenance work being performed

• Forecasts spending per component per system for the next 10 years

Page 41: ER WORKBENCH

ER Clock

• Track the success of the Equipment Reliability program at your Fleet• View all ER Clock resets and potential impacts• Analyze reset criteria to determine the weaknesses in your ER Program

Page 42: ER WORKBENCH

Equipment Reliability Event Free Days.

(1) A declaration of any ERO Emergency Classification.(2) An unplanned reactor trip (manual or automatic).(3) A Level 1, 2 or 3 Reactivity Event (i.e., control rod mis-positioning).(4) An entry into an Emergency Operating Procedure (EOP).(5) An entry into an Abnormal Operating Procedure (AOP) with significant

impact on plant operation.(6) An unplanned entry into a shutdown Technical Specification Action/LCO,

License Requirements Manual.(7) An unplanned increase by a factor of 10 in core damage frequency

category.(8) An unplanned increase in On-line risk by one or more color levels.(9) An unplanned increase by one or more color levels in Shutdown Risk

category.(10) A failed Critical Component with an actual loss of system design function.(11) A Force Loss rate event of 2% or greater for more than 12 hours. (12) A Repeat Maintenance Rule Functional Failure.


Recommended